CN107983486A - A kind of change smashes the building waste of scope and smashes equipment - Google Patents

A kind of change smashes the building waste of scope and smashes equipment Download PDF

Info

Publication number
CN107983486A
CN107983486A CN201711236596.5A CN201711236596A CN107983486A CN 107983486 A CN107983486 A CN 107983486A CN 201711236596 A CN201711236596 A CN 201711236596A CN 107983486 A CN107983486 A CN 107983486A
Authority
CN
China
Prior art keywords
gear
bull stick
welding
smashes
building waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711236596.5A
Other languages
Chinese (zh)
Inventor
李怀玉
邹宗春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711236596.5A priority Critical patent/CN107983486A/en
Publication of CN107983486A publication Critical patent/CN107983486A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/06Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
    • B02C18/08Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives within vertical containers
    • B02C18/10Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives within vertical containers with drive arranged above container
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/0084Disintegrating by knives or other cutting or tearing members which chop material into fragments specially adapted for disintegrating garbage, waste or sewage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/06Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
    • B02C18/16Details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/06Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
    • B02C18/16Details
    • B02C18/22Feed or discharge means
    • B02C18/2216Discharge means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/06Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
    • B02C18/16Details
    • B02C18/24Drives
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/04Safety devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C18/00Disintegrating by knives or other cutting or tearing members which chop material into fragments
    • B02C18/06Disintegrating by knives or other cutting or tearing members which chop material into fragments with rotating knives
    • B02C18/16Details
    • B02C2018/168User safety devices or measures in shredders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C2201/00Codes relating to disintegrating devices adapted for specific materials
    • B02C2201/06Codes relating to disintegrating devices adapted for specific materials for garbage, waste or sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Crushing And Pulverization Processes (AREA)

Abstract

The present invention relates to a kind of building waste processing equipment, more particularly to a kind of change smashes the building waste of scope and smashes equipment.The technical problem to be solved in the present invention is to provide a kind of change that can be smashed, can thoroughly be smashed to building waste to the building waste for being placed on place apparatus corner to smash the building waste of scope and smashes equipment.In order to solve the above-mentioned technical problem, the present invention provides such a change to smash the building waste of scope and smashes equipment, includes bottom plate, smashes case, support plate, fixed plate, the first guide rail, the first guide sleeve, connecting rod, fixed link, cylinder, first bearing seat, first bull stick etc.;It is provided with by bolted connection on bottom plate and smashes case, right side is connected with support plate by welding on bottom plate.Invention achieves the effect that can be smashed, can thoroughly be smashed to building waste to the building waste for being placed on place apparatus corner.

Description

A kind of change smashes the building waste of scope and smashes equipment
Technical field
The present invention relates to a kind of building waste processing equipment, more particularly to a kind of change smashes the building waste of scope and beats Broken equipment.
Background technology
Continuous with urbanization process is accelerated, and the generation of building waste and discharge quantity are also in rapid growth in city. People are enjoying urban civilization at the same time, and also by worry caused by municipal refuse, wherein building waste just occupies quite big Ratio, the 30% ~ 40% of rubbish total amount is accounted for, according to the relevant information, through to brick mix structure, full cast-in-place structural and frame structure The rough Statistics being lost etc. the construction material of building, in the work progress of every ten thousand square metres of buildings, only building waste residue will produce It is 500~600 tons raw.
At present when being smashed to building waste, much all building waste cannot thoroughly be smashed, That is during smashing, cutter and place apparatus are fixed, this, which has resulted in building waste, can have placement It can not be smashed in the corner of equipment, and the building waste come is sputtered during smashing and is also easy to wound people.
Therefore there is an urgent need for research and develop it is a kind of the building waste for being placed on place apparatus corner can be smashed, can to building What rubbish was thoroughly smashed, which change, smashes the building waste of scope and smashes equipment building waste is carried out at present to overcome The building waste for being placed on place apparatus corner can not be smashed, building waste can not be carried out by existing during smashing The shortcomings that thoroughly smashing.
The content of the invention
(1)Technical problems to be solved
The present invention in order to overcome building waste is smashed at present during exist can not be to being placed on place apparatus corner Building waste the shortcomings that being smashed, building waste can not thoroughly being smashed, the technical problem to be solved in the present invention The building waste for being placed on place apparatus corner can be smashed, building waste thoroughly can be smashed by being to provide A kind of change smash the building waste of scope and smash equipment.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a change to smash the building waste of scope and smashes and set It is standby, include bottom plate, smash case, support plate, fixed plate, the first guide rail, the first guide sleeve, connecting rod, fixed link, cylinder, first Bearing block, the first bull stick, skewback, smash knife, first gear, motor and second gear, on bottom plate by bolted connection It is provided with and smashes case, right side is connected with support plate by welding on bottom plate, and support plate upper end connects by welding Fixed plate is connected to, the left and right sides is connected with the first guide rail by welding on the downside of fixed plate, and slidingtype connects on the first guide rail It is connected to the first guide sleeve, is connected with connecting rod on the inside of the first guide sleeve by welding, passes through weldering between side-lower in connecting rod The mode connect is connected with fixed link, and left is provided with cylinder by bolted connection on the downside of fixed plate, is connected on the downside of cylinder The middle side part in fixed link, middle part is provided with first bearing seat by bolted connection in fixed link, in first bearing seat The first bull stick is connected with, the first bull stick lower end is connected with skewback, pacifies by welding on the downside of skewback by welding Equipped with knife is smashed, first gear is connected with the upside of the first bull stick, right is provided with by bolted connection on the downside of fixed link Motor, the motor output shaft on the downside of motor are connected with second gear by shaft coupling, and second gear is engaged with first gear.
Preferably, support base, first rotating shaft and the first cover board have been further included, has smashed and rectangular opening is provided with the left of case, bottom plate is left Side is connected with support base by welding, is rotatably connected with first rotating shaft on front side of support base, is connected with first rotating shaft First cover board, the first cover board cover rectangular opening.
Preferably, material-pulling device has been further included, material-pulling device includes the second guide sleeve, the second guide rail, pushing block, the first tooth Article, contiguous block, the second shaft, the 3rd gear and crank, smash and be equipped with material-pulling device on the right side of case, smash in the middle part of on the right side of case and pass through The mode of welding is provided with the second guide sleeve, and the second guide sleeve inner sliding type is connected with the second guide rail, and the second guide rail left end passes through welding Mode pushing block is installed, the first rack is installed by bolted connection on the upside of the second guide rail, it is right on the upside of the first guide sleeve Side is connected with contiguous block by welding, is rotatably connected with the second shaft on the right side of contiguous block, is connected with the second shaft 3rd gear, the 3rd gear are engaged with the first rack, and rotatably crank is connected with front side of the 3rd gear.
Preferably, the first screw rod, the first nut and the first rack, the side that contiguous block upside left passes through welding have been further included Formula is provided with the first screw rod, and the first rack is connected with the first screw rod, and the first rack is engaged with the 3rd gear, is revolved on the first screw rod There is the first nut, the first nut and the first screw rod coordinate.
Preferably, further included and smashed range regulation device, smashed range regulation device and include the first connecting plate, second Bearing block, the second bull stick, the second connecting plate, the 3rd bull stick, the second nut and the second screw rod, the first bull stick downside, which is equipped with, smashes model Regulating device is enclosed, the first bull stick lower end is connected with the first connecting plate by welding, and middle part passes through spiral shell in the first connecting plate Tether the mode connect and second bearing seat is installed, the second bull stick is connected with second bearing seat, the second bull stick lower end passes through welding Mode the second connecting plate is installed, the 3rd bull stick is connected with front side of the second connecting plate by welding, under the 3rd bull stick End is provided with skewback by welding, and the second connecting plate right end is connected with the second nut, the second spiral shell by welding The second screw rod is rotary with mother, the second screw rod and the second nut coordinate.
Preferably, telescopic rod and the 3rd screw rod have been further included, empty slot has been provided with the downside of the 3rd bull stick, is placed with empty slot flexible Bar, telescopic rod lower end are provided with skewback by welding, and lower section is provided with threaded hole on the left of the 3rd bull stick, is rotary with threaded hole 3rd screw rod, the 3rd screw rod coordinate with threaded hole.
Preferably, linkage rotation device has been further included, linkage rotation device includes the first mounting rod, the 4th gear, Five gears, the 6th gear, 3rd bearing seat, fourth bearing seat and the 7th gear, the first bull stick are equipped with linkage rotation device, Gu Left is connected with the first mounting rod by welding on the downside of fixed pole, is connected with by welding on the right side of the first mounting rod 4th gear, for the 4th geared sleeve on the downside of the first bull stick, the second bull stick upper end is connected with the 5th gear, the 5th gear and the 4th tooth Wheel engagement, the second bull stick downside are connected with the 6th gear, and the 3rd bull stick upper end is connected with the 7th gear, the 7th gear and the 6th tooth Wheel engagement, the interior right side of the second connecting plate are provided with 3rd bearing seat, are connected with 3rd bearing seat by bolted connection Second bull stick, bolted mode is passed on left in the second connecting plate and is provided with fourth bearing seat, connection in fourth bearing seat There is the 3rd bull stick.
Preferably, the second mounting rod, fixed block and the second cover board have been further included, the first connecting plate passes on left the side of welding Formula is connected with the second mounting rod, is connected with fixed block, fixed block and the second installation on the right side of the first connecting plate by welding The second cover board is installed by welding on the outside of bar, the second cover board, which covers, smashes case.
Operation principle:When user needs to smash building waste, building waste can be placed on by user to be beaten In broken case, then user's control cylinder extend, cylinder promote fixed link move down, fixed link move downwards through connecting rod and First guide sleeve moves down on the first guide rail, so as to drive the first bull stick to move down so that drive skewback and smash knife to Lower movement, when smash knife be moved to smash in case when, user can open motor, and motor drives second gear to rotate clockwise, Second gear drives first gear to rotate counterclockwise, so as to drive the first bull stick to rotate counterclockwise, so as to drive skewback and smash Knife rotates, and makes to smash knife and the building waste smashed in case is smashed, and user closes motor after the completion of smashing, and then controls gas Cylinder moves up, and user can be collected the building waste smashed smashed in case at this time.
Because having further included support base, first rotating shaft and the first cover board, smash and rectangular opening is provided with the left of case, it is logical on the left of bottom plate The mode for crossing welding is connected with support base, is rotatably connected with first rotating shaft on front side of support base, first is connected with first rotating shaft Cover board, the first cover board cover rectangular opening, and when user needs to be collected the building waste smashed in case, user can rotate First cover board, makes the first cover board be rotated counterclockwise around first rotating shaft, so that the first cover board no longer blocks rectangular opening, then user The building waste smashed in case can be collected out by rectangular opening.
Because having further included material-pulling device, material-pulling device includes the second guide sleeve, the second guide rail, pushing block, the first rack, company Block, the second shaft, the 3rd gear and crank are connect, smashes and is equipped with material-pulling device on the right side of case, middle part on the right side of case is smashed and passes through welding Mode the second guide sleeve is installed, the second guide sleeve inner sliding type is connected with the second guide rail, the side that the second guide rail left end passes through welding Formula is provided with pushing block, is provided with the first rack on the upside of the second guide rail by bolted connection, and right leads on the upside of the first guide sleeve The mode for crossing welding is connected with contiguous block, is rotatably connected with the second shaft on the right side of contiguous block, the 3rd is connected with the second shaft Gear, the 3rd gear are engaged with the first rack, and rotatably crank is connected with front side of the 3rd gear, when user's needs are quickly and laborsaving Collection when smashing the building waste smashed in case, user can rotate clockwise crank, and crank drives the 3rd gear suitable Hour hands rotate, and the 3rd gear is rotated on the first rack, so as to drive the second guide rail to be moved to the left in the second guide sleeve, makes second Guide sleeve drives pushing block to be moved to the left, so that pushing block promotes the building waste smashed in case to be moved to the left, so as to fulfill collection Purpose.
Because having further included the first screw rod, the first nut and the first rack, contiguous block upside left is by welding First screw rod is installed, the first rack is connected with the first screw rod, the first rack is engaged with the 3rd gear, is rotary with the first screw rod First nut, the first nut and the first screw rod coordinate, and when user need not use pushing block to promote building waste, user can revolve Turn the first nut, nut is made the first nut promote the first rack to move down, made by the downward precession of cooperation with the first screw rod First rack is engaged with the 3rd gear, it is no longer rotated so as to fix the 3rd gear.
Range regulation device is smashed because having further included, range regulation device is smashed and includes the first connecting plate, the second axis Bearing, the second bull stick, the second connecting plate, the 3rd bull stick, the second nut and the second screw rod, the first bull stick downside, which is equipped with, smashes scope Regulating device, the first bull stick lower end are connected with the first connecting plate by welding, and middle part passes through bolt in the first connecting plate The mode of connection is provided with second bearing seat, and the second bull stick is connected with second bearing seat, and the second bull stick lower end passes through welding Mode is provided with the second connecting plate, and the 3rd bull stick, the 3rd bull stick lower end are connected with by welding on front side of the second connecting plate Skewback is installed by welding, the second connecting plate right end is connected with the second nut, the second nut by welding The second screw rod is inside rotary with, the second screw rod and the second nut coordinate, when user needs cover board to smash to smashing the building rubbish in case When rubbish is comprehensively smashed, that is to say, that when needing to smash the building waste for smashing each corner in case, user The second connecting plate can be rotated around the second bull stick, the second bull stick rotates in second bearing seat, and the second connecting plate drives the 3rd turn Bar obtains cover board with knife rotation, the horizontal distance for making to smash knife and the first bull stick is smashed, so that the first bull stick, which drives, smashes knife There can be different radiuss of turn when rotation, and when user regulates required radius of turn, user can rotate second Screw rod, the second screw rod make the second screw rod touch on the downside of the first connecting plate by the upward precession of cooperation with the second nut, so that Fix the second connecting plate no longer to be rotated on this position, then user opens motor, so that the first bull stick drives First connecting plate rotates, and the first connecting plate drives the rotation of the second connecting plate, so as to drive the 3rd bull stick to rotate, is smashed so as to drive Knife rotates.
Because having further included telescopic rod and the 3rd screw rod, empty slot is provided with the downside of the 3rd bull stick, telescopic rod is placed with empty slot, Telescopic rod lower end is provided with skewback by welding, and lower section is provided with threaded hole on the left of the 3rd bull stick, and the is rotary with threaded hole Three screw rods, the 3rd screw rod and threaded hole coordinate, when user need further to change smash knife and smash box bracket apart from when, use Family, which can move up and down, smashes knife, smashes knife and is moved up and down by telescopic rod in empty slot, and when user chooses required height When spending, user can rotate the 3rd screw rod, and the 3rd screw rod touches the 3rd screw rod by the precession to the right of the cooperation with threaded hole Telescopic rod, is no longer moved so that telescopic rod is fixed on this position.
Because having further included linkage rotation device, linkage rotation device includes the first mounting rod, the 4th gear, the 5th tooth Wheel, the 6th gear, 3rd bearing seat, fourth bearing seat and the 7th gear, the first bull stick are equipped with linkage rotation device, fixed link Downside left is connected with the first mounting rod by welding, and the 4th is connected with by welding on the right side of the first mounting rod Gear, for the 4th geared sleeve on the downside of the first bull stick, the second bull stick upper end is connected with the 5th gear, and the 5th gear is nibbled with the 4th gear Close, be connected with the 6th gear on the downside of the second bull stick, the 3rd bull stick upper end is connected with the 7th gear, and the 7th gear is nibbled with the 6th gear Close, right side is provided with 3rd bearing seat by bolted connection in the second connecting plate, and second is connected with 3rd bearing seat Bull stick, passes on left bolted mode in the second connecting plate and is provided with fourth bearing seat, is connected with fourth bearing seat Three bull sticks, when user needs further thoroughly to smash the building waste smashed in case, drive in the first bull stick First connecting plate around the first bull stick rotate when, the first connecting plate will drive the second bull stick rotated around the first bull stick so that 5th gear rotates on the 4th gear, so as to drive the 5th gear, the 6th gear and the second bull stick in second bearing seat and Rotation in three bearing blocks, and the rotation of the 6th gear will drive the 7th gear and the 3rd bull stick to be rotated in fourth bearing seat, so that Make to smash knife to rotate around fourth bearing seat so that smash knife around the first bull stick rotate while will also be revolved around fourth bearing seat Turn, so that can be thorough to smashing for building waste.
Because having further included the second mounting rod, fixed block and the second cover board, the first connecting plate passes on left the mode of welding The second mounting rod is connected with, fixed block, fixed block and the second mounting rod are connected with by welding on the right side of the first connecting plate Outside is provided with the second cover board by welding, and the second cover board, which covers, smashes case, when user is needed to building waste The building waste that user is subject to sputter is avoided to wound during smashing, when the first connecting plate moves down, second First cover board will cover and smash case, and making to smash the building waste in case will not sputter.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
(3)Beneficial effect
Invention achieves the building waste for being placed on place apparatus corner can be smashed, building waste can be carried out The effect thoroughly smashed, drives by using the two the first connecting plates and smashes knife around the rotating mode of the second bull stick, while Because the second bull stick and the first bull stick not point-blank, can so adjust smash knife around the rotating radius of the first bull stick so as to The rotation of gamut is carried out to smashing case.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of the first cover board of the invention.
Fig. 3 is the first main structure diagram of material-pulling device of the present invention.
Fig. 4 is second of main structure diagram of material-pulling device of the present invention.
Fig. 5 is the main structure diagram that the present invention smashes range regulation device.
Fig. 6 is the main structure diagram of the 3rd bull stick of the invention.
Fig. 7 is the main structure diagram of linkage rotation device of the present invention.
Fig. 8 is the main structure diagram of the second cover board of the invention.
Mark in attached drawing for:101- bottom plates, 608- smash case, 104- support plates, 102- fixed plates, and 1704- first is led Rail, the first guide sleeves of 1703-, 301- connecting rods, 302- fixed links, 602- cylinders, 1607- first bearing seats, first turn of 1308- Bar, 207- skewbacks, 612- smash knife, 1708- first gears, 601- motors, 2708- second gears, 506- rectangular openings, 216- branch Support seat, 1401- first rotating shafts, the first cover boards of 1114-, 91- material-pulling devices, the second guide sleeves of 2703-, the second guide rails of 2704-, 209- Pushing block, the first racks of 1709-, 202- contiguous blocks, the second shafts of 2401-, the 3rd gears of 3708-, 408- cranks, 1701- first Screw rod, the first nuts of 1702-, 92- smash range regulation device, the first connecting plates of 1106-, 2607- second bearing seats, 2308- Second bull stick, the second connecting plates of 2106-, the 3rd bull sticks of 3308-, the second nuts of 2702-, the second screw rods of 2701-, 507- empty slots, 309- telescopic rods, 508- threaded holes, the 3rd screw rods of 3701-, 93- linkage rotation devices, the first mounting rods of 1307-, 4708- the 4th Gear, the 5th gears of 5708-, the 6th gears of 6708-, 3607- 3rd bearing seats, 4607- fourth bearing seats, the 7th teeth of 7708- Wheel, the second mounting rods of 2307-, 201- fixed blocks, the second cover boards of 2114-.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of change smashes the building waste of scope and smashes equipment, as shown in figures 1-8, include bottom plate 101, smash case 608, Support plate 104, fixed plate 102, the first guide rail 1704, the first guide sleeve 1703, connecting rod 301, fixed link 302, cylinder 602, One bearing block 1607, the first bull stick 1308, skewback 207, smash knife 612, first gear 1708, motor 601 and second gear 2708, it is provided with by bolted connection on bottom plate 101 and smashes case 608, right side connects by welding on bottom plate 101 Support plate 104 is connected to, 104 upper end of support plate is connected with fixed plate 102, the downside of fixed plate 102 left and right two by welding Side is connected with the first guide rail 1704 by welding, and slidingtype is connected with the first guide sleeve 1703 on the first guide rail 1704, the The inner side of one guide sleeve 1703 is connected with connecting rod 301 by welding, the side in connecting rod 301 between side-lower by welding Formula is connected with fixed link 302, and 102 downside left of fixed plate is provided with cylinder 602 by bolted connection, under cylinder 602 Side is connected to middle side part in fixed link 302, and middle part is provided with first bearing seat by bolted connection in fixed link 302 1607, the first bull stick 1308 is connected with first bearing seat 1607, and 1308 lower end of the first bull stick is connected with by welding Skewback 207, the downside of skewback 207 is provided with by welding smashes knife 612, and the upside of the first bull stick 1308 is connected with the first tooth Wheel 1708,302 downside right of fixed link are provided with motor 601, the motor 601 of the downside of motor 601 by bolted connection Output shaft is connected with second gear 2708 by shaft coupling, and second gear 2708 is engaged with first gear 1708.
Embodiment 2
A kind of change smashes the building waste of scope and smashes equipment, as shown in figures 1-8, include bottom plate 101, smash case 608, Support plate 104, fixed plate 102, the first guide rail 1704, the first guide sleeve 1703, connecting rod 301, fixed link 302, cylinder 602, One bearing block 1607, the first bull stick 1308, skewback 207, smash knife 612, first gear 1708, motor 601 and second gear 2708, it is provided with by bolted connection on bottom plate 101 and smashes case 608, right side connects by welding on bottom plate 101 Support plate 104 is connected to, 104 upper end of support plate is connected with fixed plate 102, the downside of fixed plate 102 left and right two by welding Side is connected with the first guide rail 1704 by welding, and slidingtype is connected with the first guide sleeve 1703 on the first guide rail 1704, the The inner side of one guide sleeve 1703 is connected with connecting rod 301 by welding, the side in connecting rod 301 between side-lower by welding Formula is connected with fixed link 302, and 102 downside left of fixed plate is provided with cylinder 602 by bolted connection, under cylinder 602 Side is connected to middle side part in fixed link 302, and middle part is provided with first bearing seat by bolted connection in fixed link 302 1607, the first bull stick 1308 is connected with first bearing seat 1607, and 1308 lower end of the first bull stick is connected with by welding Skewback 207, the downside of skewback 207 is provided with by welding smashes knife 612, and the upside of the first bull stick 1308 is connected with the first tooth Wheel 1708,302 downside right of fixed link are provided with motor 601, the motor 601 of the downside of motor 601 by bolted connection Output shaft is connected with second gear 2708 by shaft coupling, and second gear 2708 is engaged with first gear 1708.
Support base 216,1401 and first cover board 1114 of first rotating shaft have been further included, the left side of case 608 has been smashed and is provided with rectangular opening 506, the mode that bottom plate 101 passes on left welding is connected with support base 216, and the front side of support base 216 is rotatably connected with first turn Axis 1401, is connected with the first cover board 1114 in first rotating shaft 1401, the first cover board 1114 covers rectangular opening 506.
Embodiment 3
A kind of change smashes the building waste of scope and smashes equipment, as shown in figures 1-8, include bottom plate 101, smash case 608, Support plate 104, fixed plate 102, the first guide rail 1704, the first guide sleeve 1703, connecting rod 301, fixed link 302, cylinder 602, One bearing block 1607, the first bull stick 1308, skewback 207, smash knife 612, first gear 1708, motor 601 and second gear 2708, it is provided with by bolted connection on bottom plate 101 and smashes case 608, right side connects by welding on bottom plate 101 Support plate 104 is connected to, 104 upper end of support plate is connected with fixed plate 102, the downside of fixed plate 102 left and right two by welding Side is connected with the first guide rail 1704 by welding, and slidingtype is connected with the first guide sleeve 1703 on the first guide rail 1704, the The inner side of one guide sleeve 1703 is connected with connecting rod 301 by welding, the side in connecting rod 301 between side-lower by welding Formula is connected with fixed link 302, and 102 downside left of fixed plate is provided with cylinder 602 by bolted connection, under cylinder 602 Side is connected to middle side part in fixed link 302, and middle part is provided with first bearing seat by bolted connection in fixed link 302 1607, the first bull stick 1308 is connected with first bearing seat 1607, and 1308 lower end of the first bull stick is connected with by welding Skewback 207, the downside of skewback 207 is provided with by welding smashes knife 612, and the upside of the first bull stick 1308 is connected with the first tooth Wheel 1708,302 downside right of fixed link are provided with motor 601, the motor 601 of the downside of motor 601 by bolted connection Output shaft is connected with second gear 2708 by shaft coupling, and second gear 2708 is engaged with first gear 1708.
Support base 216,1401 and first cover board 1114 of first rotating shaft have been further included, the left side of case 608 has been smashed and is provided with rectangular opening 506, the mode that bottom plate 101 passes on left welding is connected with support base 216, and the front side of support base 216 is rotatably connected with first turn Axis 1401, is connected with the first cover board 1114 in first rotating shaft 1401, the first cover board 1114 covers rectangular opening 506.
Further included material-pulling device 91, material-pulling device 91 include the second guide sleeve 2703, the second guide rail 2704, pushing block 209, First rack 1709, contiguous block 202, the second shaft 2401, the 3rd gear 3708 and crank 408, smash the right side of case 608 and are equipped with and push away Expect device 91, smash middle part in the right side of case 608 and second guide sleeve 2703 is installed by welding, slided in the second guide sleeve 2703 Dynamic formula is connected with the second guide rail 2704, and 2704 left end of the second guide rail is provided with pushing block 209, the second guide rail by welding 2704 upsides are provided with the first rack 1709, the side that 1703 upside right of the first guide sleeve passes through welding by bolted connection Formula is connected with contiguous block 202, and the right side of contiguous block 202 is rotatably connected with the second shaft 2401, is connected with the second shaft 2401 3rd gear 3708, the 3rd gear 3708 are engaged with the first rack 1709, and the front side of the 3rd gear 3708 is rotatably connected with crank 408。
Embodiment 4
A kind of change smashes the building waste of scope and smashes equipment, as shown in figures 1-8, include bottom plate 101, smash case 608, Support plate 104, fixed plate 102, the first guide rail 1704, the first guide sleeve 1703, connecting rod 301, fixed link 302, cylinder 602, One bearing block 1607, the first bull stick 1308, skewback 207, smash knife 612, first gear 1708, motor 601 and second gear 2708, it is provided with by bolted connection on bottom plate 101 and smashes case 608, right side connects by welding on bottom plate 101 Support plate 104 is connected to, 104 upper end of support plate is connected with fixed plate 102, the downside of fixed plate 102 left and right two by welding Side is connected with the first guide rail 1704 by welding, and slidingtype is connected with the first guide sleeve 1703 on the first guide rail 1704, the The inner side of one guide sleeve 1703 is connected with connecting rod 301 by welding, the side in connecting rod 301 between side-lower by welding Formula is connected with fixed link 302, and 102 downside left of fixed plate is provided with cylinder 602 by bolted connection, under cylinder 602 Side is connected to middle side part in fixed link 302, and middle part is provided with first bearing seat by bolted connection in fixed link 302 1607, the first bull stick 1308 is connected with first bearing seat 1607, and 1308 lower end of the first bull stick is connected with by welding Skewback 207, the downside of skewback 207 is provided with by welding smashes knife 612, and the upside of the first bull stick 1308 is connected with the first tooth Wheel 1708,302 downside right of fixed link are provided with motor 601, the motor 601 of the downside of motor 601 by bolted connection Output shaft is connected with second gear 2708 by shaft coupling, and second gear 2708 is engaged with first gear 1708.
Support base 216,1401 and first cover board 1114 of first rotating shaft have been further included, the left side of case 608 has been smashed and is provided with rectangular opening 506, the mode that bottom plate 101 passes on left welding is connected with support base 216, and the front side of support base 216 is rotatably connected with first turn Axis 1401, is connected with the first cover board 1114 in first rotating shaft 1401, the first cover board 1114 covers rectangular opening 506.
Further included material-pulling device 91, material-pulling device 91 include the second guide sleeve 2703, the second guide rail 2704, pushing block 209, First rack 1709, contiguous block 202, the second shaft 2401, the 3rd gear 3708 and crank 408, smash the right side of case 608 and are equipped with and push away Expect device 91, smash middle part in the right side of case 608 and second guide sleeve 2703 is installed by welding, slided in the second guide sleeve 2703 Dynamic formula is connected with the second guide rail 2704, and 2704 left end of the second guide rail is provided with pushing block 209, the second guide rail by welding 2704 upsides are provided with the first rack 1709, the side that 1703 upside right of the first guide sleeve passes through welding by bolted connection Formula is connected with contiguous block 202, and the right side of contiguous block 202 is rotatably connected with the second shaft 2401, is connected with the second shaft 2401 3rd gear 3708, the 3rd gear 3708 are engaged with the first rack 1709, and the front side of the 3rd gear 3708 is rotatably connected with crank 408。
The first screw rod 1701, the first nut 1702 and the first rack 1709 are further included, 202 upside left of contiguous block passes through The mode of welding is provided with the first screw rod 1701, is connected with the first rack 1709 on the first screw rod 1701, the first rack 1709 with 3rd gear 3708 engages, and the first nut 1702 is rotary with the first screw rod 1701, and the first nut 1702 is matched somebody with somebody with the first screw rod 1701 Close.
Further include and smashed range regulation device 92, smashed range regulation device 92 and include the first connecting plate 1106, Two bearing bracket 2607, the second bull stick 2308, the second connecting plate 2106, the 3rd bull stick 3308, the second nut 2702 and the second screw rod 2701, the downside of the first bull stick 1308, which is equipped with, smashes range regulation device 92, and 1308 lower end of the first bull stick connects by welding The first connecting plate 1106 is connected to, middle part is provided with second bearing seat by bolted connection in the first connecting plate 1106 2607, the second bull stick 2308 is connected with second bearing seat 2607, and 2308 lower end of the second bull stick is provided with by welding Second connecting plate 2106, the front side of the second connecting plate 2106 are connected with the 3rd bull stick 3308, the 3rd bull stick by welding 3308 lower ends are provided with skewback 207 by welding, and 2106 right end of the second connecting plate is connected with by welding Two nuts 2702, are rotary with the second screw rod 2701 in the second nut 2702, the second screw rod 2701 coordinates with the second nut 2702.
309 and the 3rd screw rod 3701 of telescopic rod is further included, the downside of the 3rd bull stick 3308 is provided with empty slot 507, in empty slot 507 Telescopic rod 309 is placed with, 309 lower end of telescopic rod is provided with skewback 207, the left side of the 3rd bull stick 3308 lower section by welding Threaded hole 508 is provided with, the 3rd screw rod 3701 is rotary with threaded hole 508, the 3rd screw rod 3701 coordinates with threaded hole 508.
Linkage rotation device 93 is further included, linkage rotation device 93 includes the first mounting rod 1307, the 4th gear 4708th, the 5th gear 5708, the 6th gear 6708,3rd bearing seat 3607,4607 and the 7th gear 7708 of fourth bearing seat, the One bull stick 1308 is equipped with linkage rotation device 93, and 302 downside left of fixed link is connected with the first installation by welding Bar 1307, the right side of the first mounting rod 1307 are connected with the 4th gear 4708 by welding, and the 4th gear 4708 is sleeved on the The downside of one bull stick 1308,2308 upper end of the second bull stick is connected with the 5th gear 5708, the 5th gear 5708 and the 4th gear 4708 Engagement, the downside of the second bull stick 2308 are connected with the 6th gear 6708, and 3308 upper end of the 3rd bull stick is connected with the 7th gear 7708, the Seven gears 7708 are engaged with the 6th gear 6708, and right side is provided with the 3rd by bolted connection in the second connecting plate 2106 Bearing block 3607, is connected with the second bull stick 2308 in 3rd bearing seat 3607, and bolt company is passed on left in the second connecting plate 2106 The mode connect is provided with fourth bearing seat 4607, and the 3rd bull stick 3308 is connected with fourth bearing seat 4607.
The second mounting rod 2307,201 and second cover board 2114 of fixed block are further included, the first connecting plate 1106 passes on left The mode of welding is connected with the second mounting rod 2307, and the right side of the first connecting plate 1106 is connected with fixed block by welding 201, the outside of 201 and second mounting rod of fixed block 2307 is provided with the second cover board 2114, the second cover board by welding 2114 cover and smash case 608.
Operation principle:When user needs to smash building waste, building waste can be placed on by user to be beaten In broken case 608, then user's control cylinder 602 extends, and cylinder 602 promotes fixed link 302 to move down, and fixed link 302 is downward It is moved through 301 and first guide sleeve 1703 of connecting rod to move down on the first guide rail 1704, so as to drive the first bull stick 1308 Move down, so as to drive skewback 207 and smash knife 612 and move down, when smash knife 612 be moved to smash in case 608 when, use Family can open motor 601, and motor 601 drives second gear 2708 to rotate clockwise, and second gear 2708 drives first gear 1708 rotations counterclockwise, so as to drive the first bull stick 1308 to rotate counterclockwise, rotate so as to drive skewback 207 and smash knife 612, Make to smash knife 612 and smashed to smashing the building waste in case 608, user closes motor 601 after the completion of smashing, and then controls Cylinder 602 moves up, and user can be collected the building waste smashed smashed in case 608 at this time.
Because having further included support base 216,1401 and first cover board 1114 of first rotating shaft, smash the left side of case 608 and be provided with square Shape hole 506, the mode that bottom plate 101 passes on left welding are connected with support base 216, and the front side of support base 216 is rotary to be connected with the One shaft 1401, is connected with the first cover board 1114 in first rotating shaft 1401, the first cover board 1114 covers rectangular opening 506, works as user When needing to be collected to smashing the building waste in case 608, user can rotate the first cover board 1114, make the first cover board 1114 Rotated counterclockwise around first rotating shaft 1401, so that the first cover board 1114 no longer blocks rectangular opening 506, then user can incite somebody to action The building waste smashed in case 608 is come out by the collection of rectangular opening 506.
Because having further included material-pulling device 91, material-pulling device 91 includes the second guide sleeve 2703, the second guide rail 2704, pushing block 209th, the first rack 1709, contiguous block 202, the second shaft 2401, the 3rd gear 3708 and crank 408, smash the right side of case 608 and set There is material-pulling device 91, smash middle part in the right side of case 608 and second guide sleeve 2703, the second guide sleeve 2703 are installed by welding Inner sliding type is connected with the second guide rail 2704, and 2704 left end of the second guide rail is provided with pushing block 209 by welding, and second leads The upside of rail 2704 is provided with the first rack 1709 by bolted connection, and 1703 upside right of the first guide sleeve passes through welding Mode is connected with contiguous block 202, and the right side of contiguous block 202 is rotatably connected with the second shaft 2401, is connected in the second shaft 2401 There is the 3rd gear 3708, the 3rd gear 3708 is engaged with the first rack 1709, and rotary be connected with the front side of the 3rd gear 3708 is shaken 408, when user, which needs quick and labour-saving to collect, is smashing the building waste smashed in case 608, user can be with up time Pin rotates crank 408, and crank 408 drives the 3rd gear 3708 to rotate clockwise, and the 3rd gear 3708 is rotated in the first rack On 1709, so as to drive the second guide rail 2704 to be moved to the left in the second guide sleeve 2703, the second guide sleeve 2703 is set to drive pushing block 209 It is moved to the left, so that pushing block 209 promotes the building waste smashed in case 608 to be moved to the left, so as to fulfill the purpose of collection.
Because having further included the first screw rod 1701, the first nut 1702 and the first rack 1709,202 upside left of contiguous block First screw rod 1701 is installed by welding, the first rack 1709, the first rack are connected with the first screw rod 1701 1709 engage with the 3rd gear 3708, and the first nut 1702, the first nut 1702 and the first screw rod are rotary with the first screw rod 1701 1701 coordinate, and when user need not use pushing block 209 to promote building waste, user can rotate the first nut 1702, nut By the downward precession of cooperation with the first screw rod 1701, make the first nut 1702 promote the first rack 1709 to move down, make the One rack 1709 is engaged with the 3rd gear 3708, it is no longer rotated so as to fix the 3rd gear 3708.
Range regulation device 92 is smashed because having further included, range regulation device 92 is smashed and includes the first connecting plate 1106th, second bearing seat 2607, the second bull stick 2308, the second connecting plate 2106, the 3rd bull stick 3308, the second nut 2702 and Two screw rods 2701, the downside of the first bull stick 1308, which is equipped with, smashes range regulation device 92, and 1308 lower end of the first bull stick passes through welding Mode is connected with the first connecting plate 1106, and middle part is provided with second bearing by bolted connection in the first connecting plate 1106 Seat 2607, is connected with the second bull stick 2308 in second bearing seat 2607,2308 lower end of the second bull stick is installed by welding There is the second connecting plate 2106, the front side of the second connecting plate 2106 is connected with the 3rd bull stick 3308, the 3rd bull stick by welding 3308 lower ends are provided with skewback 207 by welding, and 2106 right end of the second connecting plate is connected with by welding Two nuts 2702, are rotary with the second screw rod 2701 in the second nut 2702, and the second screw rod 2701 coordinates with the second nut 2702, when with When family needs cover board to smash comprehensively to be smashed to smashing the building waste in case 608, that is to say, that need to smashing case When the building waste in each corner in 608 is smashed, user can rotate the second connecting plate 2106 around the second bull stick 2308, The rotation in second bearing seat 2607 of second bull stick 2308, the second connecting plate 2106 drive the 3rd bull stick 3308 and smash knife 612 Rotation, the horizontal distance for making to smash 612 and first bull stick 1308 of knife obtain cover board, so that the first bull stick 1308, which drives, smashes knife There can be different radiuss of turn when 612 rotation, and when user regulates required radius of turn, user can rotate the Two screw rods 2701, the second screw rod 2701 touch the second screw rod 2701 by the upward precession of cooperation with the second nut 2702 The downside of first connecting plate 1106, is no longer rotated, then user so as to fix the second connecting plate 2106 on this position Motor 601 is opened, so that the first bull stick 1308 drives the first connecting plate 1106 to rotate, the first connecting plate 1106 drives second to connect Fishplate bar 2106 rotates, so as to drive the 3rd bull stick 3308 to rotate, is rotated so as to drive and smash knife 612.
Because having further included 309 and the 3rd screw rod 3701 of telescopic rod, the downside of the 3rd bull stick 3308 is provided with empty slot 507, empty slot Telescopic rod 309 is placed with 507,309 lower end of telescopic rod is provided with skewback 207 by welding, and the 3rd bull stick 3308 is left Side-lower is provided with threaded hole 508, and the 3rd screw rod 3701 is rotary with threaded hole 508, and the 3rd screw rod 3701 coordinates with threaded hole 508, When user need further change smash knife 612 and smash 608 stent of case apart from when, user, which can move up and down, smashes knife 612, smash knife 612 and moved up and down by telescopic rod 309 in empty slot 507, and when user chooses required height, user The 3rd screw rod 3701 can be rotated, the 3rd screw rod 3701 makes the 3rd screw rod 3701 by the precession to the right of the cooperation with threaded hole 508 Telescopic rod 309 is touched, is no longer moved so that telescopic rod 309 is fixed on this position.
Because having further included linkage rotation device 93, linkage rotation device 93 includes the first mounting rod 1307, the 4th tooth The 4708, the 5th gear 5708, the 6th gear 6708,3rd bearing seat 3607,4607 and the 7th gear 7708 of fourth bearing seat are taken turns, First bull stick 1308 is equipped with linkage rotation device 93, and 302 downside left of fixed link is connected with the first peace by welding Bar 1307 is filled, the right side of the first mounting rod 1307 is connected with the 4th gear 4708 by welding, and the 4th gear 4708 is sleeved on The downside of first bull stick 1308,2308 upper end of the second bull stick is connected with the 5th gear 5708, the 5th gear 5708 and the 4th gear 4708 engagements, the downside of the second bull stick 2308 are connected with the 6th gear 6708, and 3308 upper end of the 3rd bull stick is connected with the 7th gear 7708, the 7th gear 7708 is engaged with the 6th gear 6708, and right side is pacified by bolted connection in the second connecting plate 2106 Equipped with 3rd bearing seat 3607, the second bull stick 2308 is connected with 3rd bearing seat 3607, left side is logical in the second connecting plate 2106 Cross bolted mode and fourth bearing seat 4607 be installed, the 3rd bull stick 3308 is connected with fourth bearing seat 4607, when with When family needs further thoroughly to be smashed to smashing the building waste in case 608, first is driven in the first bull stick 1308 Connecting plate 1106 around the first bull stick 1308 rotate when, the first connecting plate 1106 will drive the second bull stick 2308 around the first bull stick 1308 rotations, so that the 5th gear 5708 rotates on the 4th gear 4708, so as to drive the 5th gear 5708, the 6th gear 6708 and second rotation in second bearing seat 2607 and 3rd bearing seat 3607 of bull stick 2308, and the rotation of the 6th gear 6708 will The rotation in fourth bearing seat 4607 of the 7th gear 7708 and the 3rd bull stick 3308 is driven, so that smashing knife 612 around the 4th axis Bearing 4607 rotates so that smash knife 612 around the first bull stick 1308 rotate while will also be rotated around fourth bearing seat 4607, So that can be thorough to smashing for building waste.
Because having further included the second mounting rod 2307,201 and second cover board 2114 of fixed block, the left side of the first connecting plate 1106 The second mounting rod 2307 is connected with by welding, and the right side of the first connecting plate 1106 is connected with fixation by welding Block 201, the outside of 201 and second mounting rod of fixed block 2307 are provided with the second cover board 2114, the second cover board by welding 2114 cover and smash case 608, when user needs to avoid user from being subject to sputter to build during to the smashing of building waste Building refuse wounds, and when the first connecting plate 1106 moves down, the two the first cover boards 1114, which will cover, smashes case 608, makes Smash the building waste in case 608 and will not sputter.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute Control mode is not explained with the present invention to connect with circuit.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

1. a kind of change smashes the building waste of scope and smashes equipment, it is characterised in that includes bottom plate(101), smash case (608), support plate(104), fixed plate(102), the first guide rail(1704), the first guide sleeve(1703), connecting rod(301), it is fixed Bar(302), cylinder(602), first bearing seat(1607), the first bull stick(1308), skewback(207), smash knife(612), first Gear(1708), motor(601)And second gear(2708), bottom plate(101)On be provided with smash by bolted connection Case(608), bottom plate(101)Upper right side is connected with support plate by welding(104), support plate(104)Upper end passes through weldering The mode connect is connected with fixed plate(102), fixed plate(102)The first guide rail is connected with by welding at left and right sides of downside (1704), the first guide rail(1704)Upper slidingtype is connected with the first guide sleeve(1703), the first guide sleeve(1703)Inner side passes through welding Mode be connected with connecting rod(301), connecting rod(301)Fixed link is connected with by welding between interior side-lower (302), fixed plate(102)Downside left is provided with cylinder by bolted connection(602), cylinder(602)Downside connects In fixed link(302)Upper middle side part, fixed link(302)Interior middle part is provided with first bearing seat by bolted connection (1607), first bearing seat(1607)Inside it is connected with the first bull stick(1308), the first bull stick(1308)The side that lower end passes through welding Formula is connected with skewback(207), skewback(207)Downside is provided with smashes knife by welding(612), the first bull stick(1308) Upside is connected with first gear(1708), fixed link(302)Downside right is provided with motor by bolted connection (601), motor(601)The motor of downside(601)Output shaft is connected with second gear by shaft coupling(2708), second gear (2708)With first gear(1708)Engagement.
2. a kind of change according to claim 1 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps Support base is included(216), first rotating shaft(1401)With the first cover board(1114), smash case(608)Left side is provided with rectangular opening (506), bottom plate(101)The mode for passing on left welding is connected with support base(216), support base(216)Front side rotatably connects There is first rotating shaft(1401), first rotating shaft(1401)On be connected with the first cover board(1114), the first cover board(1114)Cover rectangle Hole(506).
3. a kind of change according to claim 2 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps Material-pulling device is included(91), material-pulling device(91)Include the second guide sleeve(2703), the second guide rail(2704), pushing block(209), One rack(1709), contiguous block(202), the second shaft(2401), the 3rd gear(3708)And crank(408), smash case(608) Right side is equipped with material-pulling device(91), smash case(608)Middle part is provided with the second guide sleeve by welding in right side(2703), Second guide sleeve(2703)Inner sliding type is connected with the second guide rail(2704), the second guide rail(2704)Left end is pacified by welding Equipped with pushing block(209), the second guide rail(2704)Upside is provided with the first rack by bolted connection(1709), first leads Set(1703)Upside right is connected with contiguous block by welding(202), contiguous block(202)Right side is rotatably connected with Two shafts(2401), the second shaft(2401)On be connected with the 3rd gear(3708), the 3rd gear(3708)With the first rack (1709)Engagement, the 3rd gear(3708)Front side is rotatably connected with crank(408).
4. a kind of change according to claim 3 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps The first screw rod is included(1701), the first nut(1702)With the first rack(1709), contiguous block(202)Upside left passes through welding Mode the first screw rod is installed(1701), the first screw rod(1701)On be connected with the first rack(1709), the first rack (1709)With the 3rd gear(3708)Engagement, the first screw rod(1701)On be rotary with the first nut(1702), the first nut(1702) With the first screw rod(1701)Coordinate.
5. a kind of change according to claim 4 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps Include and smashed range regulation device(92), smash range regulation device(92)Include the first connecting plate(1106), second bearing Seat(2607), the second bull stick(2308), the second connecting plate(2106), the 3rd bull stick(3308), the second nut(2702)With second Screw rod(2701), the first bull stick(1308)Downside is equipped with and smashes range regulation device(92), the first bull stick(1308)Lower end passes through The mode of welding is connected with the first connecting plate(1106), the first connecting plate(1106)Install by bolted connection at interior middle part There is second bearing seat(2607), second bearing seat(2607)Inside it is connected with the second bull stick(2308), the second bull stick(2308)Lower end Second connecting plate is installed by welding(2106), the second connecting plate(2106)Front side is connected with by welding 3rd bull stick(3308), the 3rd bull stick(3308)Lower end is provided with skewback by welding(207), the second connecting plate (2106)Right end is connected with the second nut by welding(2702), the second nut(2702)Inside it is rotary with the second screw rod (2701), the second screw rod(2701)With the second nut(2702)Coordinate.
6. a kind of change according to claim 5 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps Telescopic rod is included(309)With the 3rd screw rod(3701), the 3rd bull stick(3308)Downside is provided with empty slot(507), empty slot(507)Inside put It is equipped with telescopic rod(309), telescopic rod(309)Lower end is provided with skewback by welding(207), the 3rd bull stick(3308)It is left Side-lower is provided with threaded hole(508), threaded hole(508)Inside it is rotary with the 3rd screw rod(3701), the 3rd screw rod(3701)With threaded hole (508)Coordinate.
7. a kind of change according to claim 6 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps Linkage rotation device is included(93), linkage rotation device(93)Include the first mounting rod(1307), the 4th gear(4708), Five gears(5708), the 6th gear(6708), 3rd bearing seat(3607), fourth bearing seat(4607)With the 7th gear (7708), the first bull stick(1308)It is equipped with linkage rotation device(93), fixed link(302)Downside left is by welding It is connected with the first mounting rod(1307), the first mounting rod(1307)Right side is connected with the 4th gear by welding (4708), the 4th gear(4708)It is sleeved on the first bull stick(1308)Downside, the second bull stick(2308)Upper end is connected with the 5th gear (5708), the 5th gear(5708)With the 4th gear(4708)Engagement, the second bull stick(2308)Downside is connected with the 6th gear (6708), the 3rd bull stick(3308)Upper end is connected with the 7th gear(7708), the 7th gear(7708)With the 6th gear(6708) Engagement, the second connecting plate(2106)Interior right side is provided with 3rd bearing seat by bolted connection(3607), 3rd bearing Seat(3607)Inside it is connected with the second bull stick(2308), the second connecting plate(2106)Bolted mode is inside passed on left to be provided with Fourth bearing seat(4607), fourth bearing seat(4607)Inside it is connected with the 3rd bull stick(3308).
8. a kind of change according to claim 7 smashes the building waste of scope and smashes equipment, it is characterised in that also wraps The second mounting rod is included(2307), fixed block(201)With the second cover board(2114), the first connecting plate(1106)Pass on left welding Mode be connected with the second mounting rod(2307), the first connecting plate(1106)Right side is connected with fixed block by welding (201), fixed block(201)With the second mounting rod(2307)Outside is provided with the second cover board by welding(2114), the Two cover boards(2114)Cover and smash case(608).
CN201711236596.5A 2017-11-30 2017-11-30 A kind of change smashes the building waste of scope and smashes equipment Pending CN107983486A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711236596.5A CN107983486A (en) 2017-11-30 2017-11-30 A kind of change smashes the building waste of scope and smashes equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711236596.5A CN107983486A (en) 2017-11-30 2017-11-30 A kind of change smashes the building waste of scope and smashes equipment

Publications (1)

Publication Number Publication Date
CN107983486A true CN107983486A (en) 2018-05-04

Family

ID=62034701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711236596.5A Pending CN107983486A (en) 2017-11-30 2017-11-30 A kind of change smashes the building waste of scope and smashes equipment

Country Status (1)

Country Link
CN (1) CN107983486A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114273018A (en) * 2021-12-16 2022-04-05 廖鹏飞 Scrap glass fusing silk pipe crushing apparatus

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006070209A (en) * 2004-09-03 2006-03-16 Fuji Car Mfg Co Ltd Rpf production equipment
CN206027795U (en) * 2016-08-30 2017-03-22 贵州云峰药业有限公司 Chinese medicine production device of pounding medicine in a mortar fast
CN106513094A (en) * 2016-11-28 2017-03-22 广东技术师范学院 Waste treatment equipment for manufacturing of escalators
CN206082638U (en) * 2016-08-26 2017-04-12 邹近才 High -efficient crushing device of chinese herbal medicine
CN106732897A (en) * 2016-11-28 2017-05-31 广东技术师范学院 Disposed waste processing equipment is used in a kind of solar street light production
CN106881165A (en) * 2017-04-06 2017-06-23 赣州清亦华科科技有限公司 A kind of rare earth processing efficient grinding equipment of building stones
CN106985175A (en) * 2017-05-27 2017-07-28 董英山 A kind of pharmaceutical factory medicinal material cutting and crushing device
CN107115924A (en) * 2017-06-19 2017-09-01 李翔 A kind of mining industry ore efficiency crushing device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006070209A (en) * 2004-09-03 2006-03-16 Fuji Car Mfg Co Ltd Rpf production equipment
CN206082638U (en) * 2016-08-26 2017-04-12 邹近才 High -efficient crushing device of chinese herbal medicine
CN206027795U (en) * 2016-08-30 2017-03-22 贵州云峰药业有限公司 Chinese medicine production device of pounding medicine in a mortar fast
CN106513094A (en) * 2016-11-28 2017-03-22 广东技术师范学院 Waste treatment equipment for manufacturing of escalators
CN106732897A (en) * 2016-11-28 2017-05-31 广东技术师范学院 Disposed waste processing equipment is used in a kind of solar street light production
CN106881165A (en) * 2017-04-06 2017-06-23 赣州清亦华科科技有限公司 A kind of rare earth processing efficient grinding equipment of building stones
CN106985175A (en) * 2017-05-27 2017-07-28 董英山 A kind of pharmaceutical factory medicinal material cutting and crushing device
CN107115924A (en) * 2017-06-19 2017-09-01 李翔 A kind of mining industry ore efficiency crushing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114273018A (en) * 2021-12-16 2022-04-05 廖鹏飞 Scrap glass fusing silk pipe crushing apparatus

Similar Documents

Publication Publication Date Title
CN209618790U (en) Lifting device for building
CN107842694A (en) One kind building monitoring airborne dust monitoring device
CN108057486A (en) A kind of building waste for building waste recycling quickly smashes equipment
CN107150026A (en) A kind of traffic bridge sand screening installation
CN107262229A (en) It is a kind of to smash equipment with the big powder of screening for Chinese herbal medicine
CN108465548A (en) A kind of centrifugal iron removal by magnetic separation device of building waste
CN108080100B (en) A kind of building waste that can be smashed to a large amount of building wastes smashes equipment
CN105035599A (en) Medical dustbin
CN107983486A (en) A kind of change smashes the building waste of scope and smashes equipment
CN211403866U (en) Sand table display device for urban garden planning
CN204469628U (en) A kind of automatic mixing machine
CN107225031A (en) The Chinese medicine that a kind of pharmaceutical factory of traditional Chinese medicine's use can screen big powder quickly smashes equipment
CN206716056U (en) It is a kind of that there is the refuse treatment plant for kitchen use for crushing sterilizing function
CN206082835U (en) Construction waste processing uses quick sieving mechanism
CN108532715A (en) A kind of sewer flase floor handling device of municipal works
CN108355794A (en) A kind of high-efficiency garden garbage recycling equipment
CN208468532U (en) A kind of paper cutter automatic cleaning apparatus
CN207071529U (en) A kind of traffic bridge sand screening installation
CN108577381A (en) A kind of rare earth metal powder displaying device
CN107551911A (en) Litho ink agitating device is used in a kind of polybag production
CN107774566A (en) A kind of mining industry mineral screen collection device
CN108480206A (en) A kind of construction machinery for sand screening
CN108176468A (en) A kind of building waste that there is synchronous relative rotation to smash knife quickly smashes equipment
CN208194895U (en) A kind of Gardens are by with portable type fertilizer filter plant
CN207204562U (en) A kind of sandstone portable type screening plant for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180504

RJ01 Rejection of invention patent application after publication