CN108035243A - Bicycle occupation bridge pillarwork and its construction method - Google Patents

Bicycle occupation bridge pillarwork and its construction method Download PDF

Info

Publication number
CN108035243A
CN108035243A CN201711377497.9A CN201711377497A CN108035243A CN 108035243 A CN108035243 A CN 108035243A CN 201711377497 A CN201711377497 A CN 201711377497A CN 108035243 A CN108035243 A CN 108035243A
Authority
CN
China
Prior art keywords
section
web
pipeline section
semicircle pipeline
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711377497.9A
Other languages
Chinese (zh)
Other versions
CN108035243B (en
Inventor
林四新
叶代成
饶健辉
林国斌
曾芳芳
洪天识
林丁榜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Municipal Construction And Development Co Ltd
In Sanhang (xiamen) Engineering Co Ltd
Original Assignee
Xiamen Municipal Construction And Development Co Ltd
In Sanhang (xiamen) Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Municipal Construction And Development Co Ltd, In Sanhang (xiamen) Engineering Co Ltd filed Critical Xiamen Municipal Construction And Development Co Ltd
Priority to CN201711377497.9A priority Critical patent/CN108035243B/en
Publication of CN108035243A publication Critical patent/CN108035243A/en
Application granted granted Critical
Publication of CN108035243B publication Critical patent/CN108035243B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of bicycle occupation bridge pillarwork, it includes cushion cap, pier stud and footing, and the pier stud is arranged on the cushion cap top, and the footing is arranged on the cushion cap lower part, and the pier stud includes:Variable cross-section portion and the cross-section portion being connected with the bottom in the variable cross-section portion, and the shape all same of each cross section in variable cross-section portion.The bicycle occupation bridge pillarwork of the present invention can sectional, welding, convenience in transport, construction efficiency be high at the scene;And structure is slim and graceful, solid reliable, low cost.

