CN108035204A - Solve the structures and methods of urban road underground pipe gallery intersection differential settlement quality problems - Google Patents

Solve the structures and methods of urban road underground pipe gallery intersection differential settlement quality problems Download PDF

Info

Publication number
CN108035204A
CN108035204A CN201711210030.5A CN201711210030A CN108035204A CN 108035204 A CN108035204 A CN 108035204A CN 201711210030 A CN201711210030 A CN 201711210030A CN 108035204 A CN108035204 A CN 108035204A
Authority
CN
China
Prior art keywords
underground pipe
pipe gallery
road
region
soft base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711210030.5A
Other languages
Chinese (zh)
Other versions
CN108035204B (en
Inventor
吴剑兵
戈祥林
林金隆
许松宜
张永
何震华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201711210030.5A priority Critical patent/CN108035204B/en
Publication of CN108035204A publication Critical patent/CN108035204A/en
Application granted granted Critical
Publication of CN108035204B publication Critical patent/CN108035204B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Botany (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of structure for solving urban road underground pipe gallery intersection differential settlement quality problems, wherein urban road includes underground pipe gallery region and two non-underground pipe gallery regions, underground pipe gallery is located on the soft base of piping lane, on the piping lane located underground of underground pipe gallery region, two non-underground pipe gallery regions are respectively on two soft bases of road, underground pipe gallery region is between two non-underground pipe gallery regions, underground pipe gallery and the soft base of piping lane are between two soft bases of road, the soft base of piping lane and the soft base of road are formed using different soft base processing method processing, it is arranged in the middle part of greenbelt on underground pipe gallery region, the both sides of greenbelt are separately positioned on two non-underground pipe gallery regions.Additionally provide relevant method.The present invention is not required fracture to be repaired, and processing scheme is simple and practicable, and processing cost is greatly saved, ingenious in design, and simple for structure, cost is low, suitable for large-scale promotion application.

Description

Solve urban road underground pipe gallery intersection differential settlement quality problems structure and Method
Technical field
The present invention relates to technical field of building construction, more particularly to underground pipe gallery and urban road construction technical field, tool Body refers to the structures and methods for solving urban road underground pipe gallery intersection differential settlement quality problems.
Background technology
In soft clay area, since soft soil thixotropy is strong, low bearing capacity, soft soil foundation needs to meet by basement process Foundation bearing capacity requirement.And in construction, according to geological mapping situation, using different soft foundation processing technology schemes.In general, In same project, it is contemplated that treatment of soft foundation expense or the factor of construction period, often there are two kinds of different soft Ji Chu Reason form.
The national development like a raging fire of construction of Urban Underground piping lane.Many times in line with saving town site Consider, underground pipe gallery is all built immediately below urban road.In soft soil foundation region, the non-underground of underground pipe gallery and urban road (totally two, it is lower without construction underground pipe gallery in piping lane region;And underground pipe gallery region, then its lower construction have underground pipe gallery, underground Piping lane region is between two non-underground pipe gallery regions) it is required for that respective soft soil foundation handle to meet carrying Power requirement, when both method for processing foundation are different, can produce relative settlement, crack on road is caused when serious, influence driving peace Entirely.Conventional crack treatment mode is all to remove urban road, again making bituminous concrete or concrete road surface, processing It is with high costs, while cause traffic congestion.
For example as shown in Figure 1, being built on certain southern mud soft soil foundation has underground pipe gallery 1, built on underground pipe gallery 1 Equipped with urban road 2, i.e. underground pipe gallery 1 is built below urban road 2, the part city road of the top of piping lane 1 located underground Road becomes underground pipe gallery region 21, and the soft base 3 of the piping lane under underground pipe gallery 1 is using PHC high-strength prestressed concrete pipe piles basis PHC pile foundations 31, and the soft base 4 of road under the non-underground pipe gallery region 22 of the urban road 2 to connect therewith is then using plain coagulation Native pile composite foundation 41.
Because the PHC pile foundations 31 under underground pipe gallery 1 and the plain concrete under the non-underground pipe gallery region 22 of urban road 2 Between the two, there are differential settlement between rigid pile and composite foundation, settlement difference is larger for pile composite foundation 41, can cause ground Bituminous paving (the namely friendship in the underground pipe gallery region 21 of urban road 2 and non-underground pipe gallery region 22 above lower 1 side wall of piping lane At boundary) longitudinal crack 5 is produced, when longitudinal 5 both sides settlement difference of crack is larger, the comfort of driving is directly influenced, sternly In the case of weight, traffic safety is influenced, is to need to pay close attention to and make great efforts to solve the problems, such as.
To solve the problems, such as longitudinal crack, former more methods repaired using the crack to generation, the method Construction cost is added, and differential settlement continues that if development crack can be produced again.
Accordingly, it is desirable to provide it is a kind of solve urban road underground pipe gallery intersection differential settlement quality problems structure and Method, it is not required fracture to be repaired, and processing scheme is simple and practicable, and processing cost is greatly saved.
The content of the invention
In order to overcome it is above-mentioned in the prior art the shortcomings that, it is an object of the present invention to provide one kind solve urban road The structure of underground pipe gallery intersection differential settlement quality problems, it is not required fracture to be repaired, and processing scheme is simply easy OK, processing cost is greatly saved, suitable for large-scale promotion application.
Another object of the present invention is to provide a kind of solution urban road underground pipe gallery intersection differential settlement quality The structure of problem, its is ingenious in design, simple for structure, and cost is low, suitable for large-scale promotion application.
Another object of the present invention is to provide a kind of solution urban road underground pipe gallery intersection differential settlement quality The method of problem, it is not required fracture to be repaired, and processing scheme is simple and practicable, and processing cost is greatly saved, suitable for big Scale promotes and applies.
Another object of the present invention is to provide a kind of solution urban road underground pipe gallery intersection differential settlement quality The method of problem, its is ingenious in design, and simple, convenient, quick, cost is low, suitable for large-scale promotion application.
