CN107974883A - A kind of urban rail transit construction rail bonding drill - Google Patents

A kind of urban rail transit construction rail bonding drill Download PDF

Info

Publication number
CN107974883A
CN107974883A CN201711186837.XA CN201711186837A CN107974883A CN 107974883 A CN107974883 A CN 107974883A CN 201711186837 A CN201711186837 A CN 201711186837A CN 107974883 A CN107974883 A CN 107974883A
Authority
CN
China
Prior art keywords
fixed link
type fixed
clamp
away
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711186837.XA
Other languages
Chinese (zh)
Inventor
王露露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Science And Technology Information Service Co Ltd Feng Tz
Original Assignee
Anhui Science And Technology Information Service Co Ltd Feng Tz
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Science And Technology Information Service Co Ltd Feng Tz filed Critical Anhui Science And Technology Information Service Co Ltd Feng Tz
Priority to CN201711186837.XA priority Critical patent/CN107974883A/en
Publication of CN107974883A publication Critical patent/CN107974883A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B31/00Working rails, sleepers, baseplates, or the like, in or on the line; Machines, tools, or auxiliary devices specially designed therefor
    • E01B31/02Working rail or other metal track components on the spot
    • E01B31/06Making holes, e.g. by drilling, punching, flame-cutting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of urban rail transit construction rail bonding drill, including water tank, the top of the water tank is connected with water pump in turn in the horizontal direction, hydraulic pump one and supporting rod, the side wall of the water tank is vertically fixedly connected with sliding slot and sparge pipe, the inner wall of the sliding slot is connected with sliding block, side of the sliding block away from sliding slot is fixedly connected with propeller, the one end of the propeller away from sliding block is connected with drilling machine, the one end of the supporting rod away from water tank is fixedly connected with U-shaped fixed link one, U-shaped fixed link one is oppositely positioned, the junction of the supporting rod and U-shaped fixed link one is connected with fixed block, the both ends of U-shaped fixed link one are connected to L-type fixed link one and L-type fixed link two, L-type fixed link one, the junction of L-type fixed link two and U-shaped fixed link one is equipped with elastic cylindrical pin one.The configuration of the present invention is simple, designs and rationally realizes quickly dismounting and clamp, and body can slide on rail, improve work efficiency.

Description

A kind of urban rail transit construction rail bonding drill
Technical field
The present invention relates to Transit Equipment technical field, more particularly to a kind of urban rail transit construction rail bonding drill.
Background technology
When modern railways are built, the drilling of the rail is an important project under construction, the quality of the quality of its quality to railway Influence it is very big, railway, electricity Wu Deng departments maintenance construction in, frequently refer to the bore operation to rail.
Currently used fixture is more heavy, huge, carries more difficulty, meanwhile, the clamping effect of fixture is poor, Rail can not be clamped, when drilling easily produces deviation, it is impossible to ensure the quality in aperture, when operation must be by drilling machine firmly It is fixed on rail, since current used retaining mechanism is also perfect not to the utmost, the locking effect and company of drilling machine and rail Connect unsatisfactory or even serious accident that drilling machine unloads to get off from rail when there is Train Approaching is bored with dismounting speed Soap water cannot be timely used during hole to be cleaned, and be highly detrimental to the use of drill bit, waste of resource.
According to the above problem, the present invention proposes a kind of urban rail transit construction rail bonding drill.
The content of the invention
The problem of the purpose of the present invention is to solve clamping device imperfection in the prior art and dismantling inconvenience, and propose A kind of urban rail transit construction rail bonding drill.
To achieve these goals, present invention employs following technical solution:
A kind of urban rail transit construction rail bonding drill, including water tank, the top of the water tank connect successively in the horizontal direction Water pump, hydraulic pump one and supporting rod are connected to, the side wall of the water tank is vertically fixedly connected with sliding slot and sparge pipe, described The inner wall of sliding slot is connected with sliding block, and side of the sliding block away from sliding slot is fixedly connected with propeller, and the propeller is away from sliding One end of block is connected with drilling machine, and the one end of the supporting rod away from water tank is fixedly connected with U-shaped fixed link one, described U-shaped solid Fixed pole one is oppositely positioned, and the junction of the supporting rod and U-shaped fixed link one is connected with fixed block, the U-shaped fixed link one Both ends are connected to L-type fixed link one and L-type fixed link two, the L-type fixed link one, L-type fixed link two and U-shaped fixed link One junction is equipped with elastic cylindrical pin one, and the described one end of hydraulic pump one away from water tank is fixedly connected with hydraulic stem one, institute State the one end of hydraulic stem one away from hydraulic pump one and be fixedly connected with H-type fixed link one, the groove difference of the H-type fixed link one Clamping L-type fixed link one and L-type fixed link two, the described one end of L-type fixed link one away from H-type fixed link one are fixedly connected with liquid Press pump two, the described one end of hydraulic pump two away from L-type fixed link one are fixedly connected with hydraulic stem two, and the hydraulic stem two is away from liquid One end of press pump two is fixedly connected with H-type fixed link two, and side of the H-type fixed link two away from hydraulic stem two, which is fixed, to be connected It is connected to pulley, side connection rail of the pulley away from H-type fixed link two, the outer wall of the hydraulic pump two is socketed with U-shaped solid Fixed pole two, the U-shaped fixed link two is oppositely positioned, and the both ends of the U-shaped fixed link two are connected to clamp one and clamp two, The junction of the clamp one, clamp two and U-shaped fixed link two is fixedly connected with elastic cylindrical pin two, the H-type fixed link two Groove be clamped clamp one and clamp two respectively, the clamp one and clamp two are respectively engaged with rail, and the L-type is fixed Bar one is identical with the component connected in L-type fixed link two.
Preferably, through hole one is equipped with the fixed block and U-shaped fixed link one, the through hole one is mutually matched, described The inner thread of through hole one is connected with nut, and the nut to match is equiped with the nut.
Preferably, the supporting rod is L-type Telescopic rod structure, and the supporting rod is equipped with square hole, the square hole Inner thread, which is connected with, marks closely screw one.
Preferably, the sliding slot includes longitudinal chute and horizontal concrete chute, and the quantity of the horizontal concrete chute is 3-5, described The quantity of longitudinal chute is 1.
Preferably, multiple equally distributed elasticity are equipped with the L-type fixed link one and L-type fixed link two in the horizontal direction Straight pin one.
Preferably, the sparge pipe includes nozzle, and the nozzle is outstanding hemispherical dome structure, is set on the nozzle There are multiple equally distributed spray orifices.
Preferably, the propeller includes motor, and side of the motor away from propeller inner wall is connected with shaft, described Threaded one end of the shaft away from motor is connected with ball-screw, and the ball-screw is horizontal positioned, and one end passes through propeller Inner wall is connected on drilling machine.
Preferably, the horizontal concrete chute is connected with the inner thread that through hole two described in through hole two is equiped with longitudinal chute Mark closely screw two.
Preferably, the clamp one and clamp two are equipped with packing ring close to one end of rail.
Preferably, the quantity of the supporting rod is 4-8.
Preferably, the U-shaped fixed link one is equipped with multiple equally distributed through holes one.
Compared with prior art, the beneficial effects of the invention are as follows:
1. by the use of water pump and water tank, cleaning when drilling machine works and refrigerating function are realized, passes through horizontal cunning The use of groove and longitudinal chute realizes adjustment of the drilling machine in the horizontal direction with vertical direction, real by the use of propeller The propulsion functions of drilling machine are showed.
2. by supporting rod and fixed block, the combination of U-shaped fixed link one, realize to L-type fixed link one and L-type fixed link Two fixation, realizes the buffering of clamping device, convenient to clamp and dismantle, and by the use of multiple through holes one, realizes adaptation The function of different size rail, adds practicality, by the combination of H-type fixed link one, hydraulic pump one and hydraulic stem one, realizes The clamping of L-type fixed link one and L-type fixed link two, is designed by the symmetrical structure of L-type fixed link one and L-type fixed link two, The function that both sides simultaneously clamp on is realized, adds stability, improves drilling engine efficiency.
3. by the packing ring on clamp one and clamp two, the protective effect to rail is realized, it is real by the use of pulley Slip of the body on rail is showed, has improved work efficiency, by the use of U-shaped fixed link two, realized to one He of clamp The fixation of clamp two, realizes function that is flexible and clamping, is clamp one and clamp by the use of hydraulic pump two and hydraulic stem two Two provide power, ensure the stability clamped.
4. realizing the function that body slides on rail by the Telescopic rod structure of supporting rod, pass through multiple elastic cylinders The use in one hole of pin, realizes the practicality to different size of rail, by the use of multigroup supporting rod, maintains body Stability.
5. improved work efficiency by the use of symmetrical two groups of drilling machines, pass through making for hydraulic pump one and hydraulic pump two With can be rapidly performed by clamping and dismantling, ensure the security of work.
6. whole device is relatively simple for structure, and easy to operate, water tank and water pump both can be the drilling machine in work Cooling, and lubrication can be played the role of, by the design of hemispherical nozzle and equally distributed spray orifice on sparge pipe, realize Cistern water supply is wide via the area of sparge pipe water outlet, and the big function of coverage rate, pass through the through hole one and inner wall spiral shell on fixed block The use of the nut and supporting nut of line connection, realizes the fixation between supporting rod and U-shaped fixed link one, realizes hydraulic pressure Contact between bar one and L-type fixed link one and L-type fixed link two, makes device body more stablize.
Brief description of the drawings
Fig. 1 is a kind of plan of urban rail transit construction rail bonding drill proposed by the present invention;
Fig. 2 is a kind of left view of the fixed block of urban rail transit construction rail bonding drill proposed by the present invention;
Fig. 3 is a kind of front view of the supporting rod of urban rail transit construction rail bonding drill proposed by the present invention;
Fig. 4 is a kind of front view of the sliding slot of urban rail transit construction rail bonding drill proposed by the present invention;
Fig. 5 is a kind of structure diagram of the sliding slot of urban rail transit construction rail bonding drill proposed by the present invention;
Fig. 6 is a kind of left view of the sparge pipe of urban rail transit construction rail bonding drill proposed by the present invention;
Fig. 7 is a kind of plan of the propeller of urban rail transit construction rail bonding drill proposed by the present invention.
In figure:Screw one, 5 sliding slots, 51 longitudinal directions are marked closely in 1 water tank, 2 water pumps, 3 hydraulic pumps one, 4 supporting rods, 41 square holes, 42 Sliding slot, 52 horizontal concrete chutes, 53 through holes two, 54 mark closely screw two, 6 sparge pipes, 61 nozzles, 62 spray orifices, 7 sliding blocks, 8 propellers, 81 Motor, 82 shafts, 83 ball-screws, 9 drilling machines, 10U types fixed link one, 11 fixed blocks, 111 through holes one, 112 nuts, 113 spiral shells Cap, 12L types fixed link one, 13L types fixed link two, 14 elastic cylindrical pins one, 15 hydraulic stems one, 16H types fixed link one, 17 hydraulic pressure Pump two, 18 hydraulic stems two, 19H types fixed link two, 20 pulleys, 21 rail, 22U types fixed link two, 23 clamps one, 24 clamps two, 25 elastic cylindrical pins two.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that term " on ", " under ", "front", "rear", "left", "right", " top ", The orientation or position relationship of the instruction such as " bottom ", " interior ", " outer " are based on orientation shown in the drawings or position relationship, merely to just In the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation, with Specific azimuth configuration and operation, therefore be not considered as limiting the invention.
With reference to Fig. 1-7, a kind of urban rail transit construction rail bonding drill, including water tank 1, the top of the water tank 1 is along water Square to water pump 2, hydraulic pump 1 and supporting rod 4 is connected with turn, the quantity of the supporting rod 4 is 4-8, the supporting rod 4 For L-type Telescopic rod structure, the supporting rod 4 is equipped with square hole 41, realizes body by the Telescopic rod structure of supporting rod 4 and exist The function of being slided on rail 21, by the use in multiple one 14 holes of elastic cylindrical pin, realizes to different size of rail 21 Practicality, knot about resource, by the use of multigroup supporting rod 4, maintains the stability of body, the inner wall of the square hole 41 It is threaded with and marks closely screw 1, the side wall of the water tank 1 is vertically fixedly connected with sliding slot 5 and sparge pipe 6, described Sparge pipe 6 includes nozzle 61, and the nozzle 61 is outstanding hemispherical dome structure, and the nozzle 61 is equipped with multiple uniform points The spray orifice 62 of cloth, the sliding slot 5 include longitudinal chute 51 and horizontal concrete chute 52, and the quantity of the horizontal concrete chute 52 is 3-5, institute The quantity for stating longitudinal chute 51 is 1, and 2 53 through hole of through hole is equiped with the horizontal concrete chute 52 and longitudinal chute 51 2 53 inner thread, which is connected with, marks closely screw 2 54, and the inner wall of the sliding slot 5 is connected with sliding block 7, and the sliding block 7 is away from sliding slot 5 side is fixedly connected with propeller 8, and the propeller 8 includes motor 81, the motor 81 away from 8 inner wall of propeller one Side is connected with shaft 82, and the threaded one end of the shaft 82 away from motor 81 is connected with ball-screw 83, the ball-screw 83 It is horizontal positioned, and the inner wall of one end through propeller 8 is connected on drilling machine 9, is carried by the use of symmetrical two groups of drilling machines 9 High work efficiency, the drill bit of the drilling machine 9 soap water in water tank 1 are poured by sparge pipe 6, and service life increase, has saved money Source, by the use of hydraulic pump 1 and hydraulic pump 2 17, can be rapidly performed by clamping and dismantling, ensure the security of work, By the use of water pump 2 and water tank 1, cleaning when drilling machine 9 works and refrigerating function are realized, by horizontal concrete chute 52 and is indulged Use to sliding slot 53 realizes adjustment of the drilling machine in the horizontal direction with vertical direction, by the use of propeller 8, realizes The propulsion functions of drilling machine 9, the described one end of propeller 8 away from sliding block 7 are connected with drilling machine 9, and the supporting rod 4 is away from water tank 1 one end is fixedly connected with U-shaped fixed link 1, and the U-shaped fixed link 1 is equipped with multiple equally distributed through holes one 111, the U-shaped fixed link 1 is oppositely positioned, and the junction of the supporting rod 4 and U-shaped fixed link 1 is connected with fixed block 11, through hole 1 is equipped with the fixed block 11 and U-shaped fixed link 1, and the through hole 1 is mutually matched, described logical The inner thread in hole 1 is connected with nut 112, and the nut 113 to match, the U-shaped fixation are equiped with the nut 112 The both ends of bar 1 are connected to L-type fixed link 1 and L-type fixed link 2 13, and whole device is relatively simple for structure, and Easy to operate, water tank 1 and water pump 2 can not only cool down for the drilling machine 9 in work, but also can play the role of lubrication, pass through spray The design of hemispherical nozzle 61 and equally distributed spray orifice 62 on water pipe 6, realizes water tank 1 and supplies water via 6 water outlet of sparge pipe Area it is wide, the big function of coverage rate and is matched somebody with somebody at the nut 112 connected by the through hole 1 on fixed block 11 with inner thread The use of the nut 113 of set, realizes the fixation between supporting rod 4 and U-shaped fixed link 1, realizes hydraulic stem 1 and L Contact between type fixed link 1 and L-type fixed link 2 13, makes device body more stablize, and by supporting rod 4 and fixes The combination of block 11, U-shaped fixed link 1, realizes the fixation to L-type fixed link 1 and L-type fixed link 2 13, realizes folder The buffering of tight device, it is convenient to clamp and dismantle, by the use of multiple through holes 1, realize and adapt to different size rail Function, adds practicality, and the junction of the L-type fixed link 1, L-type fixed link 2 13 and U-shaped fixed link 1 is all provided with Flexible straight pin 1, multiple be uniformly distributed is equipped with the L-type fixed link 1 and L-type fixed link 2 13 in the horizontal direction Elastic cylindrical pin 1, the described one end of hydraulic pump 1 away from water tank 1 is fixedly connected with hydraulic stem 1, the hydraulic stem One 15 one end away from hydraulic pump 1 are fixedly connected with H-type fixed link 1, pass through H-type fixed link 1, one 3 and of hydraulic pump The combination of hydraulic stem 1, realizes the clamping of L-type fixed link 1 and L-type fixed link 2 13, passes through one 12 He of L-type fixed link The symmetrical structure design of L-type fixed link 2 13, realizes the function that both sides simultaneously clamp on, adds stability, improve drilling Engine efficiency, the groove of the H-type fixed link 1 are clamped L-type fixed link 1 and L-type fixed link 2 13, the L-type respectively The one end of fixed link 1 away from H-type fixed link 1 is fixedly connected with hydraulic pump 2 17, and the hydraulic pump 2 17 is consolidated away from L-type One end of fixed pole 1 is fixedly connected with hydraulic stem 2 18, is clamp one by the use of hydraulic pump 2 17 and hydraulic stem 2 18 23 and clamp 2 24 provide power, ensure clamp stability, the described one end of hydraulic stem 2 18 away from hydraulic pump 2 17 is consolidated Surely H-type fixed link 2 19 is fixedly connected with, the side of the H-type fixed link 2 19 away from hydraulic stem 2 18 is fixedly connected with pulley 20, side connection rail 21 of the pulley 20 away from H-type fixed link 2 19, drilling machine 9 is secured firmly on rail 21, institute The outer wall for stating hydraulic pump 2 17 is socketed with U-shaped fixed link 2 22, and the U-shaped fixed link 2 22 is oppositely positioned, the U-shaped fixed link 2 22 both ends are connected to clamp 1 and clamp 2 24, while rail 21 are locked, via one 12 He of L-type fixed link L-type fixed link 2 13, H-type fixed link 2 19, the buffering of clamp 1 and clamp 2 24, and bad rail 21 will not be pressed from both sides, the card First 23, the junction of clamp 2 24 and U-shaped fixed link 2 22 is fixedly connected with elastic cylindrical pin 2 25, the H-type fixed link 2 19 groove is clamped clamp 1 and clamp 2 24 respectively, by the packing ring on clamp 1 and clamp 2 24, realizes Protective effect to rail 21, by the use of pulley 20, realizes slip of the body on rail 21, improves work effect Rate, by the use of U-shaped fixed link 2 22, realizes the fixation to clamp 1 and clamp 2 24, realizes flexible and clamping Function, the clamp 1 and clamp 2 24 are respectively engaged with rail 21, and the clamp 1 and clamp 2 24 are close to rail 21 one end is equipped with packing ring, and the L-type fixed link 1 is identical with the component connected in L-type fixed link 2 13.
Operation principle:By the use of water pump 2 and water tank 1, cleaning when drilling machine 9 works and refrigerating function are realized, Adjustment of the drilling machine in the horizontal direction with vertical direction is realized by the use of horizontal concrete chute 52 and longitudinal chute 53, by pushing away Into the use of device 8, the propulsion functions of drilling machine 9 are realized, pass through supporting rod 4 and fixed block 11, the knot of U-shaped fixed link 1 Close, realize the fixation to L-type fixed link 1 and L-type fixed link 2 13, realize the buffering of clamping device, it is convenient clamp and Dismounting, by the use of multiple through holes 1, realizes the function of adapting to different size rail, adds practicality, pass through H The combination of type fixed link 1, hydraulic pump 1 and hydraulic stem 1, realizes L-type fixed link 1 and L-type fixed link 2 13 Clamp, designed by the symmetrical structure of L-type fixed link 1 and L-type fixed link 2 13, realize the function that both sides simultaneously clamp on, Stability is added, improves drilling engine efficiency, by the packing ring on clamp 1 and clamp 2 24, is realized to rail 21 Protective effect, by the use of pulley 20, realizes slip of the body on rail 21, improves work efficiency, by U-shaped solid The use of fixed pole 2 22, realizes the fixation to clamp 1 and clamp 2 24, realizes function that is flexible and clamping, passes through hydraulic pressure The use of 2 17 and hydraulic stem 2 18 is pumped, power is provided for clamp 1 and clamp 2 24, ensures the stability clamped, passes through The Telescopic rod structure of supporting rod 4 realizes the function that body slides on rail 21, passes through multiple one 14 holes of elastic cylindrical pin Use, realize the practicality to different size of rail 21, by the use of multigroup supporting rod 4, maintain the stabilization of body Property, is improved work efficiency by the use of symmetrical two groups of drilling machines 9, by the use of hydraulic pump 1 and hydraulic pump 2 17, It can be rapidly performed by clamping and dismantling, ensure the security of work, whole device is relatively simple for structure, and easy to operate, Water tank 1 and water pump 2 not only can be that the drilling machine 9 in work cools down, but also can play the role of lubrication, by sparge pipe 6 The design of hemispherical nozzle 61 and equally distributed spray orifice 62, realize water tank 1 supply water it is wide via the area of 6 water outlet of sparge pipe, The big function of coverage rate, the nut 112 and supporting nut connected by the through hole 1 on fixed block 11 with inner thread 113 use, realizes the fixation between supporting rod 4 and U-shaped fixed link 1, realizes hydraulic stem 1 and L-type fixed link Contact between one 12 and L-type fixed link 2 13, makes device body more stablize.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements and from aforesaid way Limitation, as long as the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress is employed, or without changing Other occasions are directly applied into by the design of the present invention and technical solution, within protection scope of the present invention.This hair Bright protection domain should be determined by the scope of protection defined in the claims.

Claims (10)

1. a kind of urban rail transit construction rail bonding drill, including water tank (1), it is characterised in that the top edge of the water tank (1) Horizontal direction is connected with water pump (2), hydraulic pump one (3) and supporting rod (4) in turn, and the side wall of the water tank (1) is vertically Sliding slot (5) and sparge pipe (6) are fixedly connected with, the inner wall of the sliding slot (5) is connected with sliding block (7), and the sliding block (7) is away from sliding The side of groove (5) is fixedly connected with propeller (8), and the one end of the propeller (8) away from sliding block (7) is connected with drilling machine (9), The one end of the supporting rod (4) away from water tank (1) is fixedly connected with U-shaped fixed link one (10), and the U-shaped fixed link one (10) is anti- To placement, the junction of the supporting rod (4) and U-shaped fixed link one (10) is connected with fixed block (11), the U-shaped fixed link one (10) both ends are connected to L-type fixed link one (12) and L-type fixed link two (13), the L-type fixed link one (12), L-type The junction of fixed link two (13) and U-shaped fixed link one (10) is equipped with elastic cylindrical pin one (14), and the hydraulic pump one (3) is remote One end from water tank (1) is fixedly connected with hydraulic stem one (15), and the one end of the hydraulic stem one (15) away from hydraulic pump one (3) is consolidated Surely H-type fixed link one (16) is connected with, the groove of the H-type fixed link one (16) is clamped L-type fixed link one (12) and L respectively Type fixed link two (13), the one end of the L-type fixed link one (12) away from H-type fixed link one (13) are fixedly connected with hydraulic pump two (17), the one end of the hydraulic pump two (17) away from L-type fixed link one (12) is fixedly connected with hydraulic stem two (18), the hydraulic pressure The one end of bar two (18) away from hydraulic pump two (17) is fixedly connected with H-type fixed link two (19), the H-type fixed link two (19) side away from hydraulic stem two (18) is fixedly connected with pulley (20), and the pulley (20) is away from H-type fixed link two (19) Side connection rail (21), the outer wall of the hydraulic pump two (17) is socketed with U-shaped fixed link two (22), the U-shaped fixed link Two (22) are oppositely positioned, and the both ends of the U-shaped fixed link two (22) are connected to clamp one (23) and clamp two (24), described The junction of clamp one (23), clamp two (24) and U-shaped fixed link two (22) is fixedly connected with elastic cylindrical pin two (25), described The groove of H-type fixed link two (19) is clamped clamp one (23) and clamp two (24), the clamp one (23) and clamp two respectively (24) it is respectively engaged with rail (21), the component phase connected on the L-type fixed link one (12) and L-type fixed link two (13) Together.
A kind of 2. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the fixed block (11) and in U-shaped fixed link one (10) through hole one (111) is equipped with, the through hole one (111) is mutually matched, the through hole one (111) inner thread is connected with nut (112), and the nut (113) to match is equiped with the nut (112).
A kind of 3. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the supporting rod (4) it is L-type Telescopic rod structure, the supporting rod (4) is equipped with square hole (41), the inner thread connection of the square hole (41) Mark closely screw one (42).
A kind of 4. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the sliding slot (5) Including longitudinal chute (51) and horizontal concrete chute (52), the quantity of the horizontal concrete chute (52) is 3-5, the longitudinal chute (51) Quantity be 1.
5. a kind of urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the L-type is fixed Multiple equally distributed elastic cylindrical pins one (14) are equipped with bar one (12) and L-type fixed link two (13) in the horizontal direction.
A kind of 6. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the sparge pipe (6) nozzle (61) is included, the nozzle (61) is outstanding hemispherical dome structure, and the nozzle (61) is equipped with multiple uniform The spray orifice (62) of distribution.
A kind of 7. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the propeller (8) motor (81) is included, side of the motor (81) away from propeller (8) inner wall is connected with shaft (82), the shaft (82) threaded one end away from motor (81) is connected with ball-screw (83), and the ball-screw (83) is horizontal positioned, and one end Inner wall through propeller (8) is connected on drilling machine (9).
A kind of 8. urban rail transit construction rail bonding drill according to claim 4, it is characterised in that the horizontal concrete chute (52) and in longitudinal chute (51) inner thread for being equiped with through hole two (53) through hole two (53) is connected with and marks closely screw Two (54).
A kind of 9. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the clamp one (23) and clamp two (24) is equipped with packing ring close to one end of rail (21).
A kind of 10. urban rail transit construction rail bonding drill according to claim 1, it is characterised in that the supporting rod (4) quantity is 4-8.
CN201711186837.XA 2017-11-24 2017-11-24 A kind of urban rail transit construction rail bonding drill Pending CN107974883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711186837.XA CN107974883A (en) 2017-11-24 2017-11-24 A kind of urban rail transit construction rail bonding drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711186837.XA CN107974883A (en) 2017-11-24 2017-11-24 A kind of urban rail transit construction rail bonding drill

Publications (1)

Publication Number Publication Date
CN107974883A true CN107974883A (en) 2018-05-01

Family

ID=62011501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711186837.XA Pending CN107974883A (en) 2017-11-24 2017-11-24 A kind of urban rail transit construction rail bonding drill

Country Status (1)

Country Link
CN (1) CN107974883A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611934A (en) * 2018-05-28 2018-10-02 芜湖华佳新能源技术有限公司 A kind of piercing machine for rail convenient for positioning

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2446147A1 (en) * 1979-01-12 1980-08-08 Peddinghaus Rolf Drilling machine for large steel sections - has hydraulic clamps to hold machine on running rails during drilling operation
JP3167810U (en) * 2011-02-25 2011-05-19 山田建設株式会社 Punch device for stenosis
KR20150110442A (en) * 2015-09-09 2015-10-02 황선일 Drill Movable on Board a Rail for Forming Hole
CN105672069A (en) * 2016-03-13 2016-06-15 黄斌 Ground rail drilling machine
CN205571467U (en) * 2015-07-13 2016-09-14 刘剑 Position rail bonding drill is confirmed to three -dimensional rapidogen
CN206009911U (en) * 2016-08-09 2017-03-15 无锡尊宝电动车有限公司 A kind of electronic Vehicle Processing drilling machine
CN106930162A (en) * 2015-09-17 2017-07-07 成都明日星辰科技有限公司 A kind of rail bonding drill

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2446147A1 (en) * 1979-01-12 1980-08-08 Peddinghaus Rolf Drilling machine for large steel sections - has hydraulic clamps to hold machine on running rails during drilling operation
JP3167810U (en) * 2011-02-25 2011-05-19 山田建設株式会社 Punch device for stenosis
CN205571467U (en) * 2015-07-13 2016-09-14 刘剑 Position rail bonding drill is confirmed to three -dimensional rapidogen
KR20150110442A (en) * 2015-09-09 2015-10-02 황선일 Drill Movable on Board a Rail for Forming Hole
CN106930162A (en) * 2015-09-17 2017-07-07 成都明日星辰科技有限公司 A kind of rail bonding drill
CN105672069A (en) * 2016-03-13 2016-06-15 黄斌 Ground rail drilling machine
CN206009911U (en) * 2016-08-09 2017-03-15 无锡尊宝电动车有限公司 A kind of electronic Vehicle Processing drilling machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108611934A (en) * 2018-05-28 2018-10-02 芜湖华佳新能源技术有限公司 A kind of piercing machine for rail convenient for positioning
CN108611934B (en) * 2018-05-28 2021-03-02 王宛情 Railway rail drilling machine convenient to location

Similar Documents

Publication Publication Date Title
CN107803654A (en) It is a kind of can Multidirectional-moving regulation stubborn bolt robot device
CN107974883A (en) A kind of urban rail transit construction rail bonding drill
CN206971066U (en) A kind of town road line drawing auxiliary device
CN210449662U (en) High-efficient automatic metal hot spraying device
CN104614158A (en) Propeller open water test device
CN107988937A (en) A kind of traffic roadblock cleaning device
CN212642966U (en) Device for cleaning internal broken bolt of blade root bolt sleeve of wind wheel blade
CN102457023A (en) Device for charged processing looseness of pin type insulator nut
CN204621930U (en) Electronic double end sleeve
CN208811703U (en) Cooling device for machine tool of machining center
CN201419385Y (en) Universal broken tap and drill bit taking machine tool
CN110465837A (en) A kind of electric grinder preventing clast splash
CN212000407U (en) Direct current concrete sleeper bolt changes anchor equipment
CN209022266U (en) Disconnecting device
CN208032890U (en) Rotatable mister head
CN106836234A (en) A kind of assembled foundation ditch concrete support is detachably connected joint
CN202318097U (en) Electrified fastener for porcelain bottle nuts
CN208111299U (en) A kind of portable high-pressure brake pull-rod
CN206392283U (en) A kind of adjustable cooling-liquid nozzle
CN208005556U (en) A kind of bolt tightens auxiliary body
CN203541839U (en) Welding machine cooling device
CN207738814U (en) A kind of locking rotating device of adjustable waterproof of mandrel
CN108506551A (en) A kind of ball valve quick coupling strong with sealing performance
CN217044642U (en) Cooling device for cutter
CN206332390U (en) A kind of cable anchor ear

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501