CN107946997B - The operational method of switch is isolated in a kind of replacement of insulating bar method on-load - Google Patents

The operational method of switch is isolated in a kind of replacement of insulating bar method on-load Download PDF

Info

Publication number
CN107946997B
CN107946997B CN201711392786.6A CN201711392786A CN107946997B CN 107946997 B CN107946997 B CN 107946997B CN 201711392786 A CN201711392786 A CN 201711392786A CN 107946997 B CN107946997 B CN 107946997B
Authority
CN
China
Prior art keywords
switch
insulating bar
lead
outer cover
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201711392786.6A
Other languages
Chinese (zh)
Other versions
CN107946997A (en
Inventor
闫同
李启江
许崇新
韩培庆
朱宏光
李红新
林令臣
郝京卫
于春来
周明亮
康宝华
李相辉
刁义鹏
刘波磊
赵阅群
张洪奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711392786.6A priority Critical patent/CN107946997B/en
Publication of CN107946997A publication Critical patent/CN107946997A/en
Application granted granted Critical
Publication of CN107946997B publication Critical patent/CN107946997B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Insulating Bodies (AREA)

Abstract

The present invention relates to a kind of operational methods of insulating bar method on-load replacement disconnecting switch, are widely used in the work of overhead distribution ground potential method replacement disconnecting switch, belong to distribution line hotline maintenance site technology field.The following steps are included: lead masking hanging plate is hung on side phase conductor and insulator pin using insulating bar, complete the insulation masking of opposite side phase terminal, integrated mask is hung using insulating bar, completes the insulation masking of opposite side phase strain insulator, wire clamp and part conducting wire;Switch two sides lead is isolated in disconnection, at this time in isolate switch just in electroless state, the disconnecting switch that operating personnel more renews;Disconnecting switch two sides lead is accessed into main traverse line using insulating bar.This method is not necessarily to have a power failure in operation, and complete insulation is cooperated to cover safety device, insulate to electrical body, grounding body and covers and be isolated, and ensures that operating personnel and charging equipment keep enough safe distances, safety coefficient height.

Description

The operational method of switch is isolated in a kind of replacement of insulating bar method on-load
Technical field
The present invention relates to a kind of operational methods of insulating bar method on-load replacement disconnecting switch, are widely used in overhead distribution Route ground potential method is replaced in the work of disconnecting switch, and distribution line hotline maintenance site technology field is belonged to.
Background technique
High voltage isolator is widely used in 10KV distribution line, be mainly used for " isolated power supply, grid switching operation, to It is connected to and cuts off small circuital current ", no arc-suppression function.Only divide in the case where no load current, close circuit, it can only be used His equipment operates again after disconnecting circuit.Because being widely used, the running most common failure of disconnecting switch has: 1, overload, Contact resistance increase causes contact portion to overheat;2, longtime running porcelain insulation damages and flashover electric discharge;3, refuse switching on;4, Mistake switching on.
Have a power failure replacement disconnecting switch will necessarily interrupt some region of power supply, influence a large number of users it is normal production with Life reduces power supply reliability, totally unfavorable for improving good service and user satisfaction.
The disconnecting switch work of on-load replacement at present is mainly carried out by medial potential working method, i.e., operating personnel wears insulation Safety cap, wears a full set of insulation clothing, and operation aerial lift device with insulated arm insulation bucket carries out upkeep operation close to job position.Medial potential working Method replaces disconnecting switch and there is following deficiency: 1, relying on orographic condition, landform is rugged, and narrow space is unable to satisfy vehicle parking and needs It asks;2, at high cost, aerial lift device with insulated arm goes out fare and uses with personnel's expenditure higher than pole ascending operation;3, compared to medial potential working, ground Current potential operation is mainly completed by operating stick, ensure that personnel at a distance from electrical body, safety coefficient is high.
At present, it would be highly desirable to occur it is a kind of can solve above-mentioned technical problem insulating bar method on-load replacement in isolate switch Operational method.
Summary of the invention
The on-load that the purpose of the present invention is intended to provide one kind and can be carried out with ground potential replaces disconnecting switch operational method, should Method is not necessarily to have a power failure in operation, and complete insulation is cooperated to cover safety device, to electrical body, grounding body carry out insulation masking and every From guarantee operating personnel and charging equipment keep enough safe distances, and easy to operate, safety coefficient is high.
It is isolated the operational method of switch in a kind of replacement of insulating bar method on-load, is characterized in that including following step It is rapid:
1, electrical verification is carried out to route and device, carries out next step operation after electrical verification is qualified;
2, ground potential coaster is installed on cross-arm;
3, electric pole mask is installed, insulation masking is carried out to electric pole;
4, isolation switch insulation partition is installed respectively in the phase of both sides, switch is isolated to both sides and carries out insulation masking;
5, lead masking hanging plate 22 is hung on side phase conductor and insulator pin using insulating bar, completes opposite side phase The insulation of lead is covered, and is hung integrated mask using insulating bar, is completed opposite side phase strain insulator, wire clamp and portion The insulation masking (effective masking to both sides phase cross-arm two sides charging equipment is completed using four sets of shading tools) of intraphase conductor;
6, it strips wire insulation on the outside of phase conductor wire clamp at 15-20cm in two sides (length for stripping insulating layer should expire Foot installs the length requirement of interim drainage thread and wire clamp of starting to exchange fire);
7, interim insulation lead wire is installed using insulating bar is synchronous, switch bypass is isolated by;
8, insulation lead wire through-flow situation when adjacent in detection, confirmation shunt it is good after, pull open in isolate switch;
9, switch two sides lead is isolated in disconnecting, at this time in isolate switch just in electroless state, operating personnel is more The disconnecting switch renewed;
10, after new disconnecting switch installs and draws, closes pass the test, using insulating bar by disconnecting switch two Side lead accesses main traverse line;
11, switch is isolated in closing, be isolated in detection switch it is through-flow it is all right after, use insulating bar synchronous Insulation lead wire when adjacent in dismounting;
12, the integrated mask of both sides phase is removed respectively according to the sequence opposite with when installation using insulating bar and draw Line covers hanging plate 22, and removes isolation switch insulation partition, remove electric pole mask, remove ground potential coaster, and operation terminates.
As a preferred technical solution of the present invention, the lead masking hanging plate 22 is in concave shape, and lead covers hanging plate The coupler body II for being separately installed with the coupler body I 23 mutually mounted with insulator bowl head at 22 top end positions, mutually being mounted with conducting wire 24, lead, which covers, is equipped with connector 26 on hanging plate 22, and connector 26 is installed at lead masking 22 upper position of hanging plate and position 22 length direction middle position of hanging plate is covered in lead, offers handle slot 30, handle slot 30 above lead masking hanging plate 22 Right above connector 26;
