CN107938843A - A kind of prefabricated assembled frame combined using steel core concrete column and girder steel - Google Patents
A kind of prefabricated assembled frame combined using steel core concrete column and girder steel Download PDFInfo
- Publication number
- CN107938843A CN107938843A CN201710449674.3A CN201710449674A CN107938843A CN 107938843 A CN107938843 A CN 107938843A CN 201710449674 A CN201710449674 A CN 201710449674A CN 107938843 A CN107938843 A CN 107938843A
- Authority
- CN
- China
- Prior art keywords
- steel
- iii
- plate
- conehead
- gooseneck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 261
- 239000010959 steel Substances 0.000 title claims abstract description 261
- 238000009408 flooring Methods 0.000 claims abstract description 4
- 241001149930 Protura <class> Species 0.000 claims description 83
- 244000261422 Lysimachia clethroides Species 0.000 claims description 77
- 238000005266 casting Methods 0.000 claims description 8
- 210000001015 abdomen Anatomy 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 6
- 229910000679 solder Inorganic materials 0.000 abstract description 4
- 238000003912 environmental pollution Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/30—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/185—Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention provides a kind of prefabricated assembled frame combined using steel core concrete column and girder steel, including some prefabricated steel core concrete columns and girder steel, connection between these columns and column is arranged on flooring above 1.0m~1.5m or so, it is attached by top connection and lower contact using high-strength bolt and weld seam, high-strength bolt and solder design is used by the bracket being welded on steel core concrete column between column and beam.The present invention is combined using steel core concrete column and girder steel, can be reduced member section and weight, is readily transported and install, moreover it is possible to is increased the ductility of structure, is improved anti-seismic performance;Link position reasonably avoids the node region of stress complexity, and node connection is simple and reliable;All dry operations are connected, improve execution conditions, reduce environmental pollution;Interconnection technique using the present invention, is greatly improved construction efficiency.
Description
Technical field
The present invention relates to construction engineering technical field, it is more particularly to a kind of combined using steel core concrete column and girder steel it is pre-
Assembling frame processed.
Background technology
Greatly develop assembled architecture and have become national strategy, prefabricated assembled concrete structure (PC structures) obtains fast
Exhibition is hailed, frame structure is one of structure type of most common of which, there is relatively broad application in prefabricated construction.
Existing PC frame structures are that concrete column, beams of concrete are prefabricated in the factory, the live wet construction method by being poured after entirety
Assembly connection is carried out, is had the shortcomings that:1. construction material, based on armored concrete, the strength of materials is relatively low, section is big, weight
Greatly, inconvenience is brought to prefabricated, transport, lifting and assembling;2. reinforcing bar is numerous at assembled in situ, connecting structure is complicated, construction
Quality is difficult to be protected;3. being connected using wet method, in addition to program is cumbersome, also it is unfavorable for reducing airborne dust, reduces pollution;4. use
After the assembly method poured after monoblock type is, it is necessary to wait the concrete of cast in situs to reach some strength, next process can be carried out
Construction, the technology intermission time length, be unfavorable for improve efficiency.
Concrete filled steel tube is the fill concrete in steel pipe, bears the structural elements of external load effect jointly, uses frame
During column, the advantages of concrete and steel can be given full play to, hence it is evident that improve the bearing capacity of component, increase the ductility and shock resistance of structure
Energy.Steel strength is high, deformability is strong, isotropism, when I-shaped or box-shaped is made in section, is well suited for being used for beam etc. to undertake
Component based on moment of flexure.
Concrete filled steel tube and girder steel are combined, sectional dimension can be reduced, mitigates construction weight, it is real for increase building
Area is obtained, reduces floor height, reducing transport and installation cost has positive effect.Meanwhile high-strength bolt and weldering are used between component
The dry method connection such as connect in succession, easy to control the quality, efficiency improves.Good comprehensive benefit can be obtained.
The content of the invention
The present invention provides a kind of prefabricated assembled frame combined using steel core concrete column and girder steel, to solve existing skill
Problem present in art.
To realize that the technical solution that the object of the invention uses is such, one kind uses steel core concrete column and girder steel group
The prefabricated assembled frame closed, it is characterised in that:Including some prefabricated steel core concrete columns and prefabricated gooseneck combination shape
Into assembling frame.
Different according to location, the steel core concrete column is divided into bottom steel core concrete column, middle level steel tube concrete
Earth pillar and top layer steel core concrete column three classes.
The bottom steel core concrete column includes steel pipe I, concrete I, steel corbel I and top connection I.
The steel corbel I includes upper ring plate I, lower ring plate I and four pieces of bracket web I.The upper ring plate I's and lower ring plate I
Structure is identical, there are a through hole being sleeved on steel pipe I, its surrounding Jun Yousige branches in its center.Upper ring plate I and lower ring plate I
After being fixed on steel pipe I, four groups of flange plates of upper ring plate I and the respective four branches formation steel pipe I surroundings of lower ring plate I, often
Group flange plate includes a top flange plate and a bottom wing listrium.Four pieces of bracket web I coordinate with four groups of flange plates respectively, often
One piece of bracket web I is vertically welded between a top flange plate and a bottom wing listrium.
The top connection I includes top connection conehead I and top connection end plate I.The top connection conehead I is a upper and lower ends
Open hollow revolving body.The top connection end plate I is the annular slab that a center has through hole.Cylindrical the four of whole annular slab
It is evenly distributed some U-shaped breach week.The big end of the top connection conehead I is nested and is fixed on the upper end of steel pipe I.On described
Connector end plate I is welded on the lower end of top connection conehead I, and the center through hole and top connection conehead I of top connection end plate I is coaxial.Pass through
The center through hole of top connection end plate I, to steel pipe I and top connection conehead I inside casting concrete I.
The middle level steel core concrete column includes steel pipe II, concrete II, steel corbel II, upper ring plate II, lower ring plate II, ox
Leg web II, top connection II, top connection conehead II, top connection end plate II, lower contact II, lower contact conehead II and lower contact end plate
II。
The steel corbel II includes upper ring plate II, lower ring plate II and four pieces of bracket web II.The upper ring plate II and lower ring
The structure of plate II is identical, there are a through hole being sleeved on steel pipe II, its surrounding Jun Yousige branches in its center.Upper ring plate II and
After lower ring plate II is fixed on steel pipe II, upper ring plate II and respective four branches of lower ring plate II form the four of steel pipe II surroundings
Group flange plate, every group of flange plate include a top flange plate and a bottom wing listrium.Four pieces of bracket web II respectively with four groups
Flange plate coordinates, and each piece of bracket web II is vertically welded between a top flange plate and a bottom wing listrium.
The top connection II includes top connection conehead II and top connection end plate II.The top connection conehead II is about one
The hollow revolving body of open at both ends.The top connection end plate II is the annular slab that a center has through hole.Whole annular slab
Cylindrical surrounding is evenly distributed some U-shaped breach.The big end of the top connection conehead II is nested and is fixed on the upper of steel pipe II
End.The top connection end plate II is welded on the lower end of top connection conehead II, and center through hole and the top connection of top connection end plate II are bored
Head II is coaxial.
The lower contact II includes lower contact conehead II and lower contact end plate II.The lower contact conehead II be under one under
The hollow revolving body of open at both ends.The lower contact end plate II is the annular slab that a center has through hole.Whole annular slab
Cylindrical surrounding is evenly distributed some U-shaped breach.The big end of the lower contact conehead II is nested and is fixed under steel pipe II
End.The lower contact end plate II is welded on the lower end of lower contact conehead II, and center through hole and the lower contact of lower contact end plate II are bored
Head II is coaxial.
By the center through hole of top connection end plate II or lower contact end plate II, to steel pipe II, lower contact conehead II and on connect
Casting concrete II inside nose cone head II.
The top layer steel core concrete column include steel pipe III, concrete III, steel corbel III, upper cover plate, lower ring plate III,
Bracket web III, lower contact III, lower contact conehead III and lower contact end plate III.
The steel corbel III includes upper cover plate, lower ring plate III and four pieces of bracket web III.The upper cover plate and lower ring plate
III surroundings have four branches, and the contour shape of the two surrounding is identical, and simply lower ring plate III centers are sleeved on steel pipe III with one
On through hole.Lower ring plate III is fixed on the outer wall of steel pipe III, and the upper cover plate covers and is fixed on the upper of steel pipe III
End.Upper cover plate and respective four branches of lower ring plate III form four groups of flange plates of steel pipe III surroundings, and every group of flange plate wraps
Include a top flange plate and a bottom wing listrium.Four pieces of bracket web III coordinate with four groups of flange plates respectively, each piece of bracket abdomen
Plate III is vertically welded between a top flange plate and a bottom wing listrium.
The lower contact III includes lower contact conehead III and lower contact end plate III.The lower contact conehead III is one
The hollow revolving body of lower open at both ends.The lower contact end plate III is the annular slab that a center has through hole.Whole annular
The cylindrical surrounding of plate is evenly distributed some U-shaped breach.The big end of the lower contact conehead III is nested and is fixed on steel pipe II
Lower end.The lower contact end plate III is welded on the lower end of lower contact conehead III, and the center through hole of lower contact end plate III is with
Connector conehead III is coaxial.
By the center through hole of lower contact conehead III, to steel pipe III, lower contact conehead III inside casting concrete III.
Each gooseneck includes the upper and lower two pieces horizontal gooseneck edges of a wing, and is vertically welded on this two pieces of steel horizontal strokes
Gooseneck web between flange of beam.The both ends of the gooseneck web have the connecting hole passed through for bolt.
During assembling:
The lower end of middle level steel core concrete column and the upper end of bottom steel core concrete column form intercolumniation node.The intercolumniation node
In, top connection end plate I is contacted with lower contact end plate II, the U-shaped breach alignment of the two, using both some high-strength bolt I connections
U-shaped breach.On the basis of the lower end of bottom steel core concrete column is fixed on.
Intercolumniation node is formed between the upper and lower end of upper and lower two middle level steel core concrete columns.In the intercolumniation node, it is in
The top connection end plate of the lower contact end plate II of the middle level steel core concrete column of top and the middle level steel core concrete column being below
II is contacted, the U-shaped breach alignment of the two, using some high-strength bolt I U-shaped breach connecting the two.
Intercolumniation node is formed between the lower end of top layer steel core concrete column and the upper end of middle level steel core concrete column.The intercolumniation
In node, lower contact end plate III and the top connection conehead II contacts being below in top, the U-shaped breach alignment of the two,
Using some high-strength bolt I U-shaped breach connecting the two.
The steel corbel I of bottom steel core concrete column is connected with gooseneck, and forms beam, intercolumniation connecting node.The beam, intercolumniation
The connection mode of connecting node is:Gooseneck is lifted to the side of steel corbel I, in gooseneck web and bracket web I both sides
One piece of splicing cover board is put respectively.Each piece of splicing cover board has the through hole that two row are passed through for bolt.Connected using some high-strength bolts
Connect gooseneck web and splice the side of cover board, equally using some high-strength bolts connection steel corbel web and splice the another of cover board
Outer side, i.e., so that steel corbel I is connected with gooseneck.By the upper and lower two pieces horizontal gooseneck edges of a wing respectively with upper ring plate I, under
Ring flat-plate I is welded to connect.
The steel corbel II of middle level steel core concrete column is connected with gooseneck, and forms beam, intercolumniation connecting node.The beam, column
Between the connection mode of connecting node be:Gooseneck is lifted to the side of steel corbel II, in gooseneck web and bracket web II
One piece of splicing cover board is put respectively in both sides.Each piece of splicing cover board has the through hole that two row are passed through for bolt.Using some high-strength spiral shells
The side for connecing gooseneck web and splicing cover board is tethered, equally using some high-strength bolts connection steel corbel web and splicing cover board
Other side, i.e., so that steel corbel II be connected with gooseneck.By the upper and lower two pieces horizontal gooseneck edges of a wing respectively with upper ring plate
II, lower ring plate II are welded to connect.
The steel corbel III of top layer steel core concrete column is connected with gooseneck, and forms beam, intercolumniation connecting node.The beam, column
Between the connection mode of connecting node be:Gooseneck is lifted to the side of steel corbel III, in gooseneck web and bracket web
One piece of splicing cover board is put respectively in III both sides.Each piece of splicing cover board has the through hole that two row are passed through for bolt.Using some high-strength
It is bolted gooseneck web and splices the side of cover board, is equally covered using some high-strength bolts connection steel corbel web and splicing
The other side of plate, i.e., so that steel corbel III is connected with gooseneck.By the upper and lower two pieces horizontal gooseneck edges of a wing respectively with it is upper
Cover board, lower ring plate III are welded to connect.
Further, some assembling steel pipes are further included.The assembling steel pipe is composed of two semi-steel pipes.The two half
Steel pipe surrounds intercolumniation connecting node from both sides.Gap between two semi-steel pipes uses vertical solder design, is then formed complete
Assembling steel pipe.The gap of steel pipe upper end is assembled using upper lateral solder design, the use lower, transverse solder design of lower end.
Further, the gooseneck edge of a wing is welded to connect by what butt weld was connected with ring flat-plate.
Further, intercolumniation connecting node is located at 1.0~1.5 meters of eminences above flooring.
Further, branch's number of steel corbel I, steel corbel II and steel corbel III are because of the location of steel core concrete column
And it is different, corner post branch into two, side column branch into three, center pillar branch into four.
The beneficial effects of the invention are as follows:
1. using steel core concrete column and girder steel, reduce sectional dimension of members, mitigate construction weight, reduce transport and lifting
Cost.
2. the assembling of column and column advantageously reduces the requirement of assembly node, letter near being located among the less floor of internal force
Joint structure is matched somebody with somebody in makeup, reduces assembly difficulty.
3. assembled in situ is using high-strength bolt and is welded to connect, easy to detect, easy to control the quality, without technology intermission, construction
Speed improves, and dry method assembling, reduces airborne dust, reduce pollution.
4. the ductility of component and node improves, the assembling frame of the present invention is set to can be suitably used for the antidetonation area of highlight lines.
Brief description of the drawings
Fig. 1 is the overall structure diagram of assembling frame.
Fig. 2 is top connection schematic diagram.
Fig. 3 is lower contact schematic diagram.
Fig. 4 is bottom steel core concrete column schematic diagram.
Fig. 5 is intermediate layer steel core concrete column schematic diagram.
Fig. 6 is top layer steel core concrete column schematic diagram.
Fig. 7 is steel core concrete column and girder steel assembling schematic diagram.
Fig. 8 is levels steel core concrete column assembling schematic diagram.
In figure:Bottom steel core concrete column 1, steel pipe I101, concrete I102, steel corbel I103, upper ring plate I1031, under
Ring flat-plate I1032, bracket web I1033, top connection I104, top connection conehead I1041, top connection end plate I1042,
Middle level steel core concrete column 2, steel pipe II201, concrete II202, steel corbel II203, upper ring plate II2031, lower ring
Plate II2032, bracket web II2033, top connection II204, top connection conehead II2041, top connection end plate II2042, lower contact
II205, lower contact conehead II2051, lower contact end plate II2052,
Top layer steel core concrete column 3, steel pipe III301, concrete III302, steel corbel III303, upper cover plate 3031, under
Ring flat-plate III3032, bracket web III3033, lower contact III304, lower contact conehead III3041, lower contact end plate III3042,
Gooseneck 4, the gooseneck edge of a wing 401, gooseneck web 402,
Splice cover board 10, high-strength bolt II11, backing plate 12, weld seam 13
High-strength bolt I14, assembling steel pipe 15, upper lateral weld seam 16, lower, transverse weld seam 17, vertical weld seam 18.
Embodiment
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only
It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used
With means, various replacements and change are made, should all be included within the scope of the present invention.
A kind of prefabricated assembled frame combined using steel core concrete column and girder steel, it is characterised in that:If including intervening
The assembling frame that the steel core concrete column of system and the combination of prefabricated gooseneck 4 are formed.
Different according to location, the steel core concrete column is divided into bottom steel core concrete column 1, middle level steel tube concrete
3 three classes of earth pillar 2 and top layer steel core concrete column.
The bottom steel core concrete column 1 includes steel pipe I101, concrete I102, steel corbel I103 and top connection I104.
The steel corbel I103 includes upper ring plate I1031, lower ring plate I1032 and four pieces of bracket web I1033.The upper ring
Plate I1031 is identical with the structure of lower ring plate I1032, there is a through hole being sleeved on steel pipe I101 in its center, its surrounding has
(further, steel corbel I103 branches number is different because of the location of steel core concrete column, the branch of corner post for four branches
For two, side column branch into three, center pillar branch into four).Upper ring plate I1031 and lower ring plate I1032 are fixed on steel
After on pipe I101, four groups of edges of a wing of upper ring plate I1031 and the respective four branches formation steel pipe I101 surroundings of lower ring plate I1032
Plate, every group of flange plate include a top flange plate and a bottom wing listrium.Four pieces of bracket web I1033 respectively with four groups of edges of a wing
Plate coordinates, and each piece of bracket web I1033 is vertically welded between a top flange plate and a bottom wing listrium.
The top connection I104 includes top connection conehead I1041 and top connection end plate I1042.The top connection conehead
I1041 is the hollow revolving body (hollow round platform) of a upper and lower ends opening.The top connection end plate I1042 is a center
Annular slab with through hole.The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach.The top connection conehead
The big end of I1041 is nested and is fixed on the upper end of steel pipe I101.The top connection end plate I1042 is welded on top connection conehead
The lower end of I1041, the center through hole and top connection conehead I1041 of top connection end plate I1042 are coaxial.Pass through top connection end plate
The center through hole of I1042, to steel pipe I101 and top connection conehead I1041 inside casting concrete I102.
The middle level steel core concrete column 2 includes steel pipe II201, concrete II202, steel corbel II203, upper ring plate
II2031, lower ring plate II2032, bracket web II2033, top connection II204, top connection conehead II2041, top connection end plate
II2042, lower contact II205, lower contact conehead II2051 and lower contact end plate II2052.
The steel corbel II203 includes upper ring plate II2031, lower ring plate II2032 and four pieces of bracket web II2033.It is described
Upper ring plate II2031 is identical with the structure of lower ring plate II2032, there is a through hole being sleeved on steel pipe II201 in its center, it four
Zhou Jun have four branches (further, branch's number of steel corbel II203 is different because of the location of steel core concrete column,
Corner post branch into two, side column branch into three, center pillar branch into four)..Upper ring plate II2031 and lower ring plate
After II2032 is fixed on steel pipe II201, upper ring plate II2031 and respective four branches of lower ring plate II2032 form steel pipe
Four groups of flange plates of II201 surroundings, every group of flange plate include a top flange plate and a bottom wing listrium.Four blocks of bracket webs
II2033 coordinates with four groups of flange plates respectively, and each piece of bracket web II2033 is vertically welded on a top flange plate and one
Between a bottom wing listrium.
The top connection II204 includes top connection conehead II2041 and top connection end plate II2042.The top connection conehead
II2041 is the hollow revolving body (hollow round platform) of a upper and lower ends opening.The top connection end plate II2042 is in one
Annular slab of the centre with through hole.The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach.The top connection conehead
The big end of II2041 is nested and is fixed on the upper end of steel pipe II201.The top connection end plate II2042 is welded on top connection conehead
The lower end of II2041, the center through hole and top connection conehead II2041 of top connection end plate II2042 are coaxial.
The lower contact II205 includes lower contact conehead II2051 and lower contact end plate II2052.The lower contact conehead
II2051 is the hollow revolving body (hollow round platform) of a lower open at both ends.The lower contact end plate II2052 is in one
Annular slab of the centre with through hole.The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach.The lower contact conehead
The big end of II2051 is nested and is fixed on the lower end of steel pipe II201.The lower contact end plate II2052 is welded on lower contact conehead
The lower end of II2051, the center through hole and lower contact conehead II2051 of lower contact end plate II2052 are coaxial.
By the center through hole of top connection end plate II2042 or lower contact end plate II2052, bored to steel pipe II201, lower contact
Casting concrete II202 inside head II2051 and top connection conehead II2041.
The top layer steel core concrete column 3 includes steel pipe III301, concrete III302, steel corbel III303, upper cover plate
3031st, lower ring plate III3032, bracket web III3033, lower contact III304, lower contact conehead III3041 and lower contact end plate
III3042。
The steel corbel III303 includes upper cover plate 3031, lower ring plate III3032 and four pieces of bracket web III3033.Institute
State upper cover plate 3031 and lower ring plate III3032 surroundings there are four branches (further, branch's number of steel corbel III303 is because of steel
The location of pipe concrete column and it is different, corner post branch into two, side column branch into three, center pillar branch into four
It is a)., the contour shape of the two surrounding is identical, and simply there is one to be sleeved on leading on steel pipe III301 in lower ring plate III3032 centers
Hole.Lower ring plate III3032 is fixed on the outer wall of steel pipe III301, and the upper cover plate 3031 covers and is fixed on steel pipe
The upper end of III301.Upper cover plate 3031 and respective four branches of lower ring plate III3032 form four groups of steel pipe III301 surroundings
Flange plate, every group of flange plate include a top flange plate and a bottom wing listrium.Four pieces of bracket web III3033 are respectively with four
Group flange plate coordinates, each piece of bracket web III3033 be vertically welded on a top flange plate and bottom wing listrium it
Between.
The lower contact III304 includes lower contact conehead III3041 and lower contact end plate III3042.The lower contact cone
Head III3041 is the hollow revolving body (hollow round platform) of a lower open at both ends.The lower contact end plate III3042 is one
A center has the annular slab of through hole.The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach.The lower contact
The big end of conehead III3041 is nested and is fixed on the lower end of steel pipe II201.The lower contact end plate III3042, which is welded on down, to be connect
The lower end of nose cone head III3041, the center through hole and lower contact conehead III3041 of lower contact end plate III3042 are coaxial.
By the center through hole of lower contact conehead III3041, to steel pipe III301, lower contact conehead III3041 inside pour
Build concrete III302.
Each gooseneck 4 includes the upper and lower two pieces horizontal gooseneck edges of a wing 401, and is vertically welded on this two pieces
Gooseneck web 402 between the gooseneck edge of a wing 401.The both ends of the gooseneck web 402 have the connection passed through for bolt
Hole.
During assembling, some intercolumniation nodes (label I) and beam, intercolumniation node (label II) are formed as shown in Figure 1:
The lower end of (being in upper and lower) middle level steel core concrete column 2 and the upper end of bottom steel core concrete column 1 form column
Intermediate node.In the intercolumniation node, top connection end plate I1042 is contacted with lower contact end plate II2052, the U-shaped breach alignment of the two,
Using some high-strength bolt I14 U-shaped breach connecting the two.On the basis of the lower end of bottom steel core concrete column 1 is fixed on.
Intercolumniation node is formed between the upper and lower end of upper and lower two middle level steel core concrete columns 2.In the intercolumniation node, it is in
The lower contact end plate II2052 of the middle level steel core concrete column 2 of top on the middle level steel core concrete column 2 that is below with connecing
Head end plate II2042 is contacted, the U-shaped breach alignment of the two, using some high-strength bolt I14 U-shaped breach connecting the two.
(in upper and lower) shape between the lower end of top layer steel core concrete column 3 and the upper end of middle level steel core concrete column 2
Into intercolumniation node.In the intercolumniation node, lower contact end plate III3042 in top and the top connection conehead being below
II2041 is contacted, the U-shaped breach alignment of the two, using some high-strength bolt I14 U-shaped breach connecting the two.
Preferably, some assembling steel pipes 15 are further included.The assembling steel pipe 15 is composed of two semi-steel pipes.This two
A semi-steel pipe surrounds intercolumniation connecting node from both sides.Semi-steel pipe upper end notch is vertical with length direction, and groove, two sides are done in lower end
Do groove.Gap between two semi-steel pipes is connected using vertical weld seam 18, then forms complete assembling steel pipe 15.Assemble steel
The gap of 15 upper end of pipe is connected using upper lateral weld seam 16, the gap of lower end is connected using lower, transverse weld seam 17.Embodiment
In, intercolumniation connecting node is located at 1.0~1.5 meters of eminences above flooring.
The steel corbel I103 of bottom steel core concrete column 1 is connected with gooseneck 4, and forms beam, intercolumniation connecting node.Should
Beam, the connection mode of intercolumniation connecting node are:Gooseneck 4 is lifted to the side of steel corbel I103, in 402 He of gooseneck web
Bracket web I1033 puts both sides one piece of splicing cover board 10 respectively.It is logical that there are each piece of splicing cover board 10 two row to be passed through for bolt
Hole.Using the side of some high-strength bolts 11 connection gooseneck web 402 and splicing cover board 10, equally using some high-strength bolts
The other side of 11 connection steel corbel webs 502 and splicing cover board 10, i.e., so that steel corbel I103 is connected with gooseneck 4.By it is upper,
The lower two pieces horizontal gooseneck edges of a wing 401 are welded to connect with upper ring plate I1031, lower ring plate I1032 respectively.
The steel corbel II203 of middle level steel core concrete column 2 is connected with gooseneck 4, and forms beam, intercolumniation connecting node.Should
Beam, the connection mode of intercolumniation connecting node are:Gooseneck 4 is lifted to the side of steel corbel II203, in gooseneck web 402
One piece of splicing cover board 10 is put respectively with bracket web II2033 both sides.Each piece of splicing cover board 10 has what two row were passed through for bolt
Through hole.Using the side of some high-strength bolts 11 connection gooseneck web 402 and splicing cover board 10, equally using some high-strength spiral shells
Bolt 11 connects the other side of steel corbel web 502 and splicing cover board 10, i.e., so that steel corbel II203 is connected with gooseneck 4.Will
The upper and lower two pieces horizontal gooseneck edges of a wing 401 are welded to connect with upper ring plate II2031, lower ring plate II2032 respectively.
The steel corbel III303 of top layer steel core concrete column 3 is connected with gooseneck 4, and forms beam, intercolumniation connecting node.Should
Beam, the connection mode of intercolumniation connecting node are:Gooseneck 4 is lifted to the side of steel corbel III303, in gooseneck web 402
One piece of splicing cover board 10 is put respectively with bracket web III3033 both sides.There are each piece of splicing cover board 10 two row to be passed through for bolt
Through hole.Using the side of some high-strength bolts 11 connection gooseneck web 402 and splicing cover board 10, equally using some high-strength
Bolt 11 connects the other side of steel corbel web 502 and splicing cover board 10, i.e., so that steel corbel III303 connects with gooseneck 4
Connect.The upper and lower two pieces horizontal gooseneck edges of a wing 401 are welded to connect with upper cover plate 3031, lower ring plate III3032 respectively.
Preferably, the gooseneck edge of a wing 401 is by butt weld 13 and ring flat-plate (including upper ring plate I1031, lower ring plate
I1032, upper ring plate II2031, lower ring plate II2032, upper cover plate 3031, lower ring plate III3032) connection be welded to connect.
Claims (5)
- A kind of 1. prefabricated assembled frame combined using steel core concrete column and girder steel, it is characterised in that:Including some prefabricated Steel core concrete column and prefabricated gooseneck (4) combination formed assembling frame;Different according to location, the steel core concrete column is divided into the bottom steel core concrete column (1), middle level steel pipe mixes Solidifying earth pillar (2) and top layer steel core concrete column (3) three classes;The bottom steel core concrete column (1) includes steel pipe I (101), concrete I (102), steel corbel I (103) and top connection I (104);The steel corbel I (103) includes upper ring plate I (1031), lower ring plate I (1032) and four pieces of bracket web I (1033);It is described Upper ring plate I (1031) is identical with the structure of lower ring plate I (1032), there is a through hole being sleeved on steel pipe I (101) in its center, Its surrounding Jun Yousige branches;After upper ring plate I (1031) and lower ring plate I (1032) is fixed on steel pipe I (101), upper ring plate I (1031) and respective four branches of lower ring plate I (1032) form four groups of flange plates of steel pipe I (101) surrounding, every group of flange plate Include a top flange plate and a bottom wing listrium;Four pieces of bracket web I (1033) coordinate with four groups of flange plates respectively, each Block bracket web I (1033) is vertically welded between a top flange plate and a bottom wing listrium;The top connection I (104) includes top connection conehead I (1041) and top connection end plate I (1042);The top connection conehead I (1041) be a upper and lower ends opening hollow revolving body;The top connection end plate I (1042) is that a center has through hole Annular slab;The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach;The top connection conehead I (1041) Big end is nested and is fixed on the upper end of steel pipe I (101);The top connection end plate I (1042) is welded on top connection conehead I (1041) Lower end, the center through hole and top connection conehead I (1041) of top connection end plate I (1042) be coaxial;Pass through top connection end plate I (1042) center through hole, to the internal casting concrete I (102) of steel pipe I (101) and top connection conehead I (1041);The middle level steel core concrete column (2) includes steel pipe II (201), concrete II (202), steel corbel II (203), upper ring plate II (2031), lower ring plate II (2032), bracket web II (2033), top connection II (204), top connection conehead II (2041), on Connector end plate II (2042), lower contact II (205), lower contact conehead II (2051) and lower contact end plate II (2052);The steel corbel II (203) includes upper ring plate II (2031), lower ring plate II (2032) and four pieces of bracket web II (2033); The upper ring plate II (2031) is identical with the structure of lower ring plate II (2032), its center has one to be sleeved on steel pipe II (201) Through hole, its surrounding Jun Yousige branches;Upper ring plate II (2031) and lower ring plate II (2032) are fixed on steel pipe II (201) Afterwards, respective four branches of upper ring plate II (2031) and lower ring plate II (2032) form four groups of edges of a wing of steel pipe II (201) surrounding Plate, every group of flange plate include a top flange plate and a bottom wing listrium;Four pieces of bracket web II (2033) respectively with four groups Flange plate coordinates, each piece of bracket web II (2033) be vertically welded on a top flange plate and bottom wing listrium it Between;The top connection II (204) includes top connection conehead II (2041) and top connection end plate II (2042);The top connection cone Head II (2041) is the hollow revolving body of a upper and lower ends opening;The top connection end plate II (2042) is that a center has The annular slab of through hole;The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach;The top connection conehead II (2041) big end is nested and is fixed on the upper end of steel pipe II (201);The top connection end plate II (2042) is welded on top connection The lower end of conehead II (2041), the center through hole and top connection conehead II (2041) of top connection end plate II (2042) are coaxial;The lower contact II (205) includes lower contact conehead II (2051) and lower contact end plate II (2052);The lower contact cone Head II (2051) is the hollow revolving body of a lower open at both ends;The lower contact end plate II (2052) is that a center has The annular slab of through hole;The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach;The lower contact conehead II (2051) big end is nested and is fixed on the lower end of steel pipe II (201);The lower contact end plate II (2052) is welded on lower contact The lower end of conehead II (2051), the center through hole and lower contact conehead II (2051) of lower contact end plate II (2052) are coaxial;By the center through hole of top connection end plate II (2042) or lower contact end plate II (2052), to steel pipe II (201), lower contact The internal casting concrete II (202) of conehead II (2051) and top connection conehead II (2041);The top layer steel core concrete column (3) include steel pipe III (301), concrete III (302), steel corbel III (303), on Cover board (3031), lower ring plate III (3032), bracket web III (3033), lower contact III (304), lower contact conehead III (3041) and lower contact end plate III (3042);The steel corbel III (303) includes upper cover plate (3031), lower ring plate III (3032) and four pieces of bracket web III (3033);The upper cover plate (3031) and lower ring plate III (3032) surrounding have four branches, the contour shape phase of the two surrounding Together, it is that lower ring plate III (3032) centers have a through hole being sleeved on steel pipe III (301);Lower ring plate III (3032) quilt It is fixed on the outer wall of steel pipe III (301), the upper cover plate (3031) covers and is fixed on the upper end of steel pipe III (301);On Cover board (3031) and respective four branches of lower ring plate III (3032) form four groups of flange plates of steel pipe III (301) surrounding, often Group flange plate includes a top flange plate and a bottom wing listrium;Four pieces of bracket web III (3033) respectively with four groups of edges of a wing Plate coordinates, and each piece of bracket web III (3033) is vertically welded between a top flange plate and a bottom wing listrium;The lower contact III (304) includes lower contact conehead III (3041) and lower contact end plate III (3042);The lower contact Conehead III (3041) is the hollow revolving body of a lower open at both ends;The lower contact end plate III (3042) is a center Annular slab with through hole;The cylindrical surrounding of whole annular slab is evenly distributed some U-shaped breach;The lower contact conehead The big end of III (3041) is nested and is fixed on the lower end of steel pipe II (201);The lower contact end plate III (3042) is welded on down The lower end of connector conehead III (3041), the center through hole and lower contact conehead III (3041) of lower contact end plate III (3042) are same Axis;It is internal to steel pipe III (301), lower contact conehead III (3041) by the center through hole of lower contact conehead III (3041) Casting concrete III (302);Each gooseneck (4) includes the upper and lower two pieces horizontal gooseneck edges of a wing (401), and is vertically welded on this two pieces Gooseneck web (402) between the gooseneck edge of a wing (401);The both ends of the gooseneck web (402) have to be passed through for bolt Connecting hole.During assembling:The lower end of middle level steel core concrete column (2) and the upper end of bottom steel core concrete column (1) form intercolumniation node;The intercolumniation section In point, top connection end plate I (1042) is contacted with lower contact end plate II (2052), the U-shaped breach alignment of the two, using some high-strength Bolt I (14) U-shaped breach connecting the two;On the basis of the lower end of bottom steel core concrete column (1) is fixed on;Intercolumniation node is formed between the upper and lower end of upper and lower two middle level steel core concrete columns (2);In the intercolumniation node, in upper The lower contact end plate II (2052) of the middle level steel core concrete column (2) of side and the middle level steel core concrete column (2) that is below Top connection end plate II (2042) is contacted, and the U-shaped breach alignment of the two, is lacked using some high-strength bolt I (14) U-shaped connecting the two Mouthful;Intercolumniation node is formed between the lower end of top layer steel core concrete column (3) and the upper end of middle level steel core concrete column (2);The column In intermediate node, lower contact end plate III (3042) in top and top connection conehead II (2041) contacts being below, the two U-shaped breach alignment, using some high-strength bolt I (14) U-shaped breach connecting the two;The steel corbel I (103) of bottom steel core concrete column (1) is connected with gooseneck (4), and forms beam, intercolumniation connecting node;Should Beam, the connection mode of intercolumniation connecting node are:Gooseneck (4) is lifted to the side of steel corbel I (103), in gooseneck web (402) and one piece of splicing cover board (10) is put in bracket web I (1033) both sides respectively;There are each piece of splicing cover board (10) two row to supply The through hole that bolt passes through;The side of gooseneck web (402) and splicing cover board (10) is connected using some high-strength bolts (11), together Sample causes steel ox using the other side of some high-strength bolts (11) connection steel corbel web (502) and splicing cover board (10) Leg I (103) is connected with gooseneck (4);By the upper and lower two pieces horizontal gooseneck edges of a wing (401) respectively with upper ring plate I (1031), Lower ring plate I (1032) is welded to connect;The steel corbel II (203) of middle level steel core concrete column (2) is connected with gooseneck (4), and forms beam, intercolumniation connecting node; The beam, the connection mode of intercolumniation connecting node are:Gooseneck (4) is lifted to the side of steel corbel II (203), in gooseneck abdomen One piece of splicing cover board (10) is put in plate (402) and bracket web II (2033) both sides respectively;Each piece of splicing cover board (10) has two The through hole that row are passed through for bolt;The one of gooseneck web (402) and splicing cover board (10) is connected using some high-strength bolts (11) Side, equally using the other side of some high-strength bolts (11) connection steel corbel web (502) and splicing cover board (10), that is, causes Steel corbel II (203) is connected with gooseneck (4);By the upper and lower two pieces horizontal gooseneck edges of a wing (401) respectively with upper ring plate II (2031), lower ring plate II (2032) is welded to connect;The steel corbel III (303) of top layer steel core concrete column (3) is connected with gooseneck (4), and forms beam, intercolumniation connecting node; The beam, the connection mode of intercolumniation connecting node are:Gooseneck (4) is lifted to the side of steel corbel III (303), in gooseneck One piece of splicing cover board (10) is put in web (402) and bracket web III (3033) both sides respectively;Each piece of splicing cover board (10) has The through hole that two row are passed through for bolt;Using some high-strength bolts (11) connection gooseneck web (402) and splice cover board (10) Side, equally using the other side of some high-strength bolts (11) connection steel corbel web (502) and splicing cover board (10), even if Steel corbel III (303) is obtained to be connected with gooseneck (4);By the upper and lower two pieces horizontal gooseneck edges of a wing (401) respectively with upper cover plate (3031), lower ring plate III (3032) is welded to connect.
- 2. a kind of prefabricated assembled frame combined using steel core concrete column and girder steel according to claim 1, it is special Sign is:Further include some assembling steel pipes (15);The assembling steel pipe (15) is composed of two semi-steel pipes;The two half Steel pipe surrounds intercolumniation connecting node from both sides;Gap between two semi-steel pipes is connected using vertical weld seam (18), is then formed Complete assembling steel pipe (15);The gap of steel pipe (15) upper end is assembled using upper lateral weld seam (16) connection, the use of lower end Lower, transverse weld seam (17) connects.
- 3. a kind of prefabricated assembled frame combined using steel core concrete column and girder steel according to claim 1 or 2, its It is characterized in that:The gooseneck edge of a wing (401) is welded to connect by what butt weld (13) was connected with ring flat-plate.
- 4. a kind of prefabricated assembled frame combined using steel core concrete column and girder steel according to claim 1 or 3, its It is characterized in that:Intercolumniation connecting node is located at 1.0~1.5 meters of eminences above flooring.
- 5. a kind of prefabricated assembled frame combined using steel core concrete column and girder steel according to claim 1 or 3, its It is characterized in that:Branch's number of steel corbel I (103), steel corbel II (203) and steel corbel III (303) are because of steel core concrete column institute The position at place and it is different, corner post branch into two, side column branch into three, center pillar branch into four.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710449674.3A CN107938843B (en) | 2017-06-12 | 2017-06-12 | Prefabricated assembled frame adopting steel pipe concrete column and steel beam combination |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710449674.3A CN107938843B (en) | 2017-06-12 | 2017-06-12 | Prefabricated assembled frame adopting steel pipe concrete column and steel beam combination |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107938843A true CN107938843A (en) | 2018-04-20 |
CN107938843B CN107938843B (en) | 2024-06-18 |
Family
ID=61928500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710449674.3A Active CN107938843B (en) | 2017-06-12 | 2017-06-12 | Prefabricated assembled frame adopting steel pipe concrete column and steel beam combination |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107938843B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112900646A (en) * | 2021-03-04 | 2021-06-04 | 广州大学 | Assembled integrated configuration node connecting system |
CN113216384A (en) * | 2021-04-29 | 2021-08-06 | 北京建筑大学 | Full-prefabricated concrete-filled steel tube frame structure and assembling method |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002317499A (en) * | 2001-04-20 | 2002-10-31 | Ps Corp | Precast concrete column and method of constructing joint thereof |
KR200387927Y1 (en) * | 2005-03-25 | 2005-06-28 | 유승룡 | Improved Rigid Joint Structure of CFT Precast Concrete Column Unit and Steel Beam |
KR20060041428A (en) * | 2004-11-08 | 2006-05-12 | 이은우 | Prefabrication frame by composing steel frame and concrete composite |
JP2008175023A (en) * | 2007-01-22 | 2008-07-31 | Penta Ocean Construction Co Ltd | Joining structure of column and beam |
CN101914952A (en) * | 2010-07-23 | 2010-12-15 | 华南理工大学 | Connecting joint between hollow steel tube concrete column and steel girder and construction method thereof |
KR101180575B1 (en) * | 2012-04-06 | 2012-09-06 | 신세계건설(주) | structure of Steel-Concrete Hybrid Column using square shaped steel pipe and beam connection |
CN202658726U (en) * | 2012-06-12 | 2013-01-09 | 中建钢构江苏有限公司 | Steel bracket type joint connecting structure for concrete filled steel tube column and steel reinforced concrete beam |
CN104863258A (en) * | 2015-05-29 | 2015-08-26 | 重庆大学 | Strengthened steel pipe confined concrete column-reinforced concrete beam frame joint in joint area |
CN105178441A (en) * | 2015-09-18 | 2015-12-23 | 杭萧钢构股份有限公司 | Side plate type connection joint for steel beam and steel tube beam concrete shear wall |
CN105297896A (en) * | 2015-11-30 | 2016-02-03 | 北方工业大学 | Punching corbel haunch type compound steel pipe concrete column-steel beam node |
CN105604182A (en) * | 2016-01-20 | 2016-05-25 | 重庆大学 | Round steel tube confined reinforced concrete column-steel beam frame joint with through steel beam |
CN105672491A (en) * | 2016-01-20 | 2016-06-15 | 重庆大学 | Circular steel tube constraining reinforced concrete-steel beam framework node for nodal-region composite steel tube |
CN105821968A (en) * | 2016-05-20 | 2016-08-03 | 西安建筑科技大学 | Multi-cavity steel pipe and concrete combined column and steel beam U-shaped connecting joint and assembling method |
KR20160108750A (en) * | 2015-03-06 | 2016-09-20 | 경희대학교 산학협력단 | the construction method of steel-concrete hybrid precast concrete pipe rack structure |
CN106032683A (en) * | 2016-05-20 | 2016-10-19 | 西安建筑科技大学 | Bolt connection joint for eccentric beam column and assembling method |
CN205677091U (en) * | 2016-05-20 | 2016-11-09 | 西安建筑科技大学 | A kind of bolted dual-sided board node |
CN106121057A (en) * | 2016-08-25 | 2016-11-16 | 中冶建筑研究总院有限公司 | A kind of steel column web-type splicing node and installation method |
CN206034647U (en) * | 2016-09-21 | 2017-03-22 | 武汉科技大学 | A steel core concrete column and a girder steel T shape connected node's structure |
CN207228330U (en) * | 2017-06-12 | 2018-04-13 | 重庆大学 | A kind of prefabricated assembled frame combined using steel core concrete column and girder steel |
-
2017
- 2017-06-12 CN CN201710449674.3A patent/CN107938843B/en active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002317499A (en) * | 2001-04-20 | 2002-10-31 | Ps Corp | Precast concrete column and method of constructing joint thereof |
KR20060041428A (en) * | 2004-11-08 | 2006-05-12 | 이은우 | Prefabrication frame by composing steel frame and concrete composite |
KR200387927Y1 (en) * | 2005-03-25 | 2005-06-28 | 유승룡 | Improved Rigid Joint Structure of CFT Precast Concrete Column Unit and Steel Beam |
JP2008175023A (en) * | 2007-01-22 | 2008-07-31 | Penta Ocean Construction Co Ltd | Joining structure of column and beam |
CN101914952A (en) * | 2010-07-23 | 2010-12-15 | 华南理工大学 | Connecting joint between hollow steel tube concrete column and steel girder and construction method thereof |
KR101180575B1 (en) * | 2012-04-06 | 2012-09-06 | 신세계건설(주) | structure of Steel-Concrete Hybrid Column using square shaped steel pipe and beam connection |
CN202658726U (en) * | 2012-06-12 | 2013-01-09 | 中建钢构江苏有限公司 | Steel bracket type joint connecting structure for concrete filled steel tube column and steel reinforced concrete beam |
KR20160108750A (en) * | 2015-03-06 | 2016-09-20 | 경희대학교 산학협력단 | the construction method of steel-concrete hybrid precast concrete pipe rack structure |
CN104863258A (en) * | 2015-05-29 | 2015-08-26 | 重庆大学 | Strengthened steel pipe confined concrete column-reinforced concrete beam frame joint in joint area |
CN105178441A (en) * | 2015-09-18 | 2015-12-23 | 杭萧钢构股份有限公司 | Side plate type connection joint for steel beam and steel tube beam concrete shear wall |
CN105297896A (en) * | 2015-11-30 | 2016-02-03 | 北方工业大学 | Punching corbel haunch type compound steel pipe concrete column-steel beam node |
CN105604182A (en) * | 2016-01-20 | 2016-05-25 | 重庆大学 | Round steel tube confined reinforced concrete column-steel beam frame joint with through steel beam |
CN105672491A (en) * | 2016-01-20 | 2016-06-15 | 重庆大学 | Circular steel tube constraining reinforced concrete-steel beam framework node for nodal-region composite steel tube |
CN105821968A (en) * | 2016-05-20 | 2016-08-03 | 西安建筑科技大学 | Multi-cavity steel pipe and concrete combined column and steel beam U-shaped connecting joint and assembling method |
CN106032683A (en) * | 2016-05-20 | 2016-10-19 | 西安建筑科技大学 | Bolt connection joint for eccentric beam column and assembling method |
CN205677091U (en) * | 2016-05-20 | 2016-11-09 | 西安建筑科技大学 | A kind of bolted dual-sided board node |
CN106121057A (en) * | 2016-08-25 | 2016-11-16 | 中冶建筑研究总院有限公司 | A kind of steel column web-type splicing node and installation method |
CN206034647U (en) * | 2016-09-21 | 2017-03-22 | 武汉科技大学 | A steel core concrete column and a girder steel T shape connected node's structure |
CN207228330U (en) * | 2017-06-12 | 2018-04-13 | 重庆大学 | A kind of prefabricated assembled frame combined using steel core concrete column and girder steel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112900646A (en) * | 2021-03-04 | 2021-06-04 | 广州大学 | Assembled integrated configuration node connecting system |
CN113216384A (en) * | 2021-04-29 | 2021-08-06 | 北京建筑大学 | Full-prefabricated concrete-filled steel tube frame structure and assembling method |
Also Published As
Publication number | Publication date |
---|---|
CN107938843B (en) | 2024-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088434A (en) | A kind of assembling type steel structure overlapped hollow floor system and construction method thereof | |
CN106149882A (en) | A kind of lateral resisting and antigravity separate steel structure of housing system and construction method thereof | |
CN108193782A (en) | Prefabricated modular frame node and assembling method thereof | |
CN107938835A (en) | A kind of prefabricated assembled frame combined using profile steel concrete column and girder steel | |
CN207228330U (en) | A kind of prefabricated assembled frame combined using steel core concrete column and girder steel | |
CN102979162A (en) | Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system | |
CN107654021A (en) | A kind of assembling prefabricated reinforced concrete column and assembled combination frame building system | |
CN106368348A (en) | Overlapped combined shear wall with double-phase stress characteristic | |
CN103883054A (en) | Cable-strut rib beam combined floor and construction method thereof | |
CN107762161B (en) | A kind of energy-saving assembled system of steel residential structure and installation method | |
CN107938843A (en) | A kind of prefabricated assembled frame combined using steel core concrete column and girder steel | |
CN210396247U (en) | Modularization container building connected node | |
CN110656723B (en) | Rail support for sliding construction of cylindrical arch shell roof | |
CN214942941U (en) | Staggered truss structure of layering assembled antidetonation | |
CN207295986U (en) | Assembled interlocks Bailey bracket steel building | |
CN107574923A (en) | A kind of prefabricated assembled concrete framework connected using steel joint | |
CN206015882U (en) | The steel structure of housing system that a kind of lateral resisting and antigravity separate | |
CN102912878B (en) | Modularized building isolation system | |
CN209779860U (en) | assembled steel frame structure node | |
CN207228350U (en) | A kind of concrete filled steel tube column connected node applied to prefabricated assembled frame | |
CN207228475U (en) | A kind of prefabricated profile steel concrete column unit applied to assembling frame | |
CN104264780B (en) | Post and curved beam horizontal flexibility connection space structural system | |
CN209443577U (en) | A kind of steel structure member | |
CN106400629A (en) | Round-tunnel double-layer lane frame structure system and full-prefabricated construction method thereof | |
CN204212261U (en) | Post and curved beam horizontal flexibility connection space structural system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||