CN107989592A - A kind of horizontal well fracturing method - Google Patents

A kind of horizontal well fracturing method Download PDF

Info

Publication number
CN107989592A
CN107989592A CN201610956610.8A CN201610956610A CN107989592A CN 107989592 A CN107989592 A CN 107989592A CN 201610956610 A CN201610956610 A CN 201610956610A CN 107989592 A CN107989592 A CN 107989592A
Authority
CN
China
Prior art keywords
fracturing
fluid injection
section
injection stage
proppant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610956610.8A
Other languages
Chinese (zh)
Other versions
CN107989592B (en
Inventor
蒋廷学
路保平
卫然
卞晓冰
詹美玲
李双明
王海涛
苏瑗
肖博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering filed Critical China Petroleum and Chemical Corp
Priority to CN201610956610.8A priority Critical patent/CN107989592B/en
Publication of CN107989592A publication Critical patent/CN107989592A/en
Application granted granted Critical
Publication of CN107989592B publication Critical patent/CN107989592B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/60Compositions for stimulating production by acting on the underground formation
    • C09K8/62Compositions for forming crevices or fractures
    • C09K8/66Compositions based on water or polar solvents
    • C09K8/665Compositions based on water or polar solvents containing inorganic compounds
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K8/00Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations
    • C09K8/60Compositions for stimulating production by acting on the underground formation
    • C09K8/62Compositions for forming crevices or fractures
    • C09K8/70Compositions for forming crevices or fractures characterised by their form or by the form of their components, e.g. foams
    • C09K8/706Encapsulated breakers
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09KMATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
    • C09K2208/00Aspects relating to compositions of drilling or well treatment fluids
    • C09K2208/26Gel breakers other than bacteria or enzymes

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of horizontal well fracturing method, the described method includes implement N number of load fluid injection stage successively, wherein, the bulk density for the proppant that 1 load fluid injection stage of N uses before n-th load fluid injection stage is less than using the bulk density of proppant, the N are the natural number more than 1.Further, the fracturing fluid that n-th load fluid injection stage uses selects the ratio between storage modulus and Loss modulus in (2.0 5.0):1 fracturing fluid.The method of the present invention is by improving the suspendability of proppant and/or fracturing fluid, ensure that the uniform of every cluster crack replaces effect, ensure per the uniform feed liquor in cluster crack and into sand, to reach fracturing fluid in full section cluster crack, synchronously broken glue returns row, replacement phenomenon occurred in horizontal well fracturing so as to reducing, improves effect after pressure and realizes the maximization of stable production period.

Description

A kind of horizontal well fracturing method
Technical field
The present invention relates to horizontal well fracturing technical field, and in particular to a kind of to reduce the horizontal well in segments pressure replaced Cracking method, more particularly to it is hypotonic with reducing replacement in tight sand, carbonate rock, shale and coal petrography fractured horizontal well field Horizontal well fracturing method.
Background technology
At present, horizontal well fracturing technology has become the hypotonic master with tight sand, carbonate rock, shale or even coal petrography Body development technique, and huge economic benefit and social benefit have been played in production practices.It is necessary in the technology work progress Replaced using high viscose liquid, but it is different from vertical well fracture, and all there is cross replacement phenomenon, some mistakes for horizontal well fracturing technology More than 2 times up to normal value of replacement amount.Either bore hole sliding sleeve or bridge plug perforation combined tech, to prevent horizontal wellbore from sinking The adverse effect that sand is setting to pitching or bridge plug is setting, is even excessively replaced with high viscosity glue sometimes.This is to horizontal well point The protection of the fracture support section of section pressure break is extremely disadvantageous, can also seriously affect effect after pressure.Mining site is frequently found level The actual fracturing effect of well not reaches expected simulation and forecast as a result, main cause may just be derived from this.
For technical standpoint, presently found had the main reason for replacement and had:1) horizontal wellbore diameter only has 200 More millimeters, it is allowed to which the settling height of proppant is limited;2) density of proppant is bigger than normal for fracturing fluid, the body as Product density is all in 1.7g/cm3More than, much larger than the 1.03g/cm of fracturing fluid3;3) pad of frac design flow is bigger than normal, is split after termination of pumping Seam continues to extend, and especially quartz is even more so when brittle mineral content is high.
The adverse effect replaced to fracturing effect is crossed, is mainly had:1) the serious water conservancy diversion for reducing nearly pit shaft crack at initial stage after pressure Ability, causes nearly well fracture condudtiviy to completely lose, so-called " making dumplings " effect of generation;2) such as synchronous broken glue control not Good, aquation breaks glue to the fracturing fluid of first fracturing section in advance, and leak-off causes greatly crack to close too early, the benefit to nearly well fracture condudtiviy The measure of rescuing brings fatal influence;3) method for taking the uniform perforation of every cluster in the past, causes splitting for difference cluster during same section of pressure break Stitched displacement effect difference, closer to pit shaft to cross replacement amount more, play every contribution of the shower hole to yield without balanced.
In conclusion a kind of horizontal well fracturing new technology that can reduce replacement amount by a relatively large margin of exploitation is pressed with realizing The maximization of effect and stable production period will have significant realistic meaning afterwards.
The content of the invention
It is an object of the invention to provide it is a kind of can reduce or prevent replace horizontal well fracturing new technology, especially It is hypotonic with reducing the horizontal well in segments replaced in tight sand, carbonate rock, shale and coal petrography fractured horizontal well field Fracturing process, with improve press after effect and realize the maximization of stable production period.
The Basic Design thinking of the present invention and aim at, during fractured horizontal well, by improving the outstanding of proppant Buoyancy energy, reduces in horizontal well fracturing and replacement phenomenon occurred.Further, can also be by improving the suspension of fracturing fluid , shower hole density or TSOP fracturing etc. can be optimized, ensured per the uniform feed liquor in cluster crack and into sand, to reach full section cluster crack internal pressure Splitting liquid, synchronously broken glue returns row, and replacement phenomenon occurred so as to further reduce in horizontal well fracturing.
According to the present invention, there is provided a kind of horizontal well fracturing method, including implement N number of load fluid injection rank successively Section, wherein, the bulk density for the proppant that n-th load fluid injection stage uses is less than N-1 load fluid injection stage before The bulk density of the proppant used;The N is the natural number more than 1.I.e. in fracturing process provided by the invention, last One sand uses low-density propping agent than the stage.
N represents the N number of load fluid implant operation stage successively carried out in pressing crack construction process.According to the present invention, the value of N It can be selected according to the practice of construction such as the lithology of oil well, reservoir parameter, construction requirement situation.For example, N can be oneself in 2-7 So number;Specifically, N can be 2,3,4 or 5 etc..
In construction, it is suitable with normal replacement amount that n-th load fluid injection stage typically refers to load fluid injection rate, that is, takes The sand liquid injection rate load fluid implant operation stage suitable with wellbore volume.
Preferably, the bulk density for the proppant that n-th load fluid injection stage uses is in 1.2g/cm3Hereinafter, preferably 1.2-0.8g/cm3, such as 1.05-1.15g/cm3
It is further preferred that the proppant that uses of n-th load fluid injection stage is 1.05-1.5g/ selected from bulk density cm3Low-density propping agent, bulk density be less than 1.05g/cm3(such as 1.05-0.80g/cm3) super-low-density proppant and from The one or more of suspended prop.The dosage of proppant is preferably the support in the mortar all replaced with replacement amount equivalent Agent quantity, can be counted according to pit shaft total measurement (volume) (the medium position point of every section of perforated interval calculates) and last construction sand liquor ratio height Calculate and obtain.
Described to be also referred to as from suspended prop from suspension fracturing propping agents, there is no particular limitation as to it in the present invention, this It is common in field to be applied both to the present invention from suspended prop.
In method provided by the invention, from proppant angle, low-density/extremely-low density is hot on the trail of adding the final stage of sand Proppant and new from suspended prop, can improve the suspendability of proppant, and then help to be reduced or avoided follow-up Replacement construction in replacement phenomenon occurred.
According to the preferred embodiment of the present invention, the energy storage mould for the fracturing fluid that the n-th load fluid injection stage uses The ratio between amount and Loss modulus are at (2.0-5.0):1, preferably (2.1-4.0):1, preferably (2.5-3.0):1.The energy storage mould of fracturing fluid Amount is measured and adjusted by conventional method by those skilled in the art with Loss modulus, and details are not described herein.
Preferably, the ratio between the storage modulus for the fracturing fluid that n-th load fluid injection stage uses and Loss modulus are more than it The ratio between the storage modulus for the fracturing fluid that preceding N-1 load fluid injection stage uses and Loss modulus.In the prior art, entirely taking In the sand liquid implant operation stage, the ratio between the storage modulus of the fracturing fluid used and Loss modulus are generally 2:Less than 1.Therefore, at this Invent in some embodiments, before the storage modulus for the fracturing fluid that N-1 load fluid injection stage uses and Loss modulus it Than 2:Less than 1.
Further say, the glutinous bullet coefficient for the fracturing fluid that n-th load fluid injection stage uses takes sand for N-1 more than before The glutinous bullet coefficient for the fracturing fluid that liquid injection stage uses.The increased pressure of viscoelasticity in hot pursuit is used than the stage in last sand Split liquid.
According to the present invention, implement to replace construction after n-th load fluid injection stage.
According to the preferred embodiment of the present invention, the fracturing fluid (pressure break i.e. in hot pursuit that n-th load fluid injection stage uses Liquid) it is preferably surfactant fracturing fluid, cleaning polymer fracturing fluid or fiber fracturing liquid.
According to the present invention, in N-1 load fluid injection stage before, for hypotonic and tight sand, carbonate rock With coal petrography pressure break, the viscosity of fracturing fluid is in 50-100mPa.s;Split for shale oil air pressure, fracturing fluid viscosity in 2-40mPa.s, Preferably, in 2-10mPa.s if fracturing fluid is slippery water, if fracturing fluid is glue in 20-40mPa.s.
On the basis of fracturing fluid seam and outstanding grittiness energy is met, the viscosity of fracturing fluid is lower, is more split beneficial to every section of cluster Uniform feed liquor between seam and into sand.In general, at pressure break initial stage using the fracturing fluid of as above viscosity scope.On this basis, In the last load fluid stage suitable with normal replacement amount, the good surfactant fracturing fluid of viscoelasticity, cleaning polymer pressure break are used instead Liquid or fiber fracturing liquid.In general, the ratio between storage modulus and Loss modulus should maintain more than 2 times, to further improve pressure The outstanding grittiness of liquid is split, prevents the sand setting effect of horizontal wellbore.
The specific formula of above-mentioned fracturing fluid in hot pursuit and the prioritization scheme of dosage, can combine actual core data and indoor comprehensive Evaluation results determine.
According to the present invention, in N-1 load fluid injection stage before, (refer generally to hypotonic with causing for conventional lithology Close sandstone, carbonate rock and coal petrography) pressure break, proppant uses 70-140 mesh and 20-40 mesh proppants;For shale gas pressure break, Proppant uses three kinds of 70-140 mesh, 40-70 mesh and 30-50 mesh proppants.Make in N-1 load fluid injection stage before Proppant is conventional use of proppant in state of the art, and bulk density is larger, generally in 1.5g/cm3More than.
A small amount of 70-140 mesh proppants can be selected in the proppant of conventional lithology pressure break, and to polish, nearly well crack tortuosity rubs Resistance;Shale gas fracturing propping agents generally select 70-140 mesh proppants, and such proppant dosage is big, it is except nearly well crack of polishing Bending friction, also supports microcrack effect.
The specific preferred properties requirement of proppant can be determined with reference to indoor comprehensive Evaluation results.
According to the preferred embodiment of the present invention, in pressing crack construction process, TSOP fracturing is all carried out to every section of perforation cluster The TSOP fracturing pressure break of pressure break, preferably synchronization implementation based on filter loss and the TSOP fracturing pressure break based on flaw size.
Preferably, the construction sand liquor ratio of the TSOP fracturing pressure break based on flaw size passes through trial-and-error method foundation well head pressure Power rate of change is screened, and preferably makes well head pressure climbing speed in more than 6MPa/min, preferably 6-25MPa/min, more excellent Select the construction sand liquor ratio of 8-20MPa/min.In certain embodiments, the sand liquor ratio for example can be 16-26%.
From process parameter optimizing angle, it is ensured that per the uniform feed liquor in cluster crack with into sand, appropriate low viscosity with it is suitably low Discharge capacity combination measure, this target easy to implement, and high viscosity and high discharge capacity combination, may make close to pit shaft cluster crack lose Go sufficient feed liquor with into sand chance.Every section of design and construction technology for all carrying out TSOP fracturing pressure break is taken, can prevent termination of pumping Afterwards crack continue development length it is excessive and caused by uncontrollable effect;At this time, fracture tip has stopped extending, and is pushed up even if part is crossed Replace, because significantly being lifted into seam resistance, fracture width can only be brought to continue to increase, chance of the proppant to seam length direction extension Then it is greatly lowered.On the basis of the overall fluid loss coefficient of every section of cluster reservoir of exact evaluation, the machine of two kinds of TSOP fracturings is taken Reason synchronization implementation can increase the probability of TSOP fracturing realization;First, by the TSOP fracturing effect of the big generation of leak-off, second, leaning on slit width The TSOP fracturing effect of narrow generation.
TSOP fracturing pressure break based on filter loss is designed with reference to leakoff coefficent, and TSOP fracturing pressure break has relied on leakoff coefficent There is the Process planning flow of maturation, do not go to live in the household of one's in-laws on getting married herein.As for the narrow caused TSOP fracturing technology of slit width, the method that trial and error can be taken, First constructed with a certain higher construction sand liquor ratio, pressure response feature observed after the sand liquor ratio mortar enters stratum, As unit interval (min) interior rate of pressure rise is less than 1MPa/min, illustrate that the sand liquor ratio is not reaching to TSOP fracturing effect;But Rate of pressure rise under such as a certain construction sand liquor ratio is much larger than 1MPa/min, then there occurs sand in nearly pit shaft crack for explanation It is stifled, do not meet the design concept of TSOP fracturing yet.Thus by repeatedly exploratory plus sand test, can obtain optimal can reach end The construction sand liquor ratio of portion's sand fallout effect.
Synchronous broken glue technology is to make up the Optimal action of displacement effect.By the gel breaker for optimizing every section of crack fracturing fluid Thus concentration profile, final goal are to ensure that in all sections of cluster cracks that the row's of returning moment, thoroughly broken glue returned row to fracturing fluid after pressure, can be Passive situation caused by making up replacement.
In the present invention, non-homogeneous simultaneous techniques takes another step.According to the preferred embodiment of the present invention, applied in pressure break During work, glue method is broken using non-homogeneous synchronization and carries out brokenly glue, the gel breaker that preferably every section of perforation cluster fracturing fluid uses contains weight It is 3-1 to measure ratio:1, preferably 1:1 non-capsule-type ammonium persulfate and capsule-type ammonium persulfate;And design non-capsule-type ammonium persulfate Replace injection construction parameter with capsule-type ammonium persulfate so that capsule-type ammonium persulfate and non-glue were realized on fracture height section Bladder type ammonium persulfate is alternately distributed.Even if non-capsule-type ammonium persulfate breaks glue, proppant settles, but capsule-type ammonium persulfate Not synchronous broken glue, therefore, the support section of proppant in the vertical is further improved.
In the present invention, the non-capsule-type ammonium persulfate refers to the capsule breaker for including ammonium persulfate, does not have to it Especially limitation, ammonium persulfate capsule breaker commonly used in the art are all applicable.The capsule-type ammonium persulfate can also be Ammonium persulfate microcapsule degelling agent.
According to the preferred embodiment of the present invention, the described method includes carrying out pressing preceding evaluating reservoir before pressing crack construction, It is preferred that evaluating reservoir includes obtaining brittleness index, rock mechanics parameters, Characteristics of The Matural Fractures parameter and comprehensive leak-off before the pressure Coefficient.
Before pressure evaluating reservoir with compressibility be evaluated as core, especially overall fluid loss coefficient it is definite it is particularly important that, its close It is that can really be realized to follow-up TSOP fracturing fracturing technique.Overall fluid loss coefficient can be according to conventional geology, well logging, record The methods of well, core experiment and small scale fracturing test (especially analysis of pressure drop data), obtains, and is all conventional method, herein not It is superfluous.Preferably, all data want the check of field measurement data to be applied again as far as possible, as dessert predicts that best incorporated is once Or aerogenesis (liquid) section result carries out contrast verification after multiple pressure.
Result based on evaluating reservoir before pressure determines geology and the double dessert positions of engineering, and designs perforation cluster position and divide Cloth.In general, brittleness is better, number of clusters should be more.It is preferred that the perforation cluster distribution is designed according to brittleness index, and work as brittleness When index is less than 65%, every section of perforated interval design 2-4 showers hole, when brittleness index is more than 65%, every section of perforated interval designs 4 clusters Or more (such as 4-6 clusters) perforation;It is preferred that 25~30m of cluster spacing.
From cluster perforation optimization angle, to ensure the uniform replacement effect per cluster crack, design becomes shot density.According to this hair Bright preferred embodiment, the shot density of perforation cluster are successively decreased along pit shaft direction, and in the scope of 8-24 holes/rice;It is preferred that every section The perforation sum of perforated interval is in 45-75 holes, preferably 50-70 holes.I.e. closer to the cluster of pit shaft, shot density it is lower (such as 10 holes/ Rice), on the contrary it is higher, such as 16-20 holes/rice.In the case of fracturing fluid discharge capacity is more than 15m3/min, the perforation sum of every section of perforated interval In 60-70 holes.
As for from close to pit shaft calculate, per cluster perforation density design, to integrate according to this section of average viscosity, discharge capacity and Cluster spacing etc. is adjusted, and shot density scope may be designed as 8-24 holes/rice.Average viscosity and discharge capacity are higher, and cluster spacing is bigger, The shot density of the cluster close to pit shaft can suitably be amplified.
Other flows that the method provided according to the present invention may relate to, including follow-up discharge opeing and ask production process, reference The code of conventional horizontal well staged fracturing carries out.
In certain specific embodiments of the invention, there is provided a kind of horizontal well fracturing (optimization) method, including Following steps:
1) carry out pressing preceding evaluating reservoir, obtain brittleness index, rock mechanics parameters, Characteristics of The Matural Fractures parameter and comprehensive filter Lose coefficient;
2) based on evaluation result 1), geology and the double dessert positions of engineering are determined, and designs the distribution of perforation cluster, is then penetrated Hole, wherein
When brittleness index is more than 65%, every section of perforated interval designs the perforation of 4 clusters or more,
The shot density of perforation cluster is successively decreased along pit shaft direction, and in the scope of 8-24 holes/rice,
The perforation sum of every section of perforated interval is in 45-75 holes, preferably 50-70 holes;
3) pump notes prepad fluid seam and implements N number of load fluid injection stage successively, wherein,
N is the natural number of 2-5;
In N-1 load fluid injection stage before, for hypotonic with tight sand, carbonate rock and coal petrography pressure break, The viscosity of fracturing fluid is in 50-100mPa.s;Split for shale oil air pressure, fracturing fluid viscosity is in 2-40mPa.s, it is preferable that if pressure It is slippery water then in 2-10mPa.s to split liquid, in 20-40mPa.s if fracturing fluid is glue;And
In n-th load fluid injection stage, using the ratio between storage modulus and Loss modulus 2:More than 1, preferably 2.0- 5.0:1, more preferably 2.5-3.0:1 fracturing fluid;
In N-1 load fluid injection stage before, for hypotonic and tight sand, carbonate rock and coal petrography pressure break Proppant uses 70-140 mesh and 20-40 mesh proppants, and 70-140 mesh, 40-70 mesh are used for the proppant of shale gas pressure break With three kinds of proppants of 30-50 mesh;And
Used in n-th load fluid injection stage and be selected from bulk density 1.05-1.5g/cm3Low-density propping agent, volume Density is less than 1.05g/cm3Super-low-density proppant and one or more proppants from suspended prop;
4) construction is replaced;
5) TSOP fracturing pressure break all carries out TSOP fracturing pressure break to every section of perforation cluster, and preferably synchronization implementation is based on filter loss TSOP fracturing pressure break and the TSOP fracturing pressure break based on flaw size;
The construction sand liquor ratio of the TSOP fracturing pressure break based on flaw size is by trial-and-error method according to rate of pressure change Screened, and selection makes rate of pressure rise in the construction sand liquor ratio of 6-25MPa/min;
6) implement non-homogeneous synchronization and break glue
Glue method is broken using non-homogeneous synchronization and carries out brokenly glue, the gel breaker that preferably every section of perforation cluster fracturing fluid uses contains weight Than for 3-1:1 non-capsule-type ammonium persulfate and capsule-type ammonium persulfate;And design non-capsule-type ammonium persulfate and capsule-type over cure Sour ammonium alternately injects construction parameter so that realizes that non-capsule-type ammonium persulfate and capsule-type ammonium persulfate are handed on fracture height section For distribution.
Above-mentioned steps 1) -6) in particular content or explanation be referred to it is described previously.It is above-mentioned in the case of enforceable Step 1) -6) not necessarily carried out in strict accordance with some order, as long as can achieve the object of the present invention, the implementation time of above-mentioned steps Sequence can be adjusted suitably.
Present invention also offers the fracture method for horizontal well as described above provided according to the present invention in hypotonic and fine and close sand Application in rock, carbonate rock, shale or coal petrography fractured horizontal well.
The present invention has following technical characterstic and excellent results
The present invention provides it is a kind of prevented replace horizontal well fracturing new technology, be main pressure break important composition portion Point, evaluating reservoir, shower hole conceptual design, fracturing fluid viscosity and viscoelasticity before the pressure of core are evaluated as with compressibility by carrying out Design, proppant preferably, the optimization of pressure break injection parameter, non-homogeneous synchronization break glue technology, improve proppant and fracturing fluid Suspendability, ensure that the uniform of every cluster crack replaces effect, ensure per the uniform feed liquor in cluster crack and into sand, to reach full section cluster Synchronously broken glue returns row to fracturing fluid in crack, and replacement phenomenon occurred in horizontal well fracturing so as to reduce, improves effect after pressure And realize the maximization of stable production period.This method design is reasonable, construction technology is simple, easy to operate, has in fractured horizontal well Wide application prospect.
Embodiment
The present invention has been described in detail above, the present invention has been done furtherly with reference to specific embodiment It is bright, it should be appreciated that the scope of the present invention is not limited to this.In the examples below, the step of explanation is not developed in details can be by this Field technology personnel operate according to actual conditions.The components such as the drag reducer that is used in embodiment, thickening agent are without particular/special requirement.
Embodiment
River southeast well vertical depth 2298m, depth measurement 3623m, horizontal segment length 1060m.According to following construction parameter and step Suddenly transformed.
Young's modulus, Poisson's ratio and crustal stress data are obtained according to the borehole logging tool data explanation results, by core experiment knot Fruit corrects data above, selects high brittleness, gas-bearing property height, the position of good penetrability as reservoir "sweet spot".
It is 45%~55% to calculate dessert position brittleness index according to mineral constituent and mechanics parameter, every section of 2 clusters of design (close 10 holes in hole/m, 16 holes/m)~3 cluster (close 10 holes in hole/m, 16 holes/m, 22 holes/m) perforation, and hole density is passed along pit shaft direction Subtract;Cluster 25~30m of spacing, amounts to 16 sections.
Slippery water 3~6mPas of viscosity, glue fracturing fluid viscosity 30mPas are optimized using crack extended software Meyer, The ratio between storage modulus and Loss modulus be 2.8, wherein, slippery water host agent be 0.05~0.1% drag reducer, glue fracturing fluid master Agent is 0.3% thickening agent.
With reference to crack extended software and laboratory experiment, complex optimum proppant dosage and particle diameter are respectively:Taken above 3 Sand liquid injection stage uses 38m370-140 mesh, 20m340-70 mesh and 8m3Three kinds of proppant (bulk densities 1.63 of 30-50 mesh ~1.78g/cm3), use 5m in last load fluid injection stage (the 4th load fluid injection stage)3Extremely-low density supports Agent (bulk density 1.02g/cm3).Proppant total amount is then 71m3
The first stage of pressing crack construction is the prepad fluid seam stage, takes the slippery water of viscosity 3mPas.Expand with reference to crack Open up software and laboratory experiment, complex optimum operational procedure are as follows:With 2m3The discharge capacity injection 15m of/min3Salt low-kappa number pit shaft;So Afterwards with 2-14m3The discharge capacity injection 100m of/min3The slippery water of viscosity 3mPas.
The second stage of pressing crack construction expands the seam stage (first load fluid injection stage) for the low sand ratio of small particle proppant, Take 4~5mPas of viscosity slippery water and 70-140 mesh proppant (bulk density is 1.63~1.78g/cm3).With reference to splitting Stitch extended software and laboratory experiment, complex optimum operational procedure are as follows:Discharge capacity stabilization is in 14m3/ min, slug formula injection 70-140 Mesh proppant, proppant sand ratio are 2-12%, and isolation slug is 35m3.This stage injects the slippery water of 5~6mPas altogether 1310m3, 70-140 mesh proppants 38m3
The phase III of pressing crack construction, (second load fluid injected rank for the medium size proppant high sand ratio joint filling stage Section), take viscosity 6mPas slippery water and 40-70 mesh proppant (bulk density is 1.63~1.78g/cm3).With reference to splitting Stitch extended software and laboratory experiment, complex optimum operational procedure are as follows:Discharge capacity stabilization is in 14m3/ min, slug formula injection 40-70 Mesh proppant, proppant sand ratio are followed successively by 14-16-18%, and isolation slug is 40m3.This stage injects the smooth of 6mPas altogether Water 190m3, 40-70 mesh proppants 20m3
The fourth stage of pressing crack construction is the large scale proppant high sand ratio joint filling stage (the 3rd load fluid injection stage), Take viscosity 30mPas glue and 30-50 mesh proppant (bulk density is 1.63~1.78g/cm3).Extended with reference to crack Software and laboratory experiment, complex optimum operational procedure are as follows:Discharge capacity stabilization is in 14m3/ min, injection sand is than the 30-50 for 20% Mesh Proppant Slugs.This stage injects the glue 40m of 30mPas altogether3, 30-50 mesh proppants 8m3
5th stage of pressing crack construction blocks the sealing stage (the 4th load fluid injection stage) for super-low-density proppant, Take the glue and 30-50 mesh super-low-density proppant (bulk density 1.02g/cm of viscosity 30mPas3).In work progress, Multiple field practice show, and 22% sand ratio is 8~15MPa/min into rate of pressure rise in the unit interval behind stratum, is applied Work latter stage adds the sand stage using the sand ratio as last, is replaced afterwards.Operational discharge capacity stabilization is in 14m3/ min, injection Super-low-density proppant slug of the sand than the 30-50 mesh for 22%.This stage injects the glue 23m of 30mPas altogether3, 30-50 Mesh super-low-density proppant 5m3
Broken glue is constructed, in the gel breaker of every section of cluster fracturing fluid, conventional ammonium persulfate and capsule-type ammonium persulfate gel breaker Ratio is 1:1, the 1st grade of gel breaker dosage 0.02%, subsequently increases by 0.004% step by step.
Carry out the row of returning and ask production.
By the implementation of the method for the present invention, replacement phenomenon will be crossed and fall below minimum, effect after pressure is improved and realize stable yields The maximization of phase.Open-flow capacity is 22.5 × 10 after the well pressure4m3, than same platform offset well output increased 12%.
Although the present invention has been described in detail, it will be understood by those skilled in the art that in spirit and scope of the invention Modification will be apparent.However, it should be understood that each side of the invention recorded, different embodiments Each several part and the various features enumerated can be combined or all or part of exchange.In above-mentioned each embodiment, that A little embodiments with reference to another embodiment can be combined suitably with other embodiment, this is by by this area skill Art personnel are to understand.In addition, it will be understood to those of skill in the art that description above is only exemplary mode, not purport In the limitation present invention.

Claims (12)

  1. A kind of 1. horizontal well fracturing method, it is characterised in that the described method includes implement N number of load fluid injection rank successively Section, wherein, the bulk density for the proppant that n-th load fluid injection stage uses is less than N-1 load fluid injection stage before The bulk density of the proppant used, the N are the natural number more than 1.
  2. 2. the according to the method described in claim 1, it is characterized in that, body for the proppant that n-th load fluid injection stage uses Product density is in 1.2g/cm3Hereinafter, preferably 1.2-0.8g/cm3;It is preferred that the proppant that n-th load fluid injection stage uses is selected from Bulk density 1.05-1.5g/cm3Low-density propping agent, bulk density be less than 1.05g/cm3Super-low-density proppant and from One or more in suspended prop.
  3. 3. method according to claim 1 or 2, it is characterised in that the fracturing fluid that n-th load fluid injection stage uses The ratio between storage modulus and Loss modulus are at (2.0-5.0):1, preferably (2.5-3.0):1;Preferably, n-th load fluid injection rank The fracturing fluid that N-1 load fluid injection stage uses before the ratio between the storage modulus for the fracturing fluid that section uses and Loss modulus are more than Storage modulus and the ratio between Loss modulus.
  4. 4. method according to any one of claim 1-3, it is characterised in that in pressing crack construction process, penetrated to every section Hole cluster all carries out TSOP fracturing pressure break, preferably TSOP fracturing pressure break of the synchronization implementation based on filter loss and the end based on flaw size Portion's decolorizing bacteria;The construction sand liquor ratio of the further preferably described TSOP fracturing pressure break based on flaw size passes through trial-and-error method foundation The screening of well head pressure rate of change makes well head pressure climbing speed in the construction sand liquor ratio of 6-25MPa/min.
  5. 5. according to the described method of any one of claim 1-4, it is characterised in that in pressing crack construction process, using non-equal Even synchronization breaks glue method and carries out brokenly glue, and it is 3-1 that the gel breaker that preferably every section of perforation cluster fracturing fluid uses, which contains weight ratio,:1 non-glue Bladder type ammonium persulfate and capsule-type capsule ammonium persulfate;And design non-capsule-type ammonium persulfate and replace note with capsule-type ammonium persulfate Enter construction parameter so that realize that non-capsule-type ammonium persulfate and capsule-type ammonium persulfate are alternately distributed on fracture height section.
  6. 6. according to the method any one of claim 1-5, it is characterised in that the described method includes before pressing crack construction Carry out pressing preceding evaluating reservoir, evaluating reservoir includes obtaining brittleness index, rock mechanics parameters, intrinsic fracture spy before preferably described pressure Levy parameter and overall fluid loss coefficient.
  7. 7. according to the method described in claim 6, it is characterized in that, the result based on evaluating reservoir before pressure determines geology and engineering Double dessert positions, and design the distribution of perforation cluster;It is preferred that the perforation cluster distribution is designed according to brittleness index, and work as brittleness index During less than 65%, every section of perforated interval design 2-4 showers hole, when brittleness index is more than 65%, every section of perforated interval design 4 clusters or with On perforation.
  8. 8. the method according to the description of claim 7 is characterized in that the shot density of perforation cluster is successively decreased along pit shaft direction, and The scope of 8-24 holes/rice;It is preferred that the perforation sum of every section of perforated interval is in 45-75 holes, preferably 50-70 holes;More preferably in fracturing fluid Discharge capacity is more than 15m3In the case of/min, the perforation sum of every section of perforated interval is in 60-70 holes.
  9. 9. according to the method any one of claim 1-8, it is characterised in that the n-th load fluid injection stage makes Fracturing fluid is surfactant fracturing fluid, cleaning polymer fracturing fluid or fiber fracturing liquid.
  10. 10. according to the method any one of claim 1-9, it is characterised in that the N-1 load fluid injection before described In stage, for hypotonic and tight sand, carbonate rock and coal petrography pressure break, the viscosity of fracturing fluid is in 50-100mPa.s;For page Shale oil air pressure is split, and fracturing fluid viscosity is in 2-40mPa.s;And/or
    Before described in N-1 load fluid injection stage, for hypotonic with tight sand, carbonate rock and coal petrography pressure break, make With 70-140 mesh and 20-40 mesh proppants;For shale gas pressure break, three kinds of 70-140 mesh, 40-70 mesh and 30-50 mesh branch are used Support agent.
  11. 11. a kind of horizontal well fracturing method, comprises the following steps:
    1) brittleness index, rock mechanics parameters, Characteristics of The Matural Fractures parameter and overall fluid loss coefficient are obtained;
    2) step 1) is based on, determines geology and the double dessert positions of engineering, and designs the distribution of perforation cluster, then perforation, wherein,
    When brittleness index is less than 65%, every section of perforated interval design 2-4 showers hole, when brittleness index is more than 65%, every section is penetrated Hole section design 4-6 showers hole,
    The shot density of perforation cluster is successively decreased along pit shaft direction, and in the scope of 8-24 holes/rice,
    The perforation sum of every section of perforated interval is in 45-75 holes;
    3) pump notes prepad fluid seam and implements N number of load fluid injection stage successively, wherein,
    N is the natural number of 2-5;
    In N-1 load fluid injection stage before, for hypotonic and tight sand, carbonate rock and coal petrography pressure break, pressure break The viscosity of liquid is split, fracturing fluid viscosity is in 2-40mPa.s for shale oil air pressure in 50-100mPa.s;And
    In n-th load fluid injection stage, using the ratio between storage modulus and Loss modulus in 2.0-5.0:1 fracturing fluid;
    In N-1 load fluid injection stage before, for hypotonic and tight sand, carbonate rock and coal petrography pressure break, use 70-140 mesh and 20-40 mesh proppants, for shale gas pressure break, use three kinds of 70-140 mesh, 40-70 mesh and 30-50 mesh supports Agent;And
    In n-th load fluid injection stage, using selected from bulk density 1.05-1.5g/cm3Low-density propping agent, bulk density Less than 1.05g/cm3Super-low-density proppant and one or more proppants from suspended prop;
    4) construction is replaced;
    5) TSOP fracturing pressure break
    All carry out TSOP fracturing pressure break to every section of perforation cluster, preferably TSOP fracturing pressure break of the synchronization implementation based on filter loss and be based on The TSOP fracturing pressure break of flaw size;
    The construction sand liquor ratio of the TSOP fracturing pressure break based on flaw size is carried out by trial-and-error method according to rate of pressure change Screening, and selection makes rate of pressure rise in the construction sand liquor ratio of 6-25MPa/min;
    6) implement non-homogeneous synchronization and break glue
    Glue method is broken using non-homogeneous synchronization and carries out brokenly glue, it is 3-1 that the gel breaker that every section of perforation cluster fracturing fluid uses, which contains weight ratio,: 1 non-capsule-type ammonium persulfate and capsule-type ammonium persulfate;And design non-capsule-type ammonium persulfate and handed over capsule-type ammonium persulfate For injection construction parameter so that realize that non-capsule-type ammonium persulfate and capsule-type ammonium persulfate alternately divide on fracture height section Cloth.
  12. 12. the method according to claim 1-10 any one of them method or claim 11 is in hypotonic and fine and close sand Application in rock, carbonate rock, shale or coal petrography fractured horizontal well.
CN201610956610.8A 2016-10-27 2016-10-27 Staged fracturing method for horizontal well Active CN107989592B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610956610.8A CN107989592B (en) 2016-10-27 2016-10-27 Staged fracturing method for horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610956610.8A CN107989592B (en) 2016-10-27 2016-10-27 Staged fracturing method for horizontal well

Publications (2)

Publication Number Publication Date
CN107989592A true CN107989592A (en) 2018-05-04
CN107989592B CN107989592B (en) 2020-04-07

Family

ID=62028458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610956610.8A Active CN107989592B (en) 2016-10-27 2016-10-27 Staged fracturing method for horizontal well

Country Status (1)

Country Link
CN (1) CN107989592B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281645A (en) * 2018-09-30 2019-01-29 重庆长江造型材料(集团)股份有限公司 Using the construction method from suspension riverfrac treatment proppant
CN109944578A (en) * 2019-02-27 2019-06-28 中国石油天然气股份有限公司 Preparation method and construction process of prefabricated fracturing displacement isolator
CN110700806A (en) * 2018-06-25 2020-01-17 中国石油天然气股份有限公司 Fracturing design method and device for low-permeability oil reservoir
CN111140226A (en) * 2018-11-06 2020-05-12 中国石油化工股份有限公司 Method for improving crack flow conductivity
CN111236914A (en) * 2020-01-19 2020-06-05 中国石油大学(北京) Horizontal well multi-fracture fracturing method
CN112302604A (en) * 2019-07-31 2021-02-02 中国石油化工股份有限公司 Horizontal well subsection repeated fracturing method and application thereof
CN112302611A (en) * 2019-07-25 2021-02-02 中国石油天然气股份有限公司 Method for filling and staged fracturing of multi-particle-size combined proppant
CN112343569A (en) * 2019-08-06 2021-02-09 中国石油化工股份有限公司 Horizontal well fracturing method for promoting multiple clusters of fractures by multiple acid injection and temporary plugging
CN112343560A (en) * 2019-08-07 2021-02-09 中国地质调查局水文地质环境地质调查中心 Fracturing and sand prevention combined process method for exploiting low-permeability reservoir natural gas hydrate
CN113513295A (en) * 2020-04-10 2021-10-19 中国石油化工股份有限公司 Method for improving uniform extension and support of multiple clusters of cracks in section
CN114881230A (en) * 2022-07-11 2022-08-09 成都创源油气技术开发有限公司 Fracturing fluid flowback intelligent control system and equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089224A (en) * 2011-10-28 2013-05-08 中国石油化工股份有限公司 Fracturing method for comprehensively controlling fracture height
WO2014204709A2 (en) * 2013-06-21 2014-12-24 Praxair Technology, Inc. Fracturing fluid composition and method of using same in geological formations
CN104449649A (en) * 2014-11-28 2015-03-25 中国石油化工股份有限公司胜利油田分公司采油工艺研究院 High-concentration water-in-oil emulsion-state associating polymer fracturing fluid and preparation method thereof
CN105778884A (en) * 2016-05-10 2016-07-20 西南石油大学 Supramolecular polymer clean fracturing fluid resistant to high temperature of 170 DEG C

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089224A (en) * 2011-10-28 2013-05-08 中国石油化工股份有限公司 Fracturing method for comprehensively controlling fracture height
WO2014204709A2 (en) * 2013-06-21 2014-12-24 Praxair Technology, Inc. Fracturing fluid composition and method of using same in geological formations
CN104449649A (en) * 2014-11-28 2015-03-25 中国石油化工股份有限公司胜利油田分公司采油工艺研究院 High-concentration water-in-oil emulsion-state associating polymer fracturing fluid and preparation method thereof
CN105778884A (en) * 2016-05-10 2016-07-20 西南石油大学 Supramolecular polymer clean fracturing fluid resistant to high temperature of 170 DEG C

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐瑞江等: ""元坝气田HF-1陆相深层页岩气井"", 《天然气工业》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700806A (en) * 2018-06-25 2020-01-17 中国石油天然气股份有限公司 Fracturing design method and device for low-permeability oil reservoir
CN109281645A (en) * 2018-09-30 2019-01-29 重庆长江造型材料(集团)股份有限公司 Using the construction method from suspension riverfrac treatment proppant
CN111140226A (en) * 2018-11-06 2020-05-12 中国石油化工股份有限公司 Method for improving crack flow conductivity
CN111140226B (en) * 2018-11-06 2022-09-27 中国石油化工股份有限公司 Method for improving crack flow conductivity
CN109944578A (en) * 2019-02-27 2019-06-28 中国石油天然气股份有限公司 Preparation method and construction process of prefabricated fracturing displacement isolator
CN112302611A (en) * 2019-07-25 2021-02-02 中国石油天然气股份有限公司 Method for filling and staged fracturing of multi-particle-size combined proppant
CN112302604A (en) * 2019-07-31 2021-02-02 中国石油化工股份有限公司 Horizontal well subsection repeated fracturing method and application thereof
CN112302604B (en) * 2019-07-31 2023-01-24 中国石油化工股份有限公司 Horizontal well subsection repeated fracturing method and application thereof
CN112343569A (en) * 2019-08-06 2021-02-09 中国石油化工股份有限公司 Horizontal well fracturing method for promoting multiple clusters of fractures by multiple acid injection and temporary plugging
CN112343569B (en) * 2019-08-06 2023-02-28 中国石油化工股份有限公司 Horizontal well fracturing method for promoting multiple clusters of fractures by multiple acid injection and temporary plugging
CN112343560A (en) * 2019-08-07 2021-02-09 中国地质调查局水文地质环境地质调查中心 Fracturing and sand prevention combined process method for exploiting low-permeability reservoir natural gas hydrate
CN111236914A (en) * 2020-01-19 2020-06-05 中国石油大学(北京) Horizontal well multi-fracture fracturing method
CN113513295A (en) * 2020-04-10 2021-10-19 中国石油化工股份有限公司 Method for improving uniform extension and support of multiple clusters of cracks in section
CN114881230A (en) * 2022-07-11 2022-08-09 成都创源油气技术开发有限公司 Fracturing fluid flowback intelligent control system and equipment

Also Published As

Publication number Publication date
CN107989592B (en) 2020-04-07

Similar Documents

Publication Publication Date Title
CN107989592A (en) A kind of horizontal well fracturing method
CN110608024B (en) Volume fracturing method for improving filling efficiency of micro-support system by deep shale gas
CN107503729B (en) A kind of micro- support fracturing method improving pressure break stationary phase
CN107965305B (en) Layered repeated fracturing method
CN110761763B (en) Horizontal well repeated fracturing method
CN109958416B (en) Multi-cluster perforation fracturing method for uniformly feeding liquid and sand with variable aperture and variable pore density
CN109751029B (en) Deep shale gas fracturing method
CN110344799B (en) Critical sand blocking fracturing method for improving complexity of cracks
CN107965306B (en) Acid injection fracturing method
CN109958426A (en) A kind of fracturing process improving deep layer shale gas crack complexity
CN109958424A (en) A method of realizing that hydraulic fracture end effectively blocks
CN112253066B (en) Method for improving fracture complexity and transformation volume of deep shale gas
CN109958425A (en) A kind of deep layer shale gas improves the fracturing process of multi-scale facture rupture
CN105604534A (en) Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir
CN108661616B (en) Layered fracturing method suitable for sandstone oil and gas reservoir
CN109751037A (en) A kind of normal pressure shale gas reservoir high frequency change displacement volume fracturing process
CN108952655A (en) A kind of normal pressure shale gas sieve tube completion water-jet volume fracturing method
CN109958411A (en) A kind of horizontal well shower hole staged fracturing method
CN108952668B (en) Fracturing method of normal-pressure shale gas reservoir
CN109424346A (en) A kind of stepless variable element ramp type injection fracturing process of deep layer shale gas
CN107545088A (en) A kind of normal pressure shale gas horizontal well volume fracturing method
CN109751025A (en) A kind of fracturing process improving deep layer shale gas full size fracture support volume
CN109751032A (en) A kind of more partial size mixed with proppants fracturing process
CN106545324A (en) A kind of method for pressing off the multiple horizontal bedding seams of shale gas
CN106321044A (en) Proppant-carrying acid fracturing method for high-temperature ultra-deep carbonate reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant