A kind of rail yard track switch reinforcement means and structure Download PDFInfo
- Publication number
- CN107974878B CN107974878B CN201711227336.1A CN201711227336A CN107974878B CN 107974878 B CN107974878 B CN 107974878B CN 201711227336 A CN201711227336 A CN 201711227336A CN 107974878 B CN107974878 B CN 107974878B
- Authority
- CN
- China
- Prior art keywords
- type construction
- construction beam
- switch
- track switch
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B7/00—Switches; Crossings
- E01B7/10—Frogs
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
A kind of rail yard track switch reinforcement means provided by the invention and structure, the described method includes: step 1, is arranged D type construction beam stringer in track switch two sides, and support the D type construction beam stringer using borehole column;Step 2, D type construction beam crossbeam is fixedly installed in switch tie bottom, and the both ends of the D type construction beam crossbeam are contacted with the D type construction beam stringer of the track switch two sides respectively;Step 3, the end of the D type construction beam stringer and the D type construction beam crossbeam is fastened by bracket and connecting plate.A kind of rail yard track switch reinforcement means provided by the invention ensure that safety, stationarity and comfort when train passes through track switch so that each component connection relationship is solid and reliable in rail yard track switch;Meanwhile the ruggedized construction good integrity obtained by the rail yard track switch reinforcement means, it is applicable to the reinforcing of different model track switch.
Description
Technical field
The present invention relates to railway construction technical fields, more particularly, to a kind of rail yard track switch reinforcement means and knot
Structure.
Background technique
Track switch is a kind of weakness of line connection equipment and track for making rolling stock be transferred to another station track from a station track
One of link, usually AT STATION, marshalling yard is largely laid with.There is track switch, the handling capacity of route can be given full play to.Even
Single-track railway, laying a switch build one section of cross wires for being greater than train length, so that it may split train.Track switch is on rail track
It plays an important role.
Implement the continuous development of " Ping Gaili " engineering and each urban construction, railway Grade Separation Project along with China railways
Quantity be increasing, on the basis of existing railway working line, not cut off traffic as principle, can generally use jacking
Build frame bridge.Since urban planning road network is influenced by many factors, it inevitably will appear road from railway switch
Area below by the case where.The structure design comparison of track switch is complicated, very sensitive to the vertical and horizontal displacement of route, commonly
The vertical stability chosen horizontal lift beam reinforcing and be difficult to ensure switch structure of I-steel.
Traditionally generally handled using following two method: first is that adjustment highway layout line position, avoids railway switch area, this
Sample can be using conventional track strengthening mode, but influences on urban road network planning very big;It is changed to second is that track switch is temporarily moved
Except road construction coverage, restore to the original state after frame jacking construction, but be affected to railway operation.
The existing construction method suitable for switch area track strengthening includes: to connect stringer using U-bolt with crossbeam,
Stringer is placed on caisson apical cap beam.But entire reinforcement system snap fit part is more, integral reinforcing effect is poor, it is difficult to meet track switch
The high request of stationarity;And stringer span is limited, frame jack-in process must remove the caisson in coverage, to switch structure
Stability influence it is big.
Summary of the invention
For the above technical issues, the present invention provides a kind of rail yard track switch reinforcement means and structure.
In a first aspect, the present invention provides a kind of rail yard track switch reinforcement means, comprising: step 1, be arranged in track switch two sides
D type construction beam stringer, and the D type construction beam stringer is supported using borehole column;Step 2, it is fixedly installed in switch tie bottom
D type construction beam crossbeam, and the both ends of the D type construction beam crossbeam are vertical with the D type construction beam of the track switch two sides respectively
Beam contact;Step 3, by bracket and connecting plate by the end of the D type construction beam stringer and the D type construction beam crossbeam
Fastening.
Wherein, after the step 3 further include: be laid with steel between the D type construction beam crossbeam and the switch tie
Plate, and the D type construction beam crossbeam is connect with the Interal fixation;And limit angle is respectively provided at the both ends of the switch tie
Switch tie fixation is limited on the steel plate by steel.
Wherein, limit angle steel is respectively provided at the both ends of the switch tie to specifically include: being respectively provided with cross at the both ends of the switch tie
To limit angle steel and longitudinal spacing angle steel, and the cross spacing angle steel and the longitudinal spacing angle steel are bolted on
On the steel plate.
Wherein, after the both ends of the switch tie are respectively provided with cross spacing angle steel and longitudinal spacing angle steel further include: described
Clog weedtree in gap between cross spacing angle steel and the switch tie, and the longitudinal spacing angle steel and the switch tie it
Between gap in clog weedtree.
Wherein, the rail yard track switch reinforcement means, which is characterized in that further include: it is arranged on the switch tie and hangs
Beam-and-rail, and be fixedly connected with the hanger rail beam, the D type construction beam crossbeam and the switch tie with U-bolt.
Wherein, after the step 3 further include: goat is set on the D type construction beam crossbeam, and uses angle steel
The goat is fixed on the D type construction beam crossbeam.
Wherein, the rail yard track switch reinforcement means, further includes: be arranged between the switch tie and the steel plate exhausted
Listrium.
Wherein, the rail yard track switch reinforcement means, further includes: Framed underpass bridge, and frame are carried out after the completion of reinforcing
Ruggedized equipment is removed after the completion of bridge formation jacking.
Second aspect, the present invention provide a kind of rail yard track switch ruggedized construction, comprising: the D type of track switch two sides is arranged in
Construction beam stringer supports the borehole column of the D type construction beam stringer;It is fixed at the D type construction beam of switch tie bottom
Crossbeam, and the both ends of the D type construction beam crossbeam are contacted with the D type construction beam stringer of the track switch two sides respectively;Institute
The both ends for stating D type construction beam crossbeam are equipped with connecting plate, the connecting plate by the end of the D type construction beam crossbeam with
The D type construction beam stringer is fixedly connected;And in the company of the D type construction beam crossbeam and the D type construction beam stringer
Connect place's setting bracket.
Wherein, the rail yard track switch ruggedized construction, further includes: be fixed at the D type construction beam crossbeam
With the steel plate between the switch tie;And the cross spacing angle steel and longitudinal spacing angle steel of the switch tie end are set, and institute
One right-angle side of a right-angle side and the longitudinal spacing angle steel for stating cross spacing angle steel is fixed on the steel plate.
A kind of rail yard track switch reinforcement means provided by the invention and structure are constructed by the way that D type is arranged in track switch two sides
Just beam stringer crosses switch tie bottom setting D type construction beam crossbeam, and passes through bracket and connecting plate for D type construction beam stringer
It is fixedly connected with D type construction beam crossbeam, so that each component connection relationship is solid and reliable in rail yard track switch, ensure that train
Pass through safety, stationarity and the comfort when track switch;Meanwhile the reinforcing knot obtained by the rail yard track switch reinforcement means
Structure good integrity is applicable to the reinforcing of different model track switch.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the flow chart of rail yard track switch reinforcement means provided in an embodiment of the present invention;
Fig. 2 is the plan view of rail yard track switch ruggedized construction provided in an embodiment of the present invention;
Fig. 3 is the cross-sectional view of rail yard track switch ruggedized construction shown in Fig. 2;
Fig. 4 is the switch tie and D type construction beam crossbeam of vertical main track in rail yard track switch ruggedized construction shown in Fig. 2
Connection relationship cross-section diagram;
Fig. 5 is the connection of inclined switch tie and D type construction beam crossbeam in rail yard track switch ruggedized construction shown in Fig. 2
Relationship cross-section diagram;
Fig. 6 is the plan view of switch tie and D type construction beam crossbeam in rail yard track switch ruggedized construction shown in Fig. 2;
Wherein, 1-D type construction beam stringer;2-D type construction beam crossbeam;3- hanger rail beam;4- bracket;5-U type bolt;
6- railway switch;7- angle steel;8- caisson;9- pre-embedded bolt;10- connecting plate;11- insulation board;12- tongue;13- stock rail;
14- switch tie;15- steel plate;161- cross spacing angle steel;162- longitudinal spacing angle steel;17- connection bolt;18- weedtree.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical solution in the embodiment of the present invention is explicitly described, it is clear that described embodiment is the present invention
A part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not having
Every other embodiment obtained under the premise of creative work is made, shall fall within the protection scope of the present invention.
Fig. 1 is the flow chart of rail yard track switch reinforcement means provided in an embodiment of the present invention, as shown in Figure 1, this method
Include: step 1, D type construction beam stringer is set in track switch two sides, and the D type construction beam stringer is supported using borehole column;
Step 2, switch tie bottom be fixedly installed D type construction beam crossbeam, and the both ends of the D type construction beam crossbeam respectively with it is described
The D type construction beam stringer of track switch two sides contacts;Step 3, by bracket and connecting plate by the D type construction beam stringer and institute
State the end fastening of D type construction beam crossbeam.
Wherein, bracket refers to the local structure of cantilever end and drop in beam end, also known as corbel.The effect of bracket is linking cantilever
Beam and drop in beam, and transmit the load from drop in beam.Herein due to the mutual overlap joint of beam, centre there is provision of force-transmission support seat to pass
Biggish vertically and horizontally counter-force is passed, therefore bracket height has weakened to the half less than deck-molding, but transmitted again biggish perpendicular
Straight and horizontal reacting force, this just makes it the weak part in superstructure.
Specifically, D type construction beam stringer 1 is set in track switch two sides combined with Figure 1 and Figure 2, and D is supported using borehole column 8
Type construction beam stringer 1, for example, the borehole column 8 manually built up supports D type construction beam stringer 1, track switch needs at general one
Build 4 borehole columns 8.Then 4 bottom of switch tie setting D type construction beam crossbeam 2 is crossed, that is, D type construction beam crossbeam 2 passes through
The bottom of entire switch tie 4 is then not required to that entire track switch can be reinforced track switch progress subregion, and can be adapted for different shaped
Number track switch.Then, which is tightened together with switch tie 4.
As described in Figure 3, the end of D type construction beam crossbeam 2 and D type construction beam stringer 1 are connected to connecting plate 10
Together, for example, being connected to the end of connecting plate 10 and D type construction beam crossbeam 2 and D type construction beam stringer 1 by bolt
Together.And bracket 4 is arranged in the end of D type construction beam crossbeam 2 and the junction of D type construction beam stringer 1, for example, will
Two right-angle sides of bracket 4 pass through bolt respectively and are connected with the end of D type construction beam crossbeam 2 and D type construction beam stringer 1, into
And improve the reliability of entire track switch.
In embodiments of the present invention, by the way that D type construction beam stringer is arranged in track switch two sides, switch tie bottom setting D is crossed
Type construction beam crossbeam, and be fixedly connected with D type construction beam stringer with D type construction beam crossbeam with connecting plate by bracket,
So that each component connection relationship is solid and reliable in rail yard track switch, safety when train passes through track switch, stationarity ensure that
And comfort;Meanwhile the ruggedized construction good integrity obtained by the rail yard track switch reinforcement means, it is applicable to different shaped
The reinforcing of number track switch.
In addition, pre-embedded bolt 9 can be arranged at the top of borehole column 8, to be fixed on borehole column 8 using the pre-embedded bolt 9
The lower section of D type construction beam stringer 1, to play a supporting role.Can also the top of D type construction beam stringer 1 and borehole column 8 it
Between rubber pad is set, to prevent D type construction beam stringer 1 from sliding with borehole column 8.
On the basis of the above embodiments, after the step 3 further include: the D type construction beam crossbeam 2 with
It is laid with steel plate 15 between the switch tie 4, and the D type construction beam crossbeam 2 is fixedly connected with the steel plate 15;And institute
The both ends for stating switch tie 4 are respectively provided with limit angle steel, and the switch tie 4 fixation is limited on the steel plate 15.
Wherein, angle steel is commonly called as angle bar, is that both sides are orthogonal at angular strip steel.There are equal leg angle and inequilateral angle
Point of steel.
Specifically, in conjunction with Fig. 3 and Fig. 4, steel plate 15 is laid between D type construction beam crossbeam 2 and switch tie 4, that is, steel plate 15
It is disposed longitudinally on the top of D type construction beam crossbeam 2.And be fixed together D type construction beam crossbeam 2 with steel plate 15,
For example, bolt hole is arranged in the corresponding position of steel plate 15 and D type construction beam crossbeam 2, and D type is constructed using connection bolt 17
Just beam crossbeam 2 and steel plate 15 are fixed.In the both ends of switch tie 4 setting limit angle steel, that is, use limit angle steel by 4 fixation steel plate of switch tie
On 15, to realize the purpose limited to switch tie 4, guarantee the stability of track switch.
In embodiments of the present invention, by being laid with steel plate between D type construction beam crossbeam and switch tie, and switch tie is led to
It crosses the fixed limitation of limit angle steel on the steel plate, realizes the purpose limited to switch tie, the stability of track switch is improved, so that train smooth
Pass through track switch.
On the basis of the various embodiments described above, limit angle steel is respectively provided at the both ends of the switch tie 4 and is specifically included: described
The both ends of switch tie 4 are respectively provided with cross spacing angle steel 161 and longitudinal spacing angle steel 162, and the cross spacing angle steel 161 and described
Longitudinal spacing angle steel 162 is bolted on the steel plate 15.
Specifically, as Figure 4-Figure 6, cross spacing angle steel 161 and longitudinal spacing angle steel are respectively provided at the both ends of switch tie 4
162, that is, be both provided with cross spacing angle steel 161 and longitudinal spacing angle steel 162 in every one end of switch tie 4, and can be according to practical feelings
The quantity of condition increase cross spacing angle steel 161 and longitudinal spacing angle steel 162.For example, when switch tie 4 is tilted to the left, 4 left side of switch tie
The pressure being subject to is larger, several cross spacing angle steel 161 and longitudinal spacing angle steel 162 suitably can be arranged the left end of switch tie 4 more,
So that switch tie 4 can be relatively stably fixed on steel plate 15, to guarantee the reliability of track switch.And in the corresponding positions of steel plate 15
Bolt hole is installed, and cross spacing angle steel 161 and longitudinal spacing angle steel 162 are each attached on steel plate 15 by bolt, into
And the fixation of switch tie 14 is limited on steel plate 15, that is, the fixation of switch tie 14 is limited on D type construction beam crossbeam 2, to improve
The stability of trouble.
On the basis of the various embodiments described above, cross spacing angle steel 161 and longitudinal direction are respectively provided at the both ends of the switch tie 14
After limiting angle steel 162 further include: between the cross spacing angle steel 161, the longitudinal spacing angle steel 162 and the trouble 14
Weedtree 18 is clogged in gap.
Specifically, in conjunction with Fig. 5 and Fig. 6, cross spacing angle steel 161 and longitudinal spacing angle have been respectively provided at the both ends of switch tie 14
After steel 162, also need to clog weedtree 18 in the gap between cross spacing angle steel 161, longitudinal spacing angle steel 162 and switch tie 14, that is,
The gap between two ends of switch tie 14 and limit angle steel is clogged with weedtree 18, further to limit the position of switch tie 14
It is fixed, and then improve the stability of switch tie 14.
On the basis of the various embodiments described above, further includes: hanger rail beam 3 is set on the switch tie 14, and with U-bolt 5
The hanger rail beam 3, the D type construction beam crossbeam 2 and the switch tie 14 are fixedly connected;Correspondingly, the point on the switch tie
Rail and stock rail are also secured on the D type construction beam crossbeam.
Wherein, U bolt, i.e. U-bolts, U-bolts English name are U-bolt, and criteria of right and wrong part, shape is U-shaped
So also referred to as U-bolt, both ends have screw thread that can be mainly used for fixed tube such as water pipe or tablet such as vapour in conjunction with nut
The leaf spring of vehicle, due to its fix the mode of object as people horseback, therefore referred to as U-bolts.
Specifically, hanger rail beam 3 is set on switch tie 14, for example, detaining rail with P50 rail 3-3-3-3 hanger rail beam 3, and in switch tie
Hanger rail beam 3 is arranged on 14 to carry out between construction borehole column 8.Then, by switch tie 14, hanger rail beam 3 and D type construction beam crossbeam
It is linked together with U-bolt;Correspondingly, the tongue 12 on switch tie 14 and stock rail 13 are also secured at D type construction beam crossbeam
On 2, then D type construction beam crossbeam 2, switch tie, stock rail 13, tongue 12 and hanger rail beam 3 are linked to be an entirety, so that whole
A track switch is more firm.
On the basis of the various embodiments described above, after the step 3 further include: in the D type construction beam crossbeam 2
Upper setting goat 6, and the goat 6 is fixed on the D type construction beam crossbeam 2 with angle steel 7.
Wherein, goat (switch machine/point machine) is the executing agency of switch control system;With
In conversion locking point tongue or heart rail, the position and state of point tongue or heart rail in supervision interlocking area are indicated.
Specifically, goat 6 is arranged and the goat 6 is fixed on D on D type construction beam crossbeam 2, and with angle steel 7
On type construction beam crossbeam 2, that is, open up bolt hole in the corresponding position of angle steel 7 and D type construction beam crossbeam 2;Then, by angle
Steel 7 is arranged at the lower edge of goat 6, and angle steel 7 is fixedly connected by blending bolt with D type construction beam crossbeam 2, so that turn-out track
Machine 6 is fixed on D type construction beam crossbeam 2.
On the basis of the various embodiments described above, the rail yard track switch reinforcement means, further includes: in the switch tie 14
Insulation board 11 is set between the steel plate 15.Further include: Framed underpass bridge is carried out after the completion of reinforcing, and Framed underpass bridge is completed
After remove ruggedized equipment.
Specifically, insulation board 11 is set between switch tie 14 and steel plate 15, for example, insulation board 11 is plank etc.;That is, branching off
Pillow 14, insulation board 11, steel plate 15 and D type construction beam crossbeam 2 are set gradually under upper, thus make switch tie 14 and steel plate 15 it
Between insulate, the influence to avoid steel plate 15 and D type construction beam crossbeam 2 to switch tie 14 improves the security performance of entire track switch.?
After the completion of reinforcing to rail yard track switch, Framed underpass bridge construction is carried out, Framed underpass bridge removes track strengthening equipment afterwards in place,
Restore route.In addition, above-mentioned construction procedure is only to illustrate technically feasible, the difference of sequence of construction can't be patent right
Limiting factor.
Fig. 2 is the plan view of rail yard track switch ruggedized construction provided in an embodiment of the present invention, as shown in Fig. 2, the railway
Yard track switch ruggedized construction includes: the D type construction beam stringer 1 that track switch two sides are arranged in, and supports the D type construction beam vertical
The borehole column 8 of beam 1;It is fixed at the D type construction beam crossbeam 2 of 14 bottom of switch tie, and the D type construction beam crossbeam 2
Both ends are contacted with the D type construction beam stringer 1 of the track switch two sides respectively;It is all provided at the both ends of the D type construction beam crossbeam 2
There is connecting plate 10, the connecting plate 10 is fixed by the end of the D type construction beam crossbeam 2 and the D type construction beam stringer 1
Connection;And bracket 4 is equipped in the junction of the D type construction beam crossbeam 2 and the D type construction beam stringer 1.
Specifically, D type construction beam stringer 1 is set in track switch two sides, and supports D type construction beam vertical using borehole column 8
Beam 1, for example, the borehole column 8 manually built up supports D type construction beam stringer 1, track switch needs to build 4 boreholes at general one
Column 8.Then 4 bottom of switch tie be arranged D type construction beam crossbeam 2, and the both ends of D type construction beam crossbeam 2 respectively with the road
The D type construction beam stringer 1 of two sides of branching off contacts, that is, D type construction beam crossbeam 2 passes through the bottom of entire switch tie 4, then is not required to pair
Track switch, which carries out subregion, to reinforce entire track switch, and can be adapted for the track switch of different model.And when switch tie 14 is vertical
When the switch tie 14 of straight main track, as shown in figure 4, the underface of switch tie 14 is arranged in D type construction beam crossbeam 2;When switch tie 14 is to incline
When oblique switch tie 14, as shown in figure 5, the side-lower of switch tie 14 is arranged in D type construction beam crossbeam 2.Then, which is constructed
Just beam crossbeam 2 tightens together with switch tie 4.
As described in Figure 3, the end of D type construction beam crossbeam 2 and D type construction beam stringer 1 are connected to connecting plate 10
Together;And bracket 4 is arranged in the end of D type construction beam crossbeam 2 and the junction of D type construction beam stringer 1, for example, will
Two right-angle sides of bracket 4 pass through bolt respectively and are connected with the end of D type construction beam crossbeam 2 and D type construction beam stringer 1, into
And improve the reliability of entire track switch.
The rail yard track switch ruggedized construction on the basis of the above embodiments, further includes: be fixed at the D
Steel plate 15 between type construction beam crossbeam 2 and the switch tie 14;And the cross spacing angle of 14 end of switch tie is set
Steel 161 and longitudinal spacing angle steel 162, and a right-angle side of the cross spacing angle steel 161 and the longitudinal spacing angle steel 162
A right-angle side be fixed on the steel plate 15.
Specifically, in conjunction with Fig. 6, steel plate 15 is laid between D type construction beam crossbeam 2 and switch tie 4, that is, steel plate 15 is longitudinal
The top of D type construction beam crossbeam 2 is set.And D type construction beam crossbeam 2 is fixed together with steel plate 15.And
Cross spacing angle steel 161 and longitudinal spacing angle steel 162 are respectively provided in the end of switch tie 4, that is, are all arranged at the both ends of switch tie 4
There are cross spacing angle steel 161 and longitudinal spacing angle steel 162, and cross spacing angle steel 161 and longitudinal direction can be increased according to the actual situation
Limit the quantity of angle steel 162.For example, when switch tie 4 is to by tilting, when train passes through track switch, the pressure that is subject on the right of switch tie 4 compared with
Greatly, several cross spacing angle steel 161 and longitudinal spacing angle steel 162 suitably can be set the right end of switch tie 4, so that 4 energy of switch tie more
It is enough to be relatively stably fixed on steel plate 15, to guarantee the reliability of track switch.And by cross spacing angle steel 161 and longitudinal spacing angle
Steel 162 is each attached on steel plate 15, and then the fixation of switch tie 14 is limited on steel plate 15, that is, the fixation of switch tie 14 is limited in D type
On construction beam crossbeam 2, to improve the stability of track switch.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features;
And these are modified or replaceed, technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (8)
1. a kind of rail yard track switch reinforcement means characterized by comprising
Step 1, D type construction beam stringer is set in track switch two sides, and the D type construction beam stringer is supported using borehole column;
Step 2, switch tie bottom be fixedly installed D type construction beam crossbeam, and the both ends of the D type construction beam crossbeam respectively with
The D type construction beam stringer of the track switch two sides contacts;
Step 3, by bracket and connecting plate that the end of the D type construction beam stringer and the D type construction beam crossbeam is tight
Gu;
After the step 3 further include: be laid with steel plate between the D type construction beam crossbeam and the switch tie, and by institute
D type construction beam crossbeam is stated to connect with the Interal fixation;And it is respectively provided with limit angle steel at the both ends of the switch tie, it will
The switch tie fixation is limited on the steel plate;
Further include: hanger rail beam is set on the switch tie, and with U-bolt by the hanger rail beam, the D type construction beam crossbeam
And the switch tie is fixedly connected.
2. rail yard track switch reinforcement means according to claim 1, which is characterized in that be all provided at the both ends of the switch tie
Limit angle steel is set to specifically include:
Cross spacing angle steel and longitudinal spacing angle steel are respectively provided at the both ends of the switch tie, and the cross spacing angle steel and described
Longitudinal spacing angle steel is bolted on the steel plate.
3. rail yard track switch reinforcement means according to claim 2, which is characterized in that be all provided at the both ends of the switch tie
After setting cross spacing angle steel and longitudinal spacing angle steel further include: in the gap between the cross spacing angle steel and the switch tie
Weedtree is clogged, and clogs weedtree in the gap between the longitudinal spacing angle steel and the switch tie.
4. rail yard track switch reinforcement means according to claim 1, which is characterized in that also wrapped after the step 3
It includes: goat being set on the D type construction beam crossbeam, and the goat is fixed at the D type with angle steel and is applied
Work is just on beam crossbeam.
5. rail yard track switch reinforcement means according to claim 2, which is characterized in that further include: the switch tie with
Insulation board is set between the steel plate.
6. rail yard track switch reinforcement means according to claim 1-5, which is characterized in that further include: it reinforces
Framed underpass bridge is carried out after the completion, and ruggedized equipment is removed after the completion of Framed underpass bridge.
7. a kind of rail yard track switch obtained using rail yard track switch reinforcement means described in any one of claims 1-6 is added
Fixing structure characterized by comprising the D type construction beam stringer of track switch two sides is set, supports the D type construction beam vertical
The borehole column of beam;
Be fixed at the D type construction beam crossbeam of switch tie bottom, and the both ends of the D type construction beam crossbeam respectively with it is described
The D type construction beam stringer of track switch two sides contacts;
Connecting plate is equipped at the both ends of the D type construction beam crossbeam, and the connecting plate is by the D type construction beam crossbeam
End is fixedly connected with the D type construction beam stringer;
And bracket is set in the junction of the D type construction beam crossbeam and the D type construction beam stringer.
8. rail yard track switch ruggedized construction according to claim 7, which is characterized in that further include:
The steel plate being fixed between the D type construction beam crossbeam and the switch tie;And it is arranged in the switch tie end
Cross spacing angle steel and longitudinal spacing angle steel, and a right-angle side of the cross spacing angle steel and the longitudinal spacing angle steel
One right-angle side is fixed on the steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711227336.1A CN107974878B (en) | 2017-11-29 | 2017-11-29 | A kind of rail yard track switch reinforcement means and structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711227336.1A CN107974878B (en) | 2017-11-29 | 2017-11-29 | A kind of rail yard track switch reinforcement means and structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107974878A CN107974878A (en) | 2018-05-01 |
CN107974878B true CN107974878B (en) | 2019-07-05 |
Family
ID=62008583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711227336.1A Active CN107974878B (en) | 2017-11-29 | 2017-11-29 | A kind of rail yard track switch reinforcement means and structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107974878B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593030A (en) * | 2019-09-12 | 2019-12-20 | 中铁二局第二工程有限公司 | Line turnout area reinforcing system for D-shaped beam frame |
CN114318962A (en) * | 2021-12-23 | 2022-04-12 | 山东鲁道建设工程有限公司 | Railway turnout area line reinforcing construction method |
CN114318960A (en) * | 2021-12-23 | 2022-04-12 | 山东鲁道建设工程有限公司 | Construction method of spliced railway construction boundary beam |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204417928U (en) * | 2015-01-19 | 2015-06-24 | 平煤神马建工集团有限公司土建处 | The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue |
CN106049209A (en) * | 2016-07-28 | 2016-10-26 | 中铁第四勘察设计院集团有限公司 | Temporary steel rail supporting device for disassembling and replacing railway ballastless track supporting layers |
CN206538637U (en) * | 2017-02-13 | 2017-10-03 | 中铁十八局集团第四工程有限公司 | A kind of track strengthening device for existing railway |
-
2017
- 2017-11-29 CN CN201711227336.1A patent/CN107974878B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204417928U (en) * | 2015-01-19 | 2015-06-24 | 平煤神马建工集团有限公司土建处 | The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue |
CN106049209A (en) * | 2016-07-28 | 2016-10-26 | 中铁第四勘察设计院集团有限公司 | Temporary steel rail supporting device for disassembling and replacing railway ballastless track supporting layers |
CN206538637U (en) * | 2017-02-13 | 2017-10-03 | 中铁十八局集团第四工程有限公司 | A kind of track strengthening device for existing railway |
Non-Patent Citations (3)
Title |
---|
既有线道岔区顶进框架桥线路加固设计;吴炜;《甘肃科技》;20090630(第12期);第38-39页,第15页 |
横向加宽D16型施工便梁在岔区线路加固中的应用;刘吉元等;《钢结构》;20150430(第4期);第40-43页,第47页 |
站内道岔区顶进框架桥架空加固与防护技术;张克雷;《铁道建筑技术》;20150731(第7期);第75-77页 |
Also Published As
Publication number | Publication date |
---|---|
CN107974878A (en) | 2018-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107974878B (en) | A kind of rail yard track switch reinforcement means and structure | |
CN102979041B (en) | Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway | |
CN103437254B (en) | Framed underpass bridge railway trouble district track strengthening device | |
CN109183530B (en) | Line temporary overhead device and method for ballastless track disease remediation | |
CN108166336A (en) | A kind of I-steel in length and breadth and D beams combined system reinforce the construction method of switch area | |
CN108149577B (en) | A kind of steel bracket system and its installation method | |
JP2019502844A (en) | Bevel tip rail railway | |
KR101399839B1 (en) | Transition track structure of railway bridge deck end and Construction method | |
CN109098102A (en) | Just beam ruggedized construction for switch section | |
CN106592449A (en) | D-shaped beam reinforced existing double-railway line structure and construction method thereof | |
CN108342980B (en) | Railway suspension bridge upper bearing type steel truss bridge deck structure | |
US8220095B2 (en) | Highway overpass bridge modification system and method | |
CN209114262U (en) | A kind of interim overhead device of route for non-fragment orbit Disease Treatment | |
CN102535358A (en) | Construction technology for broadening and reforming rigidity matching system of hollow slab bridge | |
CN217298467U (en) | Longitudinal connecting device for rail, rail plate beam and rail plate beam longitudinal connecting structure | |
KR101721043B1 (en) | Suspended-type bridge joint apparatus and a method for installing the same | |
CN202450441U (en) | Stiffness matching system for broadening and transforming hollow slab bridges | |
CN205857004U (en) | A kind of construction beam | |
JP3954905B2 (en) | Three-dimensional crossing method of plane intersection and viaduct | |
CN208917713U (en) | Just beam ruggedized construction for switch section | |
CN203440720U (en) | Line reinforcing device of railway turnout area in frame bridge jacking | |
CN209323280U (en) | A kind of steel construction track suitable for magnetic floating traffic | |
CN109505230B (en) | Integral beam falling prevention structure of pier on arch | |
CN112796232A (en) | Reinforced structure for existing railway underpass frame bridge construction | |
CN110205875A (en) | Existing Railway Line double crossover integrally inserts paving construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210128 Address after: 530007 No.3, Gaoxin 5th Road, Gaoxin District, Nanning City, Guangxi Zhuang Autonomous Region Patentee after: CHINA RAILWAY FOURTH GROUP NANNING SURVEY AND DESIGN INSTITUTE Co.,Ltd. Patentee after: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd. Address before: 430063 No. 745 Heping Avenue, Wuchang District, Hubei, Wuhan Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd. |
|