CN107957569A - A kind of building block system experimental rig for field calibration GIS formula current transformers - Google Patents
A kind of building block system experimental rig for field calibration GIS formula current transformers Download PDFInfo
- Publication number
- CN107957569A CN107957569A CN201711205483.9A CN201711205483A CN107957569A CN 107957569 A CN107957569 A CN 107957569A CN 201711205483 A CN201711205483 A CN 201711205483A CN 107957569 A CN107957569 A CN 107957569A
- Authority
- CN
- China
- Prior art keywords
- current
- lifting device
- current transformer
- building block
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/02—Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The present invention provides a kind of building block system experimental rig for field calibration GIS formula current transformers, it includes pressure regulator power supply, compensation capacitor group, current lifting device group, mutual-inductor tester, standard current transformer and current transformer to be measured;Pressure regulator power output end is connected with current lifting device group input terminal;Current lifting device group one exports the one end for being connected to tested current transformer, and carrying out once up-flow to tested current transformer operates;Another termination standard current transformer one end of current transformer;Another termination another output terminal of current lifting device group of standard current transformer;Mutual-inductor tester output terminal is connected with standard current transformer input terminal;The compensation capacitor group is connected with pressure regulator power output end.Versatility of the present invention is stronger, can adapt to plurality of devices with the current lifting device in adjustment equipment and capacitor group.
Description
Technical field
The invention belongs to power domain, is tried more particularly to a kind of building block system for field calibration GIS formula current transformers
Proved recipe method.
Background technology
It is electric to include subject for experiment primary current circuit when calibrating or carry out operating maintenance after the installation of GIS formulas current transformer
Current transformer and GIS switches and generalized information system pipeline loop and ground primary current conductor.GIS formula current mutual inductor on site school
Quasi- primary circuit impedance is much larger than calibration loop under conventional environment, and according to product type difference, GIS circuits apart from different changes
It is larger.
The calibration primary circuit impedance of GIS formulas current mutual inductor on site is much larger than calibration loop under conventional environment, and according to production
Product model is different, GIS circuits are changed greatly apart from difference.So the specific aim of existing equipment is stronger, substitutability and versatility
It is weaker.
The content of the invention
The object of the present invention is to provide a kind of building block system test method for field calibration GIS formula current transformers.
The present invention is realized using following technical scheme:A kind of building block system for field calibration GIS formula current transformers tries
Experiment device, it is characterised in that:Including pressure regulator power supply, compensation capacitor group, current lifting device group, mutual-inductor tester, normalized current
Mutual inductor and current transformer to be measured;Pressure regulator power output end is connected with current lifting device group input terminal;One output terminal of current lifting device group
One end of tested current transformer is connected to, carrying out once up-flow to tested current transformer operates;The other end of current transformer
Connect standard current transformer one end;Another termination another output terminal of current lifting device group of standard current transformer;Mutual-inductor tester is defeated
Outlet is connected with standard current transformer input terminal;The compensation capacitor group is connected with pressure regulator power output end.
In an embodiment of the present invention, the current lifting device group freely carries out building block system according to GIS loop lengths and builds;Up-flow
Device group includes several current lifting devices;Current lifting device is a punching structure, and one time high current line extends there through, as change current lifting device
Output terminal.
In an embodiment of the present invention, compensation capacitor group freely carries out building block system according to GIS loop lengths and builds, and compensates
Capacitor group is connected on the output terminal of pressure regulator power supply, and the reactive loss for complementation test circuit is so as to reduce the appearance of experiment power supply
Amount.
In an embodiment of the present invention, compensation capacitor group includes the capacitor of some groups of different capabilities;The mode of combination
For multigroup mode in parallel;Parallel combination by the capacitor group for electrically switching different capabilities, to meet different reactive loss
The adjustment of compensation capacity.
In an embodiment of the present invention, compensation capacitor group includes 4 group capacitors;4 group capacitor amount of capacity are 1:2:
4:8 proportionate relationship.
Compared with prior art, versatility of the present invention is stronger, can be fitted with the current lifting device in adjustment equipment and capacitor group
Answer plurality of devices.
Brief description of the drawings
Fig. 1 is that GIS switchs preinstallation principle schematic in one embodiment of the invention.
Fig. 2 is the field test principle schematic after GIS switch installations.
Embodiment
Explanation is further explained to the present invention with specific embodiment below in conjunction with the accompanying drawings.
A kind of building block system experimental rig for field calibration GIS formula current transformers, it includes pressure regulator power supply, compensation
Capacitor group, current lifting device group, mutual-inductor tester, standard current transformer and current transformer to be measured;Pressure regulator power supply exports
End is connected with current lifting device group input terminal;Current lifting device group one exports the one end for being connected to tested current transformer, mutual to tested electric current
Sensor carries out once up-flow operation;Another termination standard current transformer one end of current transformer;Standard current transformer is another
One termination another output terminal of current lifting device group;Mutual-inductor tester output terminal is connected with standard current transformer input terminal;The benefit
Capacitor group is repaid to be connected with pressure regulator power output end.
In an embodiment of the present invention, the current lifting device group freely carries out building block system according to GIS loop lengths and builds;Up-flow
Device group includes several current lifting devices;Current lifting device is a punching structure, and one time high current line extends there through, as change current lifting device
Output terminal.
In an embodiment of the present invention, compensation capacitor group freely carries out building block system according to GIS loop lengths and builds, and compensates
Capacitor group is connected on the output terminal of pressure regulator power supply, and the reactive loss for complementation test circuit is so as to reduce the appearance of experiment power supply
Amount.
In an embodiment of the present invention, compensation capacitor group includes the capacitor of some groups of different capabilities;The mode of combination
For multigroup mode in parallel;Parallel combination by the capacitor group for electrically switching different capabilities, to meet different reactive loss
The adjustment of compensation capacity.
In an embodiment of the present invention, compensation capacitor group includes 4 group capacitors;4 group capacitor amount of capacity are 1:2:
4:8 proportionate relationship.
The calibration of extra-high voltage current mutual inductor on site has two kinds of test methods, can carry out or install before GIS switchs installation
Carried out into later.
Preinstallation primary circuit is shorter and contact resistance is smaller, and required capacity of experiment is smaller.It is once tested back
Road is mainly as conducting wire of high current needed for experiment connects subject mutual inductor both sides terminal, the impedance of current lifting device primary circuit(Wear
Core type), the impedance of standard current transformer primary circuit(Punching), subject current transformer primary circuit impedance and above-mentioned component
Between connect contact impedance composition.Current mutual inductor on site calibrates always hindering for primary circuit in extra-high voltage switch under normal circumstances
Anti- about 2.5m Ω, experiment maximum current is 7200A, therefore an output voltage of current lifting device is 18V or so.Test principle shows
It is intended to as shown in Figure 1.
After installation or testing primary circuit when transport inspection is flowed up from GIS switch ends.It is tested Current Mutual Inductance
All installation is complete for device and breaker and generalized information system, but can be from the current transformer dedicated test end that the both ends that GIS is switched are reserved
Son carries out up-flow operation.Producer is needed to provide the tool part of subject Primary Conductor connection, a big current loop impedance during experiment
Mainly by the high current conducting wire needed for testing, the primary circuit impedance of GIS switches, the impedance of current lifting device primary circuit(Punching), mark
The impedance of quasi- current transformer primary circuit(Punching), subject current transformer primary circuit impedance and above-mentioned component between connect
Contact impedance composition.The impedance of its primary circuit is much larger than the test loop impedance before not installing, its total impedance is about 9m Ω,
Experiment maximum current is 7200A, therefore an output voltage of current lifting device is more than 50V.Test principle schematic diagram such as Fig. 2 institutes
Show.
Above is presently preferred embodiments of the present invention, all changes made according to technical solution of the present invention, caused function are made
During with scope without departing from technical solution of the present invention, protection scope of the present invention is belonged to.
Claims (5)
- A kind of 1. building block system experimental rig for field calibration GIS formula current transformers, it is characterised in that:Including pressure regulator electricity Source, compensation capacitor group, current lifting device group, mutual-inductor tester, standard current transformer and current transformer to be measured;Pressure regulator electricity Source output terminal is connected with current lifting device group input terminal;Current lifting device group one exports the one end for being connected to tested current transformer, to tested Current transformer carries out once up-flow operation;Another termination standard current transformer one end of current transformer;Normalized current is mutual Another termination another output terminal of current lifting device group of sensor;Mutual-inductor tester output terminal is connected with standard current transformer input terminal; The compensation capacitor group is connected with pressure regulator power output end.
- 2. the building block system experimental rig according to claim 1 for field calibration GIS formula current transformers, its feature exists In:The current lifting device group freely carries out building block system according to GIS loop lengths and builds;Current lifting device group includes several current lifting devices;Rise Stream device is a punching structure, and one time high current line extends there through, as the output terminal for changing current lifting device.
- 3. the building block system experimental rig according to claim 1 for field calibration GIS formula current transformers, its feature exists In:Compensation capacitor group freely carries out building block system according to GIS loop lengths and builds, and compensation capacitor group is connected on pressure regulator power supply Output terminal, the reactive loss for complementation test circuit is so as to reduce the capacity of pressure regulator power supply.
- 4. the building block system experimental rig according to claim 3 for field calibration GIS formula current transformers, its feature exists In:Compensation capacitor group includes the capacitor of some groups of different capabilities;The mode of combination is multigroup mode in parallel;By electric Switch the parallel combination of the capacitor group of different capabilities, to meet the adjustment of different reactive loss compensation capacities.
- 5. the building block system experimental rig according to claim 4 for field calibration GIS formula current transformers, its feature exists In:Compensation capacitor group includes 4 group capacitors;4 group capacitor amount of capacity are 1:2:4:8 proportionate relationship.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711205483.9A CN107957569A (en) | 2017-11-27 | 2017-11-27 | A kind of building block system experimental rig for field calibration GIS formula current transformers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711205483.9A CN107957569A (en) | 2017-11-27 | 2017-11-27 | A kind of building block system experimental rig for field calibration GIS formula current transformers |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107957569A true CN107957569A (en) | 2018-04-24 |
Family
ID=61959503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711205483.9A Pending CN107957569A (en) | 2017-11-27 | 2017-11-27 | A kind of building block system experimental rig for field calibration GIS formula current transformers |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107957569A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109324306A (en) * | 2018-12-14 | 2019-02-12 | 国家电网有限公司 | A kind of GIS device current transformer error test macro and its construction method |
CN112710879A (en) * | 2021-03-26 | 2021-04-27 | 中国电力科学研究院有限公司 | Multiple harmonic wave superposition current generation device and method for temperature rise test |
CN113325356A (en) * | 2021-06-11 | 2021-08-31 | 国家电网有限公司 | Crawler-type on-site metering verification vehicle for high-voltage current transformer |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101424728A (en) * | 2008-11-10 | 2009-05-06 | 西北电网有限公司 | On site precision detecting test line for high-voltage current transformer |
CN102043139A (en) * | 2010-12-16 | 2011-05-04 | 中国人民解放军空军工程大学 | Calibration device of current transformer and method for calibrating current transformer by using same |
CN102375135A (en) * | 2010-08-11 | 2012-03-14 | 苏州华电电气股份有限公司 | Field calibration system of current transformer for metering |
CN203310990U (en) * | 2013-06-06 | 2013-11-27 | 陕西省电力公司规划评审中心 | On-site accuracy verification device for 750 kV current transformer |
WO2014008707A1 (en) * | 2012-07-13 | 2014-01-16 | 天门市电工仪器仪表研究所 | Ratio error self calibration system for miniature current transformer |
CN105929354A (en) * | 2016-06-29 | 2016-09-07 | 国家电网公司 | Automatic calibrating device and method for large current transformer |
CN205787084U (en) * | 2016-06-29 | 2016-12-07 | 国家电网公司 | Great current mutual inductor automatic calibrator |
-
2017
- 2017-11-27 CN CN201711205483.9A patent/CN107957569A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101424728A (en) * | 2008-11-10 | 2009-05-06 | 西北电网有限公司 | On site precision detecting test line for high-voltage current transformer |
CN102375135A (en) * | 2010-08-11 | 2012-03-14 | 苏州华电电气股份有限公司 | Field calibration system of current transformer for metering |
CN102043139A (en) * | 2010-12-16 | 2011-05-04 | 中国人民解放军空军工程大学 | Calibration device of current transformer and method for calibrating current transformer by using same |
WO2014008707A1 (en) * | 2012-07-13 | 2014-01-16 | 天门市电工仪器仪表研究所 | Ratio error self calibration system for miniature current transformer |
CN203310990U (en) * | 2013-06-06 | 2013-11-27 | 陕西省电力公司规划评审中心 | On-site accuracy verification device for 750 kV current transformer |
CN105929354A (en) * | 2016-06-29 | 2016-09-07 | 国家电网公司 | Automatic calibrating device and method for large current transformer |
CN205787084U (en) * | 2016-06-29 | 2016-12-07 | 国家电网公司 | Great current mutual inductor automatic calibrator |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109324306A (en) * | 2018-12-14 | 2019-02-12 | 国家电网有限公司 | A kind of GIS device current transformer error test macro and its construction method |
CN112710879A (en) * | 2021-03-26 | 2021-04-27 | 中国电力科学研究院有限公司 | Multiple harmonic wave superposition current generation device and method for temperature rise test |
CN113325356A (en) * | 2021-06-11 | 2021-08-31 | 国家电网有限公司 | Crawler-type on-site metering verification vehicle for high-voltage current transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107957569A (en) | A kind of building block system experimental rig for field calibration GIS formula current transformers | |
CN206460118U (en) | A kind of distribution line short circuit and earth fault analog simulation pilot system | |
CN111157941A (en) | Device and method for quickly switching and checking primary winding of power transformer | |
RU2686447C1 (en) | Switching device, test device and method for operation of switching device for measuring device for transformer | |
CN108957242B (en) | Contact net fault recognition device and method of electrified railway AT power supply system | |
CN101523679A (en) | Power supply and electronic ballast with auxiliary protection circuit | |
CN108152779A (en) | Electronic current mutual inductor check system and method | |
CN104808022A (en) | Temperature rise test connection method for three-side combined operation of three-phase three-winding transformer | |
CN108344906A (en) | A kind of blowout coil set apparatus analog simulation testing stand | |
CN105021980A (en) | AC filter circuit breaker double-break voltage distribution feature evaluation system and method | |
CN104155627A (en) | Error characteristic detection method of extra high voltage capacitive voltage transformer | |
CN106771907A (en) | Low voltage equipment intellectuality power frequency withstanding voltage pilot system and method | |
CN203350397U (en) | Abnormal noise inspection device of high voltage sealed switch cabinet or sealed bus bar | |
CN103954889A (en) | Capacitive type device insulation parameter electrification testing method based on pincerlike current sensors | |
CN108037365A (en) | A kind of shunt reactor testboard | |
CN210626597U (en) | Detection apparatus for utilize capacitive sleeve pipe end screen to carry out homonymy high-tension apparatus partial discharge | |
CN207866899U (en) | A kind of shunt reactor testboard | |
CN209232242U (en) | Modularization distribution line physical simulation experiment device | |
CN108535587B (en) | Transformer wiring fault testing device | |
CN105242115A (en) | High-voltage transmission line impedance measuring circuit and measuring method | |
CN113253009B (en) | On-site test method for mobile comprehensive test platform of neutral point grounding equipment of power distribution network | |
CN204479622U (en) | A kind of three-phase three-winding transformer three side cooperation temperature rise test wiring | |
CN205509359U (en) | Intelligent automatic supervision and control low pressure inlet wire switch board | |
CN205301429U (en) | Intelligent substation presses and becomes automatic nuclear phase ware of secondary | |
CN101449172A (en) | A detection device for a switch cabinet with an input terminal module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180424 |