CN107975054A - A kind of deep foundation pit rigid water drainage platform device and its application method - Google Patents

A kind of deep foundation pit rigid water drainage platform device and its application method Download PDF

Info

Publication number
CN107975054A
CN107975054A CN201610919523.5A CN201610919523A CN107975054A CN 107975054 A CN107975054 A CN 107975054A CN 201610919523 A CN201610919523 A CN 201610919523A CN 107975054 A CN107975054 A CN 107975054A
Authority
CN
China
Prior art keywords
platform
steel
foundation pit
babinet
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610919523.5A
Other languages
Chinese (zh)
Inventor
白双江
卢永胜
祝洪平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201610919523.5A priority Critical patent/CN107975054A/en
Publication of CN107975054A publication Critical patent/CN107975054A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/20Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention provides a kind of deep foundation pit rigid water drainage platform device and its application method, is related to a kind of technical field of building construction.The invention includes babinet platform, steel-tube construction is provided with the center of babinet platform, steel-tube construction includes steel pipe, ring flange and steel plate seat, ring flange is arranged on the top of steel pipe, steel plate seat is arranged on the bottom of steel pipe, and steel duct bottom is provided with draining pump, drainpipe is communicated with draining pump, babinet platform is the chamfered edge platform structure of bottom lock, and some ribs are surrounded by the outside of babinet platform.The present invention can effective lowering of watertable, reduce drainage system amount, prevent foundation pit collapse, shorten the draining duration, save engineering cost, ensure construction quality, structure design is simple, easy to operate.

Description

A kind of deep foundation pit rigid water drainage platform device and its application method
Technical field
The present invention relates to a kind of technical field of building construction, more particularly to a kind of deep foundation pit rigid water drainage platform device and Its application method.
Background technology
It is particularly important that skyscraper development at full speed, depth of foundation constantly refresh, and water drainage of deep foundation pit works.When running into sandstone Plumbing work brings very big difficulty when supporting course and higher level of ground water.Traditional way is to use dewatering well, by foundation pit Interior entirety level of ground water is down to 500mm under the work layers such as elevator foundation pit, catch pit (because the absolute altitude such as elevator foundation pit, catch pit is The minimum absolute altitude of foundation pit).Such a way dewatering project amount is big, long construction period, work efficiency are low, and effluent cost is high, once it is useless Control level of ground water, foundation pit easily caves in, and bed course and waterproof layer easily destroy, to engineering bring the very big duration and Economic loss.
The content of the invention
Shortcoming present in regarding to the issue above, the present invention provide a kind of deep foundation pit rigid water drainage platform device and its Application method, makes its effective drainage of foundation pit higher to sandstone supporting course, level of ground water, can with lowering of watertable, prevent base Hole caves in, and anhydrous job platform is provided for next procedure construction.
To solve the above-mentioned problems, the present invention provides a kind of deep foundation pit rigid water drainage platform device, wherein, including babinet puts down Platform, is provided with steel-tube construction at the center of the babinet platform, the steel-tube construction includes steel pipe, ring flange and steel plate seat, institute The top that ring flange is arranged on the steel pipe is stated, the steel plate seat is arranged on the bottom of the steel pipe, the steel duct bottom Draining pump is provided with, drainpipe is communicated with the draining pump, the babinet platform is the chamfered edge platform structure of bottom lock, described Some ribs are surrounded by the outside of babinet platform.
Preferably, the steel pipe bottom is fixedly connected with metal cage, and steel wire is equipped with around the metal cage.
Preferably, the ring flange includes ring flange top, rubber cushion and the ring flange bottom cover set gradually from top to bottom, institute The both ends for stating ring flange are respectively arranged with screw structural, and the ring flange top, the rubber cushion and the ring flange bottom cover are logical The screw structural is crossed to be fixedly connected.
Preferably, the both sides of the steel-tube construction are respectively arranged with the first hanging ring, the second hanging ring, the 3rd hanging ring and the 4th and hang Ring, first hanging ring, second hanging ring, the 3rd hanging ring and the 4th hanging ring are separately positioned on the babinet platform On the corner of bottom, first hanging ring and second hanging ring be located at the babinet platform left end and the steel-tube construction it Between, the 3rd hanging ring and the 4th hanging ring are between the babinet platform and the steel-tube construction.
Preferably, it is provided with seal ring on the steel pipe, the seal ring, which is arranged on the steel pipe and is located at the babinet, puts down At 1/3 above platform bottom.
A kind of application method of deep foundation pit rigid water drainage platform device, wherein, comprise the following steps:
The present apparatus, be lifted in foundation pit using lifting equipment by S10, pours surrounding bed course coagulation after location determination is good again Soil, the concrete in the range of ribs thicken, and ribs is all embedded in concrete base after concrete has been poured, in metal cage Interior placement draining pump, and drained into ponding on the outside of foundation pit by drainpipe;
S20, pour base concrete in water tank platform before take out metal cage draining pump and drainpipe, by ring flange Closing, i.e., rubber cushion blending bolt is tightened on pad between ring flange head cover and ring flange bottom cover, and guarantee is water-tight, because device exists Concrete base is all embedded in after having poured base concrete, has prevented the generation of drainage;
S30, when level of ground water exceedes bottom of foundation ditch absolute altitude, foundation pit surrounding sandstone is subject to the restriction of babinet platform not send out Life is caved in, and is less had underground water and is entered in babinet platform, and an anhydrous job platform is provided for next procedure construction.
Compared with prior art, the present invention has the following advantages:
The present invention can effective lowering of watertable, reduce drainage system amount, prevent foundation pit collapse, shorten the draining duration, Engineering cost is saved, ensures construction quality, structure design is simple, easy to operate.
Brief description of the drawings
Fig. 1 is the top view of the present invention;
Fig. 2 is the overall structure diagram of the present invention;
Fig. 3 is the overall structure scheme of installation of the present invention;
Fig. 4 is the closing steel pipe top structure diagram of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with the accompanying drawings with example to this Invention is described in further detail, but example is not as a limitation of the invention.
As shown in Figures 1 to 4, the embodiment of the present invention include babinet platform 1, steel pipe 2, ring flange bottom cover 3, seal ring 4, Metal cage 5, steel wire 6, ribs 7, draining pump 9, babinet platform 1 are the chamfered edge platform structure of bottom lock, the outside of babinet platform 1 Some ribs 7 are surrounded by, 1 lower center position of babinet platform is fixed with steel pipe 2,2 bottom of steel pipe and 1 bottom of babinet platform Concordantly, steel pipe 2 is being fixedly connected with seal ring 4 at 1/3 height above 1 bottom of babinet platform, and ring flange bottom is fixed with the top of steel pipe 2 Lid 3,2 bottom of steel pipe are fixedly connected with metal cage 5, steel wire 6, bottom fixing connection steel plate seat 14, metal are equipped with around metal cage 5 Draining pump 9 is equipped with cage 5.
A kind of application method of deep foundation pit rigid water drainage platform device, comprises the following steps:
1) present apparatus is lifted in foundation pit using lifting equipment, surrounding blinding concrete is poured again after location determination is good, Concrete in the range of ribs 7 thickeies, and ribs 7 is all embedded in concrete base after concrete has been poured, in metal cage 5 Interior placement draining pump 9, and drained into ponding on the outside of foundation pit by drainpipe 10;
2) draining pump 9 and drainpipe 10 of metal cage are taken out before pouring base concrete in babinet platform 1, by flange Disk seal closes, i.e., 13 blending bolt 12 of rubber cushion is tightened on pad between flange head cover 11 and ring flange bottom cover 3, and guarantee is water-tight, because Concrete base is all embedded in after base concrete has been poured for device, has prevented the generation of drainage;
3) when level of ground water exceedes bottom of foundation ditch absolute altitude, foundation pit surrounding sandstone is subject to the restriction of babinet platform 1 not send out Life is caved in, and is less had underground water and is entered in babinet platform 1, and an anhydrous job platform is provided for next procedure construction.
In the present embodiment, steel plate box is welded (with ground into 60 ° of angles) according to the foundation pit slope size of engineering construction drawing Platform 1, box height are base depth.The outside of babinet platform 1 sets support reinforcing rib 7 along surrounding, and ribs 7 is justified using Φ 18 Steel is soldered on the outside of babinet, and spacing 400mm, horizontal length 500mm, extending concrete cushion bottom prevents the present apparatus from inclining Cover.1 lower center position of babinet platform installation steel pipe 2 (Φ 300mm), height 700mm and will be less than foundation pit concrete bottom thickness of slab Degree, 2 top welding flange bottom cover 3 of steel pipe, the 1/3 height welding steel seal ring 4 on steel pipe.In 1 bottom four of babinet platform Four Φ of welded corner joint, 20 round steel hanging rings 8, for lifting.
Below babinet platform 1, i.e. 2 bottom welding metal cage 5 of steel pipe, highly between 500-700mm, metal cage 5 four Week, steel wire 6 wrapped up, and bottom welding steel seat 14, prevents sandstone from entering in cage.The present apparatus is lifted on using lifting equipment In foundation pit, circumferential concrete and blinding concrete are being poured after location determination is good, 7 scope inner concrete of ribs thickeies.With this Draining pump 9 is placed in metal cage 5 at the same time, and is drained into ponding on the outside of foundation pit by drainpipe 10.Even if level of ground water exceedes Bottom of foundation ditch absolute altitude, foundation pit surrounding sandstone are subject to the restriction of babinet platform 1 not cave in, less have underground water into cartonning In body platform 1, it is ensured that work surface provides a waterless operation platform without ponding for next procedure construction.Mixed pouring foundation pit Draining pump 9 and drainpipe 10 are taken out before solidifying soil, ring flange is closed, i.e., rubber cushion 13 and uses screw on 11 underlay of flange head cover 12 tighten, and ensure water-tight.Finally pour foundation pit concrete.Because device is all embedded in concrete bottom after concrete has been poured Portion, has prevented the generation of drainage, it is ensured that construction quality.
The present invention can effective lowering of watertable, reduce drainage system amount, prevent foundation pit collapse, shorten the draining duration, Engineering cost is saved, ensures construction quality, structure design is simple, easy to operate.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or use the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and the principles and novel features disclosed herein phase one The most wide scope caused.

Claims (6)

1. a kind of deep foundation pit rigid water drainage platform device, it is characterised in that including babinet platform, at the center of the babinet platform Steel-tube construction is provided with, the steel-tube construction includes steel pipe, ring flange and steel plate seat, and the ring flange is arranged on the steel pipe Top, the steel plate seat are arranged on the bottom of the steel pipe, and the steel duct bottom is provided with draining pump, on the draining pump Drainpipe is communicated with, the babinet platform is the chamfered edge platform structure of bottom lock, is surrounded by the outside of the babinet platform some Ribs.
2. deep foundation pit rigid water drainage platform device as claimed in claim 1, it is characterised in that the steel pipe bottom is fixedly connected There is metal cage, steel wire is equipped with around the metal cage.
3. deep foundation pit rigid water drainage platform device as claimed in claim 2, it is characterised in that the ring flange include from upper and Under the ring flange top, rubber cushion and the ring flange bottom cover that set gradually, the both ends of the ring flange are respectively arranged with screw structural, institute State ring flange top, the rubber cushion is fixedly connected with the ring flange bottom cover by the screw structural.
4. deep foundation pit rigid water drainage platform device as claimed in claim 3, it is characterised in that the both sides of the steel-tube construction point The first hanging ring, the second hanging ring, the 3rd hanging ring and the 4th hanging ring, first hanging ring, second hanging ring, described are not provided with Three hanging rings and the 4th hanging ring are separately positioned on the corner of the babinet mesa base, first hanging ring and described second Hanging ring is located between left end and the steel-tube construction of the babinet platform, and the 3rd hanging ring and the 4th hanging ring are located at institute State between babinet platform and the steel-tube construction.
5. deep foundation pit rigid water drainage platform device as claimed in claim 4, it is characterised in that be provided with sealing on the steel pipe Ring, the seal ring are arranged on the steel pipe and are located at 1/3 above the babinet mesa base.
A kind of 6. application method of the deep foundation pit rigid water drainage platform device based on described in claim 1, it is characterised in that including Following steps:
The present apparatus, be lifted in foundation pit using lifting equipment by S10, is poured surrounding blinding concrete again after location determination is good, is added Concrete in the range of strong rib thickeies, and ribs is all embedded in concrete base after concrete has been poured, and is put in metal cage Draining pump is put, and is drained into ponding on the outside of foundation pit by drainpipe;
S20, pour base concrete in water tank platform before take out metal cage draining pump and drainpipe, by flange disk seal Close, i.e., rubber cushion blending bolt is tightened on pad between ring flange head cover and ring flange bottom cover, and guarantee is water-tight, because device is pouring Concrete base is all embedded in after having built base concrete, has prevented the generation of drainage;
S30, when level of ground water exceedes bottom of foundation ditch absolute altitude, foundation pit surrounding sandstone is subject to the restriction of babinet platform not collapse Collapse, less have underground water and enter in babinet platform, an anhydrous job platform is provided for next procedure construction.
CN201610919523.5A 2016-10-24 2016-10-24 A kind of deep foundation pit rigid water drainage platform device and its application method Pending CN107975054A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610919523.5A CN107975054A (en) 2016-10-24 2016-10-24 A kind of deep foundation pit rigid water drainage platform device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610919523.5A CN107975054A (en) 2016-10-24 2016-10-24 A kind of deep foundation pit rigid water drainage platform device and its application method

Publications (1)

Publication Number Publication Date
CN107975054A true CN107975054A (en) 2018-05-01

Family

ID=62004479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610919523.5A Pending CN107975054A (en) 2016-10-24 2016-10-24 A kind of deep foundation pit rigid water drainage platform device and its application method

Country Status (1)

Country Link
CN (1) CN107975054A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201679008U (en) * 2010-04-09 2010-12-22 中国三冶集团有限公司建筑安装工程公司 Rigid water drainage device for foundation pit
CN103061350A (en) * 2013-01-31 2013-04-24 中国三冶集团有限公司建筑安装工程公司 Deep foundation pit rigid water drainage platform device and using method
CN203113360U (en) * 2013-01-31 2013-08-07 中国三冶集团有限公司建筑安装工程公司 Deep foundation pit rigidity drainage platform device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201679008U (en) * 2010-04-09 2010-12-22 中国三冶集团有限公司建筑安装工程公司 Rigid water drainage device for foundation pit
CN103061350A (en) * 2013-01-31 2013-04-24 中国三冶集团有限公司建筑安装工程公司 Deep foundation pit rigid water drainage platform device and using method
CN203113360U (en) * 2013-01-31 2013-08-07 中国三冶集团有限公司建筑安装工程公司 Deep foundation pit rigidity drainage platform device

Similar Documents

Publication Publication Date Title
CN101845831B (en) Deepwater pile extension technology
CN105951856A (en) Construction method and structure of underwater reinforced concrete combined suspension-box cofferdam free of bottom-sealing concrete
JP2006265964A (en) Drainage treatment method
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN210127485U (en) Concrete suction type caisson foundation and thin-wall pier stud connecting structure
CN109025899B (en) Well sealing device
CN107354950A (en) A kind of economic quickly catch pit local dewatering method
CN210712963U (en) Drainage structure of basement bottom plate post-cast strip
CN107975054A (en) A kind of deep foundation pit rigid water drainage platform device and its application method
CN110258660A (en) The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating
CN107419811B (en) The method and its structure of basement bottom board support pile and drain hole waterproofing and leakage-stopping
CN103061350A (en) Deep foundation pit rigid water drainage platform device and using method
CN203113360U (en) Deep foundation pit rigidity drainage platform device
CN214530742U (en) Waterproof construction of local foundation ditch caisson
CN104631477B (en) A kind of method that dewatering device is installed and blocked in processing foundation ditch
JP2000130065A (en) Construction method for vertical shaft
CN110468862B (en) Plugging structure for precipitation wellhead of subway station
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method
CN202081425U (en) Water-saving mechanism for foundation pit water of building construction
CN217923590U (en) Wet operation mud water conservancy diversion processing system of resistance to plucking stock
JP2007218072A (en) Manhole
CN206448289U (en) It is provided with the large tank basis of connection raceway groove
JP2008223267A (en) Building foundation structure and building foundation construction method
JP4956512B2 (en) Manhole protrusion and levitation prevention structure
CN218713200U (en) Sump pit bottom plate pours device in advance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501