Description

Bicycle occupation bridge pillarwork and its construction method
Technical field
The present invention relates to structural engineering field, more particularly to a kind of bicycle occupation bridge pillarwork and its construction party Method.
Background technology
China is the country of bicycle ownership maximum in the world, especially with flourishing for shared bicycle, is had The bicycle of the characteristic such as green, body-building, convenient will occupy critical role in the trip of people.But current China lacks bicycle Accommodation road, bicycle, pedestrian and motor vehicle mixing are gone together, and thus cause Frequent Accidents, it both have impact on the driving of motor vehicle Efficiency, also brings security risk to bicycle and pedestrian, reduces the comfort and convenience of cycling trip.
The content of the invention
The present invention is directed to the drawbacks described above of the prior art, there is provided a kind of bicycle occupation bridge pillarwork and its construction party Method, its simple in structure, easy to assembly, low cost.
The technical solution adopted by the present invention to solve the technical problems is:
On the one hand, there is provided a kind of bicycle occupation bridge pillarwork, it includes cushion cap, pier stud and footing, the pier Column is arranged on the cushion cap top, and the footing is arranged on the cushion cap lower part, and the pier stud includes:Variable cross-section portion and with institute State the cross-section portion of the bottom connection in variable cross-section portion, and the shape all same of each cross section in variable cross-section portion.
Preferably, the cross section in the variable cross-section portion and cross-section portion is ellipse, and the horizontal stroke in the variable cross-section portion Area of section is gradually reduced from top to bottom.
Preferably, the variable cross-section portion includes:First semicircle pipeline section, the first web, the second semicircle pipeline section and the second abdomen Plate;The first semicircle pipeline section, the first web, the second semicircle pipeline section and the second web are sequentially connected, and are cut with surrounding described become Face;And the top of the first semicircle pipeline section and the second semicircle pipeline section is bent outwards.
Preferably, the first semicircle pipeline section and the second semicircle pipeline section include sequentially connected some straight from top to bottom Line segment.
Preferably, the cross-section portion includes:The 3rd semicircle pipeline section positioned at the first semicircle pipeline section bottom, positioned at institute State the 3rd web of the first web bottom, the 4th semicircle pipeline section positioned at the second semicircle pipeline section bottom and positioned at described 4th web of two web bottoms.
Preferably, the footing includes:Anchoring base and the supporting part being arranged on the anchoring base.
Preferably, the supporting part outer circumferential surface is provided with some exterior stiffeners, and is set inside the supporting part Inside stiffener arranged in a crossed manner.
Preferably, the anchoring base lower surface is provided with some anchor ribs.
On the other hand, a kind of construction method of above-mentioned bicycle occupation bridge pillarwork is also provided, it includes step as follows Suddenly:
Straight-seam pipes, be cut in half as two semicircles by S1, obtains some straightways, the 3rd semicircle pipeline section and the 4th half Pipe section, then by some straightway spellings, welding, to form the first semicircle pipeline section and the second semicircle pipeline section;
S2, cutting form first web, the second web, the 3rd web and the 4th web;
S3, welding the first semicircle pipeline section, the second semicircle pipeline section, the first web and second web, form the change Cross-section;
S4, welding the 3rd semicircle pipeline section, the 4th semicircle pipeline section, the 3rd web and the 4th web, form described etc. Cross-section;
S5, the welding variable cross-section portion and cross-section portion, form the pillar;
S6, cutting form the exterior stiffener and internal stiffener, and the exterior stiffener are welded to described On supporting part outer circumferential surface and anchoring base, the internal stiffener is welded to inside the supporting part;
S7, in the anchoring base lower surface fix the anchor rib, forms the footing;
And S8, top and lower part that the pier stud, footing are correspondingly arranged to the cushion cap respectively..
The beneficial effect of technical solution of the present invention is:
The bridge structure of the present invention can sectional, welding, convenience in transport, construction efficiency be high at the scene;And structure it is slim and graceful, It is solid reliable, low cost.