To achieve the above objectives, in the first aspect of the present invention, there is provided one kind solves urban road underground pipe gallery and has a common boundary Locate the structure of differential settlement quality problems, including the soft base of underground pipe gallery, urban road, piping lane and two soft bases of road, it is described Urban road includes underground pipe gallery region and two non-underground pipe gallery regions, and the underground pipe gallery is located on the soft base of the piping lane, The underground pipe gallery region is located on the underground pipe gallery, and two non-underground pipe gallery regions are located at two roads respectively On soft base, the underground pipe gallery region is between two non-underground pipe gallery regions, the underground pipe gallery and the piping lane For soft base between two soft bases of road, the soft base of piping lane and the soft base of the road use different soft base processing methods Processing forms, its main feature is that, the structure of the solution urban road underground pipe gallery intersection differential settlement quality problems is also Including greenbelt, it is arranged in the middle part of the greenbelt on the underground pipe gallery region, the both sides of the greenbelt are set respectively On two non-underground pipe gallery regions.
It is preferred that the soft base of piping lane is PHC pile foundations, the soft base of road is Pure-Concrete-Pile Composite Subgrade.
It is preferred that the greenbelt is planting bed.
More preferably, the planting bed includes two plain concrete bases, two planting bed frames, planting soil and greening seedling Wood, two plain concrete bases are separately positioned on two non-underground pipe gallery regions, two planting bed frames Be separately positioned on the basis of two plain concretes, the planting soil be located at the underground pipe gallery region and two it is described non-ly On lower piping lane region and between two planting bed frames, the greening seedling growth is in the planting soil.
More preferably, the structure of the solution urban road underground pipe gallery intersection differential settlement quality problems further includes Drainpipe, the drainpipe are arranged on the lowest point of the planting bed.
In the second aspect of the present invention, there is provided one kind solves urban road underground pipe gallery intersection differential settlement quality and asks The method of topic, its main feature is that, comprise the following steps:
(1) greenbelt, the greening are set on the underground pipe gallery region of urban road and two non-underground pipe gallery regions It is arranged in the middle part of band on the underground pipe gallery region, the both sides of the greenbelt are separately positioned on two non-underground pipe galleries On region, wherein, there is underground pipe gallery under the underground pipe gallery region, there are the soft base of piping lane, two institutes under the underground pipe gallery State has two soft bases of road respectively under non-underground pipe gallery region, the underground pipe gallery region is located at two non-underground pipe galleries Between region, the underground pipe gallery and the soft base of the piping lane are between two soft bases of road, the soft base of the piping lane and institute The soft base of road is stated to form using different soft base processing method processing.
It is preferred that the method further includes:
(2) when the intersection in the underground pipe gallery region and the non-underground pipe gallery region produces sedimentation so that it is described to cause When the planting soil of greenbelt produces sedimentation, mended and be filled in the greenbelt with other planting soil.
It is preferred that the greenbelt is planting bed.
More preferably, the planting bed includes two plain concrete bases, two planting bed frames, planting soil and greening seedling Wood, the step (1) specifically include:
Two plain concrete bases are separately positioned on two non-underground pipe gallery regions, by two kinds Plant pool side frame to be separately positioned on the basis of two plain concretes, the planting soil is located at the underground pipe gallery region and two On a non-underground pipe gallery region and between two planting bed frames, by the greening seedling growth in the kind Plant in soil.
More preferably, the step (1) further includes:Drainpipe is arranged on to the lowest point of the planting bed.
Beneficial effects of the present invention essentially consist in:
1st, the structure of solution urban road underground pipe gallery intersection differential settlement quality problems of the invention includes underground The soft base of piping lane, urban road, piping lane, greenbelt and two soft bases of road, urban road includes underground pipe gallery region and two non- Underground pipe gallery region, underground pipe gallery are located on the soft base of piping lane, on the piping lane located underground of underground pipe gallery region, two non-underground pipe galleries Region respectively on two soft bases of road, underground pipe gallery region between two non-underground pipe gallery regions, underground pipe gallery and The soft base of piping lane between two soft bases of road, the soft base of piping lane and the soft base of road using different soft base processing method processing and Into being arranged in the middle part of greenbelt on underground pipe gallery region, the both sides of greenbelt are separately positioned on two non-underground pipe gallery regions On, so as to cover the crack of differential settlement generation by greenbelt, the planting soil for filling out greenbelt is mended if necessary, does not influence to drive a vehicle The safety in road, therefore, it is not required fracture to be repaired, and processing scheme is simple and practicable, and processing cost is greatly saved, and is suitable for Large-scale promotion application.
2nd, the structure of solution urban road underground pipe gallery intersection differential settlement quality problems of the invention includes underground The soft base of piping lane, urban road, piping lane, greenbelt and two soft bases of road, urban road includes underground pipe gallery region and two non- Underground pipe gallery region, underground pipe gallery are located on the soft base of piping lane, on the piping lane located underground of underground pipe gallery region, two non-underground pipe galleries Region respectively on two soft bases of road, underground pipe gallery region between two non-underground pipe gallery regions, underground pipe gallery and The soft base of piping lane between two soft bases of road, the soft base of piping lane and the soft base of road using different soft base processing method processing and Into being arranged in the middle part of greenbelt on underground pipe gallery region, the both sides of greenbelt are separately positioned on two non-underground pipe gallery regions On, so as to cover the crack of differential settlement generation by greenbelt, the planting soil for filling out greenbelt is mended if necessary, does not influence to drive a vehicle The safety in road, therefore, its is ingenious in design, simple for structure, and cost is low, suitable for large-scale promotion application.
3rd, the method for solution urban road underground pipe gallery intersection differential settlement quality problems of the invention includes following Step:Greenbelt is set on the underground pipe gallery region of urban road and two non-underground pipe gallery regions, is set in the middle part of greenbelt Put on underground pipe gallery region, the both sides of greenbelt are separately positioned on two non-underground pipe gallery regions, under underground pipe gallery region With underground pipe gallery, there is the soft base of piping lane under underground pipe gallery, there are two soft bases of road respectively under two non-underground pipe gallery regions, Underground pipe gallery region between two non-underground pipe gallery regions, underground pipe gallery and the soft base of piping lane positioned at two soft bases of road it Between, the soft base of piping lane and the soft base of road are formed using different soft base processing method processing, so as to be covered by greenbelt uneven The crack produced is settled, the planting soil for filling out greenbelt is mended if necessary, does not influence the safety of runway, therefore, counterincision is not required in it Seam is repaired, and processing scheme is simple and practicable, and processing cost is greatly saved, suitable for large-scale promotion application.
4th, the method for solution urban road underground pipe gallery intersection differential settlement quality problems of the invention includes following Step:Greenbelt is set on the underground pipe gallery region of urban road and two non-underground pipe gallery regions, is set in the middle part of greenbelt Put on underground pipe gallery region, the both sides of greenbelt are separately positioned on two non-underground pipe gallery regions, under underground pipe gallery region With underground pipe gallery, there is the soft base of piping lane under underground pipe gallery, there are two soft bases of road respectively under two non-underground pipe gallery regions, Underground pipe gallery region between two non-underground pipe gallery regions, underground pipe gallery and the soft base of piping lane positioned at two soft bases of road it Between, the soft base of piping lane and the soft base of road are formed using different soft base processing method processing, so as to be covered by greenbelt uneven The crack produced is settled, the planting soil for filling out greenbelt is mended if necessary, does not influence the safety of runway, therefore, its is ingenious in design, behaviour Make simple, convenient, fast, cost is low, suitable for large-scale promotion application.
These and other objects, feature and the advantage of the present invention, by following detailed descriptions, drawings and claims obtain To fully demonstrate, and can be achieved by means, device and the combinations thereof specially pointed out in appended claims.
Brief description of the drawings
Fig. 1 is that the underground pipe gallery region of urban road and the intersection in non-underground pipe gallery region are split because differential settlement produces The main view schematic cross-sectional view of seam, wherein horizontal dotted line represents the urban road after differential settlement, vertical dotted line represents crack.
Fig. 2 is a tool of the structure of the solution urban road underground pipe gallery intersection differential settlement quality problems of the present invention The main view schematic cross-sectional view of body embodiment.
(symbol description)
1 underground pipe gallery;2 urban roads;21 underground pipe gallery regions;22 non-underground pipe gallery regions;The soft base of 3 piping lanes;31PHC Basis;The soft base of 4 roads;41 Pure-Concrete-Pile Composite Subgrades;5 cracks;6 greenbelts;61 planting beds;62 planting bed frames;63 is green Change nursery stock.
Embodiment
Make more detailed elaboration to present disclosure below, and the present invention is made into one with reference to the drawings and specific embodiments Walk explanation.
Shown in Figure 2, in the specific embodiment of the present invention, solution urban road underground pipe gallery of the invention is handed over The structure of differential settlement quality problems includes underground pipe gallery 1, urban road 2, the soft base 3 of piping lane, greenbelt 6 and two roads at boundary The soft base 4 in road, the urban road 2 include underground pipe gallery region 21 and two non-underground pipe gallery regions 22, the underground pipe gallery 1 In on the soft base 3 of the piping lane, the underground pipe gallery region 21 is located on the underground pipe gallery 1, two non-underground pipe gallery areas Respectively on two soft bases 4 of road, the underground pipe gallery region 21 is located at two non-underground pipe gallery regions in domain 22 Between 22, the underground pipe gallery 1 and the soft base 3 of the piping lane are between two soft bases 4 of road, soft 3 He of base of piping lane The soft base 4 of road is formed using different soft base processing method processing, and the middle part of the greenbelt 6 is arranged on the buried pipe On corridor region 21, the both sides of the greenbelt 6 are separately positioned on two non-underground pipe gallery regions 22.
The soft base 3 of piping lane can use the processing of any suitable soft base processing method to form, shown in Figure 2, In the specific embodiment of the present invention, the soft base 3 of piping lane is PHC pile foundations 31.The i.e. described soft base 3 of piping lane is high-strength using PHC Prestressed concrete pipe pile carries out treatment of soft foundation and forms.
The PHC pile foundations 31 can be any suitable PHC pile foundations, in the specific embodiment of the present invention, institute It is PHC- Φ 400-95 pile pile AB type pipe pile foundations to state PHC pile foundations 31.
The soft base 4 of road can use the processing of any suitable soft base processing method to form, shown in Figure 2, In the specific embodiment of the present invention, the soft base 4 of road is Pure-Concrete-Pile Composite Subgrade 41.The i.e. described soft base 4 of road is adopted Treatment of soft foundation is carried out with plain concrete pile to form.
The Pure-Concrete-Pile Composite Subgrade 41 can be any suitable Pure-Concrete-Pile Composite Subgrade, the present invention's In one specific embodiment, the Pure-Concrete-Pile Composite Subgrade 41 is C20 Pure-Concrete-Pile Composite Subgrades.
The greenbelt 6 can be any suitable greenbelt, shown in Figure 2, in the specific implementation of the present invention In example, the greenbelt 6 is planting bed 61.
The planting bed 61 can have any suitable composition, shown in Figure 2, in the specific implementation of the present invention In example, the planting bed 61 includes two plain concrete basis (not shown)s, two planting bed frames 62, planting soil (figure Not shown in) and greening seedling 63, two plain concrete bases be separately positioned on two non-underground pipe gallery regions 22 On, two planting bed frames 62 are separately positioned on the basis of two plain concretes, and the planting soil is positioned at describedly It is described green on lower piping lane region 21 and two non-underground pipe gallery regions 22 and between two planting bed frames 62 Change nursery stock 63 to be planted in the planting soil.
In order to avoid rainwater penetrates into ground when planting soil internal water accumulation is serious under crack, pavement depression is caused, at this In one specific embodiment of invention, the structure of the solution urban road underground pipe gallery intersection differential settlement quality problems Drainpipe (not shown) is further included, the drainpipe is arranged on the lowest point of the planting bed 61.Namely described in distance Underground pipe gallery 1 is most nearby.
The width of the both sides of the greenbelt 6 can determine as needed, in the specific embodiment of the present invention, institute The width of the both sides for the greenbelt 6 stated is 1000m.
Present invention also offers the knot of above-mentioned solution urban road underground pipe gallery intersection differential settlement quality problems The construction method of structure, its main feature is that, comprise the following steps:
(1) greenbelt 6, institute are set on the underground pipe gallery region 21 of urban road 2 and two non-underground pipe gallery regions 22 The middle part for stating greenbelt 6 is arranged on the underground pipe gallery region 21, and the both sides of the greenbelt 6 are separately positioned on described in two On non-underground pipe gallery region 22.
In order to occur remaining to the crack for covering differential settlement generation during big sedimentation, in the specific implementation of the present invention In example, the method further includes:
(2) when the intersection in the underground pipe gallery region 21 and the non-underground pipe gallery region 22 produces sedimentation so as to cause When the planting soil of the greenbelt 6 produces sedimentation, mended and be filled in the greenbelt 6 with other planting soil.
Include two plain concrete bases, two planting beds in the greenbelt 6 for planting bed 61 and the planting bed 61 In the case of frame 62, planting soil and greening seedling 63, the step (1) specifically includes:
Two plain concrete bases are separately positioned on two non-underground pipe gallery regions 22, by described in two Planting bed frame 62 is separately positioned on the basis of two plain concretes, and the planting soil is located at the underground pipe gallery region 21 and two non-underground pipe gallery regions 22 on and between two planting bed frames 62, by the greening seedling 63 It is planted in the planting soil.
Draining is further included in the structure of the solution urban road underground pipe gallery intersection differential settlement quality problems In the case of pipe, the step (1) further includes:The drainpipe is arranged on to the lowest point of the planting bed 61.
In order to be more clearly understood that the technology contents of the present invention, described in detail especially exemplified by following embodiments.
Embodiment 1
The 2 overall length 41.4km of underground pipe gallery 1 and urban road of the present embodiment, underground pipe gallery 1 is by muddy soft soil Area, soft base are thicker (6m~15m).Soft Soil Layer under two non-underground pipe gallery regions 22 of underground pipe gallery 1 and urban road 2 needs Carry out basement process.The soft base 3 of piping lane wherein under underground pipe gallery 1 uses PHC- Φ 400-95 pile pile AB type pipe pile foundations, pilespacing 1.1m~2.5m, vertical bearing capacity of single pile characteristic value are 760KN, and the soft base 4 of the road under non-underground pipe gallery region 22 is using C20 elements Concrete-pile composite foundation, pilespacing 1.2m~1.6m, plain concrete pile stake bottom penetrate mud and are not less than 1m into hard stratum, single Pile vertical carrying capacity characteristic value 20KN.
By traditional thinking, for the ground intersection of two kinds of Soft Ground technique as other surface layers, it is special not do Processing, then be easy to produce crack in intersection.
To solve this problem, a kind of underground pipe gallery that the solution of greenbelt 6 is set using two kinds for the treatment of of soft foundation schemes is proposed The method of 22 intersection differential settlement quality problems of region 21 and non-underground pipe gallery region, greenbelt 6 use planting bed 61, kind Plant the soil body in pond 61 and vegetation is blinded by the crack of differential settlement generation well.Occur backfilling planting soil during larger depression Easily, rehabilitation expense is reduced, should be widely promoted application.Specifically way is:Area with the appearance differential settlement estimated Each 1000mm scopes in domain and both sides (in other words, include two non-underground pipe gallery regions in underground pipe gallery region 21 and its both sides 22 part) in, greenbelt 6 is set, and when less sedimentation occurs, the soil body of greenbelt 6 and vegetation are blinded by not well The crack that uniform settlement produces, carries out benefit to planting soil when big sedimentation occurs and fills out, do not influence the safety of runway.
1st, preparation of construction
(1) labour prepares
Per 50m construction operation sections, 4 people of concrete work, 6 people of Gardener, 4 people of planting bed erector.
(2) material prepares
Planting bed frame 62 is using granite planting bed frame, cement mortar, concrete, planting soil, greening seedling 63.
2nd, technological process
The size of construction equipment and raw material site acceptance → planting bed 61, positioning determine → planting bed frame 62 installs → Greening seedling 63 is transplanted.
3rd, construction point
(1) planting bed 61 positions
Greenbelt 6 is arranged at two kinds of soft soil foundation boundary differential settlements 1000mm scopes beyond estimated generation crack It is interior.
(2) planting bed frame 62 uses granite material, and basis is using C15 plain concretes basis.Ensure fastness and whole Body, 61 lowest point of planting bed set D300PVC pipes, surface fully-jewelledHole and looping non-woven fabrics, as drainpipe, avoid rainwater Ground is penetrated under crack when planting soil internal water accumulation is serious, causes pavement depression.
(3) installation is complete for planting bed 61, and when planting earthen backfill, planting soil surface level is than granite planting bed frame absolute altitude The low 50mm of top surface is advisable.
(4) greening seedling 63 is transplanted.
(5) when planting soil deflection is big in the larger sedimentation of appearance, planting bed 61, mended with other planting soil Fill out.
So as to the intersection differential settlement quality in underground pipe gallery region and non-underground pipe gallery region for urban road In addition problem, the present invention devise a resolving ideas, set greenbelt to carry out in the ground intersection of different treatments of soft foundation green Change plantation.The greenbelt soil body and vegetation are blinded by the crack of differential settlement generation well, do not influence runway safety, ingenious Ground solves crack problem, is innovative very strong construction way, preferably resolves this problem.
Therefore, the present invention proposes a kind of knot for solving urban road underground pipe gallery intersection differential settlement quality problems Structure and method.Method by setting greenbelt in the intersection of two kinds of grounds using two kinds of different soft base processing methods, when When there is the settlement difference of two kinds of grounds, directly show that the planting soil in greenbelt sinks, only need at this time to planting soil into Row benefit is filled out, it is not necessary to carries out the repairing in crack, processing scheme is simple and practicable, and processing cost is greatly saved.For solving two kinds The crack of the soft soil foundation intersection of different process processing.
To sum up, the structure of solution urban road underground pipe gallery intersection differential settlement quality problems of the invention need not Fracture is repaired, and processing scheme is simple and practicable, and processing cost is greatly saved, ingenious in design, and simple for structure, cost is low, Suitable for large-scale promotion application.
It can be seen from the above that the purpose of the present invention is achieved completely and effectively.The function and structural principle of the present invention Shown and illustrated in embodiment, under without departing substantially from the principle, embodiment can make any modification.So this hair The bright all variant embodiments included based on claim spirit and right.

Claims (10)

1. a kind of structure for solving urban road underground pipe gallery intersection differential settlement quality problems, including underground pipe gallery, city The soft base of city's road, piping lane and two soft bases of road, the urban road include underground pipe gallery region and Liang Gefei underground pipe galleries area Domain, the underground pipe gallery are located on the soft base of the piping lane, and the underground pipe gallery region is located on the underground pipe gallery, described in two Respectively on two soft bases of road, the underground pipe gallery region is located at two non-buried pipes in non-underground pipe gallery region Between corridor region, the underground pipe gallery and the soft base of the piping lane between two soft bases of road, the soft base of piping lane and The soft base of road is formed using different soft base processing method processing, it is characterised in that the solution urban road underground The structure of piping lane intersection differential settlement quality problems further includes greenbelt, and the underground is arranged in the middle part of the greenbelt On piping lane region, the both sides of the greenbelt are separately positioned on two non-underground pipe gallery regions.
2. the structure of urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 1, its It is characterized in that, the soft base of piping lane is PHC pile foundations, and the soft base of road is Pure-Concrete-Pile Composite Subgrade.
3. the structure of urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 1, its It is characterized in that, the greenbelt is planting bed.
4. the structure of urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 3, its It is characterized in that, the planting bed includes two plain concrete bases, two planting bed frames, planting soil and greening seedling, two The plain concrete basis is separately positioned on two non-underground pipe gallery regions, and two planting bed frames are set respectively On the basis of two plain concretes, the planting soil is located at the underground pipe gallery region and two non-underground pipe gallery areas On domain and between two planting bed frames, the greening seedling growth is in the planting soil.
5. the structure of urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 3, its It is characterized in that, the structure of the solution urban road underground pipe gallery intersection differential settlement quality problems further includes draining Pipe, the drainpipe are arranged on the lowest point of the planting bed.
A kind of 6. method for solving urban road underground pipe gallery intersection differential settlement quality problems, it is characterised in that including Following steps:
(1) greenbelt is set on the underground pipe gallery region of urban road and two non-underground pipe gallery regions, the greenbelt Middle part is arranged on the underground pipe gallery region, and the both sides of the greenbelt are separately positioned on two non-underground pipe gallery regions On, wherein, there is underground pipe gallery under the underground pipe gallery region, there is the soft base of piping lane under the underground pipe gallery, two are described non- There are two soft bases of road respectively, the underground pipe gallery region is located at two non-underground pipe gallery regions under underground pipe gallery region Between, the underground pipe gallery and the soft base of the piping lane are between two soft bases of road, the soft base of piping lane and the road The soft base in road is formed using different soft base processing method processing.
7. the method for urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 6, its It is characterized in that, the method further includes:
(2) when the intersection in the underground pipe gallery region and the non-underground pipe gallery region produces sedimentation so as to cause the greening When the planting soil of band produces sedimentation, mended and be filled in the greenbelt with other planting soil.
8. the method for urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 6, its It is characterized in that, the greenbelt is planting bed.
9. the method for urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 8, its It is characterized in that, the planting bed includes two plain concrete bases, two planting bed frames, planting soil and greening seedling, described Step (1) specifically includes:
Two plain concrete bases are separately positioned on two non-underground pipe gallery regions, by two planting beds Frame is separately positioned on the basis of two plain concretes, and the planting soil is located at the underground pipe gallery region and two institutes State on non-underground pipe gallery region and between two planting bed frames, by the greening seedling growth in the planting soil In.
10. the method for urban road underground pipe gallery intersection differential settlement quality problems is solved as claimed in claim 8, its It is characterized in that, the step (1) further includes:Drainpipe is arranged on to the lowest point of the planting bed.
CN201711210030.5A 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery Active CN108035204B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711210030.5A CN108035204B (en) 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711210030.5A CN108035204B (en) 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery

Publications (2)

Publication Number Publication Date
CN108035204A true CN108035204A (en) 2018-05-15
CN108035204B CN108035204B (en) 2020-06-09

Family

ID=62094254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711210030.5A Active CN108035204B (en) 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery

Country Status (1)

Country Link
CN (1) CN108035204B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908625A (en) * 2021-11-25 2022-08-16 上海建工集团股份有限公司 Foundation treatment and anti-settlement device and method for comprehensive pipe gallery crossing road

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101170815B1 (en) * 2011-12-16 2012-08-02 조영철 Vegetational apparatus for rainwater retention
CN105804116A (en) * 2016-04-01 2016-07-27 上海市政工程设计研究总院(集团)有限公司 Combined-construction section structure of underpass tunnel and comprehensive pipe gallery
CN106592608A (en) * 2016-12-21 2017-04-26 东南大学 Differential settlement control method for new foundation and old roadbed of utility tunnel
CN106759473A (en) * 2016-11-11 2017-05-31 中国建筑第八工程局有限公司 The constructing structure and its construction method of underground pipe gallery and road

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101170815B1 (en) * 2011-12-16 2012-08-02 조영철 Vegetational apparatus for rainwater retention
CN105804116A (en) * 2016-04-01 2016-07-27 上海市政工程设计研究总院(集团)有限公司 Combined-construction section structure of underpass tunnel and comprehensive pipe gallery
CN106759473A (en) * 2016-11-11 2017-05-31 中国建筑第八工程局有限公司 The constructing structure and its construction method of underground pipe gallery and road
CN106592608A (en) * 2016-12-21 2017-04-26 东南大学 Differential settlement control method for new foundation and old roadbed of utility tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908625A (en) * 2021-11-25 2022-08-16 上海建工集团股份有限公司 Foundation treatment and anti-settlement device and method for comprehensive pipe gallery crossing road

Also Published As

Publication number Publication date
CN108035204B (en) 2020-06-09

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN105421470B (en) Assembled anchor pole arched framework combined type ecological revetment construction method
CN101451355B (en) Water retention method of back fill course
CN103883328B (en) The dark construction method of half lid half of high steep V-type coombe biased segment is worn under separate tunnel
CN105569058A (en) Expansive soil cutting structure and construction method thereof
CN106759473A (en) The constructing structure and its construction method of underground pipe gallery and road
CN107100227B (en) A kind of pergola on the city road LID biology delay ditch construction method
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
AU2016228704B2 (en) Hard road construction method for natural groundwater recharge
CN206681021U (en) Multi-functional side slope reinforced structure
CN106703044A (en) Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN110485231A (en) A kind of rainy season roadbed earthwork engineering construction method
CN107152012A (en) Sluice construction technique
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN107268365A (en) A kind of Construction of Soft Soil Subgrade technique
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN108194104A (en) A kind of interval rock pillar reinforcement means of city shallow embedding small-clear-distance tunnel
CN205399440U (en) Inflation dirt road moat structure
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN102817298A (en) Construction method on frozen soil
CN108035204A (en) Solve the structures and methods of urban road underground pipe gallery intersection differential settlement quality problems
CN107268373A (en) A kind of water permeability asphalt concrete road and its construction method
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant