CN107940161A - Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure - Google Patents
Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure Download PDFInfo
- Publication number
- CN107940161A CN107940161A CN201710929335.5A CN201710929335A CN107940161A CN 107940161 A CN107940161 A CN 107940161A CN 201710929335 A CN201710929335 A CN 201710929335A CN 107940161 A CN107940161 A CN 107940161A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- sleeve
- section
- reparation
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/168—Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L23/00—Flanged joints
- F16L23/02—Flanged joints the flanges being connected by members tensioned axially
- F16L23/024—Flanged joints the flanges being connected by members tensioned axially characterised by how the flanges are joined to, or form an extension of, the pipes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L23/00—Flanged joints
- F16L23/02—Flanged joints the flanges being connected by members tensioned axially
- F16L23/024—Flanged joints the flanges being connected by members tensioned axially characterised by how the flanges are joined to, or form an extension of, the pipes
- F16L23/026—Flanged joints the flanges being connected by members tensioned axially characterised by how the flanges are joined to, or form an extension of, the pipes by welding
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L23/00—Flanged joints
- F16L23/16—Flanged joints characterised by the sealing means
- F16L23/18—Flanged joints characterised by the sealing means the sealing means being rings
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pipe Accessories (AREA)
Abstract
The invention discloses a kind of pipe repairing method, including:Determine the reparation section of the pipeline, and the both ends difference dredge operation of the reparation section is cheated and the pipe that breaks;The inner surface of pipeline of the reparation section is cleared up;Liner hose is drawn to the other end from one end of the reparation section;Inflated into the liner hose, the liner hose is attached on the inner-walls of duct of the reparation section;The both ends of the reparation section are met and discussed with the pipe head of adjacent segment respectively and are connected.The metallic conduit that the pipe repairing method takes place frequently, can not be replaced in time for active time length, seriously corroded, leakage accident, can be in the case where being excavated to pipeline non-integral, realization disposably passes through the elbow of 1.5D, meet the pipeline rehabilitation of long range at the same time, there is significant economic and social benefit to effectively extending nonmetal pipeline service life.
Description
Technical field
The present invention relates to pipe-line maintenance service technique field, more particularly to a kind of pipe repairing method and for pipeline rehabilitation
Pipeline meet and discuss connection structure.
Background technology
Pipeline be widely used in feedwater, draining, heat supply, give gas, long distance delivery oil and natural gas, agricultural irrigation,
The every profession and trades such as hydraulic engineering, pipeline have certain service life, more by pumped (conveying) medium etc. with the extension of pipeline active time
The problems such as influence of aspect factor, corrosion failure, ageing failure inevitably occur for pipeline after certain time limit is used, make
Revealed into pumped (conveying) medium, not only influence normal production run, also bring environmental pollution hidden danger.In petroleum industry, for being on active service
Time length, the metallic conduit of seriously corroded, using tradition excavates substitute mode long construction period, quantities is big, construction cost is high,
Environmental ecology and civil order are disturbed when pipeline is worn across river, lake, building or the important main line of communication at the same time big.
The restorative procedure of pipeline mainly has in-situ solidifying method (Cured in Place Pipe, CIPP), wears in PE pipes at present
The method of inserting, pipeline coating solidification method, once maximum construction distance is 0.3km to in-situ solidifying method;Insertion method once apply by maximum in PE pipes
Work distance is 1.2km, and needs individually disconnected pipe processing for the elbow of elbow≤1.5D;Pipeline coating solidification method once apply by maximum
Work distance is 1.5km, but quality control on construction difficulty is big, and application range is restricted.
Therefore the metallic conduit that takes place frequently, can not be replaced in time for active time length, seriously corroded, leakage accident,
How to realize disposably by the elbow of 1.5D, while meet the pipeline rehabilitation of long range, make to effectively extending nonmetal pipeline
There is significant economic and social benefit with the service life.
The content of the invention
Have in view of that, the present invention provides one kind and restricted from buried pipeline position, and can realize disposable over long distances
The pipe repairing method effectively repaired and pipeline for pipeline rehabilitation are met and discussed connection structure, existing in the prior art to solve
Problem.
According to the first aspect of the invention, there is provided a kind of pipe repairing method, including:
Determine the reparation section of the pipeline, and the both ends difference dredge operation of the reparation section is cheated and the pipe that breaks;
The inner surface of pipeline of the reparation section is cleared up;
Liner hose is drawn to the other end from one end of the reparation section;
Inflated into the liner hose, the liner hose is attached on the inner-walls of duct of the reparation section;
The both ends of the reparation section are met and discussed with the pipe head of adjacent segment respectively and are connected.
Preferably, the inner surface of pipeline to the reparation section, which carries out cleaning, includes:
Remove the foreign matter of the inner surface of pipeline of the reparation section;
High density polyethylene pipe is tried on the slotting reparation section, if inserting process is obstructed or the high density polyethylene pipe
The face of taking temperature is damaged, then the inner surface of pipeline of the reparation section is handled again, until qualified.
Preferably, it is additionally included in and draws liner hose to before the other end from one end of the reparation section, first to clear
The inner surface of pipeline of the reparation section after reason carries out corrosion inhibiter protection.
Preferably, described draw liner hose to the other end from one end of the reparation section includes:
By the liner hose backfin;
One end of the liner hose and one end of traction steel wire are connected, the other end of the traction steel wire is described in
Section is repaired, and is connected with pulling equipment;
The liner hose is drawn to the other end from one end of the reparation section by the pulling equipment.
Preferably, the traction steel wire is connected through moment of torsion release structure with the liner hose.
Preferably, it is described by it is described reparation section both ends meet and discuss respectively with the pipe head of adjacent segment be connected including:
The first horn sleeve barrel is welded on the termination for repairing section, the pipe head opposite with the termination of the reparation section
The opening of the second horn sleeve barrel of upper welding, first horn sleeve barrel and second horn sleeve barrel is opposite;
First flange disk is welded on the end face of the termination for repairing section, the pipe end opposite with the termination of the reparation section
Second flange disk is welded on the end face of head;
It will be sealed and connected between the first flange plate and second flange disk;
Be arranged outer sleeve in the outside of first flange disk and second flange disk, and by the both ends of the outer sleeve be respectively welded in
On first horn sleeve barrel and the second horn sleeve barrel;
Injecting sealing material in the cavity to be formed is connected to first horn sleeve barrel, the second loudspeaker sleeve, outer sleeve.
Preferably, it is described will be sealed between the first flange plate and second flange disk and connect including:
Sealing ring is installed on the first flange disk and second flange disk respectively;
The first inner sleeve pressure ring is installed on the termination for repairing section, on the pipe head opposite with the termination of the reparation section
Second inner sleeve pressure ring is installed, the first inner sleeve pressure ring and the second inner sleeve pressure ring are respectively used to fix corresponding liner hose
And sealing ring;
Flange gasket is set between the first inner sleeve pressure ring and the second inner sleeve pressure ring, and by first flange disk and second flange disk
Through being bolted.
According to the second aspect of the invention, there is provided a kind of pipeline for pipeline rehabilitation is met and discussed connection structure, including first
Loudspeaker sleeve, the second loudspeaker sleeve, outer sleeve and flange connecting assembly and sealing material, the first loudspeaker sleeve weld is in institute
State on the termination of reparation section of pipeline, the second loudspeaker sleeve weld is in the pipe head opposite with the termination of the reparation section
On, the opening of the first loudspeaker sleeve and the second loudspeaker sleeve is opposite, and the flange connecting assembly is used to connect and seal institute
State the termination for repairing section and the pipe head opposite with the termination of the reparation section, the outer sleeve are sheathed on the flanged joint
The outside of component, and the both ends of the outer sleeve are respectively with the first loudspeaker sleeve and the second loudspeaker sleeve connection, it is described
Sealing material is filled in the cavity formed between the first loudspeaker sleeve, the second loudspeaker sleeve and outer sleeve.
Preferably, the flange connecting assembly include first flange disk, second flange disk, the first inner sleeve pressure ring, sealing ring,
Second inner sleeve pressure ring and bolt,
Wherein, first flange disk be connected to it is described reparation section termination end face on, second flange disk be connected to it is described
Repair on the end face of the opposite pipe head in termination of section, the first inner sleeve pressure ring is fixed for fixing the liner of the pipeline
Hose, between the first flange disk and the first inner sleeve pressure ring, and between the second flange disk and the second inner sleeve pressure ring respectively
Equipped with a sealing ring, the bolt is each passed through the first flange disk and second flange disk, for fastening described first
Ring flange and second flange disk.
Preferably, the outer sleeve is equipped with injection hole, for injecting the sealing material.
Pipe repairing method provided by the invention, and for pipeline rehabilitation pipeline meet and discuss connection structure the advantages of
In:
(1) can buried pipeline because building, waters restrict and excavates replacement constructional difficulties under the conditions of, realize ageing failure
Repair the no-dig technique underground of old pipeline;
(2) once most long reparation straight pipeline distance 5.0km, and can repairing caliber once by 2 1.5D elbows and exist
DN100-DN600, repairs the 1.2km that distance is far longer than Insertion method in 0.3km, PE pipe of in-situ solidifying method, and pipeline coating is solid
The 1.5km of change method, and pipeline pressure-bearing 6.0MPa after reparation;
(3) connection structure of meeting and discussing of the pipeline for pipeline rehabilitation used is simple and reliable, it can be achieved that at disconnected pipe between connector
Close connection.
Therefore, in the application pipe repairing method for active time length, seriously corroded, leakage accident take place frequently, Wu Fajin
The metallic conduit replaced in time of row, can be realized disposably by the elbow of 1.5D, together in the case where being excavated to pipeline non-integral
When meet the pipeline rehabilitation of long range, there is significant economic and social benefit to effectively extending nonmetal pipeline service life.
Brief description of the drawings
, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all of the figs, similar element
Or part is generally identified by similar reference numeral.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 shows the flow chart of pipe repairing method according to embodiments of the present invention.
Fig. 2 shows the construction schematic diagram of pipe repairing method according to embodiments of the present invention.
Fig. 3 shows the structure diagram of jointing according to embodiments of the present invention.
Fig. 4 shows that the pipeline according to the present invention for pipeline rehabilitation is met and discussed the structure diagram of connection structure.
Fig. 5 shows the particular flow sheet of step S06.
In figure:Repair section 100, adjacent segment pipeline 200, first operation hole 11, second operation hole 12, hose folding machine 2,
Liner hose 3, pulley 4, moment of torsion releasing-joint 5, traction steel wire 6, pulling equipment 7, the first loudspeaker sleeve 81, the second loudspeaker sleeve
82nd, outer sleeve 83, upper arc sleeve 831, injection hole 8311, lower arc sleeve 832, sealing material 84, first flange disk 851, second
Ring flange 852, the first inner sleeve pressure ring 853, sealing ring 855, the second inner sleeve pressure ring 856, bolt 857, flange gasket 86.
Embodiment
The embodiment of technical solution of the present invention is described in detail below in conjunction with attached drawing.Following embodiments are only used for
Clearly illustrate technical scheme, therefore be only used as example, and the protection model of the present invention cannot be limited with this
Enclose.
The present invention provides a kind of pipe repairing method, is carried out in the present embodiment by taking the restorative procedure to petroleum pipeline as an example detailed
Describe in detail bright.As shown in Figures 1 to 5, more detailed introduction is carried out to the pipe repairing method with reference to step S01-S06.
S01 the reparation section 100 of the pipeline), is determined, and by the both ends difference dredge operation hole of the reparation section 100 simultaneously
Disconnected pipe;
Specifically, according to pipeline construction G- Design to be repaired and reconnaissance trip, duct segments point and elbow transformation point are specified,
Determine the reparation section 100 of pipeline, and operation hole and disconnected pipe are excavated at the both ends for repairing end.The place refers to disconnected pipe and refers to repairing
The two of section 100 bring out, i.e., disconnect pipeline in the position in operation hole.When determining to repair section 100 as far as possible, it should avoid in complexity
Terrain, such as geology is harder, building, waters or hollow mire etc. are not easy the place of constructing operation as repairing section 100
Endpoint, i.e., as operation hole tap point.In addition, also needing to consider the quantity for repairing 1.5D elbows in section 100, section 100 is repaired
The quantity of interior 1.5D elbows is selected within two as far as possible, such as one or 2, avoid excessive elbow from influencing to repair pipeline
It is multiple.
In the embodiment, the first operation hole 11 is excavated in the first end for repairing section 100, is dug in the second end for repairing section 100
The operation of pick second hole 12.
S02), the inner surface of pipeline of the reparation section 100 is cleared up;
Specifically, which includes the following steps again:
S021 the foreign matter of the inner surface of pipeline for repairing section 100), is removed;
In the step, to be repaired section 100 of inner surface of pipeline is cleared up, scale removal, iron rust and overlap welding slag
Deng foreign matter so that inner surface of pipeline is smooth.
S022), high density polyethylene pipe is tried on the slotting reparation section 100, if inserting process is obstructed or described highly dense
The degree polyethylene pipe face of taking temperature is damaged, then the inner surface of pipeline of the reparation section 100 is handled again, until qualified.
In the step, with high density polyethylene pipe it is exploratory it is interspersed repair section 100 pipeline, if inserting process is obstructed,
Such as run into foreign matter obstruction so that inserting process cannot be smoothed out, then there are larger for the inner surface of pipeline of explanation reparation section 100
Foreign matter or blocking, if examination inserting process in be only high density polyethylene pipe surface serious damage, illustrate to be repaired
There are larger foreign matter for the inner surface of pipeline of section 100.In the case of this two kinds, be both needed to to be repaired section 100 of inner surface of pipeline into
Row is cleared up again, until qualified.
S03 the inner surface of pipeline of the reparation section 100 after), clearing up carries out corrosion inhibiter protection;
In the step, corrosion inhibiter batch processing is carried out to the inner surface of pipeline for repairing section 100, realizes that old pipeline metal surface is delayed
Lose agent protection.
S04), liner hose 3 is drawn to the other end from one end of the reparation section 100;
Specifically, which specifically includes the following steps again:
S041), by 3 backfin of liner hose;
In the step, hose folding machine 2 is laid on the ground near the first operation hole 11, liner hose 3 is rolled over
Fold and will wind thereon, such as the section of liner hose is folded into U-shaped, so that liner hose 3, which passes through, repairs section
With smaller by section during 100 pipeline, in favor of passing through.
In the embodiment, liner hose 3 selects high pressure composite hose, for being repaired to the pipeline for repairing section 100.
S042), one end of the liner hose 3 is connected with one end of traction steel wire 6, the traction steel wire 6 it is another
End is connected through the reparation section 100 with pulling equipment 7;
In the step, one end of liner hose 3 is connected through moment of torsion releasing-joint 5 with the first end of traction steel wire 6 first,
And the second end of traction steel wire 6 is passed through and repairs section 100.Then, traction is laid on the ground near the second operation hole 12 to set
Standby 7, and multiple pulleys 4 are laid in the front end of pulling equipment 7, for guiding traction steel wire 6.The second end of traction steel wire 6 is worn
Cross reparation section 100 and be drawn out on pulley 4 and pulling equipment 7.Start 7 traction steel wire 6 of pulling equipment so that traction steel wire 6 is led
Draw liner hose 3 through reparation section 100.
S05), inflated into the liner hose 3, the liner hose 3 is attached in the pipeline of the reparation section 100
On wall;
Specifically, gases at high pressure are squeezed into liner hose 3 so that liner hose 3 expands and adhere well to reparation section
On 100 inner-walls of duct.
S06), the both ends of the reparation section 100 are met and discussed with the termination of the pipeline 200 of adjacent segment respectively and are connected, form pipe
Road is met and discussed connection structure.
Connection structure of meeting and discussing first below to the pipeline for pipeline rehabilitation in the embodiment describes in detail.
With reference to figure 3 to Fig. 4, which can be to be repaired section 100 of pipe joint, or with to be repaired section 100
The connector of adjacent pipeline, is docked through to be repaired section 100 of pipe joint with the connector of to be repaired section of 100 adjacent pipelines,
And it is attached the pipeline for pipeline rehabilitation that can be formed in the embodiment after sealing and meets and discusses connection structure.
The pipeline for pipeline rehabilitation in the embodiment is met and discussed connection structure, including the first loudspeaker sleeve 81, the second loudspeaker
Sleeve 82, outer sleeve 83 and flange connecting assembly and sealing material 84, the first loudspeaker sleeve 81 are welded in the pipeline
Reparation section 100 termination on, the second loudspeaker sleeve 82 is welded in the opposite pipe end in termination with the reparation section 100
On head, the opening of the first loudspeaker sleeve 81 and the second loudspeaker sleeve 82 is opposite, and the flange connecting assembly is used to connect simultaneously
The termination and the pipe head opposite with the termination of the reparation section 100, the outer sleeve 83 for sealing the reparation section 100 are arranged
In the outside of the flange connecting assembly, and the both ends of the outer sleeve 83 respectively with the first loudspeaker sleeve 81 and second
Loudspeaker sleeve 82 connects, and the sealing material 84 is filled in the first loudspeaker sleeve 81, the second loudspeaker sleeve 82 and outer sleeve
In the cavity formed between 83.
The flange connecting assembly includes first flange disk 851, second flange disk 852, the first inner sleeve pressure ring 853, sealing
Enclose the 855, second inner sleeve pressure ring 856 and bolt 857.Wherein, first flange disk 851 is connected to the termination of the reparation section 100
On end face, second flange disk 852 be connected to on the end face of the opposite pipe head in termination of the reparation section 100, described the
One inner sleeve pressure ring 853 is fixed for fixing the liner hose 3 of the pipeline, the 851 and first inner sleeve pressure ring of first flange disk
Between 853, and a sealing ring 855 is respectively provided between 852 and second inner sleeve pressure ring 856 of the second flange disk, it is described
Bolt 857 is each passed through the first flange disk 851 and second flange disk 852, for fastening the first flange disk 851 and
Two ring flanges 852.
In the embodiment, inner sleeve pressure ring is to include canister portion and stage portion, and stage portion is arranged on the end face of canister portion.Use
When, canister portion is inserted into liner hose 3, and liner hose 3 is squeezed on inner-walls of duct, and stage portion is used for 855 clamping of sealing ring
In on corresponding ring flange.
In the embodiment, outer sleeve 83 is split structure, including upper arc sleeve 831 and lower arc sleeve 832, upper arc sleeve
831 and lower arc sleeve 832 be connected to each other, and upper arc sleeve 831 is located at the top of lower arc sleeve 832.Using split structure
Design, can be easy to the execution of pipe repairing method, the especially progress easy to sealing.
Further, upper arc sleeve 831 is equipped with injection hole 8311, for injecting the sealing material 84.
With reference to figure 5, which includes again:
S061 the first horn sleeve barrel), is welded on the termination for repairing section 100, the termination phase with the reparation section 100
To pipe head on weld the opening of the second horn sleeve barrel, first horn sleeve barrel and second horn sleeve barrel
Relatively;
S062 first flange disk 851), is welded on the end face of the termination for repairing section 100, with the reparation section 100
Second flange disk 852 is welded on the end face of the opposite pipe head in termination;
S063), it will be sealed and connected between the first flange plate and second flange disk 852;
Specifically, which includes again:
S0631), sealing ring 855 is installed on the first flange disk 851 and second flange disk 852 respectively;
S0632 first inner sleeve pressure ring 853), is installed on the termination for repairing section 100, the termination with the reparation section 100
Second inner sleeve pressure ring 856 is installed, the first inner sleeve pressure ring 853 and the second inner sleeve pressure ring 856 are distinguished on opposite pipe head
For fixing corresponding liner hose 3 and sealing ring 855;
S0633), flange gasket 86 is set between first inner sleeve pressure ring 853 and the second inner sleeve pressure ring 856, and by the first method
Blue disk 851 and second flange disk 852 are connected through bolt 857.
S064), it is arranged outer sleeve 83 in the outside of first flange disk 851 and second flange disk 852, and by the outer sleeve 83
Both ends be respectively welded on first horn sleeve barrel and the second horn sleeve barrel.
S065), noted in the cavity formed to first horn sleeve barrel, the second loudspeaker sleeve 82, the connection of outer sleeve 83
Enter sealing material 84.
In the step, sealing material 84 is polymer cement mortar.Polymer cement mortar is injected through injection hole 8311
In the cavity that first horn sleeve barrel, the second loudspeaker sleeve 82, the connection of outer sleeve 83 are formed, realize and two pipe joints are consolidated
Fixed and sealing.
After above-mentioned steps, the reparation to old pipeline can be completed, and formed and met and discussed company for the pipeline of pipeline rehabilitation
Binding structure.
Pipe repairing method provided by the invention, and for pipeline rehabilitation pipeline meet and discuss connection structure the advantages of
In:
(1) can buried pipeline because building, waters restrict and excavates replacement constructional difficulties under the conditions of, realize ageing failure
Repair the no-dig technique underground of old pipeline;
(2) once most long reparation straight pipeline distance 5.0km, and can repairing caliber once by 2 1.5D elbows and exist
DN100-DN600, repairs the 1.2km that distance is far longer than Insertion method in 0.3km, PE pipe of in-situ solidifying method, and pipeline coating is solid
The 1.5km of change method, and pipeline pressure-bearing 6.0MPa after reparation;
(3) connection structure of meeting and discussing of the pipeline for pipeline rehabilitation used is simple and reliable, it can be achieved that at disconnected pipe between connector
Close connection.
Therefore, in the application pipe repairing method for active time length, seriously corroded, leakage accident take place frequently, Wu Fajin
The metallic conduit replaced in time of row, can be realized disposably by the elbow of 1.5D, together in the case where being excavated to pipeline non-integral
When meet the pipeline rehabilitation of long range, there is significant economic and social benefit to effectively extending nonmetal pipeline service life.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this hair
The ordinary meaning that bright one of ordinary skill in the art are understood.
In addition, term " first ", " second " etc. are only used for description purpose, and it is not intended that indicating or implying relatively important
Property or the implicit quantity for indicating indicated technical characteristic.In the description of the present invention, " multiple " are meant that two or more,
Unless otherwise specifically defined.
In this application, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc.
Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects
Connect or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be in two elements
The connection in portion or the interaction relationship of two elements.For the ordinary skill in the art, can be according to specific feelings
Condition understands the concrete meaning of above-mentioned term in the present invention.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to
Can so modify to the technical solution described in foregoing embodiments, either to which part or all technical characteristic into
Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology
The scope of scheme, it should all cover among the claim of the present invention and the scope of specification.Especially, as long as there is no knot
Structure conflict, items technical characteristic mentioned in the various embodiments can be combined in any way.The present invention does not limit to
In specific embodiment disclosed herein, but all technical solutions including falling within the scope of the appended claims.
Claims (10)
- A kind of 1. pipe repairing method, it is characterised in that including:Determine the reparation section of the pipeline, and the both ends difference dredge operation of the reparation section is cheated and the pipe that breaks;The inner surface of pipeline of the reparation section is cleared up;Liner hose is drawn to the other end from one end of the reparation section;Inflated into the liner hose, the liner hose is attached on the inner-walls of duct of the reparation section;The both ends of the reparation section are met and discussed with the pipe head of adjacent segment respectively and are connected.
- 2. pipe repairing method according to claim 1, it is characterised in that the inner surface of pipeline to the reparation section Carrying out cleaning includes:Remove the foreign matter of the inner surface of pipeline of the reparation section;High density polyethylene pipe is tried on the slotting reparation section, if inserting process is obstructed or the high density polyethylene pipe is taken temperature Face is damaged, then the inner surface of pipeline of the reparation section is handled again, until qualified.
- 3. pipe repairing method according to claim 1, it is characterised in that be additionally included in liner hose from the reparation One end of section is drawn to before the other end, carries out corrosion inhibiter protection to the inner surface of pipeline of the reparation section after cleaning first.
- 4. pipe repairing method according to claim 1, it is characterised in that it is described by liner hose from the reparation section One end, which is drawn to the other end, to be included:By the liner hose backfin;One end of the liner hose and one end of traction steel wire are connected, the other end of the traction steel wire passes through the reparation Section, and be connected with pulling equipment;The liner hose is drawn to the other end from one end of the reparation section by the pulling equipment.
- 5. pipe repairing method according to claim 4, it is characterised in that the traction steel wire through moment of torsion release structure with The liner hose connection.
- 6. pipe repairing method according to claim 1, it is characterised in that it is described by it is described reparation section both ends respectively with The connection of meeting and discussing of the pipe head of adjacent segment includes:The first horn sleeve barrel is welded on the termination for repairing section, is welded on the pipe head opposite with the termination of the reparation section Connect the second horn sleeve barrel, the opening of first horn sleeve barrel and second horn sleeve barrel is opposite;First flange disk is welded on the end face of the termination for repairing section, the pipe head opposite with the termination of the reparation section Second flange disk is welded on end face;It will be sealed and connected between the first flange plate and second flange disk;Outer sleeve is arranged in the outside of first flange disk and second flange disk, and the both ends of the outer sleeve are respectively welded in described On first horn sleeve barrel and the second horn sleeve barrel;Injecting sealing material in the cavity to be formed is connected to first horn sleeve barrel, the second loudspeaker sleeve, outer sleeve.
- 7. pipe repairing method according to claim 6, it is characterised in that described by the first flange plate and the second method Sealed between blue disk and connect including:Sealing ring is installed on the first flange disk and second flange disk respectively;The first inner sleeve pressure ring is installed on the termination for repairing section, is installed on the pipe head opposite with the termination of the reparation section Second inner sleeve pressure ring, the first inner sleeve pressure ring and the second inner sleeve pressure ring be respectively used to fix corresponding liner hose and Sealing ring;Flange gasket is set between the first inner sleeve pressure ring and the second inner sleeve pressure ring, and by first flange disk and second flange disk through spiral shell Tether and connect.
- The connection structure 8. a kind of pipeline for pipeline rehabilitation is met and discussed, it is characterised in that including the first loudspeaker sleeve, the second loudspeaker Sleeve, outer sleeve and flange connecting assembly and sealing material, the first loudspeaker sleeve weld is in the reparation section of the pipeline On termination, the second loudspeaker sleeve weld in on the opposite pipe head in termination of the reparation section, first loudspeaker The opening of sleeve and the second loudspeaker sleeve is opposite, the flange connecting assembly be used for connect and seal it is described reparation section termination and The pipe head opposite with the termination of the reparation section, the outer sleeve are sheathed on the outside of the flange connecting assembly, and The both ends of the outer sleeve are filled in institute with the first loudspeaker sleeve and the second loudspeaker sleeve connection, the sealing material respectively State in the cavity formed between the first loudspeaker sleeve, the second loudspeaker sleeve and outer sleeve.
- The connection structure 9. pipeline according to claim 8 for pipeline rehabilitation is met and discussed, it is characterised in that the flange connects Connected components include first flange disk, second flange disk, the first inner sleeve pressure ring, sealing ring, the second inner sleeve pressure ring and bolt,Wherein, first flange disk is connected on the end face of the termination of the reparation section, and second flange disk is connected to and the reparation On the end face of the opposite pipe head in termination of section, the liner that the first inner sleeve pressure ring is fixed for fixing the pipeline is soft Pipe, between the first flange disk and the first inner sleeve pressure ring, and respectively sets between the second flange disk and the second inner sleeve pressure ring There is a sealing ring, the bolt is each passed through the first flange disk and second flange disk, for fastening first method Blue disk and second flange disk.
- The connection structure 10. pipeline for pipeline rehabilitation according to claim 8 or claim 9 is met and discussed, it is characterised in that described outer Sleeve is equipped with injection hole, for injecting the sealing material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710929335.5A CN107940161A (en) | 2017-10-09 | 2017-10-09 | Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710929335.5A CN107940161A (en) | 2017-10-09 | 2017-10-09 | Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107940161A true CN107940161A (en) | 2018-04-20 |
Family
ID=61936059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710929335.5A Pending CN107940161A (en) | 2017-10-09 | 2017-10-09 | Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107940161A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108679358A (en) * | 2018-06-29 | 2018-10-19 | 江苏爱索新材料科技有限公司 | A kind of gas pipeline no-dig technique liner repairing construction technique |
CN108916534A (en) * | 2018-09-19 | 2018-11-30 | 扬州苏油三圆技术有限公司 | Hose interts buried pipeline anti-corrosion reinforcing device and buried pipeline restorative procedure |
CN109237197A (en) * | 2018-11-12 | 2019-01-18 | 上海辉拓市政工程有限公司 | A kind of reinforcement and repair method based on ultraviolet light solidification pipeline |
CN109751475A (en) * | 2019-03-20 | 2019-05-14 | 叶聪梅 | A kind of circular pipe feed formula entirety prosthetic appliance and its restorative procedure |
CN109780365A (en) * | 2019-03-29 | 2019-05-21 | 江苏爱索新材料科技有限公司 | A kind of heating method for flanging for no-dig technique pipeline rehabilitation |
CN110748742A (en) * | 2019-10-09 | 2020-02-04 | 南京晨光复合管工程有限公司 | Online repair technology for inserted pipeline in RTP pipe |
CN113074291A (en) * | 2020-01-06 | 2021-07-06 | 五行科技股份有限公司 | Method for repairing pipe joint |
CN113202174A (en) * | 2021-06-04 | 2021-08-03 | 湖北今非塑业有限公司 | Method for repairing leakage of cement drain pipe by using PE 100-grade modified O-concave O-lining pipe |
CN113482127A (en) * | 2021-07-16 | 2021-10-08 | 湖北今非塑业有限公司 | Method for repairing leakage of cement drain pipe by using PE 100-grade modified round-concave round vacuum lining pipe |
WO2022007264A1 (en) * | 2020-07-08 | 2022-01-13 | 五行科技股份有限公司 | Connecting pipe assembly, delivery pipe assembly, method for repairing connecting joint of delivery pipe, and method for repairing delivery pipe |
CN114060647A (en) * | 2021-11-19 | 2022-02-18 | 长春工业大学 | Connecting method and combined connecting joint for repaired old underground water injection pipeline |
CN114278797A (en) * | 2021-12-31 | 2022-04-05 | 河南黄埔建筑安装有限公司 | Heating and ventilation pipeline butt joint device based on BIM technology and butt joint method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2327865Y (en) * | 1998-04-22 | 1999-07-07 | 王明岐 | Structure for repairing and connecting steel pipe with turnable glass fiber reinforced plastic lining |
CN1514157A (en) * | 2003-07-04 | 2004-07-21 | 濮阳市中原锐弛清洗防腐有限公司 | Cross linking high density polyethylene pipe and construction process of its alternuting repairing old pipe line |
CN2731237Y (en) * | 2004-11-12 | 2005-10-05 | 广东联塑科技实业有限公司 | Device for repairing damaged pipe line |
CN101413613A (en) * | 2008-11-21 | 2009-04-22 | 大庆油田有限责任公司 | Method for restoring small diameter metal old pipe long-distance inner overturn lining hose |
CN102235565A (en) * | 2010-04-23 | 2011-11-09 | 上海管清环境技术有限公司 | Trenchless repair method for underground pipeline by turning and attaching lining pipe |
CN104405998A (en) * | 2014-10-16 | 2015-03-11 | 烟台中泰管业工程有限公司 | Repairing method for adding liner on underground pipe |
CN106958718A (en) * | 2017-04-25 | 2017-07-18 | 天津环通管道清洗有限公司 | A kind of pipe lining restorative procedure |
-
2017
- 2017-10-09 CN CN201710929335.5A patent/CN107940161A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2327865Y (en) * | 1998-04-22 | 1999-07-07 | 王明岐 | Structure for repairing and connecting steel pipe with turnable glass fiber reinforced plastic lining |
CN1514157A (en) * | 2003-07-04 | 2004-07-21 | 濮阳市中原锐弛清洗防腐有限公司 | Cross linking high density polyethylene pipe and construction process of its alternuting repairing old pipe line |
CN2731237Y (en) * | 2004-11-12 | 2005-10-05 | 广东联塑科技实业有限公司 | Device for repairing damaged pipe line |
CN101413613A (en) * | 2008-11-21 | 2009-04-22 | 大庆油田有限责任公司 | Method for restoring small diameter metal old pipe long-distance inner overturn lining hose |
CN102235565A (en) * | 2010-04-23 | 2011-11-09 | 上海管清环境技术有限公司 | Trenchless repair method for underground pipeline by turning and attaching lining pipe |
CN104405998A (en) * | 2014-10-16 | 2015-03-11 | 烟台中泰管业工程有限公司 | Repairing method for adding liner on underground pipe |
CN106958718A (en) * | 2017-04-25 | 2017-07-18 | 天津环通管道清洗有限公司 | A kind of pipe lining restorative procedure |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108679358A (en) * | 2018-06-29 | 2018-10-19 | 江苏爱索新材料科技有限公司 | A kind of gas pipeline no-dig technique liner repairing construction technique |
CN108916534A (en) * | 2018-09-19 | 2018-11-30 | 扬州苏油三圆技术有限公司 | Hose interts buried pipeline anti-corrosion reinforcing device and buried pipeline restorative procedure |
CN109237197A (en) * | 2018-11-12 | 2019-01-18 | 上海辉拓市政工程有限公司 | A kind of reinforcement and repair method based on ultraviolet light solidification pipeline |
CN109751475A (en) * | 2019-03-20 | 2019-05-14 | 叶聪梅 | A kind of circular pipe feed formula entirety prosthetic appliance and its restorative procedure |
CN111594694A (en) * | 2019-03-20 | 2020-08-28 | 叶聪梅 | Circular pipeline feeding type integral repairing equipment and repairing method thereof |
CN109751475B (en) * | 2019-03-20 | 2020-11-03 | 福建巨联建筑科技股份有限公司 | Circular pipeline feeding type integral repairing equipment and repairing method thereof |
CN109780365A (en) * | 2019-03-29 | 2019-05-21 | 江苏爱索新材料科技有限公司 | A kind of heating method for flanging for no-dig technique pipeline rehabilitation |
CN110748742A (en) * | 2019-10-09 | 2020-02-04 | 南京晨光复合管工程有限公司 | Online repair technology for inserted pipeline in RTP pipe |
CN113074291A (en) * | 2020-01-06 | 2021-07-06 | 五行科技股份有限公司 | Method for repairing pipe joint |
WO2022007264A1 (en) * | 2020-07-08 | 2022-01-13 | 五行科技股份有限公司 | Connecting pipe assembly, delivery pipe assembly, method for repairing connecting joint of delivery pipe, and method for repairing delivery pipe |
CN113202174A (en) * | 2021-06-04 | 2021-08-03 | 湖北今非塑业有限公司 | Method for repairing leakage of cement drain pipe by using PE 100-grade modified O-concave O-lining pipe |
CN113202174B (en) * | 2021-06-04 | 2022-07-05 | 湖北今非塑业有限公司 | Method for repairing leakage of cement drain pipe by using PE 100-grade modified O-concave O-lining pipe |
CN113482127A (en) * | 2021-07-16 | 2021-10-08 | 湖北今非塑业有限公司 | Method for repairing leakage of cement drain pipe by using PE 100-grade modified round-concave round vacuum lining pipe |
CN114060647A (en) * | 2021-11-19 | 2022-02-18 | 长春工业大学 | Connecting method and combined connecting joint for repaired old underground water injection pipeline |
CN114278797A (en) * | 2021-12-31 | 2022-04-05 | 河南黄埔建筑安装有限公司 | Heating and ventilation pipeline butt joint device based on BIM technology and butt joint method thereof |
CN114278797B (en) * | 2021-12-31 | 2024-04-05 | 河南黄埔建筑安装有限公司 | BIM technology-based heating and ventilation pipeline docking device and docking method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107940161A (en) | Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure | |
KR101359448B1 (en) | Entire repairing method for pipe lines with non-excavation | |
CN110159867A (en) | Intert PE pipe repairing method in no-dig technique | |
CN110645418B (en) | Connecting method for mounting large-diameter pipeline | |
CN101619779B (en) | Sealing device for buried pipe connected with protective well | |
CN114636047B (en) | Stainless steel lining repairing method for heating pipeline | |
CN204717225U (en) | A kind of fiber reinforced plastic pipe is damaged and is leaked maintenance unit | |
CN108679358A (en) | A kind of gas pipeline no-dig technique liner repairing construction technique | |
CN202327484U (en) | High-density polyethylene pipe material | |
CN114526398A (en) | Construction method for repairing drainage pipeline by newly added lining pipe | |
CN115076510B (en) | Repairing device and repairing method for reinforcing and repairing pipeline lining | |
CN2327865Y (en) | Structure for repairing and connecting steel pipe with turnable glass fiber reinforced plastic lining | |
CN205101771U (en) | Be used for prosthetic attach fitting of FRP pipe on -line interlude | |
CN204785312U (en) | Well water pipeling and normal water conveying system | |
Kou et al. | Application progress of oil and gas pipeline rehabilitation technology | |
RU2374551C2 (en) | Method for repair of pipeline defects | |
CN209196400U (en) | A kind of high-density polytene pipeline liner reparation structure | |
US20120211916A1 (en) | Method of strengthening the connection between pipe sections in high pressure pipelines | |
CN210372529U (en) | Auxiliary anti-falling device for half joint | |
CN211232016U (en) | Socket-embedded self-fixing steel-plastic composite full-swinging dragging pipe | |
CN110131508A (en) | A kind of socket joint embeds self-hard steel plastic compount and is flapped toward dilatory pipe entirely | |
CN205806728U (en) | Jointing | |
CN216692626U (en) | Underground tee joint for pipeline connection | |
RU142274U1 (en) | TUBE WITH PIPES AND INTERNAL COATING | |
RU2134373C1 (en) | Method of repair of pipe line deformed by bending |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180420 |