CN107908907A - A kind of complicated communal space assembling building decoration construction method based on BIM - Google Patents

A kind of complicated communal space assembling building decoration construction method based on BIM Download PDF

Info

Publication number
CN107908907A
CN107908907A CN201711322079.XA CN201711322079A CN107908907A CN 107908907 A CN107908907 A CN 107908907A CN 201711322079 A CN201711322079 A CN 201711322079A CN 107908907 A CN107908907 A CN 107908907A
Authority
CN
China
Prior art keywords
construction
bim
building
information
complicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711322079.XA
Other languages
Chinese (zh)
Inventor
孙运峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Great Fu Decorates Ltd Co
Original Assignee
Anhui Great Fu Decorates Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Great Fu Decorates Ltd Co filed Critical Anhui Great Fu Decorates Ltd Co
Priority to CN201711322079.XA priority Critical patent/CN107908907A/en
Publication of CN107908907A publication Critical patent/CN107908907A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of complicated communal space assembling building decoration construction method based on BIM, including such as Imitating percentage:Go out 1≤wind speed≤5m/s around building at 10 150cm distances of pedestrian area with CFD software analysis mode, pressure difference≤5Pa before and after 1≤winter building, pressure difference≤5Pa before and after 1≤summer building, the present invention helps to serve design, build, O&M, the Life cycle of dismounting, can be with digital virtual, informationization describes various factor of system, realize that Informatization Cooperative designs, Visual assembly, the interaction of quantities information connects the brand-new utilization such as simulation and inspection with node, the full industrial chain of integration architecture, realize overall process, comprehensive IT application integrates, aid in determining whether space use demand, reduce design alteration number, reach the number for reducing engineering phase palpus design for change, shorten the construction period and save project cost, improve construction efficiency, reduce the cost input in work progress.

Description

A kind of complicated communal space assembling building decoration construction method based on BIM
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of complicated communal space assembling based on BIM is built Build decoration construction method.
Background technology
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also Say it is various lines on design drawing, in specified place, become process in kind.It includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
But existing complicated communal space assembling building decoration construction method remains during construction Some unreasonable factors, existing complexity communal space assembling building decoration construction method is by flat in the construction process Face figure is exchanged views, although being known together in talking stage, the situation that cognition differs can often occur in reality when performing, real If not meeting user's demand after the completion of the construction of border, apply again again, add quantities;Existing complexity communal space dress With change building decoration construction method be in the construction process built by engineer, the remittance of structure and each system electromechanical diagram Whole, workload is huge and complicated, is easier to cause the mistake slipped and artificially judged, end product is exactly that site operation makees bullet again Property adjustment, waste the time, reduce efficiency, also add cost.
The content of the invention
It is an object of the invention to provide a kind of complicated communal space assembling building decoration construction method based on BIM, To solve mistake of the existing complicated communal space assembling building decoration construction method proposed in the above background technology in construction Some unreasonable factors are remained in journey, existing complexity communal space assembling building decoration construction method is being constructed During be to be exchanged views by plan, it is actual often to recognize when performing although being known together in talking stage Know the situation to differ, if not meeting user's demand after the completion of practice of construction, apply again again, add quantities;It is existing Complicated communal space assembling building decoration construction method be in the construction process built by engineer, structure and each The remittance of system electromechanical diagram is whole, and workload is huge and complicated, is easier to cause the mistake slipped and artificially judged, end product is exactly Site operation does elastic adjustment again, the problem of wasting the time, reduce efficiency, also add cost.
To achieve the above object, the present invention provides following technical solution:A kind of complicated communal space assembling based on BIM Building decoration construction method, the construction method are as follows:
Step 1:Prefabricated structure model, simulates the mode of factory process by the foundation of assembled architecture BIM component bases, Increase quantity, species and the specification of BIM imaginary components, progressively structure standardization prefabricated components storehouse, it is dynamic to form BIM production simulations The material of the auxiliary training such as picture, flow chart, explanatory drawin;
Step 2:Component is split, and the technology path and industrialization target of assembled architecture is determined, in the schematic design phase Project Creation is carried out according to component disassembly principle according to set objective;
Step 3:Collaborative design, material information, process equipment information, cost information to building etc. carries out data analysis, Go out 1≤wind speed≤5m/s around building at pedestrian area 10-150cm distances with CFD software analysis mode, 1≤winter builds Build pressure difference≤5Pa before and after thing, pressure difference 5Pa before and after 1≤summer building;
Step 4:Construction site is simulated, and construction schedule is write BIM information models, spatial information and time are believed Breath is incorporated into a visual 4D model, predict in advance the control method, construction that this project mainly constructs arrange it is whether balanced, Whether overall planning, Ground arrangement are reasonable, and whether process is correct, and is optimized in time;
Step 5:Construction and installation and simulated crash detection, virtual construction know the assembling of assembled architecture, and to structure The problems such as collision detection of each part inside into prefabricated components, floor heating pipe is potentially staggeredly collided with electric appliance pipeline, is repaiied Just;
Step 6:Node is simulated, and construction simulation previews complex region and critical construction node in advance;
Step 7:Information integration, final BIM models are imported into plant produced turn-key system, factory's turn-key system root Component information timing is sent directionally among plant produced line relevant control machine according to the production schedule, conceptual level and production work Factory is docked;
Step 8:Site construction management, completes to construct, can respectively check project reality in the three-dimensional model according to construction plan Apply progress.
As a preferred technical solution of the present invention, including such as Imitating percentage:Go out with CFD software analysis mode 1≤wind speed≤5m/s around building at pedestrian area 10-150cm distances, pressure difference≤5Pa before and after 1≤winter building, 1≤ Pressure difference≤5Pa before and after summer building.
As a preferred technical solution of the present invention, in the step 2, closed according to component race storehouse and Splitting Logic System, the intelligence that assembled architecture is carried out to final design are split.
As a preferred technical solution of the present invention, after the completion of the construction, maintenance and management is carried out to project.
As a preferred technical solution of the present invention, the construction party can be checked the project life cycle among model Information, and to needing modified component to be modified.
Compared with prior art, the beneficial effects of the invention are as follows:
(1) present invention helps to serve design, construction, O&M, the Life cycle removed, can with digital virtual, Informationization describes various factor of system, realizes Informatization Cooperative design, Visual assembly, and the interaction of quantities information and node connect Connect simulation and inspection etc. completely newly to use, the full industrial chain of integration architecture, realizes that overall process, comprehensive IT application integrate;
(2) aid in determining whether space use demand, reduce design alteration number;
(3) reach and reduce the number of engineering phase palpus design for change, shorten the construction period and save project cost.
Embodiment
Embodiment 1
A kind of complicated communal space assembling building decoration construction method based on BIM, including such as Imitating percentage:Fortune Go out wind speed=1m/s around building at pedestrian area 10cm distances with CFD software analysis mode, pressure difference before and after winter building =1Pa, pressure difference=1Pa before and after summer builds.
Include the following steps:
Step 1:Prefabricated structure model, simulates the mode of factory process by the foundation of assembled architecture BIM component bases, Increase quantity, species and the specification of BIM imaginary components, progressively structure standardization prefabricated components storehouse, it is dynamic to form BIM production simulations The material of the auxiliary training such as picture, flow chart, explanatory drawin;
Step 2:Component is split, and the technology path and industrialization target of assembled architecture is determined, in the schematic design phase Project Creation is carried out according to component disassembly principle according to set objective;
Step 3:Collaborative design, material information, process equipment information, cost information to building etc. carries out data analysis, Go out 1≤wind speed≤5m/s around building at pedestrian area 10-150cm distances with CFD software analysis mode, 1≤winter builds Build pressure difference≤5Pa before and after thing, pressure difference 5Pa before and after 1≤summer building;
Step 4:Construction site is simulated, and construction schedule is write BIM information models, spatial information and time are believed Breath is incorporated into a visual 4D model, predict in advance the control method, construction that this project mainly constructs arrange it is whether balanced, Whether overall planning, Ground arrangement are reasonable, and whether process is correct, and is optimized in time;
Step 5:Construction and installation and simulated crash detection, virtual construction know the assembling of assembled architecture, and to structure The problems such as collision detection of each part inside into prefabricated components, floor heating pipe is potentially staggeredly collided with electric appliance pipeline, is repaiied Just;
Step 6:Node is simulated, and construction simulation previews complex region and critical construction node in advance;
Step 7:Information integration, final BIM models are imported into plant produced turn-key system, factory's turn-key system root Component information timing is sent directionally among plant produced line relevant control machine according to the production schedule, conceptual level and production work Factory is docked;
Step 8:Site construction management, completes to construct, can respectively check project reality in the three-dimensional model according to construction plan Apply progress.
Embodiment 2
A kind of complicated communal space assembling building decoration construction method based on BIM, including such as Imitating percentage:Fortune Go out around building wind speed=3m/s at pedestrian area 80cm distances with CFD software analysis mode, pressure difference before and after winter building= 3Pa, pressure difference=3Pa before and after summer builds.
Include the following steps:
Step 1:Prefabricated structure model, simulates the mode of factory process by the foundation of assembled architecture BIM component bases, Increase quantity, species and the specification of BIM imaginary components, progressively structure standardization prefabricated components storehouse, it is dynamic to form BIM production simulations The material of the auxiliary training such as picture, flow chart, explanatory drawin;
Step 2:Component is split, and the technology path and industrialization target of assembled architecture is determined, in the schematic design phase Project Creation is carried out according to component disassembly principle according to set objective;
Step 3:Collaborative design, material information, process equipment information, cost information to building etc. carries out data analysis, Go out 1≤wind speed≤5m/s around building at pedestrian area 10-150cm distances with CFD software analysis mode, 1≤winter builds Build pressure difference≤5Pa before and after thing, pressure difference 5Pa before and after 1≤summer building;
Step 4:Construction site is simulated, and construction schedule is write BIM information models, spatial information and time are believed Breath is incorporated into a visual 4D model, predict in advance the control method, construction that this project mainly constructs arrange it is whether balanced, Whether overall planning, Ground arrangement are reasonable, and whether process is correct, and is optimized in time;
Step 5:Construction and installation and simulated crash detection, virtual construction know the assembling of assembled architecture, and to structure The problems such as collision detection of each part inside into prefabricated components, floor heating pipe is potentially staggeredly collided with electric appliance pipeline, is repaiied Just;
Step 6:Node is simulated, and construction simulation previews complex region and critical construction node in advance;
Step 7:Information integration, final BIM models are imported into plant produced turn-key system, factory's turn-key system root Component information timing is sent directionally among plant produced line relevant control machine according to the production schedule, conceptual level and production work Factory is docked;
Step 8:Site construction management, completes to construct, can respectively check project reality in the three-dimensional model according to construction plan Apply progress.
Embodiment 3
A kind of complicated communal space assembling building decoration construction method based on BIM, including such as Imitating percentage:Fortune Go out wind speed=5m/s around building at pedestrian area 150cm distances with CFD software analysis mode, pressure difference before and after winter building =5Pa, pressure difference=5Pa before and after summer builds.
Include the following steps:
Step 1:Prefabricated structure model, simulates the mode of factory process by the foundation of assembled architecture BIM component bases, Increase quantity, species and the specification of BIM imaginary components, progressively structure standardization prefabricated components storehouse, it is dynamic to form BIM production simulations The material of the auxiliary training such as picture, flow chart, explanatory drawin;
Step 2:Component is split, and the technology path and industrialization target of assembled architecture is determined, in the schematic design phase Project Creation is carried out according to component disassembly principle according to set objective;
Step 3:Collaborative design, material information, process equipment information, cost information to building etc. carries out data analysis, Go out 1≤wind speed≤5m/s around building at pedestrian area 10-150cm distances with CFD software analysis mode, 1≤winter builds Build pressure difference≤5Pa before and after thing, pressure difference 5Pa before and after 1≤summer building;
Step 4:Construction site is simulated, and construction schedule is write BIM information models, spatial information and time are believed Breath is incorporated into a visual 4D model, predict in advance the control method, construction that this project mainly constructs arrange it is whether balanced, Whether overall planning, Ground arrangement are reasonable, and whether process is correct, and is optimized in time;
Step 5:Construction and installation and simulated crash detection, virtual construction know the assembling of assembled architecture, and to structure The problems such as collision detection of each part inside into prefabricated components, floor heating pipe is potentially staggeredly collided with electric appliance pipeline, is repaiied Just;
Step 6:Node is simulated, and construction simulation previews complex region and critical construction node in advance;
Step 7:Information integration, final BIM models are imported into plant produced turn-key system, factory's turn-key system root Component information timing is sent directionally among plant produced line relevant control machine according to the production schedule, conceptual level and production work Factory is docked;
Step 8:Site construction management, completes to construct, can respectively check project reality in the three-dimensional model according to construction plan Apply progress.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of changes, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (5)

  1. A kind of 1. complicated communal space assembling building decoration construction method based on BIM, it is characterised in that the construction method It is as follows:
    Step 1:Prefabricated structure model, the mode for simulating factory process pass through the foundation of assembled architecture BIM component bases, increase Quantity, species and the specification of BIM imaginary components, progressively structure standardization prefabricated components storehouse, forms BIM productions simulation animation, stream The material of the auxiliary training such as Cheng Tu, explanatory drawin;
    Step 2:Component is split, and determines the technology path and industrialization target of assembled architecture, the schematic design phase according to Set objective carries out Project Creation according to component disassembly principle;
    Step 3:Collaborative design, material information, process equipment information, cost information to building etc. carries out data analysis, uses CFD software analysis mode goes out 1≤wind speed≤5m/s at pedestrian area 10-150cm distances, 1≤winter building around building Front and rear pressure difference≤5Pa, pressure difference 5Pa before and after 1≤summer builds;
    Step 4:Construction site is simulated, and construction schedule is write BIM information models, and spatial information is whole with temporal information Close in a visual 4D model, predict in advance the control method, construction that this project mainly constructs arrange it is whether balanced, it is overall Whether plan, Ground arrangement are reasonable, and whether process is correct, and is optimized in time;
    Step 5:Construction and installation and simulated crash detection, virtual construction know the assembling of assembled architecture, and pre- to forming The problems such as collision detection of each part of component inside processed, floor heating pipe is potentially staggeredly collided with electric appliance pipeline, is modified;
    Step 6:Node is simulated, and construction simulation previews complex region and critical construction node in advance;
    Step 7:Information integration, final BIM models is imported into plant produced turn-key system, factory's turn-key system is according to life Production plan sends directionally to component information timing among plant produced line relevant control machine, conceptual level and production plant into Row docking;
    Step 8:Site construction management, according to construction plan complete construct, can respectively check in the three-dimensional model the project implementation into Degree.
  2. 2. a kind of complicated communal space assembling building decoration construction method based on BIM according to claim 1, it is special Sign is, including such as Imitating percentage:Go out with CFD software analysis mode around building at pedestrian area 10-150cm distances 1≤wind speed≤5m/s, pressure difference≤5Pa before and after 1≤winter building, pressure difference≤5Pa before and after 1≤summer building.
  3. 3. a kind of complicated communal space assembling building decoration construction method based on BIM according to claim 1, it is special Sign is:In the step 2, according to component race storehouse and Splitting Logic relation, to the intelligence of final design progress assembled architecture It can split.
  4. 4. a kind of complicated communal space assembling building decoration construction method based on BIM according to claim 1, it is special Sign is:After the completion of the construction, maintenance and management is carried out to project.
  5. 5. a kind of complicated communal space assembling building decoration construction method based on BIM according to claim 1, it is special Sign is:The construction party can check the information of the project life cycle among model, and to needing modified component to repair Just.
CN201711322079.XA 2017-12-12 2017-12-12 A kind of complicated communal space assembling building decoration construction method based on BIM Pending CN107908907A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711322079.XA CN107908907A (en) 2017-12-12 2017-12-12 A kind of complicated communal space assembling building decoration construction method based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711322079.XA CN107908907A (en) 2017-12-12 2017-12-12 A kind of complicated communal space assembling building decoration construction method based on BIM

Publications (1)

Publication Number Publication Date
CN107908907A true CN107908907A (en) 2018-04-13

Family

ID=61865406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711322079.XA Pending CN107908907A (en) 2017-12-12 2017-12-12 A kind of complicated communal space assembling building decoration construction method based on BIM

Country Status (1)

Country Link
CN (1) CN107908907A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109063382A (en) * 2018-09-17 2018-12-21 江苏舒适云信息技术有限公司 A kind of room ground heating pipe designing system
CN109408903A (en) * 2018-09-29 2019-03-01 鼎宸建设管理有限公司 Assembled architecture design method based on BIM technology
CN112417566A (en) * 2020-11-23 2021-02-26 温岭市第一建筑工程有限公司 BIM-based house construction unified integration supervision method
CN112434906A (en) * 2020-10-28 2021-03-02 中建科技武汉有限公司 Generation method and device of complex process interpenetration slash analysis chart
CN113190899A (en) * 2021-04-26 2021-07-30 河北工业大学 Integrated design method for parameterization of fabricated building
CN114675904A (en) * 2022-03-31 2022-06-28 阿里巴巴(中国)有限公司 Equipment processing method and device
CN116187950A (en) * 2023-03-02 2023-05-30 北京城建集团有限责任公司 Airport full-specialized collaborative design system based on BIM

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109063382A (en) * 2018-09-17 2018-12-21 江苏舒适云信息技术有限公司 A kind of room ground heating pipe designing system
CN109408903A (en) * 2018-09-29 2019-03-01 鼎宸建设管理有限公司 Assembled architecture design method based on BIM technology
CN112434906A (en) * 2020-10-28 2021-03-02 中建科技武汉有限公司 Generation method and device of complex process interpenetration slash analysis chart
CN112417566A (en) * 2020-11-23 2021-02-26 温岭市第一建筑工程有限公司 BIM-based house construction unified integration supervision method
CN113190899A (en) * 2021-04-26 2021-07-30 河北工业大学 Integrated design method for parameterization of fabricated building
CN114675904A (en) * 2022-03-31 2022-06-28 阿里巴巴(中国)有限公司 Equipment processing method and device
CN114675904B (en) * 2022-03-31 2024-04-09 阿里巴巴(中国)有限公司 Equipment processing method and device
CN116187950A (en) * 2023-03-02 2023-05-30 北京城建集团有限责任公司 Airport full-specialized collaborative design system based on BIM

Similar Documents

Publication Publication Date Title
CN107908907A (en) A kind of complicated communal space assembling building decoration construction method based on BIM
CN106156408B (en) Building cooperative construction system and method based on component classification and combination
CN110502868B (en) Method for establishing multi-level virtual maintenance training system for complex equipment vehicle
CN104866648A (en) Pretreatment template and treatment method of simulation model of high speed driving transport vehicle
CN109948224A (en) A kind of architectural engineering information interacting method that actual situation combines
CN101727508B (en) method for researching and developing large-sized equipment based on virtual reality technology
CN104866525A (en) Virtual nuclear power station simulation teaching system and building method thereof
Lotfabadi et al. Sustainability; as a combination of parametric patterns and bionic strategies
CN105912780A (en) Method for three-dimensional design and construction progress simulating interaction of underground cavern group
CN102867078A (en) Three-dimensional computer-aided design (CAD) platform-based quick planning method for mechanical product disassembly process
Yang et al. Research on building information model (BIM) technology
CN103324806A (en) Sketchup workshop auto-modeling method on the basis of language Ruby
CN113989438A (en) Method and system for realizing whole-process three-dimensional visualization of thermal power plant
Rao et al. The current status and future perspectives of virtual maintenance
Jiang et al. “Intelligent Construction, Digital Modeling of the Future” Internet+ BIM Service EPC Project——Take the Exhibition Center of National Cybersecurity Center for Education and Innovation Project as an Example
CN107194035A (en) A kind of automatized script generation method towards SCADE
Zhanglin et al. Application of BIM technology in prefabricated buildings
Jianfeng et al. Construction of intelligent building design system based on BIM and AI
CN103839476A (en) Three-dimensional simulation system for production supervision of assembly of transformer
Zhu et al. Design study on green sports building based on BIM
CN114840908A (en) BIM and neural network model-based archaized building energy-saving optimization method
Shi Research on the Application Mode of Prefabricated Steel Structure Building Design Based on BIM Technology
CN111625889A (en) BIM technology-based curved surface special-shaped steel structure construction method
CN111581705A (en) BIM technology-based construction method for irregular curved surface steel structure
Dong et al. The Simulation and Research of Steel-Work Construction Based on Fuzor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180413

WD01 Invention patent application deemed withdrawn after publication