As a preferred technical solution of the present invention, connector I 36 is installed on the outer wall of the integration mask, Integrated mask includes the conducting wire outer cover 32 for covering at the insulator outer cover 31 of exterior insulator and covering at outside conducting wire, absolutely Edge outer cover (31) and conducting wire outer cover (32) are respectively provided with bottom opening and the two is the integral structure to connect, insulator outer cover 31 Side be equipped with the card slot I 33 that is mutually clamped with insulator bowl head, the side of conducting wire outer cover 32 be equipped with for across conducting wire and with lead The card slot II 34 that line is mutually clamped, the cross section of insulator outer cover 31 are in N-shaped, and the cross section of conducting wire outer cover 32 is in convex, insulation The height of sub- outer cover 31 is higher than the height of conducting wire outer cover 32, the cover bottom width degree phase of the width and conducting wire outer cover 32 of insulator outer cover 31 Matching, card slot I 33 and the perpendicular strip of card slot II 34, the top design of card slot I 33 is arc, bottom is designed as splayed, The top design of card slot II 34 is "-" type, bottom is designed as splayed configuration, and the top of conducting wire outer cover 32 is equipped with handle 35;
As a preferred technical solution of the present invention, the connector 26, connector I 36 are T-shaped, including horizontal peace Piece installing 27 is horizontally mounted and is equipped with the fixing piece 28 perpendicular with it on part 27, and the bottom of fixing piece 28 is equipped with connection-peg 29, Drift bolt 25 is installed, the both ends of drift bolt 25 are located at the outside of fixing piece 28 in the diametrical direction of fixing piece 28;
As a preferred technical solution of the present invention, the insulating bar includes and connector 26 or connector I 36 The ferrule 4 plugged, ferrule 4 are installed on the end of insulating driving rod 6, and the outer cover of ferrule 4 is equipped with for fixing The outer cover of the intermediate ring 3 of connector 26 or connector I 36, intermediate ring 3 is equipped with liftable retaining ring 1, along insulated transmission The outer tube I 12 being mutually screwed on, outer tube II 13, end and the insulating driving rod 6 of outer tube II 13 are arranged on 6 outer length direction of bar End is mutually fixed;
As a preferred technical solution of the present invention, the ferrule 4 includes the inserted terminal plugged with connection-peg 29 4-1 and the installation end 4-2 being installed in insulating driving rod 6, inserted terminal 4-1 are structure as a whole with installation end 4-2, inserted terminal 4-1 Outer diameter greater than installation end 4-2 outer diameter to the two junction formed chuck I 14;
As a preferred technical solution of the present invention, the intermediate ring 3 includes the end being sheathed on outside ferrule 4 15, intermediate casing 16, fixing pipe 17, end 15, intermediate casing 16, fixing pipe 17 are end to end integral structure, and three Outer diameter and internal diameter successively successively decrease to form chuck II 18, in centre in the outer wall junction of end 15 and intermediate casing 16 The inner wall junction of casing 16 and fixing pipe 17 forms chuck III 19, and chuck III 19 is clamped with I 14 phase of chuck;
As a preferred technical solution of the present invention, drift bolt hole I 5 is offered in the fixing pipe 17, is opened on outer tube I 12 Equipped with the drift bolt hole II 10 being used cooperatively with drift bolt hole I 5, the end of outer tube II 13 is equipped with drift bolt hole III 21, insulating driving rod 6 End is equipped with the drift bolt hole IV 8 being used cooperatively with drift bolt hole III 21;
As a preferred technical solution of the present invention, the end 15 is opened up close to one end of electric power tool there are two engraving Empty calorie slot 20, two hollow out card slots 20 are symmetrical as eccentric axial using the central axis of end 15, and hollow out card slot 20 includes from end 15 Close to electric power tool one end extend to 15 middle position of end vertical hollow slots 20-1, with vertical 21 phase of hollow slots The end of the horizontal hollow slots 20-2 of perforation, horizontal hollow slots 20-2 are equipped with the arc hollow slots 20-3 upwardly extended;
As a preferred technical solution of the present invention, the vertical hollow slots 20-1 and the intersection horizontal hollow slots 20-2 It is designed as ramped shaped;
As a preferred technical solution of the present invention, the retaining ring 1 includes the spring 9 that part is set in retaining ring 1 And it is butted on the base ring 2 of 9 tail portion of spring, the inner wall of retaining ring 1 is equipped with annular chuck IV 11, annular chuck IV 11 and chuck II 18 It is mutually clamped, the internal diameter of annular chuck IV 11 is less than the outer diameter of chuck II 18, is butted on annular chuck IV 11 at the top of one end of spring 9 On, the other end is butted on base ring 2, and the side of base ring 2 is butted on outer tube I 12.
The operational method of switch is isolated in insulating bar method on-load replacement of the invention, more typical medial potential working The change of operation mode and the application of rigid insulation shading tool are theed improvement is that, compared to medial potential working method, insulation Relatively major insulation from aerial lift device with insulated arm insulation arm becomes insulating bar to bar method, and alternate major insulation is still the air gap, insulation Bar method is dielectrically separated from adjacent two-phase electrical body by rigid insulation masking apparatus realization, plays the role of supplementary insulation, absolutely In edge bar method operation process, key, which is to insulate, covers the mounting and dismounting of order and drainage thread, and cooperation operating arm dedicated can Conveniently to realize the comprehensive masking to electrical body and the grounding body that may be touched.Insulating bar method on-load of the invention It is small to operating environment requirement limitation that switching operations method is isolated in replacement, power tool is convenient for carrying transport, struggles against compared to insulation Arm vehicle medial potential working has place strong applicability, and cost of investment is low, and personnel have convenient for training, the high advantage of safety coefficient Help expand livewire work range, improve electric network reliability, ensures that user's normal electricity consumption has great social benefit.
Detailed description of the invention
Fig. 1: the structural schematic diagram of lead masking hanging plate;
Fig. 2: the structural schematic diagram of insulating bar;
Fig. 3: the erection sequence schematic diagram of ferrule, intermediate ring, retaining ring, spring, base ring in insulating driving rod;
Fig. 4: the structural schematic diagram of intermediate ring;
Fig. 5: the structural schematic diagram of ferrule;
Fig. 6: Fig. 4 A is to structural schematic diagram;
Fig. 7: the structural schematic diagram of retaining ring;
Fig. 8: Fig. 7 A-A cuts open structural schematic diagram;
Fig. 9: the structural schematic diagram that retaining ring, spring, base ring match;
Figure 10: the mounting structure schematic diagram of lead masking hanging plate;
Figure 11: the structural schematic diagram of integrated mask;
Figure 12: Figure 11 A-A cuts open structural schematic diagram;
Figure 13: Figure 11 B-B cuts open structural schematic diagram;
Figure 14: Figure 11 left view;
Figure 15: Figure 11 right view;
Figure 16: the mounting structure schematic diagram of mask.
In figure: 1, retaining ring;2, base ring;3, intermediate ring;4, ferrule;5, drift bolt hole I;6, insulating driving rod;7, it insulate Connection ring;8, drift bolt hole IV;9, chuck III;10, drift bolt hole II;11, chuck IV;12, outer tube I;13, outer tube II;14, chuck I; 15, end;16, intermediate casing;17, fixing pipe;18, chuck II;19, chuck III;20, hollow out card slot;20-1, vertical hollow out Slot;20-2, horizontal hollow slots;20-3, arc hollow slots;21, drift bolt hole III;22, lead covers hanging plate;23, coupler body I;24, hook Body II;25, drift bolt;26, connector;27, it is horizontally mounted part;28, fixing piece;29, connection-peg;30, handle slot;31, insulator Outer cover;32, conducting wire outer cover;33, card slot I;34, card slot II;35, handle;36, connector I.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
The operational method of switch is isolated in the insulating bar method on-load replacement of the present embodiment, with reference to attached drawing 1-16, this reality Applying and isolating tool used in the operational method of switch mainly in the insulating bar method on-load replacement of example includes with lower component:
Retaining ring 1, base ring 2, intermediate ring 3, ferrule 4, drift bolt hole I 5, insulating driving rod 6, insulation connection ring 7, drift bolt hole IV 8, chuck III 9, drift bolt hole II 10, chuck IV 11, outer tube I 12, outer tube II 13, chuck I 14, end 15, intermediate casing 16, solid Determine pipe 17, chuck II 18, chuck III 19, hollow out card slot 20, vertical hollow slots 20-1, horizontal hollow slots 20-2, arc hollow slots 20-3, drift bolt hole III 21, lead masking hanging plate 22, coupler body I 23, coupler body II 24, drift bolt 25, connector 26, be horizontally mounted part 27, Fixing piece 28, handle slot 30, insulator outer cover 31, conducting wire outer cover 32, card slot I 33, card slot II 34, handle 35, connects connection-peg 29 Connector I 36.
It is isolated the operational method of switch in the insulating bar method on-load replacement of the present embodiment, includes the following steps:
1) Job readiness: scene is surveyed again, arranges working site, execute work permit system, hold scene station class meeting, detection Insulating tool, strain insulator and prepare before stepping on bar;
2) operating personnel's first steps on bar to job position on bar, carries out electrical verification to route and device, carries out down after electrical verification is qualified Single stepping;
3) ground potential coaster is installed on cross-arm by operating personnel's first using insulating bar on bar;
4) operating personnel's first, second installs electric pole mask on bar, carries out insulation masking to electric pole;
5) operating personnel's first, second is coupled two pieces of isolation switch insulation partitions on bar, isolates switch to both sides and carries out Insulation masking;
6) operating personnel is hung over lead masking hanging plate on side phase conductor and insulator pin using insulating bar on bar, Complete the insulation masking of opposite side phase terminal;Integrated mask is hung using insulating bar, completes opposite side phase strain insulator, line The insulation masking of folder and part conducting wire;It (is completed using four sets of shading tools to the effective of both sides phase cross-arm two sides charging equipment Masking)
7) operating personnel's first, second works in coordination and strips wire insulation at 15cm on the outside of phase conductor wire clamp in two sides on bar (length for stripping insulating layer should meet the length requirement for installing interim drainage thread and wire clamp of starting to exchange fire);
8) two operating personnels of first, second install interim insulation lead wire using weighting meter is synchronous, by middle phase Disconnecting switch bypass;
9) insulation lead wire through-flow situation when adjacent in operating personnel's detection, confirmation shunt it is good after, pull open in be isolated Switch;
10) operating personnel using abnormity insulation conductor cutter disconnect in isolate switch two sides lead, at this time in be separated by and leave It closes and is just in electroless state, the disconnecting switch that operating personnel more renews;
11) it is installed to new disconnecting switch, after drawing, closing pass the test, operating personnel uses multifunction insulating on bar Disconnecting switch two sides lead is accessed main traverse line by operating stick,
12) operating personnel close in isolate switch, be isolated in detection switch it is through-flow it is all right after, operation people on bar Member is in suitable position, insulation lead wire when synchronizing adjacent in removing using weighting meter.
13) operating personnel using weighting meter removes both sides according to opposite sequence when installation respectively on bar Mutually integrated mask and lead cover hanging plate, and remove isolation switch insulation partition, remove electric pole mask, remove coaster, Operating area is left, operation terminates.
14) work terminates to arrange Work tool and site clearing, holds meeting of knocking off, and handles work termination formality.
Connection relationship: lead masking 22 height of hanging plate of the present embodiment is 1.2 meters, and width is 0.9 meter, with a thickness of 4 millimeters, Lead cover hanging plate be in concave shape, lead masking hanging plate 22 top be equipped with the coupler body I 23 mutually mounted with insulator bowl head, with The coupler body II 24 that conducting wire mutually mounts, lead, which covers, is equipped with connector 26 on hanging plate 22, connector 26 is connected with dismountable exhausted Edge operating stick, insulating bar include the ferrule 4 plugged with connection-peg 29, and ferrule 4 is installed on the end of insulating driving rod 6 Portion, the outer cover of metallic plug 4 are equipped with the intermediate ring 3 for fixing electric power tool, and the outer cover of intermediate ring 3 is equipped with liftable Retaining ring 1, be arranged with the outer tube I 12 being mutually screwed on, outer tube II 13, outer tube II on 6 outer length direction of insulating driving rod 13 end and the end of insulating driving rod 6 are mutually fixed;
The integrated mask of the present embodiment includes covering at the insulator outer cover 31 of exterior insulator and covering at conducting wire External conducting wire outer cover 32, insulator outer cover (31) is respectively provided with bottom opening with conducting wire outer cover (32) and the two is one to connect Body structure, the side of insulator outer cover 31 are equipped with the card slot I 33 being mutually clamped with insulator bowl head, and the side of conducting wire outer cover 32 is equipped with For passing through conducting wire and the card slot II 34 that is mutually clamped with conducting wire, pacify on insulator outer cover 31 and the outer wall of 32 intersection of conducting wire outer cover Equipped with connector I 36, connector I 36 is connected with dismountable insulating bar, and insulating bar includes inserting with 26 phase of connector The ferrule 4 connect, ferrule 4 are installed on the end of insulating driving rod 6, and the outer cover of ferrule 4 is equipped with for fixing electric power The outer cover of the intermediate ring 3 of tool, intermediate ring 3 is equipped with liftable retaining ring 1, along 6 outer length direction of insulating driving rod On be arranged with the outer tube I 12 being mutually screwed on, outer tube II 13, the end of outer tube II 13 is mutually fixed with the end of insulating driving rod 6;
It is in concave shape that the embodiment of the present invention lead, which covers hanging plate 22, and lead covers the top end positions punishment of hanging plate 22 Coupler body I 23, coupler body II 24 are not installed, connector 26, which is installed at lead masking 22 upper position of hanging plate and is located at lead, to be covered 22 length direction middle position of hanging plate, lead, which covers, offers handle slot 30 above hanging plate 22, and handle slot 30 is located at connector Right above 26, connector 26 is T-shaped, is horizontally mounted part 27 including being fixed on lead masking hanging plate 22, is horizontally mounted part 27 On the fixing piece 28 perpendicular with it is installed, the bottom of fixing piece 28 is equipped with connection-peg 29, the diametrical direction of fixing piece 28 On drift bolt 25 is installed, the both ends of drift bolt 25 are located at the outside of fixing piece 28;
The cross section of the insulator outer cover 31 of the present embodiment is in N-shaped, and the cross section of conducting wire outer cover 32 is in convex, insulator The height of outer cover 31 is higher than the height of conducting wire outer cover 32, the cover bottom width degree phase of the width and conducting wire outer cover 32 of insulator outer cover 31 Match, card slot I 33 and the perpendicular strip of card slot II 34, the top design of card slot I 33 is arc, bottom is designed as splayed, is blocked The top design of slot II 34 is "-" type, bottom is designed as splayed configuration, and the top of conducting wire outer cover 32 is equipped with handle 35;
The ferrule 4 of the present embodiment includes the inserted terminal 4-1 plugged with connection-peg 29 and is installed in insulating driving rod 6 Installation end 4-2, inserted terminal 4-1 is structure as a whole with installation end 4-2, and the outer diameter of inserted terminal 4-1 is greater than the outer diameter of installation end 4-2 To form chuck I 14 in the two junction;
The intermediate ring 3 of the present embodiment includes being sheathed on end 15 ferrule 4 outside, intermediate casing 16, fixing pipe 17, is held First 15, intermediate casing 16, fixing pipe 17 be end to end integral structure, and the outer diameter of three and internal diameter successively successively decrease to It is connect with the outer wall junction of intermediate casing 16 formation chuck II 18, in intermediate casing 16 with the inner wall of fixing pipe 17 in end 15 Place forms chuck III 19, and chuck III 19 is clamped with I 14 phase of chuck, offers drift bolt hole I 5 in fixing pipe 17, opens up on outer tube I 12 There is the drift bolt hole II 10 being used cooperatively with drift bolt hole I 5, the end of outer tube II 13 is equipped with drift bolt hole III 21, the end of insulating driving rod 6 End is equipped with the drift bolt hole IV 8 being used cooperatively with drift bolt hole III 21;
The end 15 of the present embodiment is opened up close to one end of electric power tool there are two hollow out card slot 20, two hollow out card slots 20 Symmetrical as eccentric axial using the central axis of end 15, hollow out card slot 20 includes prolonging always from end 15 close to one end of electric power tool The vertical hollow slots 20-1 for extending to 15 middle position of end, the horizontal hollow slots 20-2 to connect with vertical hollow slots 21, water The end of flat hollow slots 20-2 is equipped with the arc hollow slots 20-3 upwardly extended;Vertical hollow slots 20-1 and horizontal hollow slots 20-2 Intersection is designed as ramped shaped;
The retaining ring 1 of the present embodiment includes the spring 9 and the base ring 2 for being butted on 9 tail portion of spring that part is set in retaining ring 1, The inner wall of retaining ring 1 be equipped with annular chuck IV 11, annular chuck IV 11 and II 18 phase of chuck clamping, annular chuck IV 11 it is interior Diameter is less than the outer diameter of chuck II 18, is butted in annular chuck IV 11 at the top of one end of spring 9, the other end is butted on base ring 2, bottom The side of ring 2 is butted on outer tube I 12.
The working principle of lead masking hanging plate 22 and integrated mask: the present embodiment is to use insulating bar by lead It covers hanging plate 22 to hang to conducting wire, coupler body I 23 is hung on the bowl head of insulator, and coupler body II 24 is hung on conducting wire, then opposite direction rotation Turn operating stick and connector 26 is unlocked into removal operation bar, completes the installation of lead masking hanging plate, pay attention to insulating strain insulator when hanging Substring is placed in lead masking 22 indent of hanging plate, and the present embodiment is hung mask to conducting wire using insulating bar, mask Insulator outer cover 31 cover at exterior insulator, conducting wire outer cover 32 covers at outside conducting wire, and the both ends of mask are hung in On the bowl head and conducting wire of insulator, after hanging, connector 26 is unlocked removal operation bar by opposite direction rotation process bar, is completed The installation of mask, detailed process is as follows:
The ferrule 4 of the present embodiment is located in intermediate ring 3, and the chuck I 14 of ferrule 4 is connected in the chuck in intermediate ring 3 On III 19, intermediate 3 part of ring is located in retaining ring 1, and the chuck II 18 outside intermediate ring 3 is connected in the chuck inside retaining ring 1 On IV 11, the ring 1 that is locked of the part hollow out card slot 20 on intermediate ring 3 is sheltered from, in use, electrician pole climbing is to appropriate position on bar It sets, the safe distance of 0.4m or more is kept with electrical body around, ground electrician is covered insulating bar and lead by rope Hanging plate 22 is uploaded to electrician on bar, and electrician plugs ferrule 4 and connection-peg 29 on bar, then pushes retaining ring 1, makes hollow out Then all exposures of card slot 20 rotate intermediate ring 3 so that drift bolt 25 be made to be inserted into vertical hollow slots 20-1, drift bolt 25 is mobile It in horizontal hollow slots 20-2, and then is moved in arc hollow slots 20-3, at this point, retaining ring 1 is multiple under the action of spring 9 Position, drift bolt 25 is tightly stuck in arc hollow slots 20-3 by the top of retaining ring 1, thus by one end of insulating bar and lead Masking hanging plate 22 is fixed as one, at this point, staff is provoked lead masking hanging plate 22 by insulating bar, coupler body I 23 It hanging on the bowl head of insulator, coupler body II 24 is hung on conducting wire, after hanging, then opposite direction spun outer tube II 13, it will connect Insulating bar is removed in first 26 unlock, is completed the installation of lead masking hanging plate, is hung mask similarly, staff passes through insulation Operating stick provokes mask, and I 33 side of card slot of mask is hung on insulator bowl head, and II 34 side of card slot is hung on conducting wire On, after hanging, then opposite direction spun outer tube II 13, insulating bar is removed into the unlock of connector 26, completes mask Installation, very easy to use, work efficiency is high, and effect is good, and safety coefficient is high.
Switching operations method is isolated in insulating bar method on-load replacement of the invention, and small, operation is limited to operating environment requirement Tool is convenient for carrying transport, compared to aerial lift device with insulated arm medial potential working, has place strong applicability, cost of investment is low, people Member helps to expand livewire work range, improves electric network reliability, ensureing user just convenient for training, the high advantage of safety coefficient Common electricity has great social benefit.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. isolate the operational method of switch in a kind of replacement of insulating bar method on-load, be characterized in that the following steps are included:
1) electrical verification, is carried out to route and device, carries out next step operation after electrical verification is qualified;
2), ground potential coaster is installed on cross-arm;
3), electric pole mask is installed, insulation masking is carried out to electric pole;
4), isolation switch insulation partition is installed respectively in the phase of both sides, switch is isolated to both sides and carries out insulation masking;
5), lead masking hanging plate (22) is hung on side phase conductor and insulator pin using insulating bar, completes opposite side phase The insulation of lead is covered, and is hung integrated mask using insulating bar, is completed opposite side phase strain insulator, wire clamp and portion The insulation of intraphase conductor is covered;
6), wire insulation is stripped at 15-20cm on the outside of phase conductor wire clamp in two sides;
7) interim insulation lead wire, is installed using insulating bar is synchronous, switch bypass is isolated by;
8) insulation lead wire through-flow situation when, adjacent in detection, confirmation shunt it is good after, pull open in isolate switch;
9) switch two sides lead is isolated in, disconnecting, at this time in isolate switch just in electroless state, operating personnel more renews Disconnecting switch;
10), after new disconnecting switch installs and draws, closes pass the test, using insulating bar by disconnecting switch two sides Lead accesses main traverse line;
11) switch is isolated in, closing, be isolated in detection switch it is through-flow it is all right after, synchronized and torn open using insulating bar Insulation lead wire when adjacent in removing;
12), both sides mutually integrated mask and lead are removed respectively according to the sequence opposite with when installation using insulating bar It covers hanging plate (22), and removes isolation switch insulation partition, remove electric pole mask, remove ground potential coaster, operation terminates;
Connector I (36) is installed, integrated mask includes covering at outside insulator on the outer wall of the integration mask The insulator outer cover (31) in portion and conducting wire outer cover (32) outside conducting wire is covered at, insulator outer cover (31) and conducting wire outer cover (32) It is respectively provided with bottom opening and the two is the integral structure to connect, the side of insulator outer cover (31) is equipped with and insulator bowl head phase The card slot I (33) of clamping, the side of conducting wire outer cover (32) are equipped with for across conducting wire and the card slot II (34) that is mutually clamped with conducting wire, The cross section of insulator outer cover (31) is in N-shaped, and the cross section of conducting wire outer cover (32) is in convex, the height of insulator outer cover (31) Higher than the height of conducting wire outer cover (32), the width of insulator outer cover (31) matches with the cover bottom width degree of conducting wire outer cover (32), card Slot I (33) and the perpendicular strip of card slot II (34), the top design of card slot I (33) is arc, bottom is designed as splayed, is blocked The top design of slot II (34) is "-" type, bottom is designed as splayed configuration, and handle (35) are equipped at the top of conducting wire outer cover (32).
2. isolating the operational method of switch in a kind of insulating bar method on-load replacement described in accordance with the claim 1, feature exists In the lead masking hanging plate (22) be in concave shape, lead masking hanging plate (22) top end positions at be separately installed with absolutely Coupler body I (23) that edge bowl head mutually mounts, the coupler body II (24) mutually mounted with conducting wire, lead cover the company of being equipped on hanging plate (22) Connector (26), connector (26), which is installed at lead masking hanging plate (22) upper position and is located at lead, covers hanging plate (22) length Direction middle position, lead masking hanging plate (22) top offer handle slot (30), and handle slot (30) is located at connector (26) Surface.
3. isolating the operational method of switch in a kind of insulating bar method on-load replacement according to claim 2, feature exists It is T-shaped in the connector (26) or connector I (36), including part (27) are horizontally mounted, it is horizontally mounted on part (27) and installs Have the fixing piece perpendicular with it (28), the bottom of fixing piece (28) is equipped with connection-peg (29), the diameter side of fixing piece (28) It is equipped with drift bolt (25) upwards, the both ends of drift bolt (25) are located at the outside of fixing piece (28).
4. isolating the operational method of switch in a kind of insulating bar method on-load replacement described in accordance with the claim 3, feature exists It include the ferrule (4) plugged with connector (26) or connector I (36) in the insulating bar, ferrule (4) is installed In the end of insulating driving rod (6), the outer cover of ferrule (4) is equipped with for fixing connector (26) or connector I (36) Intermediate ring (3), the outer cover of intermediate ring (3) is equipped with liftable retaining ring (1), along insulating driving rod (6) outer length The outer tube I (12) being mutually screwed on, outer tube II (13), the end of outer tube II (13) and the end of insulating driving rod (6) are arranged on direction End is mutually fixed.
5. isolating the operational method of switch in a kind of insulating bar method on-load replacement according to claim 4, feature exists In the ferrule (4) include the inserted terminal (4-1) plugged with connection-peg (29) and the peace being installed on insulating driving rod (6) It fills end (4-2), inserted terminal (4-1) is structure as a whole with installation end (4-2), and the outer diameter of inserted terminal (4-1) is greater than installation end (4-2) Outer diameter to the two junction formed chuck I (14).
6. isolating the operational method of switch in a kind of insulating bar method on-load replacement according to claim 4, feature exists It include being sheathed on the external end (15) of ferrule (4), intermediate casing (16), fixing pipe (17), end in the intermediate ring (3) (15), intermediate casing (16), fixing pipe (17) are end to end integral structure, and the outer diameter of three and internal diameter successively successively decrease To form chuck II (18), in intermediate casing (16) and fixing pipe in the outer wall junction of end (15) and intermediate casing (16) (17) inner wall junction forms chuck III (19), and chuck III (19) is mutually clamped with chuck I (14).
7. isolating the operational method of switch in a kind of insulating bar method on-load replacement according to claim 6, feature exists In offering drift bolt hole I (5) on the fixing pipe (17), offers on outer tube I (12) and worn with what drift bolt hole I (5) was used cooperatively Nail hole II (10), the end of outer tube II (13) are equipped with drift bolt hole III (21), and the end of insulating driving rod (6) is equipped with and drift bolt hole III (21) the drift bolt hole IV (8) being used cooperatively.
8. isolating the operational method of switch in a kind of insulating bar method on-load replacement according to claim 6, feature exists There are two opening up in one end of the end (15) close electric power tool hollow out card slot (20), two hollow out card slots (20) are with end (15) central axis is that eccentric axial is symmetrical, and hollow out card slot (20) includes prolonging always from end (15) close to one end of electric power tool The vertical hollow slots (20-1) for extending to end (15) middle position, the horizontal hollow slots to connect with vertical hollow slots (21) (20-2), the end of horizontal hollow slots (20-2) are equipped with the arc hollow slots (20-3) upwardly extended, vertical hollow slots (20-1) Ramped shaped is designed as with the intersection horizontal hollow slots (20-2).
9. isolating the operational method of switch in a kind of insulating bar method on-load replacement according to claim 6, feature exists It include the spring (9) and the base ring (2) for being butted on spring (9) tail portion that part is set in retaining ring (1), lock in the retaining ring (1) The inner wall of tight ring (1) is equipped with annular chuck IV (11), and annular chuck IV (11) is mutually clamped with chuck II (18), annular chuck IV (11) internal diameter is less than the outer diameter of chuck II (18), is butted in annular chuck IV (11) at the top of one end of spring (9), the other end It is butted on base ring (2), the side of base ring (2) is butted on outer tube I (12).
CN201711392786.6A 2017-12-21 2017-12-21 The operational method of switch is isolated in a kind of replacement of insulating bar method on-load Expired - Fee Related CN107946997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711392786.6A CN107946997B (en) 2017-12-21 2017-12-21 The operational method of switch is isolated in a kind of replacement of insulating bar method on-load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711392786.6A CN107946997B (en) 2017-12-21 2017-12-21 The operational method of switch is isolated in a kind of replacement of insulating bar method on-load

Publications (2)

Publication Number Publication Date
CN107946997A CN107946997A (en) 2018-04-20
CN107946997B true CN107946997B (en) 2019-07-19

Family

ID=61941620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711392786.6A Expired - Fee Related CN107946997B (en) 2017-12-21 2017-12-21 The operational method of switch is isolated in a kind of replacement of insulating bar method on-load

Country Status (1)

Country Link
CN (1) CN107946997B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114094495B (en) * 2021-12-08 2023-10-31 云南电网有限责任公司临沧供电局 Installation method of wire clamp device with insulation shield type without power outage

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5742000A (en) * 1993-11-03 1998-04-21 Carolina Power & Light Company Device and method for preventing arcing and resultant flashing during repairs performed inside pad-mounted transformers
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN101728786A (en) * 2008-10-29 2010-06-09 国网电力科学研究院 Protective measure for replacing beeline pole side-phase post insulator in 20kV circuit in charged state
CN102394484A (en) * 2011-12-12 2012-03-28 辽宁省电力有限公司锦州供电公司 Method for replacing isolating switch with 10kV load
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203932760U (en) * 2014-06-04 2014-11-05 国家电网公司 Isolating switch insulating barrier on a kind of post
CN105429031A (en) * 2015-12-02 2016-03-23 国网新疆电力公司乌鲁木齐供电公司 Special insulating barrier for changing pole-mounted circuit breaker
CN106410674A (en) * 2016-11-13 2017-02-15 国网湖北省电力公司咸宁供电公司 Hot-line work method for 10-kV distribution line and equipment
CN205985893U (en) * 2016-09-07 2017-02-22 国网浙江淳安县供电公司 Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN207765879U (en) * 2018-01-08 2018-08-24 国网辽宁省电力有限公司鞍山供电公司 10kV hard combined type biplate suspension insulator masks

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5742000A (en) * 1993-11-03 1998-04-21 Carolina Power & Light Company Device and method for preventing arcing and resultant flashing during repairs performed inside pad-mounted transformers
CN101728786A (en) * 2008-10-29 2010-06-09 国网电力科学研究院 Protective measure for replacing beeline pole side-phase post insulator in 20kV circuit in charged state
CN101640390A (en) * 2009-07-15 2010-02-03 武汉科瑞德电力科技有限公司 Live-wire operation method for lapping drainage wire for 35kV distribution circuit
CN102394484A (en) * 2011-12-12 2012-03-28 辽宁省电力有限公司锦州供电公司 Method for replacing isolating switch with 10kV load
CN103001142A (en) * 2012-09-03 2013-03-27 辽宁省电力有限公司鞍山供电公司 Operation method for on-load replacing of 10kV pole-mounted disconnector
CN203932760U (en) * 2014-06-04 2014-11-05 国家电网公司 Isolating switch insulating barrier on a kind of post
CN105429031A (en) * 2015-12-02 2016-03-23 国网新疆电力公司乌鲁木齐供电公司 Special insulating barrier for changing pole-mounted circuit breaker
CN205985893U (en) * 2016-09-07 2017-02-22 国网浙江淳安县供电公司 Electrified column switch professional equipment that changes of indirect bypass of 10kV circuit insulator spindle
CN106410674A (en) * 2016-11-13 2017-02-15 国网湖北省电力公司咸宁供电公司 Hot-line work method for 10-kV distribution line and equipment
CN207765879U (en) * 2018-01-08 2018-08-24 国网辽宁省电力有限公司鞍山供电公司 10kV hard combined type biplate suspension insulator masks

Also Published As

Publication number Publication date
CN107946997A (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN203734209U (en) Live working device for cable bypass
CN107946997B (en) The operational method of switch is isolated in a kind of replacement of insulating bar method on-load
CN106842448A (en) A kind of enterprising remaining cable case of cable insulation landing of transformer station
CN108335890B (en) Portable voltage transformer
CN208024045U (en) A kind of novel power transmission and distribution electric pole
CN201069751Y (en) Boundary switch
CN109887798A (en) A kind of single ground connection combined type ice-melt disconnecting switch
CN109167407A (en) A kind of aerial earth wire energy obtaining system
CN107910812A (en) A kind of insulating bar method on-load isolates the special isolation shading tool of switch in replacing
CN208939544U (en) Can plug protector alternately interconnect grounding box
CN101282033A (en) User demarcation load switch
CN210016172U (en) Box-sharing type multifunctional detachable device for GIS
CN209515544U (en) A kind of single ground connection combined type ice-melt disconnecting switch
CN204144204U (en) A kind of fast disassembly type outdoor high-voltage current-limiting fuse
CN209515539U (en) Multifunction combined ice-melt disconnecting switch
CN208015077U (en) A kind of lightning protection device and its system for ancient building
CN210040043U (en) Upper outlet wire fixing mechanism for outdoor high-voltage vacuum circuit breaker
CN109244915B (en) Miniature integrated transformer substation on post
CN206023159U (en) Pillar spark gap
CN209515540U (en) A kind of horizontal retractable ice-melt fracture isolating switch structure
CN104184061A (en) Side-mount type flame-proof type high voltage vacuum distribution device for mining
CN201444171U (en) Wall bushing mounting voltage transducer
CN216085714U (en) Floor type installed primary and secondary fusion pole-mounted circuit breaker
CN105069943B (en) Cable anti-theft arrangement
CN204030406U (en) Side-mounted flameproof high-voltage vacuum distribution equipment for mining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant