CN107956214A - Ecological river channel and treatment method - Google Patents

Ecological river channel and treatment method Download PDF

Info

Publication number
CN107956214A
CN107956214A CN201711433947.1A CN201711433947A CN107956214A CN 107956214 A CN107956214 A CN 107956214A CN 201711433947 A CN201711433947 A CN 201711433947A CN 107956214 A CN107956214 A CN 107956214A
Authority
CN
China
Prior art keywords
river
girt
cutoff
river channel
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711433947.1A
Other languages
Chinese (zh)
Inventor
孟庆奕
罗思
马卫忠
刘启超
张亚
纵霄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201711433947.1A priority Critical patent/CN107956214A/en
Publication of CN107956214A publication Critical patent/CN107956214A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae
    • C02F3/322Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae use of algae
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Biotechnology (AREA)
  • Hydrology & Water Resources (AREA)
  • Botany (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides an ecological river channel, which comprises an old river channel and a new river channel, wherein one end of the old river channel is provided with a river ring starting point, and the other end of the old river channel is provided with a river ring terminal point; the two ends of the new river channel are respectively connected with a river ring starting point and a river ring end point; the old river channel and the new river channel are respectively provided with an old river channel gate and a new river channel gate at the starting point of the river ring; a plurality of restoration units are also arranged in the old riverway, and submerged plants are arranged among the restoration units; the river center of the new river channel is provided with a deep pool, submerged plants are arranged in the deep pool, and emergent plants are arranged around the deep pool. The invention has the advantages that the old river channel is reserved after the straight river channel is cut and transformed, the upstream incoming water can be allocated in stages through the control of 2 gates, the problem of flood discharge and drainage can be effectively solved by opening the gate of the new river channel in the flood period, and in the non-flood period, the upstream incoming water mainly passes through the old river channel, so that the original habitat and water self-purification capacity of the river channel are maintained.

Description

A kind of ecological riverway and administering method
Technical field
The present invention relates to a kind of ecological riverway and administering method, belongs to river regulation technical field.
Background technology
Meander stream is the result of river itself river bed change.During river overbending, river body is cranky to leading off Flood is unfavorable, easily triggers flood.It is generally believed that to these meander streams implement cut-off can effectively lower cut it is curved Section upstream flood position simultaneously improve the flood control capacity of upstream, however, it is this to natural river it is artificial reconstructed for the mankind bring it is huge While interests, inestimable destruction inevitably also is caused to the ecological environment in river.Due to original tortuous channel Destroyed or abandonment, the habitat diversification of straight cutoff is relatively low with complexity, causes the aquatile biology in river more Sample declines;On the other hand, since river water is shorter in straight cutoff residence time, and the aquatic ecosystem knot of cutoff Structure is single uncoordinated, and the self-purification capacity in river declines, and causes the water pollution problems of downstream river course to be aggravated.
Although currently the pollution problem and Ecology problem for river have formd more effective water pollution Administer and aquatic ecosystem constructing technology system, but these river regulation technologies coordinate river flood passage water drainage, The function such as purification of water quality and bio-diversity conservation.
The content of the invention
In order to solve the above technical problems, the present invention provides a kind of ecological riverway and administering method, the ecological riverway and control Reason method takes into account river course flood water drainage, purification of water quality and bio-diversity conservation, solves current formula river regulation of cut-offfing During the ecological problem that is faced.
The present invention is achieved by the following technical programs.
The present invention provides a kind of ecological riverway, including girt and cutoff, one end of the girt is equipped with river ring Starting point, the other end are equipped with river ring terminal;The both ends of the cutoff connect river ring starting point and river ring terminal respectively;The girt With cutoff girt gate and cutoff gate are respectively equipped with river ring starting point;Several are additionally provided with the girt to repair Multiple unit, submerged plant is equipped between unit is repaired;Deep water pool is equipped with the middle of the river of the cutoff, deep water is equipped with pool Submerged plant, emergent aquactic plant is surrounded by deep water pool.
It is described to repair the river bend outside that unit includes pool and shoal pool is located at girt, and shoal is located at girt On the inside of river bend, pool is closely connected with shoal.
The submerged plant planted in the girt is one kind in eel grass, hydrilla verticillata, watermifoil.
The emergent aquactic plant is one kind in canna, reed, typha angustifolia, and the submerged plant planted in deep water pool is Eel grass or hydrilla verticillata.
The curved type of girt, cutoff are of a straight line type.
Based on a kind of ecological riverway administering method, comprise the following steps:
1. choose girt:By satellite map and reconnaissance trip, girt is chosen;
2. determine river ring starting point and river ring terminal:The topography and geomorphology of girt is 1. obtained according to step, determines girt River ring starting point and river ring terminal;
3. excavated:Region between river ring starting point and river ring terminal is excavated, forms a cutoff, the Xinhe River Road is made of river entrance, river Drainage Section and river outlet, and the river entrance of cutoff is connected with river ring starting point, river entrance Bifurcation mouth is formed with girt, the river drainage end of cutoff and girt are separate, river outlet and the river ring of cutoff Terminal connects;
4. deep water pool is set:Deep water pool is excavated in the middle of the river of cutoff, and planting submerged plant is planted in deep water pool, deep water pool Surrounding plantation emergent aquactic plant;
5. cutoff gate and girt gate are set:In the bifurcated mouth of girt and cutoff, Xinhe River banister is set respectively Door and girt gate;
6. aquatic ecosystem reparation is carried out to girt:Several are set to repair unit in girt, in each reparation Planting submerged plant is planted between unit.
The step 3. in, cutoff is straight river.
The width of the cutoff is wider than the width of girt.
The beneficial effects of the present invention are:
1. remaining girt after river transformation of cut-offfing, upland water can be carried out by the control of 2 gates Allocate by stages, cutoff gate is opened in flood period can efficiently solve flood passage water drainage problem;
2. in non-flood season, upland water is mainly passed through girt, maintain that river is original to inhabit habitat and water body Self-purification capacity;
3. by carrying out aquatic ecosystem reparation or structure in new girt, the water body self-purification ability in river is enhanced, is carried These river habitat suitabilities have been risen, precondition has been created for purification of water quality and bio-diversity conservation, properly handles The cut-off Ecology faced below and water pollution problems.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention;
In figure:1- girts, 2- cutoffs, 3- rivers ring starting point, 4- rivers ring terminal, 5- girt gates, 6- Xinhe River banister Door, 7- pools, 8- shoals, 9- submerged plants, 10- deep water pool, 11- emergent aquactic plants.
Embodiment
Be described further below technical scheme, but claimed scope be not limited to it is described.
As shown in Figure 1, a kind of ecological riverway, including girt 1 and cutoff 2, one end of the girt 1 are equipped with river ring Starting point 3, the other end are equipped with river ring terminal 4;The both ends of the cutoff 2 connect river ring starting point 3 and river ring terminal 4 respectively;It is described Girt 1 and cutoff 2 are respectively equipped with girt gate 5 and cutoff gate 6 at river ring starting point 3;In the girt 1 also Equipped with several reparation units, submerged plant 9 is equipped between unit is repaired;Deep water is equipped with the middle of the river of the cutoff 2 Pool 10, deep water pool 10 is interior to be equipped with submerged plant 9, and emergent aquactic plant 11 is surrounded by deep water pool 10.
The reparation unit includes pool 7 and shoal 8, and pool 7 is located on the outside of the river bend of girt 1, and shoal 8 is positioned at old On the inside of the river bend in river 1, pool 7 is closely connected with shoal 8.
The submerged plant 9 planted in the girt 1 is one kind in eel grass, hydrilla verticillata, watermifoil.
The emergent aquactic plant 11 is one kind in canna, reed, typha angustifolia, and the heavy water planted in deep water pool 10 is planted Thing 9 is eel grass or hydrilla verticillata.
The 1 curved type of girt, cutoff 2 are of a straight line type.
Based on a kind of ecological riverway administering method, comprise the following steps:
1. choose girt 1:By satellite map and reconnaissance trip, girt 1 is chosen;
2. determine river ring starting point 3 and river ring terminal 4:The topography and geomorphology of girt 1 is 1. obtained according to step, determines girt 1 river ring starting point 3 and river ring terminal 4;
3. excavated:Region between river ring starting point 3 and river ring terminal 4 is excavated, forms a cutoff 2, Cutoff 2 is straight river, and cutoff 2 is made of river entrance, river Drainage Section and river outlet, and the river of cutoff 2 enters Mouth is connected with river ring starting point 1, and river entrance and girt 1 form bifurcation mouth, the river drainage end of cutoff 2 and 1 phase of girt Mutually independent, the river outlet of cutoff 2 is connected with river ring terminal 4, and the width of cutoff 2 is wider than the width of girt 1;
4. deep water pool 10 is set:Deep water pool 10, and the kind planting submerged plant in deep water pool 10 are excavated in the middle of the river of cutoff 2 9, the surrounding plantation emergent aquactic plant 11 in deep water pool 10;
5. cutoff gate 6 and girt gate 5 are set:In the bifurcated mouth of girt 1 and cutoff 2, the Xinhe River is set respectively Road gate 6 and girt gate 5;
6. aquatic ecosystem reparation is carried out to girt 1:Set several to repair unit in girt 1, repaiied each Planting submerged plant 9 is planted between multiple unit.
Embodiment
As described above, one section of river to be administered is chosen, the landform in river is grasped by satellite map and reconnaissance trip Looks situation, and river ring starting point 3 and river ring terminal 4 are determined with this.By engineering measure by the area of river ring starting point 3 and river ring terminal 4 Domain is excavated into straight and wider cutoff 2, and is excavated at 2 middle of the river of cutoff into deeper deep water pool 10, is made it withered Shallow water depression is formed during water.In the bifurcation mouth of cutoff 2 and girt 1, cutoff gate 6 and girt gate 5 are set respectively, With the flow for controlling the whereabouts of upland water and its entering new girt.Aquatic ecosystem development to girt 1 is investigated further, The data such as water quality, landform and living aquatic resources of girt 1 is fully grasped, and the Ecology for assessing with this girt 1 shows Shape, analyzes Ecology problem existing for girt 1, then carries out aquatic ecosystem recovery project to girt 1, deep by building Pool 7, shoal 8, plant planting submerged plant 9, such as eel grass, hydrilla verticillata, watermifoil, strengthen girt water body self-purification ability and Hydrophytic habitat suitability.Carry out aquatic ecosystem structure engineering to cutoff 2, by distinguishing in the inside in deep water pool 10 and surrounding Kind planting submerged plant 9 and emergent aquactic plant 11 (such as canna, reed, typha angustifolia), lift the ornamental value and water body of cutoff 2 Self-purification capacity.
In flood period, open cutoff gate 6 and close girt gate 5, flood is passed through the straight and wider Xinhe River Road 2 flows away, and avoids big flood waterlogging from occurring and flood washing away and destroy to 1 aquatic ecosystem of girt;In non-flood season, open Girt gate 5 is opened, and by controlling cutoff gate 6, upland water is flowed primarily through girt 1, flows through cutoff on a small quantity 2, and then the pollutant of upland water is fully purified and is degraded in sinuous girt 1.
In conclusion retaining sinuous girt 1 on the basis of cut-offfing to river, cutoff is made full use of 2 and girt 1 carry out river regulation, enhance the water body self-purification ability in river, improve these river habitat suitabilities, be Purification of water quality and bio-diversity conservation create precondition, have properly handled the Ecology and water for cut-offfing and facing below Pollution problem.

Claims (8)

1. a kind of ecological riverway, including girt (1) and cutoff (2), it is characterised in that:One end of the girt (1) is set There is river ring starting point (3), the other end is equipped with river ring terminal (4);The both ends of the cutoff (2) connect respectively river ring starting point (3) and River ring terminal (4);The girt (1) and cutoff (2) are respectively equipped with girt gate (5) and new at river ring starting point (3) place River course gate (6);Several are additionally provided with the girt (1) and repairs unit, submerged plant is equipped between unit is repaired (9);Deep water pool (10) are equipped with the middle of the river of the cutoff (2), submerged plant (9) are equipped with deep water pool (10), in deep water pool (10) be surrounded by emergent aquactic plant (11).
2. ecological riverway as claimed in claim 1, it is characterised in that:The reparation unit includes pool (7) and shoal (8), Pool (7) is located on the outside of the river bend of girt (1), and shoal (8) are located on the inside of the river bend of girt (1), pool (7) and shoal (8) close connection.
3. ecological riverway as claimed in claim 1, it is characterised in that:The submerged plant (9) of plantation is in the girt (1) One kind in eel grass, hydrilla verticillata, watermifoil.
4. ecological riverway as claimed in claim 1, it is characterised in that:The emergent aquactic plant (11) is canna, reed, narrow leaf One kind in cattail, the submerged plant (9) of plantation is eel grass or hydrilla verticillata in deep water pool (10).
5. ecological riverway as claimed in claim 1, it is characterised in that:The curved type of the girt (1), cutoff (2) are in Linear pattern.
A kind of 6. ecological riverway administering method, it is characterised in that:Comprise the following steps:
1. choose girt (1):By satellite map and reconnaissance trip, girt (1) is chosen;
2. determine river ring starting point (3) and river ring terminal (4):The topography and geomorphology of girt (1) is 1. obtained according to step, determines old river The river ring starting point (3) and river ring terminal (4) in road (1);
3. excavated:Region between river ring starting point (3) and river ring terminal (4) is excavated, forms a cutoff (2), cutoff (2) is made of river entrance, river Drainage Section and river outlet, and river entrance and the river ring of cutoff (2) rise Point (1) connects, and river entrance and girt (1) form bifurcation mouth, and the river drainage end of cutoff (2) and girt (1) are mutual Independent, the river outlet of cutoff (2) is connected with river ring terminal (4);
4. set deep water pool (10):Deep water pool (10) are excavated in the middle of the river of cutoff (2), and the heavy water of plantation in deep water pool (10) Plant (9), the surrounding plantation emergent aquactic plant (11) of deep water pool (10);
5. cutoff gate (6) and girt gate (5) are set:Set respectively in the bifurcated mouth of girt (1) and cutoff (2) Cutoff gate (6) and girt gate (5);
6. aquatic ecosystem reparation is carried out to girt (1):Set several to repair unit in girt (1), repaiied each Planting submerged plant (9) is planted between multiple unit.
7. ecological riverway administering method as claimed in claim 6, it is characterised in that:The step 3. in, cutoff (2) is suitable Straight river.
8. ecological riverway administering method as claimed in claim 6, it is characterised in that:The width of the cutoff (2) is than old river The width in road (1) is wide.
CN201711433947.1A 2017-12-26 2017-12-26 Ecological river channel and treatment method Withdrawn CN107956214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711433947.1A CN107956214A (en) 2017-12-26 2017-12-26 Ecological river channel and treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711433947.1A CN107956214A (en) 2017-12-26 2017-12-26 Ecological river channel and treatment method

Publications (1)

Publication Number Publication Date
CN107956214A true CN107956214A (en) 2018-04-24

Family

ID=61955937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711433947.1A Withdrawn CN107956214A (en) 2017-12-26 2017-12-26 Ecological river channel and treatment method

Country Status (1)

Country Link
CN (1) CN107956214A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108715486A (en) * 2018-06-11 2018-10-30 华川技术有限公司 A kind of method of basin pool shoal molecular fluid restoration of the ecosystem
CN109267535A (en) * 2018-11-16 2019-01-25 彭国洪 A kind of administering method of plain river
CN109748396A (en) * 2019-02-15 2019-05-14 广东南方建设集团有限公司 A kind of downstream river course water body regulation method
CN110528457A (en) * 2019-08-28 2019-12-03 河海大学 A kind of straight river optimization form based on water plant layout
CN112607979A (en) * 2021-01-22 2021-04-06 路书杰 Bending and straight river channel water ecological purification system and scheduling method thereof
US11028568B1 (en) * 2020-03-20 2021-06-08 Frank Charles Adamek Detention pond method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108715486A (en) * 2018-06-11 2018-10-30 华川技术有限公司 A kind of method of basin pool shoal molecular fluid restoration of the ecosystem
CN109267535A (en) * 2018-11-16 2019-01-25 彭国洪 A kind of administering method of plain river
CN109748396A (en) * 2019-02-15 2019-05-14 广东南方建设集团有限公司 A kind of downstream river course water body regulation method
CN110528457A (en) * 2019-08-28 2019-12-03 河海大学 A kind of straight river optimization form based on water plant layout
CN110528457B (en) * 2019-08-28 2020-11-13 河海大学 Aquatic plant layout-based straight river channel optimization form
US11028568B1 (en) * 2020-03-20 2021-06-08 Frank Charles Adamek Detention pond method
CN112607979A (en) * 2021-01-22 2021-04-06 路书杰 Bending and straight river channel water ecological purification system and scheduling method thereof

Similar Documents

Publication Publication Date Title
CN107956214A (en) Ecological river channel and treatment method
CN211200321U (en) Fish passageway structure is crossed to low head weir dam
CN108005040A (en) Minisize ecological natural flow station
Huffaker et al. Agricultural water conservation legislation: Will it save water?
CN110563146B (en) Annular horizontal subsurface flow constructed wetland with adjustable operation mode
CN108277783A (en) Fish pass moisturizing attracting structure and its moisturizing attracting method
Jakobsson Industrialization of rivers: A water system approach to hydropower development
KR20030080174A (en) A method of constructing an fish that is configured to facilitate the movement of fish by the resistance action of the flow rate guide plate and the fish cover
CN207828890U (en) Ecological river channel
CN207175595U (en) A kind of easy ecological wastewater processing pond
CN207512709U (en) Minisize ecological natural flow station
CN208501611U (en) A kind of device for realizing beheaded river one-way flow using tide
CN103603315B (en) River irrigation by pumping multifunctional landscape waterfall dam
Molle et al. Macro‐and micro‐level impacts of droughts: the case of the Zayandeh Rud river basin, Iran
CN205328708U (en) Overall arrangement of compound water purification surface low wetland system
CN203583433U (en) River lifting irrigation multifunctional landscape waterfall dam
Siy Jr Averting the bureaucratization of a community-managed resource: the case of the zanjeras
CN105366818B (en) A kind of composite water purifying surface-flow system
De S. Hewavisenthi Mahaweli water resources project
CN204849678U (en) Novel butyl dam structure
CN204138400U (en) A kind of Multifunctional centralized reduction chlorination contact tank
Kelman The Brazilian San Francisco River Basin Narrative
Belyaev et al. A Complex of Measures Aimed at the Preservation of the Unique Ecosystem of the Volga-Akhtuba Floodplain on the Territory of the Volgograd Region
Ruritan Water governance In Indonesia: From indigenous to post-colonial technology
Sarma et al. Reservoir Project in North-East India: Scope and Constraints

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180424