Brief description of the drawings
Below in conjunction with accompanying drawings and embodiments, the invention will be further described, in attached drawing:
Fig. 1 is the overall structure figure of bicycle occupation bridge pillarwork in the embodiment of the present invention one;
Fig. 2 is the overall structure figure of pier stud in the embodiment of the present invention one;
Fig. 3 is the Structure explosion diagram of pier stud in the embodiment of the present invention one;
Fig. 4 is the first semicircle pipeline section in the embodiment of the present invention one, the first web, the second semicircle pipeline section, the second web Structure chart;
Fig. 5 a are the structure charts of footing in the embodiment of the present invention one;
Fig. 5 b are the top views of the structure of footing in the embodiment of the present invention one;
Fig. 6 is the spelling schematic diagram of two cathetus section of the embodiment of the present invention;
Fig. 7 is the structure chart of internal stiffener in the embodiment of the present invention two.
Embodiment
In order to which the purpose of the present invention, technical solution and advantage is more clearly understood, below in conjunction with drawings and examples, The present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used for explaining this hair It is bright, it is not intended to limit the present invention.
Embodiment one:
As shown in Figure 1, the bicycle occupation bridge pillarwork of the present invention includes cushion cap 100, for carrying steel box-girder P's Pier stud 200 and at least one footing 300, the pier stud 200 are arranged on 100 top of cushion cap, and the footing 300 is arranged on 100 lower part of cushion cap.
Specifically, as shown in Fig. 2, the pier stud 100 includes:Variable cross-section portion 101 and the bottom with the variable cross-section portion 101 The cross-section portion 102 of portion's connection;In the present embodiment, the cross section 102 in the variable cross-section portion 101 and cross-section portion is ellipse Shape, and the shape all same of 101 each cross section of the variable cross-section portion, meanwhile, the cross-sectional area in the variable cross-section portion 101 from It is gradually reduced under, is consequently formed up big and down small structure, thus increases the contact with 100 structure of pier stud (such as steel box-girder P) Area, increases load-bearing capacity.
Further, as shown in figure 3, the variable cross-section portion 101 includes:First semicircle pipeline section 1011, the first web 1012, Second semicircle pipeline section 1013 and the second web 1014;The first semicircle pipeline section 1011, the first web 1012, the second semi-circular tube 1013 and second web 1014 of section is sequentially connected and (such as welds), to surround the variable cross-section portion 101;And first semicircle The top of 1011 and second semicircle pipeline section 1013 of pipeline section is bent outwards.Corresponding, the cross-section portion 102 includes: The 3rd semicircle pipeline section 1021, the 3rd web positioned at the first web bottom positioned at the first semicircle pipeline section bottom 1022nd, the 4th positioned at the 4th semicircle pipeline section 1023 of the second semicircle pipeline section bottom and positioned at the second web bottom Web 1024.
As shown in figure 4, the first semicircle pipeline section 1011 and the second semicircle pipeline section 1013 are included from top to bottom successively Some straightways of connection, in the present embodiment, the straightway has 4, is L1-L4, and the connecting portion of each straightway gives phase Transversal, and each straightway, the first web 1012 and the second web 1014 with a hook at the end repair cut surplus (surplus 8-12mm, it is excellent Elect 10mm as).
As shown in Fig. 5 a-5b, the footing 300 includes:Anchoring base 301 and it is arranged on the anchoring base 301 Supporting part 302 (can be cylindrical steel structure).Add specifically, being provided with some outsides around 302 outer circumferential surface of supporting part Strength plate 303, and the inside of the supporting part 302 sets inside stiffener 304 arranged in a crossed manner.Further, it is strong for enhancing structure Degree, 301 lower surface of anchoring base are provided with some anchor ribs 305, it is preferred that the anchor rib 305 can form some Concentric structure, so that uniform force.
Embodiment two:
The present embodiment additionally provides a kind of construction method of above-mentioned bicycle occupation bridge pillarwork, it includes step as follows Suddenly:
Straight-seam pipes, be cut in half as two semicircles by S1, and obtaining some straightways, (each straightway is a semicircle Pipe, is straightway in each semicircle length of tube), the 3rd semicircle pipeline section and the 4th semicircle pipeline section, semicircle after incision can be by The effect of material internal stress in coiling process and flick, cause half circular diameter after cutting to become larger or lose circle, it is therefore necessary into Row flame straightening is handled, by the control of tube coupling out-of-roundness in the regular claimed range of manufacture;First semicircle pipeline section, the second semicircle pipeline section With a hook at the end to ask to repair during blanking and cut surplus (surplus 8-12mm, is preferably 10mm);Again by some straightways on moulding bed spelling (such as Fig. 6), docking site give intersection coordinate, and adjusting it is linear after carry out positioning welding, to form described the first half Pipe section and the second semicircle pipeline section;During welding, using CO2Gas shielded welding is completed, the first semicircle pipeline section after welding, the Two semicircle pipeline sections must carry out linear repetition measurement, and must be polished on the outside of butt weld, to ensure impression quality, if repetition measurement is unqualified Then carry out flame straightening processing;Finally, Non-Destructive Testing is carried out to the first semicircle pipeline section, the second semicircle pipeline section completing to weld, closed It is stand-by after lattice;In addition, the first semicircle pipeline section and the second semicircle pipeline section welding groove are the bilateral V-butt of single side, can use After the cutting of hand handle cutter, polish according to the requirement of manufacture rule, reach bevel angle and root face ruler that qualification of welding procedure gives It is very little;
S2, cutting form first web, the second web, the 3rd web and the 4th web;Likewise, the first web And second with a hook at the end at the top of web to repair and cut surplus (surplus 8-12mm, is preferably 10mm);Likewise, each web welding slope Mouth is also the bilateral V-butt of single side, after can using the cutting of hand handle cutter, according to the requirement polishing of manufacture rule, reaches welding procedure Evaluation given bevel angle and root face size;
S3, welding the first semicircle pipeline section, the second semicircle pipeline section, the first web and second web, form the change Cross-section;
S4, welding the 3rd semicircle pipeline section, the 4th semicircle pipeline section, the 3rd web and the 4th web, form described etc. Cross-section;
S5, crouch on platform by variable cross-section section and cross-section section and spell, and carries out tunneling boring docking, the variable cross-section section after spelling with Cross-section section should check each portion's size, and especially middle diagonal is poor;Positioning welding is carried out after each dimensional gaughing qualification;Welding is made CO is used during industry2Gas shielded arc welding carries out variable cross-section section and the intersegmental welding of cross-section;Each portion's size is checked after welding, to deformation Position is corrected, and carries out Non-Destructive Testing;
S6, cutting form the exterior stiffener and internal stiffener;The internal stiffener blanking gives tolerance -6 ~-4mm (as shown in Figure 7), and internal stiffener is first welded as entirety, it is being welded to inside the supporting part;
During exterior stiffener welding, bisector and exterior stiffener bars position line first are marked in supporting part outer circumferential surface, Then exterior stiffener spelling and positioning welding are carried out, thus will the exterior stiffener be welded to the supporting part outer circumferential surface with And on anchoring base;
And the exterior stiffener positioning welding it is complete after, check base plane, such as exterior stiffener is not same flat In face, then exterior stiffener must be reinstalled, exterior stiffener out of plumb must then polish or mechanical process;
S7, in the anchoring base lower surface fix the anchor rib, forms the footing;
And S8, top and lower part that the pier stud, footing are correspondingly arranged to the cushion cap respectively.
It should be noted that the technical characteristic in above-described embodiment one, two can be combined, and the skill being composed Art scheme belongs to protection scope of the present invention.
In conclusion the present invention bicycle occupation bridge pillarwork and its construction method can at the scene sectional, Welding, convenience in transport, construction efficiency are high;And multi-point welding technique is used, structure is slim and graceful, solid reliable.

Claims (9)

1. a kind of bicycle occupation bridge pillarwork, it includes cushion cap, pier stud and footing, and the pier stud is arranged on described hold Platform top, the footing are arranged on the cushion cap lower part, it is characterised in that the pier stud includes:Variable cross-section portion and with it is described The cross-section portion of the bottom connection in variable cross-section portion, and the shape all same of each cross section in variable cross-section portion.
2. bicycle occupation bridge pillarwork as claimed in claim 1, it is characterised in that the variable cross-section portion and wait cut The cross section of face is ellipse, and the cross-sectional area in the variable cross-section portion is gradually reduced from top to bottom.
3. bicycle occupation bridge pillarwork as claimed in claim 1, it is characterised in that the variable cross-section portion includes:The One semi-circular tube section, the first web, the second semicircle pipeline section and the second web;The first semicircle pipeline section, the first web, the second half Pipe section and the second web are sequentially connected, to surround the variable cross-section portion;And the first semicircle pipeline section and the second semicircle The top of pipeline section is bent outwards.
4. bicycle occupation bridge pillarwork as claimed in claim 3, it is characterised in that the first semicircle pipeline section and Second semicircle pipeline section includes sequentially connected some straightways from top to bottom.
5. bicycle occupation bridge pillarwork as claimed in claim 4, it is characterised in that the cross-section portion includes:Position In the 3rd semicircle pipeline section of the first semicircle pipeline section bottom, the 3rd web positioned at the first web bottom, positioned at described The 4th semicircle pipeline section and the 4th web positioned at the second web bottom of second semicircle pipeline section bottom.
6. bicycle occupation bridge pillarwork as claimed in claim 5, it is characterised in that the footing includes:Anchor bottom Seat and the supporting part being arranged on the anchoring base.
7. bicycle occupation bridge pillarwork as claimed in claim 6, it is characterised in that around the supporting part outer circumferential surface Some exterior stiffeners are provided with, and inside stiffener arranged in a crossed manner is set inside the supporting part.
8. bicycle occupation bridge pillarwork as claimed in claim 7, it is characterised in that the anchoring base lower surface is set It is equipped with some anchor ribs.
9. a kind of construction method of bicycle occupation bridge pillarwork as claimed in claim 8, it is characterised in that including such as Lower step:
Straight-seam pipes, be cut in half as two semicircles by S1, obtains some straightways, the 3rd semicircle pipeline section and the 4th semi-circular tube Section, then by some straightway spellings, welding, to form the first semicircle pipeline section and the second semicircle pipeline section;
S2, cutting form first web, the second web, the 3rd web and the 4th web;
S3, welding the first semicircle pipeline section, the second semicircle pipeline section, the first web and second web, form the variable cross-section Portion;
S4, welding the 3rd semicircle pipeline section, the 4th semicircle pipeline section, the 3rd web and the 4th web, form the cross-section Portion;
S5, the welding variable cross-section portion and cross-section portion, form the pillar;
S6, cutting form the exterior stiffener and internal stiffener, and the exterior stiffener is welded to the support On portion's outer circumferential surface and anchoring base, the internal stiffener is welded to inside the supporting part;
S7, in the anchoring base lower surface fix the anchor rib, forms the footing;
And S8, top and lower part that the pier stud, footing are correspondingly arranged to the cushion cap respectively.
CN201711377497.9A 2017-12-19 2017-12-19 Bridge pier column structure special for bicycle and construction method thereof Active CN108035243B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711377497.9A CN108035243B (en) 2017-12-19 2017-12-19 Bridge pier column structure special for bicycle and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711377497.9A CN108035243B (en) 2017-12-19 2017-12-19 Bridge pier column structure special for bicycle and construction method thereof

Publications (2)

Publication Number Publication Date
CN108035243A true CN108035243A (en) 2018-05-15
CN108035243B CN108035243B (en) 2024-02-06

Family

ID=62100059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711377497.9A Active CN108035243B (en) 2017-12-19 2017-12-19 Bridge pier column structure special for bicycle and construction method thereof

Country Status (1)

Country Link
CN (1) CN108035243B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136596A (en) * 1998-10-30 2000-05-16 Mitsubishi Alum Co Ltd Hollow member
CN201391090Y (en) * 2009-04-30 2010-01-27 中国水电建设集团路桥工程有限公司 Reinforcement assembling mold for pier columns
CN102400518A (en) * 2011-11-18 2012-04-04 江苏沪宁钢机股份有限公司 Section-variable crossed circular tube switching steel column and manufacturing method thereof
CN103374881A (en) * 2012-04-24 2013-10-30 上海市政工程设计研究总院(集团)有限公司 Prefabricated segment assembling pier structure system and construction method thereof
CN204849571U (en) * 2015-08-12 2015-12-09 江苏建筑职业技术学院 Prefabricated assembly pier of posttension prestressing force tongue -and -groove plug -in type
CN106592417A (en) * 2016-10-28 2017-04-26 上海市政工程设计研究总院(集团)有限公司 Variable section upright and construction method thereof
CN206189253U (en) * 2016-10-28 2017-05-24 上海市政工程设计研究总院(集团)有限公司 Variable cross -section column
CN107326793A (en) * 2017-05-23 2017-11-07 中建钢构有限公司 A kind of bicycle is at a high speed across overpass and its construction method
CN207919322U (en) * 2017-12-19 2018-09-28 中交三航(厦门)工程有限公司 Bicycle occupation bridge pillarwork

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136596A (en) * 1998-10-30 2000-05-16 Mitsubishi Alum Co Ltd Hollow member
CN201391090Y (en) * 2009-04-30 2010-01-27 中国水电建设集团路桥工程有限公司 Reinforcement assembling mold for pier columns
CN102400518A (en) * 2011-11-18 2012-04-04 江苏沪宁钢机股份有限公司 Section-variable crossed circular tube switching steel column and manufacturing method thereof
CN103374881A (en) * 2012-04-24 2013-10-30 上海市政工程设计研究总院(集团)有限公司 Prefabricated segment assembling pier structure system and construction method thereof
CN204849571U (en) * 2015-08-12 2015-12-09 江苏建筑职业技术学院 Prefabricated assembly pier of posttension prestressing force tongue -and -groove plug -in type
CN106592417A (en) * 2016-10-28 2017-04-26 上海市政工程设计研究总院(集团)有限公司 Variable section upright and construction method thereof
CN206189253U (en) * 2016-10-28 2017-05-24 上海市政工程设计研究总院(集团)有限公司 Variable cross -section column
CN107326793A (en) * 2017-05-23 2017-11-07 中建钢构有限公司 A kind of bicycle is at a high speed across overpass and its construction method
CN207919322U (en) * 2017-12-19 2018-09-28 中交三航(厦门)工程有限公司 Bicycle occupation bridge pillarwork

Also Published As

Publication number Publication date
CN108035243B (en) 2024-02-06

Similar Documents

Publication Publication Date Title
CN201080609Y (en) Prestressed concrete pipe pile connecting component
CN108146578A (en) A kind of manufacturing method of two phase stainless steel chemical tanker topside segmentation
US4181235A (en) Liquefied natural gas tank construction
CN110185138A (en) A kind of welding ball grid and its method for assembling and welding
CN107988908A (en) The total assembling method of tubular arch
CN105290573A (en) Welding method of medium-sized storage tank of 1000m<3>00Cr14Ni14Si4 steel
CN102601498A (en) Welding method for U-shaped ribs of orthotropic plate of bridge girder
CN102491011A (en) Large recovered oil and gas tank
CN105499770B (en) A kind of welding technology of automatic submerged-arc welding of building structural steel Q420GJC
CN203867159U (en) Sleeve type cantilever scaffold structure
CN110576939A (en) Construction method for large conical cylinder segments
CN102380690A (en) Method for controlling welding deformation of joint between inserted large inclined tube and barrel
CN207919322U (en) Bicycle occupation bridge pillarwork
CN211398998U (en) Sleeve for repairing pipeline
CN102049647A (en) Welding fixture for girder of truss
CN104191176A (en) Method for manufacturing low-temperature flow weighing container
CN203867158U (en) Cantilever type scaffold structure with positioning plug for fixation
CN102995553A (en) Arch rib of reinforced concrete arch bridge and erection support and manufacture method of arch rib
CN108035243A (en) Bicycle occupation bridge pillarwork and its construction method
CN208165234U (en) A kind of ship sail skeleton structure
CN205502623U (en) Building structure consolidates and uses connecting device
CN205000372U (en) Side slope of being completed prestressed anchorage cable locking power detection device
CN209256164U (en) A kind of moulding bed device built for flare tower
CN108747069A (en) A kind of installation method of tower body equipment
CN202577317U (en) Reinforced guiding support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 11th Floor, No. 189 Huachang Road, Huli District, Xiamen City, Fujian Province, 361011

Applicant after: CCCC Third Aviation Bureau Sixth Engineering (Xiamen) Co.,Ltd.

Applicant after: XIAMEN MUNICIPAL CONSTRUCTION DEVELOPMENT CO.,LTD.

Address before: 361000 No. 189, Huachang Road, Huli District, Xiamen City, Fujian Province

Applicant before: CCCC Sanya (Xiamen) Engineering Co.,Ltd.

Applicant before: XIAMEN MUNICIPAL CONSTRUCTION DEVELOPMENT CO.,LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant