CN108009230A - Data processing method and device - Google Patents

Data processing method and device Download PDF

Info

Publication number
CN108009230A
CN108009230A CN201711224800.1A CN201711224800A CN108009230A CN 108009230 A CN108009230 A CN 108009230A CN 201711224800 A CN201711224800 A CN 201711224800A CN 108009230 A CN108009230 A CN 108009230A
Authority
CN
China
Prior art keywords
data
arcgis
attribute
mistake
spatial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711224800.1A
Other languages
Chinese (zh)
Inventor
李玉桂
林燕
杨菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Survey & Remote Sensing Group Co Ltd
Aerial Photogrammetry and Remote Sensing Co Ltd
Original Assignee
China Coal Survey & Remote Sensing Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Survey & Remote Sensing Group Co Ltd filed Critical China Coal Survey & Remote Sensing Group Co Ltd
Priority to CN201711224800.1A priority Critical patent/CN108009230A/en
Publication of CN108009230A publication Critical patent/CN108009230A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases

Landscapes

  • Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Sensing (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Processing Or Creating Images (AREA)

Abstract

The embodiment of the present invention provides a kind of data processing method and device, and applied to Arcgis platforms, the described method includes the attribute data information that destination object is extracted in dependence database;Detected based on preset data attribute and whether there is mistake in the attribute data information, if mistake is not present in the attribute data information, which is converted into Arcgis spatial datas.The present invention can effectively reduce data processing difficulty, improve the accuracy and reliability of data processing.

Description

Data processing method and device
Technical field
The present invention relates to geographic information processing technical field, in particular to a kind of data processing method and device.
Background technology
In the existing data processing method based on Arcgis instruments, data-handling efficiency is low, and data type is wanted Ask higher, do not apply to the processing of batch data.
The content of the invention
In view of this, the present invention provides a kind of data processing method and device, can be effectively improved the above problem.
Present pre-ferred embodiments provide a kind of data processing method, applied to Arcgis platforms, the described method includes:
The attribute data information of destination object is extracted in dependence database;
Detect and whether there is mistake in the attribute data information, if mistake is not present in the attribute data information, The attribute data information is converted into Arcgis spatial datas.
Alternatively, the method further includes:
If judge whether type of error corresponding with the mistake there are mistake in the attribute data information and repair Correction data, if in the presence of basis amendment data corresponding with the type of error modify the type of error, if not depositing Miscue is then being carried out according to the type of error.
Alternatively, after the attribute data information is converted to Arcgis spatial datas, the method further includes:
The Arcgis spatial datas are shown;
The GIS operational orders of user's triggering are responded, and according to the GIS operational orders to the Arcgis spaces after the displaying Data perform corresponding operation.
Alternatively, the method further includes:
Detect and analyze to whether there is in the Arcgis spatial datas and do not meet spatial data logic fundamental;
If in the presence of, the fundamental for not meeting spatial data logic is modified, and revised Arcgis is empty Between data preserved.
Alternatively, the fundamental includes administrative area, geographic element and thematic factor.
Alternatively, the attribute data includes flex point coordinate character string, which is converted to Arcgis skies Between data the step of include:
The flex point coordinate character string is analyzed and identifies each flex point in the flex point coordinate character string;
Each flex point is mapped into Arcgis spaces to generate initial space data, and based in the Arcgis spaces Each area of space, by the initial space data carry out structure surface treatment;
Topology processing is carried out according to default topology processing rule to the initial space data for completing structure surface treatment to obtain Arcgis spatial datas.
Present pre-ferred embodiments also provide a kind of data processing equipment, and applied to Arcgis platforms, described device includes:
Attribute data extraction module, for extracting the attribute data information of destination object in dependence database;
Conversion of Spatial Data module, whether there is mistake, if the attribute number for detecting in the attribute data information It is believed that mistake is not present in breath, then the attribute data information is converted into Arcgis spatial datas.
Alternatively, described device further includes:
Error correction module, if for, there are mistake, being judged whether and the mistake in the attribute data information Corresponding type of error and amendment data, if in the presence of according to amendment data corresponding with the type of error to the wrong class Type is modified, if being not present, miscue is carried out according to the type of error.
Alternatively, described device further includes:
Data display module, for being shown to the Arcgis spatial datas;And
Data operation modules, for responding the GIS operational orders of user's triggering, and according to the GIS operational orders to described Arcgis spatial datas after displaying perform corresponding operation.
Alternatively, described device includes:
Logic detection module, space number is not met for detecting and analyzing to whether there is in the Arcgis spatial datas According to logic fundamental;
Logic correcting module, for exist do not meet spatial data logic fundamental when, to not meeting space number It is modified according to the fundamental of logic, and revised Arcgis spatial datas is preserved.
The embodiment of the present invention provides a kind of data processing method and device, wherein, which is directed to target pair The attribute data information of elephant carries out Weigh sensor, processing, and need not carry out field extraction, split, and effectively reduces at data Complexity during reason, has saved data processing cost, and data processing of embodiment of the present invention accuracy rate is high, and handling result can Lean on.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair The restriction of scope, for those of ordinary skill in the art, without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the frame structure schematic diagram of the electric terminal of application data processing equipment provided in an embodiment of the present invention.
Fig. 2 is the flow diagram of data processing method provided in an embodiment of the present invention.
Fig. 3 is the sub-process schematic diagram of data processing method provided in an embodiment of the present invention.
Fig. 4 is the frame structure schematic diagram of data processing equipment provided in an embodiment of the present invention.
Icon:10- electric terminals;100- data processing equipments;110- attribute data extraction modules;120- spatial datas turn Change the mold block;130- error correction modules;140- data display modules;150- data operation modules;160- logic detection modules; 170- logic correcting modules;200- memories;300- storage controls;400- processors.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.The present invention implementation being usually described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiments of the present invention, this area is common Technical staff's all other embodiments obtained without creative efforts, belong to the model that the present invention protects Enclose.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the prior art, Arcgis instruments support the txt coordinate string expression ways of conversion and most of mineral resources to register Storehouse, verify that the area coordinate character string such as storehouse is inconsistent, if therefore carry out verification of data message etc. using the prior art, it is necessary into The substantial amounts of area coordinate character string housekeeping of row, including Edition Contains, arrangement and coordinate conversion etc., and can only manual identified seat The problem of in mark and attribute error phenomenon, it is less efficient, it is stronger to requirements such as data types, it is not suitable for the place of bulk data Reason.
Based on this, to improve the above problem, the embodiment of the present invention provides a kind of data processing side based on Arcgis platforms Method and device, wherein, as shown in Figure 1, being application data processing method provided in an embodiment of the present invention and the electric terminal of device 10 structure diagram, wherein, the electric terminal 10 include data processing equipment 100, memory 200, storage control 300 with And processor 400.Wherein, the memory 200, storage control 300,400 each element of processor between each other directly or Ground connection is electrically connected, to realize the transmission of data or interaction.For example, between these elements by one or more communication bus or Signal wire, which is realized, to be electrically connected.The data processing equipment 100 can be stored in including at least one in the form of software or firmware In the memory 200 or the software function module that is solidificated in the operating system of the electric terminal 10.The processor 400 The memory 200 is accessed under the control of the storage control 300, for performing what is stored in the memory 200 Executable module, such as software function module included by the data processing equipment 100 and computer program etc..Alternatively, The electric terminal 10 may be, but not limited to, smart mobile phone, IPAD, computer, server etc..
It should be appreciated that the structure shown in Fig. 1 is only to illustrate.The electric terminal 10 can have it is more more than shown in Fig. 1 or The less component of person, or there is the configuration different from shown in Fig. 1.Wherein, each component shown in Fig. 1 can be by software, hardware Or a combination thereof realization.
As shown in Fig. 2, a kind of data processing method based on Arcgis platforms provided for present pre-ferred embodiments Flow diagram.The data processing method is applied to the electric terminal 10 shown in Fig. 1.Below in conjunction with Fig. 2 to the number It is described in detail according to the idiographic flow and step of processing method.It should be noted that data processing method of the present invention Not using Fig. 2 and particular order as described below as limitation.It should be appreciated that the data processing method described in the embodiment of the present invention The order of which part step can be exchanged with each other according to actual needs, or part steps therein can also be omitted or deleted Remove.
Step S110, the attribute data information of destination object is extracted in dependence database.
In the present embodiment, the destination object can be but not limited to mineral resources, region terrain information etc..Wherein, with Exemplified by mineral resources, the attribute data information includes but not limited to the area in mining right data message, Exploration right data message Domain coordinate string information etc., the present embodiment is not limited herein.
It is understood that the attribute data information can be stored in the category in the form of mineral properties Basic Information Table In property database, wherein, the attribute database can be but not limited to access database files etc..
Step S120, detects and whether there is mistake in the attribute data information, if existing in the attribute data information Mistake, then perform step S130, if mistake is not present in the attribute data information, performs step S140.
Wherein, it is different according to the requirement of the accuracy to the attribute data information, detecting the attribute data information In with the presence or absence of mistake when can be based on preset data attribute realize, wherein, which can be according to institute The requirement for stating the accuracy of attribute data information carries out flexible design, for example, the preset data attribute can be mining industry Weigh register base area coordinate standard or set according to self-demand, the present embodiment is not limited herein.
In the present embodiment, by taking the preset data attribute is mining right registration base area coordinate standard as an example, such as It is respectively mining right area coordinate reference format and Exploration right area coordinate reference format shown in lower.
(1) mining right area coordinate reference format
N, 1N, F11, X11, Y11, F12, X12, Y12 ..., F1N, X1N, Y1N, S1, E1, KT1,1 [0/-1], 2N, F21, X21, Y21, F22, X22, Y22 ..., F2N, X2N, Y2N, S2, E2, KT2,1 [0/-1] ... ... nN, FN1, XN1, YN1, FN2, XN2, YN2 ..., FNN, XNN, YNN, SN, EN, KTN, 1 [0/-1]
Wherein, n represents areal, and xN represents the flex point number in certain region, and FNN denotation coordination point identifications are (without ", " Character string), (XNN, YNN) denotation coordination point (longitude and latitude or rectangular co-ordinate), [SN, EN] has represented absolute altitude and only absolute altitude, KTN tables Show ore body mark (without the character string of ", "), 1 [0/-1] represents area increase (do not calculate and subtract each other).
(2) Exploration right area coordinate reference format
N, 1N, X11, Y11, X12, Y12 ..., X1N, Y1N, 0,0,0,2N, X21, Y21, X22, Y22 ..., X2N, Y2N, -1,0,0 ... nN, Xn1, Yn1, Xn2, Yn2 ..., XnN, YnN, -1,0,0
Wherein, n represents areal, and xN represents the flex point number in certain region, and [0,0,0] represents supervisor area, [- 1,0,0] Expression hollows out area.
It should be noted that in the present embodiment, the preset data attribute can be as above shown in (1)-(2) but not limited to this.
Further, in the present embodiment, a variety of different type of errors may be deposited in the attribute data information, specifically such as Under.
First, area coordinate is lack of standardization
(1) figure spot number and coordinate string list are inconsistent up to figure spot number;
(2) it generally there are total flex point number and actual flex point number be inconsistent;
(3) lack " absolute altitude is played, only absolute altitude, ore body mark, ore body property " content (general considerations, if structure meets, content Allow to lack);
(4) " ore body mark " description has ", " character, causes program misjudgment (needing artificial treatment);
(5) construction error or missing (gross error, is manually changed with register base contrast comprehensive descision), as points should be 3 It is a and more than;
(6) removing other forbidden characters beyond ", ", such as space, newline etc., (artificial mistake of statistics type, utilizes calculating Machine is unified to be changed);
(7) X, Y-coordinate value are inverted, i.e., X position extends this as ordinate, and Y location extends this as abscissa.No matter the problem is adopting It is more typical in mineral rights or Exploration right area coordinate string;
(8) X in mining right rectangular coordinate system, Y-coordinate expression disunity, there are 6 degree, 3 degree various situations with, 1.5 bands.
(9) coordinate value missing reel number, is analyzed to related figure spot, generally passes through attribute polishing;
(10) coordinate system is inconsistent, generally using Xi'an 80 and 54 two kinds of Beijing coordinate system to be common;
(11) there are half-angle, double byte character.
2nd, self intersection
(1) self intersection caused by dot sequency mistake;
(2) area of knockout is stated unclear in character string, i.e., ore body property is not " -1 ";
(3) more figure spots, particularly complex region are reached by a figure spot string list, often also likely to be present self intersection;
3rd, field contents mistake
Since register base is slipped up in input process, field is caused to lose position, multidigit, wrong situations such as being worth.With mineral properties flex point Exemplified by coordinate, flying spot is mainly shown as in space, other information then shows as analytic statistics mistake.
In addition, the type of error is also possible to be the format errors such as form, document, field contents missing and attribute data Information does not meet spatial relationship, such as area of knockout coordinate outside basic figure spot or part outside, the present embodiment is not done herein Limitation.
Step S130, judge whether type of error corresponding with the mistake and correct data, if in the presence of, according to The type of error it is corresponding correct data modify to the type of error, if being not present, according to the type of error into Row miscue.
Wherein, the amendment data pre-set and preserve, and according to the difference of type of error, the amendment data Also differ, it is specific as follows.
(1) double byte character, refers mainly to comma, " and numeral:Half-angle can uniformly be replaced with;
(2) mess code, carriage return character, space etc.:Automatic identification simultaneously delete/replace;
(3) coordinate fields part general information is imperfect (such as absolute altitude value, ore body mark is not filled in):Obtain corresponding absolute altitude Value, ore body mark carry out supplement and fill in;
(4) reel number is incorrect (rectangular co-ordinate value):Batch processing is 3 degree of bands;
(5) coordinate value X, Y is inverted:Artificial treatment (a small amount of)/program batch processing (a large amount of);
(6) other guide mistake/deletion condition:The prompting that reports an error manually carries out error correction/supplement;
In addition, during actual implementation, if searching amendment data corresponding less than with the type of error, need according to the mistake Type generates corresponding miscue information, in order to which staff can carry out artificial correction according to the type of error.
Step S140, Arcgis spatial datas are converted to by the attribute data information.
Wherein, when ensuring that attribute data information is out of question, the attribute data information is converted into Arcgis spaces number According to.If for example, the Arcgis spatial datas include flex point coordinate character string, then are ensuring that the flex point coordinate character string is errorless Afterwards, the conversion to the flex point coordinate character string can be realized by step S141- steps S143, with reference to Fig. 3 to step S141- steps S143 is illustrated.
Step S141, analyzes flex point coordinate character string and identifies each flex point in the flex point coordinate character string.
In the present embodiment, if the attribute data information is that the attribute is stored in the form of mineral properties Basic Information Table In database, then the flex point coordinate character string can be analyzed, know based on the specification of filling in of mineral properties Basic Information Table Not, to be counted, the content such as period.Specifically, the present embodiment is not limited herein.
Step S142, maps to Arcgis spaces to generate initial space data, and based on described by each flex point The initial space data are carried out structure surface treatment by each area of space in Arcgis spaces.
When the initial space data carry out structure surface treatment, structure can be linked in sequence in the flex point of each area of space Face, wherein, if central point need to be generated, central point can be obtained after the completion of structure face.
The initial space data for completing structure surface treatment are carried out topological processing by step S143 according to default topology processing rule Obtain Arcgis spatial datas.
Wherein, the default topology processing rule is included according to ore body property to the initial space data behind structure face into progress Hollow out operation etc..For example, if ore body property is -1, then it is assumed that the ore body region needs to draw in face around to hollow out area Hole is handled so that ore body regional extent to be cut out, and the present embodiment is not limited herein.
Step S150, is shown the Arcgis spatial datas.
In the present embodiment, the Arcgis spatial datas can be subjected to locus displaying by program window, such as passed through The Data View interface of simulation Arcmap is shown, and the spatial distribution of Arcgis spatial datas is browsed for staff Situation, and whether check the Arcgis spatial datas also there are mistake, such as the wrong one digit number of one of point of quadrangle, or is turned The period order of point is unreasonable, then the mistakes such as flying spot, distortion, deformation can occur for quadrangle.
Step S160, response user triggering GIS operational orders, and according to the GIS operational orders to the displaying after Arcgis spatial datas perform corresponding operation.
Wherein, GIS operational orders include view amplification, diminution, movement, attribute query etc., pass through the GIS operational order energy The operability to the Arcgis spatial datas is enough further improved, while improves the accurate of the Arcgis spatial datas Property.
In addition, the GIS operational orders can also be attribute field mounting instruction, with by the GIS operational orders to institute State Arcgis spatial datas and add corresponding attribute information, such as zone name, mineral products title and attribute, the present embodiment is herein not It is limited.
Step S170, detects and analyzes in the Arcgis spatial datas with the presence or absence of the base for not meeting spatial data logic Essentiality.
Wherein, the fundamental includes but not limited to administrative region, geographic element and thematic factor etc., in addition, examining It is main to judge respectively when surveying and analyzing in the Arcgis spatial datas with the presence or absence of the fundamental for not meeting spatial data logic The fitting uniformity of fundamental, topological integrity, logical specification etc., the present embodiment is not limited.
Step S180, if in the presence of, the fundamental for not meeting spatial data logic is modified, and will be revised Arcgis spatial datas are preserved.
Wherein, when there is the fundamental for not meeting spatial data logic, miscue, and responsive operation people can be carried out The artificial correction instruction of member's triggering, to carry out the amendment of spatial data logic according to the artificial revision directive.
Alternatively, the save location of the Arcgis spatial datas can be selected flexibly according to the actual requirements, for example, can Preserve into Oracle 11g databases, the present embodiment is not limited herein.It is to be understood that protected by Arcgis spatial datas The premise deposited is that the Arcgis spatial datas should meet spatial data logic and there is no attribute information mistake.
Based on the description to above-mentioned data processing method, it can be seen that relative to prior art be that embodiment has Advantages below:
(1) field need not be extracted, carries out fractionation editor.Field type need not be individually txt forms into edlin, arrangement Multiple texts, save a large amount of human and material resources, reduce data processing cost.
(2) intelligent, the degree of automation height.For the coordinate format in attribute data information, content etc., can intelligently know Not and handle, and for different type of error etc., processing method is more comprehensive, perfect, and the degree of automation is higher, such as can Automatic identification carries out intelligent decision, cover processing etc. with conversion full-shape separator/whole-angle figure and to numerical value length.
(3) accuracy rate is high, and data processed result is reliable.Using built-in logic judgment, analysis module, examination can go out rapidly Data are in itself there are wrong, nonstandard place, and according to reporting an error, prompt message completes progressively correcting process.Improving error correction efficiency While, by Content inspection repeatedly, the mistake judgement for being manually difficult to distinguish is strengthened, the logical consistency of such as data, makes It is more accurate, reliable to generate result.
Further, as shown in figure 4, the data processing equipment applied to the electric terminal 10 provided for this example 100 frame structure schematic diagram, wherein, which includes attribute data extraction module 110, spatial data turns Change the mold block 120, error correction module 130, data display module 140, data operation modules 150, logic detection module 160 and patrol Collect correcting module 170.
The attribute data extraction module 110, for extracting the attribute data information of destination object in dependence database. In the present embodiment, the description as described in the attribute data extraction module 110 is specifically referred to the step S110 as shown in Fig. 2 It is described in detail, that is, the step S110 can be performed by attribute data extraction module 110, thus no longer illustrates herein.
The Conversion of Spatial Data module 120, whether there is mistake, if described for detecting in the attribute data information Mistake is not present in attribute data information, then the attribute data information is converted into Arcgis spatial datas.In the present embodiment, close Specifically referred in the description of the attribute data extraction module 110 to the detailed of the step S120 shown in Fig. 2 and step S140 Thin description, that is, the step S120 and step S140 can be performed by Conversion of Spatial Data module 120, thus herein no longer Illustrate.
The error correction module 130, if for there are mistake, judged whether in the attribute data information with The corresponding amendment data of the type of error, if in the presence of according to amendment data corresponding with the type of error to the wrong class Type is modified, if being not present, miscue is carried out according to the type of error.In the present embodiment, repaiied on the mistake The description of positive module 130 specifically refers to the detailed description to the step S130 shown in Fig. 2, that is, the step S130 can To be performed by error correction module 130, thus no longer illustrate herein.
The data display module 140, for being shown to the Arcgis spatial datas.In the present embodiment, on The description of the data display module 140 specifically refers to the detailed description to the step S150 shown in Fig. 2, that is, described Step S150 can be performed by data display module 140, thus no longer be illustrated herein.
The data operation modules 150, for responding the GIS operational orders of user's triggering, and according to the GIS operational orders Corresponding operation is performed to the Arcgis spatial datas after the displaying.In the present embodiment, on the data operation modules 150 Description specifically refer to detailed description to the step S160 shown in Fig. 2, that is, the step S160 can be grasped by data Make module 150 to perform, thus no longer illustrate herein.
The logic detection module 160, is not inconsistent for detecting and analyzing to whether there is in the Arcgis spatial datas Close spatial data logic fundamental.In the present embodiment, the description as described in the logic detection module 160 is specifically referred to figure The detailed description of step S170 shown in 2, that is, the step S170 can be performed by logic detection module 160, thus This is no longer illustrated.
The logic correcting module 170, for exist do not meet spatial data logic fundamental when, to not meeting The fundamental of spatial data logic is modified, and revised Arcgis spatial datas are preserved.In the present embodiment, The description as described in the logic correcting module 170 specifically refers to the detailed description to the step S180 as shown in Fig. 2, that is, The step S180 can be performed by logic correcting module 170, thus no longer be illustrated herein.
In conclusion the embodiment of the present invention provides a kind of data processing method and device, wherein, the data processing method pin Weigh sensor, processing are carried out to the attribute data information of destination object, and field extraction need not be carried out, split, is effectively reduced Complexity in data handling procedure, has saved data processing cost, and data processing of embodiment of the present invention accuracy rate is high, place Manage reliable results.
In the description of the present invention, term " setting ", " connected ", " connection " should be interpreted broadly, for example, it may be fixed Connect or be detachably connected, or be integrally connected;Can mechanically connect or be electrically connected;Can be direct It is connected, can also be indirectly connected by intermediary, can be the connection inside two elements.For the ordinary skill of this area For personnel, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
In several embodiments that the embodiment of the present invention is provided, it should be understood that disclosed apparatus and method, also may be used To realize by other means.Apparatus and method embodiment described above is only schematical, for example, the stream in attached drawing Journey figure and block diagram show that the device of default quantity embodiment, method and computer program product may be real according to the present invention Existing architectural framework, function and operation.At this point, each square frame in flow chart or block diagram can represent module, a journey A part for sequence section or code.A part for the module, program segment or code includes one or default quantity is used for realization Defined logic function.
It should also be noted that at some as in the implementation replaced, the function of being marked in square frame can also be with difference The order marked in attached drawing occurs.For example, two continuous square frames can essentially perform substantially in parallel, they are sometimes It can also perform in the opposite order, this is depending on involved function.It is also noted that in block diagram and/or flow chart The combination of each square frame and the square frame in block diagram and/or flow chart, can use the dedicated of function as defined in performing or action Hardware based system is realized, or can be realized with the combination of specialized hardware and computer instruction.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this area For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

  1. A kind of 1. data processing method, applied to Arcgis platforms, it is characterised in that the described method includes:
    The attribute data information of destination object is extracted in dependence database;
    Detect and whether there is mistake in the attribute data information, should if mistake is not present in the attribute data information Attribute data information is converted to Arcgis spatial datas.
  2. 2. data processing method according to claim 1, it is characterised in that the method further includes:
    If judge whether type of error corresponding with the mistake there are mistake in the attribute data information and correct number According to, if in the presence of, modified according to amendment data corresponding with the type of error to the type of error, if being not present, Miscue is carried out according to the type of error.
  3. 3. data processing method according to claim 1, it is characterised in that be converted to by the attribute data information After Arcgis spatial datas, the method further includes:
    The Arcgis spatial datas are shown;
    The GIS operational orders of user's triggering are responded, and according to the GIS operational orders to the Arcgis spatial datas after the displaying Perform corresponding operation.
  4. 4. data processing method according to claim 1, it is characterised in that the method further includes:
    Detect and analyze to whether there is in the Arcgis spatial datas and do not meet spatial data logic fundamental;
    If in the presence of, the fundamental for not meeting spatial data logic is modified, and by revised Arcgis spaces number According to being preserved.
  5. 5. data processing method according to claim 4, it is characterised in that the fundamental includes administrative area, geography Key element and thematic factor.
  6. 6. data processing method according to claim 1, it is characterised in that the attribute data includes flex point coordinate character The step of going here and there, which is converted to Arcgis spatial datas includes:
    The flex point coordinate character string is analyzed and identifies each flex point in the flex point coordinate character string;
    Each flex point is mapped into Arcgis spaces to generate initial space data, and based on every in the Arcgis spaces The initial space data are carried out structure surface treatment by a area of space;
    Topology processing is carried out to the initial space data for completing structure surface treatment according to default topology processing rule and obtains Arcgis skies Between data.
  7. A kind of 7. data processing equipment, applied to Arcgis platforms, it is characterised in that described device includes:
    Attribute data extraction module, for extracting the attribute data information of destination object in dependence database;
    Conversion of Spatial Data module, whether there is mistake for detecting in the attribute data information, if the attribute number it is believed that Mistake is not present in breath, then the attribute data information is converted into Arcgis spatial datas.
  8. 8. data processing equipment according to claim 7, it is characterised in that described device further includes:
    Error correction module, if for, there are mistake, being judged whether corresponding with the mistake in the attribute data information Type of error and correct data, if in the presence of, according to it is corresponding with the type of error amendment data to the type of error into Row modification, if being not present, miscue is carried out according to the type of error.
  9. 9. data processing equipment according to claim 7, it is characterised in that described device further includes:
    Data display module, for being shown to the Arcgis spatial datas;And
    Data operation modules, for responding the GIS operational orders of user's triggering, and according to the GIS operational orders to the displaying Arcgis spatial datas afterwards perform corresponding operation.
  10. 10. data processing equipment according to claim 7, it is characterised in that described device includes:
    Logic detection module, is patrolled with the presence or absence of not meeting spatial data for detecting and analyzing in the Arcgis spatial datas Collect fundamental;
    Logic correcting module, for when there is the fundamental for not meeting spatial data logic, patrolling not meeting spatial data The fundamental collected is modified, and revised Arcgis spatial datas are preserved.
CN201711224800.1A 2017-11-29 2017-11-29 Data processing method and device Pending CN108009230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711224800.1A CN108009230A (en) 2017-11-29 2017-11-29 Data processing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711224800.1A CN108009230A (en) 2017-11-29 2017-11-29 Data processing method and device

Publications (1)

Publication Number Publication Date
CN108009230A true CN108009230A (en) 2018-05-08

Family

ID=62054593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711224800.1A Pending CN108009230A (en) 2017-11-29 2017-11-29 Data processing method and device

Country Status (1)

Country Link
CN (1) CN108009230A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109558474A (en) * 2018-12-07 2019-04-02 董云 The method and system in forest land and forest reserves geographical data bank are established based on Arcgis
CN110096560A (en) * 2019-04-16 2019-08-06 湖北地信科技集团股份有限公司 Data managing method, equipment, storage medium and device based on picture library one
CN110489106A (en) * 2019-07-22 2019-11-22 北京字节跳动网络技术有限公司 A kind of generation method, device, medium and the electronic equipment of project initial code
CN110597712A (en) * 2019-08-27 2019-12-20 北京奇艺世纪科技有限公司 Component attribute checking method and device, terminal and storage medium
CN112307139A (en) * 2019-07-30 2021-02-02 阿里巴巴集团控股有限公司 Data processing method, device, server and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477548A (en) * 2009-01-20 2009-07-08 中国测绘科学研究院 Regulation based universal space data quality checking technique
CN101719127A (en) * 2009-12-07 2010-06-02 中国科学院新疆生态与地理研究所 Quick systemic checking method of data quality of geological and mineral spatial database
CN101976248A (en) * 2010-10-15 2011-02-16 陕西电力科学研究院 Method for rapidly identifying environmental risk of power transmission and transformation project
CN102253359A (en) * 2011-04-28 2011-11-23 深圳市锐能微科技有限公司 Method and system for correcting false wiring of three-phase four-wire watt-hour meter and watt-hour meter
US20130321407A1 (en) * 2012-06-02 2013-12-05 Schlumberger Technology Corporation Spatial data services
CN104123125A (en) * 2013-04-26 2014-10-29 腾讯科技(深圳)有限公司 Webpage resource acquisition method and device
CN105279243A (en) * 2015-09-28 2016-01-27 张新长 Spatial data conversion method and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477548A (en) * 2009-01-20 2009-07-08 中国测绘科学研究院 Regulation based universal space data quality checking technique
CN101719127A (en) * 2009-12-07 2010-06-02 中国科学院新疆生态与地理研究所 Quick systemic checking method of data quality of geological and mineral spatial database
CN101976248A (en) * 2010-10-15 2011-02-16 陕西电力科学研究院 Method for rapidly identifying environmental risk of power transmission and transformation project
CN102253359A (en) * 2011-04-28 2011-11-23 深圳市锐能微科技有限公司 Method and system for correcting false wiring of three-phase four-wire watt-hour meter and watt-hour meter
US20130321407A1 (en) * 2012-06-02 2013-12-05 Schlumberger Technology Corporation Spatial data services
CN104123125A (en) * 2013-04-26 2014-10-29 腾讯科技(深圳)有限公司 Webpage resource acquisition method and device
CN105279243A (en) * 2015-09-28 2016-01-27 张新长 Spatial data conversion method and system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周峤: ""基于移动GIS技术的管道智能巡检***开发与研究"", 《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》 *
杨军杰等: ""采矿权登记信息矢量化的设计与实现"", 《地理与地理信息科学》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109558474A (en) * 2018-12-07 2019-04-02 董云 The method and system in forest land and forest reserves geographical data bank are established based on Arcgis
CN110096560A (en) * 2019-04-16 2019-08-06 湖北地信科技集团股份有限公司 Data managing method, equipment, storage medium and device based on picture library one
CN110489106A (en) * 2019-07-22 2019-11-22 北京字节跳动网络技术有限公司 A kind of generation method, device, medium and the electronic equipment of project initial code
CN112307139A (en) * 2019-07-30 2021-02-02 阿里巴巴集团控股有限公司 Data processing method, device, server and storage medium
CN110597712A (en) * 2019-08-27 2019-12-20 北京奇艺世纪科技有限公司 Component attribute checking method and device, terminal and storage medium

Similar Documents

Publication Publication Date Title
CN108009230A (en) Data processing method and device
Deng et al. Automatic indoor construction process monitoring for tiles based on BIM and computer vision
CN110292775B (en) Method and device for acquiring difference data
CN108491959B (en) Intelligent similar weather forecast method and system and information data processing terminal
CN111563509B (en) Tesseract-based substation terminal row identification method and system
CN109255288A (en) A kind of road surface breakage detection method, device and terminal device
CN110427441B (en) Railway external environment hidden danger detection and management method based on air-ground integration technology
CN114511718B (en) Intelligent management method and system for materials for building construction
CN104504045A (en) GIS (geographic information system) positioning analysis system based on power customer address word segments
CN107783979A (en) Kilometer stone information preparation method and device, geographic information acquisition equipment and navigation chip
CN113177774A (en) Building construction supervision method based on BIM
CN116580350A (en) Laboratory safety monitoring and early warning method and system
CN112066997A (en) Method and system for exporting high-definition route map
CN112232339A (en) Flight display equipment fault detection method and monitoring device based on convolutional neural network
CN112380894A (en) Video overlapping area target duplicate removal method and system based on three-dimensional geographic information system
CN117094660A (en) Construction monitoring method and system based on digital twin technology
Chang et al. Safety risk assessment of electric power operation site based on variable precision rough set
CN108802512B (en) Power distribution system test method and device
CN114417788A (en) Drawing analysis method and device, storage medium and electronic equipment
CN115762728A (en) Medical medicament storage cabinet reminding method and device
KR20150142459A (en) Automated system and method of instrument index
CN116541574B (en) Intelligent extraction method, device, storage medium and equipment for map sensitive information
CN115052270B (en) Service index determining method and device, electronic equipment and nonvolatile storage medium
CN112149624B (en) Traffic identification image processing method and device
CN107491906A (en) Mapping product inspection method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180508

RJ01 Rejection of invention patent application after publication