CN108005079A - Implanted prefabricated pile grouting device and implanted grouting process - Google Patents

Implanted prefabricated pile grouting device and implanted grouting process Download PDF

Info

Publication number
CN108005079A
CN108005079A CN201810020891.5A CN201810020891A CN108005079A CN 108005079 A CN108005079 A CN 108005079A CN 201810020891 A CN201810020891 A CN 201810020891A CN 108005079 A CN108005079 A CN 108005079A
Authority
CN
China
Prior art keywords
pile
inner tube
implanted
grouting device
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810020891.5A
Other languages
Chinese (zh)
Other versions
CN108005079B (en
Inventor
刘永超
崔凤祥
李刚
刘洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Original Assignee
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANCHENG JIYE GROUP CO Ltd filed Critical TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority to CN201810020891.5A priority Critical patent/CN108005079B/en
Publication of CN108005079A publication Critical patent/CN108005079A/en
Application granted granted Critical
Publication of CN108005079B publication Critical patent/CN108005079B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a kind of implanted prefabricated pile grouting device and implanted grouting process, inner tube is arranged on the inside of outer tube, the side wall of inner tube, which is dug, multigroup interior slurry outlet, multigroup inner tube sealing ring is equipped between inner tube and outer tube, the side wall of outer tube, which is dug, multigroup outer slurry outlet, the outer tube and inner tube of slip casing by pressure mechanism are ring pipe, wherein one end of three-way pipe is arranged on the outside of outer tube, multiple rollers are all connected to the inner ring of annular outer tube, steel hoop is connected with multiple supporting blocks, the outer tube and inner tube of each slip casing by pressure mechanism are " u "-shaped, the inner tube of each slip casing by pressure mechanism is communicated in connecting tube by a communicating pipe respectively.Implanted prefabricated pile grouting device and implanted grouting process of the present invention, avoid the waste for planting stake displacement in prior art stake holes after the stirring of soil cement total cross-section, the effective pile diameter that the effective pile diameter formed at the same time can plant stake than stirring soil is big, so the bearing capacity of pile bigger that can be provided.

Description

Implanted prefabricated pile grouting device and implanted grouting process
Technical field
The invention belongs to the realm of building construction, more particularly, to a kind of implanted prefabricated pile grouting device and implanted slip casting Technique.
Background technology
Existing construction of prefabricated piles technology has hammering method and static pressure method.Hammering method is that prefabricated stake is driven underground with sledgehammer, It is a kind of most traditional piling method, but because noise is very big, and vibrate and the ground nearby built may be damaged, therefore And forbid driving piles in this way in city at present.Static press piling is the mode that counterweight is conducted oneself with dignity or added with stake machine, will be prefabricated Stake is pressed directly into underground, this method is almost without noise, but because harder rock stratum can not be squeezed into, in the place that rock stratum is shallow It is general inapplicable, and to geologic requirements than more uniform, otherwise easily (prefabricated pile is because pressure is excessive or the effect of being hit is quick-fried for quick-fried stake Split).Bored concrete pile is opposite with prefabricated pile, is to produce a stake holes using the instrument such as drill bit or stake cylinder, afterwards by concrete Pour into underground and stake is directly now made in underground, almost can be adapted for the pile foundation construction of all occasions, but because of underground feelings Condition can not detect, so higher to technological requirement, otherwise easily occur collapsing hole, inclined footpath, the problem of broken pile is a kind of.Bored concrete pile at the same time A large amount of mud can be produced in construction, to site operation environmental effects, are unsatisfactory for the requirement instantly to environmental protection.
It is currently used plant piling method be:
A. pile-grafting machine is in place:Simultaneously centering is in place to fixed pile is referred to for pile-grafting machine;
B. hole operation is drawn:Start pile-grafting machine, the drilling rod of pile-grafting machine is sunk along leading truck, the drilling rod for starting pile-grafting machine is drilled into Projected depth;
C. lifting whitewashing stirring:Lifting pile-grafting machine drilling rod, open and send stock pump, to the soil body water-spray type slurry for referring to fixed pile, plants The drilling rod of stake machine water-spray type slurry and stirring concrete earth in lifting;
D. sink to stirring:Pile-grafting machine lifting drilling rod is whitewashed to ground, is sunk again and is started pile-grafting machine stirring concrete earth;
E. second lift whitewashing stirring:The operating process of step c is repeated, then pile-grafting machine drilling rod is displaced to next position weight Multiple a steps and b step, unload pore-forming drilling rod to aperture, wait to whitewash, stir and pile sinking;
F. pile-grafting machine returns lifting pile-sinking device and pile pile in situ:Pile-grafting machine lifts pile-sinking device, and lifting pile pile enters b step and draws In hole;
G. screw in and plant stake:Pile pile is screwed in and has been stirred in molding stake holes;
H. pile extension working face is reserved;
I. Jointing:Electric welding stake is used between section pile crown up and down, to prevent pile body from falling, sets clip to fill in aperture Put, lower section pile body is encircled after fixing and connect section stake;
J. it is once again screwed into plant stake:The pile body connected is once again screwed into soil cement to designed elevation;Operation, which finishes, to be moved to Next stake position for having sunk to pore-forming drilling rod, carries out next section pile driving construction.
The plant piling method first carries out counterbore with cement mixing, and a large amount of displacement mud waste of resource can be produced in whipping process And pollution environment, while pile body section and cement is not required, therefore also result in the waste of resource.
The content of the invention
In view of this, the present invention is directed to propose a kind of implanted prefabricated pile grouting device, solves and exist in the prior art Hammer-impact construction noise is big, vibration may damage the ground nearby built, static pressure stake is in the shallow place one in rock stratum As do not apply to, easy quick-fried stake and bored concrete pile are higher to technological requirement because subsurface picture can not detect, otherwise easily appearance The problems such as hole, inclined footpath, broken pile and generation mud collapse not environmentally.
To reach above-mentioned purpose, the technical proposal of the invention is realized in this way:
Implanted prefabricated pile grouting device, including:Slip casing by pressure mechanism, the first grouting device and the second grouting device.
The slip casing by pressure mechanism includes rubber sleeve, outer tube, inner tube and inner tube sealing ring, and said inner tube is arranged on the interior of outer tube Portion, the side wall of inner tube, which is dug, multigroup interior slurry outlet, and multigroup inner tube sealing ring, every group of inner tube sealing ring are equipped between inner tube and outer tube Equipped with two, two inner tube sealing rings with group are arranged on the both ends of slurry outlet in one group, and inner tube sealing ring is close to inner and outer tubes, The side wall of outer tube, which is dug, multigroup outer slurry outlet, and every group of outer slurry outlet is arranged between two inner tube sealing rings with group, outer tube Outer wall is cased with multiple rubber sleeves, and each rubber sleeve covers one group of outer slurry outlet.
First grouting device includes slip casing by pressure mechanism, three-way pipe and roller, the outer tube of the slip casing by pressure mechanism It is the circuit of closure with inner tube, wherein one end of three-way pipe is arranged on the outside of outer tube, remaining both ends of three-way pipe are communicated in Inner tube, the roller be equipped with it is multiple, multiple rollers are all connected to the inner ring of annular outer tube.
Second grouting device includes slip casing by pressure mechanism, steel hoop, supporting block and connecting tube, the steel hoop It is connected with multiple supporting blocks, multiple supporting blocks are centrosymmetric distribution centered on the axis of steel hoop, slip casing by pressure mechanism Equipped with multiple, the outer tube and inner tube of each slip casing by pressure mechanism are " u "-shaped, and the both ends of outer tube are connected to steel hoop, each The inner tube of slip casing by pressure mechanism is communicated in same connecting tube by a communicating pipe respectively.
Further, the supporting block is tubular, and the diameter of supporting block is more than the outside diameter of rubber sleeve in the second grouting device.
Further, the slip casing by pressure mechanism is arranged on the inside of steel hoop, and the steel hoop is connected with angle steel.
Further, second grouting device includes four slip casing by pressure mechanisms and four supporting blocks, slip casing by pressure machine Structure and supporting block are interspersed.
Further, the steel hoop is connected with angle steel.
Further, comprise the following steps:
Step A, pile-grafting machine are in place:Simultaneously centering is in place to fixed pile is referred to for pile-grafting machine.
Step B, draws hole operation:Pore-forming is sent out to projected depth using mud off using pore-forming equipments such as diving brills.
Step C, plants stake:Prefabricated pile and grouting device are implanted into pore-forming mud.
Step D, Jointing:Up and down with electric welding Jointing between section pile crown.
Step E, slip casting:Slip casting is carried out using implanted prefabricated pile grouting device in the present invention.
Further, in the step C, the first grouting device is connected to the domain of prefabricated pile, by the second grouting device Pile body is connected to close to the one end on chassis, implanted prefabricated pile grouting device is together implanted into stake holes together with prefabricated pile.
Further, the step E includes:Step a, pile grouting and step b, pile body slip casting.
Further, the step a, pile grouting, toward the second grouting device injection mud, carries out stake bottom slip casting, step Rapid b, pile body slip casting, mud is passed through toward the first grouting device, while moves up the first grouting device, realizes and pile body is carried out Slip casting.
Relative to the prior art, a kind of implanted prefabricated pile grouting device of the present invention has the advantage that:Using The outer slip casting of grouting device of the present invention targetedly carries out slip casting to pile body and stake bottom.Avoid soil cement in prior art stake holes The waste of stake displacement is planted after total cross-section stirring;Due to using the implanted grouting device, the coverage of slip casing by pressure is than existing The coverage of technology cement mixing is big, and the effective pile diameter that the effective pile diameter formed can plant stake than stirring soil is big, so, there is provided Bearing capacity of pile bigger;In addition mud of the present invention is only used for retaining wall pore-forming, without the secondary pile hole cleaning of drilled pile, avoids a large amount of Mud is replaced, less compared to the mud used in filling pile construction, more environmentally-friendly;The last present invention plants stake in mud and is stirred compared with cement Mix in soil plant stake resistance it is small, stake implantation it is more efficient.
Brief description of the drawings
The attached drawing for forming the part of the present invention is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its explanation is used to explain the present invention, do not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the front view of the first grouting device in the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the front view of the second grouting device in the present invention;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the present invention in use, the structure diagram of pile pile;
Fig. 6 is the present invention in use, the structure diagram of square pile;
Fig. 7 is the present invention in use, the structure diagram of rectangular pile;
Fig. 8 is the use schematic diagram of the first grouting device in the present invention.
Description of reference numerals:
1- rubber sleeves;2- outer tubes;The outer slurry outlets of 3-;4- inner tubes;5- inner tube sealing rings;Slurry outlet in 6-;7- three-way pipes;8- Roller;9- pile bodies;10- steel hoops;11- supporting blocks;12- connecting tubes;13- angle steel;14- communicating pipes;15- bottoms.
Embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
In the description of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", " under ", The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are Based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or dark Show that the device of meaning or element there must be specific orientation, with specific azimuth configuration and operation, thus it is it is not intended that right The limitation of the present invention.In addition, term " first ", " second " etc. are only used for description purpose, and it is not intended that instruction or hint phase To importance or the implicit quantity for indicating indicated technical characteristic.Thus, the feature for defining " first ", " second " etc. can To express or implicitly include one or more this feature.In the description of the present invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the present invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
Below with reference to the accompanying drawings and the present invention will be described in detail in conjunction with the embodiments.
As shown in figures 1-4, implanted prefabricated pile grouting device, including:Slip casing by pressure mechanism, the first grouting device and Two grouting devices;
The slip casing by pressure mechanism includes rubber sleeve 1, outer tube 2, inner tube 4 and inner tube sealing ring 5, and said inner tube 4 is arranged on outer The inside of pipe 2, the side wall of inner tube 4, which is dug, multigroup interior slurry outlet 6, multigroup inner tube sealing ring 5 is equipped between inner tube 4 and outer tube 2, often Group inner tube sealing ring 5 is equipped with two, and two inner tube sealing rings 5 with group are arranged on the both ends of slurry outlet 6 in one group, inner tube sealing ring 5 are close to inner tube 4 and outer tube 2, and the side wall of outer tube 2, which is dug, multigroup outer slurry outlet 3, and every group of outer slurry outlet 3 is arranged on two with group Between inner tube sealing ring 5, the outer wall of outer tube 2 is cased with multiple rubber sleeves 1, and each rubber sleeve 1 covers one group of outer slurry outlet 3.
First grouting device includes slip casing by pressure mechanism, three-way pipe 7 and roller 8, the slip casing by pressure mechanism it is outer Pipe 2 and inner tube 4 are the circuit of closure, and wherein one end of three-way pipe 7 is arranged on the outside of outer tube 2, remaining both ends of three-way pipe 7 are equal It is communicated in inner tube 4, the roller 8 is equipped with multiple, and multiple rollers 8 are all connected to the inner ring of annular outer tube 2.
Second grouting device includes slip casing by pressure mechanism, steel hoop 10, supporting block 11 and connecting tube 12, the ring Shape reinforcing bar 10 is connected with multiple supporting blocks 11, and multiple supporting blocks 11 are centrosymmetric point centered on the axis of steel hoop 10 Cloth, slip casing by pressure mechanism are equipped with multiple, and the outer tube 2 and inner tube 4 of each slip casing by pressure mechanism are " u "-shaped, and the both ends of outer tube 2 connect Steel hoop 10 is connected to, the inner tube 4 of each slip casing by pressure mechanism is communicated in same connecting tube by a communicating pipe 14 respectively 12。
The supporting block 11 is tubular, and the diameter of supporting block 11 is more than the outside diameter of rubber sleeve 1 in the second grouting device.
The slip casing by pressure mechanism is arranged on the inside of steel hoop 10, and the steel hoop 10 is connected with angle steel 13.
Second grouting device includes four slip casing by pressure mechanisms and four supporting blocks 11, slip casing by pressure mechanism and support Block 11 is interspersed.
The steel hoop 10 is connected with angle steel 13.
Step A, pile-grafting machine are in place:Simultaneously centering is in place to fixed pile is referred to for pile-grafting machine;
Step B, draws hole operation:Mud off method pore-forming to projected depth is used using pore-forming equipments such as diving brills;
Step C, plants stake:Prefabricated pile and grouting device are implanted into pore-forming mud;
Step D, Jointing:Up and down with electric welding Jointing between section pile crown;
Step E, slip casting:Slip casting is carried out using implanted prefabricated pile grouting device in the present invention.
In the step C, the first grouting device is connected to the chassis of prefabricated pile, the second grouting device is connected to pile body Close to the one end on chassis, implanted prefabricated pile grouting device is together implanted into stake holes together with prefabricated pile.
The step E includes:Step a pile groutings and step b pile body slip castings.
The step a, pile grouting, toward the second grouting device injection cement mortar, slip casting, step b, pile body are carried out to stake bottom Slip casting, cement mortar is passed through toward the first grouting device, while moves up the first grouting device, is realized and is carried out slip casting to pile body.
As shown in figures 5-8, prefabricated pile includes pile body 9 and stake bottom 15, and stake bottom 15 is connected to the lower end of pile body 9.
The device operation principle, during installation, is arranged on side of the stake bottom 15 away from pile body 9, by second by the second grouting device The connecting tube 12 of grouting device connects disposable Grouting Pipe, and disposable Grouting Pipe passes through the hole at the middle part of stake bottom 15, disposable slip casting Pipe is pierced by out of pile body 9, and the first grouting device is connected to pile body 9 close to the one end at a bottom 15, and connects roller 8 with steel wire, Grouting Pipe is communicated in three-way pipe 7, and the first grouting device, the second grouting device are together put into pit foundation together with pile pile;In use, first By the bottom slip casting of disposable Grouting Pipe and the second grouting device to pile pile, after slurries squeeze into inner tube 4, pass through interior slurry outlet 6 Into outer tube 2, with the gradual increase of pressure, slurries jack up rubber sleeve 1 and enter in pit foundation, after slip casting is stopped, due to outer tube 2 The pressure in outside is more than the pressure of the inner side of outer tube 2, and rubber sleeve 1 is pressed on outer tube 2 and blocks outer slurry outlet 3, avoids occurring by slurries Countercurrently, disposable Grouting Pipe is pulled down and be put into pile body 9, carried out by Grouting Pipe and the first grouting device to the outside of pile body 9 Slip casting, slurries are by entering connecting tube 12, communicating pipe 14 inner tube 4, and slurries jack up rubber sleeve 1 and enter in pit foundation, with slurries liquid The rising in face, pulls the first grouting device to move up, roller 8 prevents the first grouting device from rubbing with pile body 9 by steel wire Wipe, after the completion of slip casting, the first grouting device is taken out.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention god.

Claims (9)

1. implanted prefabricated pile grouting device, it is characterised in that:Including:Slip casing by pressure mechanism, the first grouting device and the second note Sizing device;
The slip casing by pressure mechanism includes rubber sleeve (1), outer tube (2), inner tube (4) and inner tube sealing ring (5), said inner tube (4) Arranged on the inside of outer tube (2), the side wall of inner tube (4), which is dug, multigroup interior slurry outlet (6), is equipped between inner tube (4) and outer tube (2) more Group inner tube sealing ring (5), every group of inner tube sealing ring (5) are equipped with two, and two inner tube sealing rings (5) with group are arranged in one group The both ends of hole (6) are starched, inner tube sealing ring (5) is close to inner tube (4) and outer tube (2), and the side wall of outer tube (2), which is dug, multigroup outer slurry outlet (3), every group of outer slurry outlet (3) is arranged between two inner tube sealing rings (5) with group, and the outer wall of outer tube (2) is cased with multiple rubbers Gum cover (1), each rubber sleeve (1) cover one group of outer slurry outlet (3);
First grouting device includes slip casing by pressure mechanism, three-way pipe (7) and roller (8), the slip casing by pressure mechanism it is outer Pipe (2) and inner tube (4) are the circuit of closure, and wherein one end of three-way pipe (7) is arranged on the outside of outer tube (2), three-way pipe (7) Remaining both ends is communicated in inner tube (4), and the roller (8) is equipped with multiple, and multiple rollers (8) are all connected to annular outer tube (2) Inner ring;
Second grouting device includes slip casing by pressure mechanism, steel hoop (10), supporting block (11) and connecting tube (12), described Steel hoop (10) is connected with multiple supporting blocks (11), during multiple supporting blocks (11) are in centered on the axis of steel hoop (10) The heart is symmetrical, slip casing by pressure mechanism be equipped with it is multiple, the outer tube (2) and inner tube (4) of each slip casing by pressure mechanism are " u "-shaped, The both ends of outer tube (2) are connected to steel hoop (10), and the inner tube (4) of each slip casing by pressure mechanism passes through a communicating pipe respectively (14) it is communicated in same connecting tube (12).
2. implanted prefabricated pile grouting device according to claim 1, it is characterised in that:The supporting block (11) is cylinder Shape, the diameter of supporting block (11) are more than the outside diameter of rubber sleeve (1) in the second grouting device.
3. implanted prefabricated pile grouting device according to claim 1, it is characterised in that:The slip casing by pressure mechanism is arranged on The inside of steel hoop (10), the steel hoop (10) are connected with angle steel (13).
4. implanted prefabricated pile grouting device according to claim 2, it is characterised in that:Second grouting device includes Four slip casing by pressure mechanisms and four supporting blocks (11), slip casing by pressure mechanism and supporting block (11) are interspersed.
5. implanted prefabricated pile grouting device according to claim 3, it is characterised in that:Steel hoop (10) connection There is angle steel (13).
A kind of 6. implanted grouting process, using the implanted prefabricated pile grouting device of any one of Claims 1 to 5, its feature It is:Comprise the following steps:
Step A, pile-grafting machine are in place:Simultaneously centering is in place to fixed pile is referred to for pile-grafting machine;
Step B, draws hole operation:Mud off method pore-forming to projected depth is used using pore-forming equipments such as diving brills;
Step C, plants stake:Prefabricated pile and grouting device are implanted into pore-forming mud;
Step D, Jointing:Up and down with electric welding Jointing between section pile crown;
Step E, slip casting:Slip casting is carried out using implanted prefabricated pile grouting device in the present invention.
A kind of 7. implanted grouting process according to claim 6, it is characterised in that:In the step C, by the first slip casting Device is connected to the chassis of prefabricated pile, the second grouting device is connected to pile body close to the one end on chassis, by implanted prefabricated pile Grouting device is together implanted into stake holes together with prefabricated pile.
A kind of 8. implanted grouting process according to claim 7, it is characterised in that:The step E includes:Step a, stake Rising pouring slurry and step b, pile body slip casting.
A kind of 9. implanted grouting process according to claim 8, it is characterised in that:The step a, pile grouting are past Second grouting device injects cement mortar, slip casting is carried out to stake bottom, step b, pile body slip casting, cement is passed through toward the first grouting device Slurry, while the first grouting device is moved up, realize and slip casting is carried out to pile body.
CN201810020891.5A 2018-01-09 2018-01-09 Implanted precast pile grouting device and implanted grouting process Active CN108005079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810020891.5A CN108005079B (en) 2018-01-09 2018-01-09 Implanted precast pile grouting device and implanted grouting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810020891.5A CN108005079B (en) 2018-01-09 2018-01-09 Implanted precast pile grouting device and implanted grouting process

Publications (2)

Publication Number Publication Date
CN108005079A true CN108005079A (en) 2018-05-08
CN108005079B CN108005079B (en) 2023-07-14

Family

ID=62050511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810020891.5A Active CN108005079B (en) 2018-01-09 2018-01-09 Implanted precast pile grouting device and implanted grouting process

Country Status (1)

Country Link
CN (1) CN108005079B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127615A (en) * 2023-10-26 2023-11-28 天津建城基业管桩有限公司 Precast pile grouting equipment and method for building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184734A (en) * 2013-03-19 2013-07-03 浙江天润建设有限公司 Implanted and grouted compound pile and construction method
CN103243713A (en) * 2013-05-07 2013-08-14 天津建城基业集团有限公司 Method for planting prestressed pipe pile at one step
CN103603363A (en) * 2013-10-31 2014-02-26 周兆弟 Cement mixing grouting protruding sectional pile foundations and forming method
CN106013088A (en) * 2016-06-07 2016-10-12 湖北天利建筑技术有限责任公司 High-bearing-capacity drilling pile planting method
CN206784372U (en) * 2017-04-19 2017-12-22 上海市建工设计研究总院有限公司 Injection forming club-footed pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184734A (en) * 2013-03-19 2013-07-03 浙江天润建设有限公司 Implanted and grouted compound pile and construction method
CN103243713A (en) * 2013-05-07 2013-08-14 天津建城基业集团有限公司 Method for planting prestressed pipe pile at one step
CN103603363A (en) * 2013-10-31 2014-02-26 周兆弟 Cement mixing grouting protruding sectional pile foundations and forming method
CN106013088A (en) * 2016-06-07 2016-10-12 湖北天利建筑技术有限责任公司 High-bearing-capacity drilling pile planting method
CN206784372U (en) * 2017-04-19 2017-12-22 上海市建工设计研究总院有限公司 Injection forming club-footed pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117127615A (en) * 2023-10-26 2023-11-28 天津建城基业管桩有限公司 Precast pile grouting equipment and method for building
CN117127615B (en) * 2023-10-26 2024-01-23 天津建城基业管桩有限公司 Precast pile grouting equipment and method for building

Also Published As

Publication number Publication date
CN108005079B (en) 2023-07-14

Similar Documents

Publication Publication Date Title
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN105604001B (en) Drilling tool is stirred in the stake of stiff-core cement soil cylinder and the rotation of construction method and tubular
CN106013151A (en) Continuous pile wall construction method and construction device used for continuous pile wall construction method
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN111794205B (en) Anti-collapse rotary digging pile construction device and construction method thereof
CN105672307A (en) Expanded-base combination end pile bearing foundation
CN109183790A (en) A kind of Screw Pile and its construction tool and construction method
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
JP2001115458A (en) Deep well construction method using earth retaining wall
CN105544579B (en) A kind of construction method of pile foundation
CN108005079A (en) Implanted prefabricated pile grouting device and implanted grouting process
CN101173515B (en) Steel pipe pile foundation built by planting steel stick and building method thereof
CN104831735B (en) The sealing supporting construction of a kind of curtain unification and construction method thereof and construction equipment
JP2001098541A (en) Steel pipe soil cement composite pile, and construction method and device
CN205742191U (en) A kind of piling wall constructing device continuously
JP6730121B2 (en) Underground wall construction method
KR20100123576A (en) Method for carrying out improved pile
CN207727585U (en) implanted prefabricated pile grouting device
JP3673158B2 (en) Pile embedding method and jig
CN111441368A (en) Deep foundation pit supporting structure and construction method
CN220099894U (en) Rectangular section bored concrete pile of double-sleeve construction
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
CN108086322A (en) The method removed mudcake device and pouring pile bearing capacity is improved using the device
CN212561469U (en) Foundation reinforcing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant