CN107893135B CN201711217651.6A CN201711217651A CN107893135B CN 107893135 B CN107893135 B CN 107893135B CN 201711217651 A CN201711217651 A CN 201711217651A CN 107893135 B CN107893135 B CN 107893135B
Authority
CN
China
Prior art keywords
shell
furnace
wall
cooling wall
furnace shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711217651.6A
Other languages
Chinese (zh)
Other versions
CN107893135A (en
Inventor
张勇
徐永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201711217651.6A priority Critical patent/CN107893135B/en
Publication of CN107893135A publication Critical patent/CN107893135A/en
Application granted granted Critical
Publication of CN107893135B publication Critical patent/CN107893135B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/10Cooling; Devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention belongs to blast furnace maintenance areas, disclose a kind of last furnace shell Local Cracking processing method, economical operation is suddenly seriously affected to solve the problems, such as that prior art blast furnace cooling wall breakage causes blast furnace that cannot keep the safety in production, this method is by making spare cooling wall and standby boiler hull shape into shell wall one cooling wall, and the weld seam of the two is staggered, at work, spare cooling wall is set to be effectively protected the weld seam of spare furnace shell, blast furnace staying chance installs the serious position of craze and transfiguration using shell wall one cooling wall, restore the refrigerating function of this position after installation, the present invention is fixed when removing after needing to change furnace shell and cutting first with stifled burnt plate and last furnace shell, effectively prevent the outflow of furnace charge.The present invention inwardly remove furnace charge when, using the sintered strength support furnace charge of hydrous taphole loam, furnace charge unexpected avalanche when avoiding cleaning, effectively reduce furnace shell again craze and transfiguration the phenomenon that, it is ensured that the safe operation of blast furnace extends blast furnace generation furnace service life.

Description

A kind of last furnace shell Local Cracking processing method
Technical field
The present invention relates to blast furnace maintenance areas, and in particular to a kind of last furnace shell Local Cracking processing method.
Background technique
Key equipment of the cooling wall as blast furnace is responsible for effectively being completely cut off outside furnace heat and furnace, it is ensured that furnace Shell temperature is stablized at 30 DEG C hereinafter, furnace labour later period cooling wall damage, furnace shell directly contact gas fluid in blast furnace, and casing temperature increases, Cracking leakage coal gas or even Strength Failure, furnace body are burnt, and cooling wall once damaging, lose by refrigerating function, and furnace shell is heated rubescent strong Degree failure, makes blast furnace be forced blowing out medium-capital overhauling.
No. 7 blast furnace dischargeable capacity 2650m3 of wine steel iron-smelter, blast furnace design 15 sections of cooling walls altogether, occur since 2011 Cooling wall breakage, by the end of the year 2016,8 sections of cooling wall breakages reach 48.81%, and 9 sections of cooling wall breakages reach 99.4%, and 10 sections cold But wall breakage reaches 81.25%.
Since 2014, because cooling wall breakage causes, the caused rubescent cracking of furnace shell increases blast furnace.Blast furnace protects aspect outside Take the reparation of copper cooling wall pipe root, installation it is chilly, pressure, which makes lining, furnace skin is fetched water, buries the modes such as copper pipe, pressure grouting carries out furnace Body maintenance, it is interior support to take stop oxygen, limited production, block up the measures such as air port and provided special care to, pass through the measure taken on support within and the outer casing Certain effect is achieved, but the trend that furnace body deteriorates is not solved.Breaking with cooling wall water pipe since 2016 Damage increases, and furnace Pi Fahong, deformation, cracking phenomena constantly occur.Because blast furnace staying caused by the rubescent cracking of furnace skin reaches 104.5h, It is that blast furnace safety production and economical operation bring and seriously affect that the furnace body due to caused by cooling wall breakage, which deteriorates, and the prior art can not It solves the above problems.
Summary of the invention
The purpose of the present invention is to solve prior art blast furnace cooling wall breakages to cause blast furnace that cannot keep the safety in production suddenly sternly Ghost image rings the problem of economical operation, provides a kind of last furnace shell Local Cracking processing method.
In order to achieve the above object, the invention adopts the following technical scheme:
A kind of last furnace shell Local Cracking processing method, comprising the following steps:
1) according to blast furnace situation and damping down time determine shell deformation position and the damaged cooling wall needed replacing and The furnace shell size of craze and transfiguration;
2) spare cooling wall and spare furnace shell are made according to the size after determination;
3) after spare cooling wall and spare furnace shell complete, spare cooling wall is mounted on the inside of spare furnace shell, spare Every side edge of cooling wall is 30-50mm smaller than every side edge of spare furnace shell, and the weld seam of spare cooling wall and spare furnace shell is handed over Mistake setting, forms shell wall one cooling wall;
4) the furnace shell position scribing line confirmation after blast furnace staying to needing to change, cuts off to furnace shell is needed to change, is needing to change After the top joint-cutting of furnace shell is cut, it must not will need to change furnace shell and directly remove, need first at the cutting line of top that stifled burnt plate is horizontal Squeeze into furnace charge, block up the driving depth of coke plate than shell wall one cooling wall thickness more than 50-100mm, and by stifled burnt plate and blast furnace Furnace shell is welded and fixed, then will be needed to change furnace shell and be rotated down and remove;
5) it needs to change after furnace shell removes, it is inwardly clear according to the size for needing to change furnace shell from stifled burnt plate and lower part cutting line Except furnace charge, inwardly remove the thickness of furnace charge than shell wall one cooling wall thickness more than 20-50mm, remove after a part in time with having It is purged again after water stemming material tamping furnace charge;
6) after furnace charge cleans out, the shell wall one cooling wall of new production is installed, first by shell wall one when installation Lower joint after body cooling wall and excision to just, after to just afterwards the lower part of shell wall one cooling wall fixed with lower joint, Shell wall one cooling wall is rotated up, when the angle of shell wall one cooling wall and last furnace shell is less than 15 °, excision step 4) in The stifled burnt plate of installation, then by shell wall one cooling wall and last furnace shell all to just, and with welding rod to shell wall one cooling wall It is welded with last furnace shell;
7) carrying out the position of opening that pressure makes lining, and makes lining hole after welding on shell wall one cooling wall is shell wall one The marginal position of body cooling wall, the lining amount of making for making lining hole is 250-300kg, makes lining with a thickness of 300-500mm, makes health 6- after lining Multiple wind after 8h.
Further, restore the cold of shell wall one cooling wall with high-pressure cooling water in time when making health after serving as a contrast in step 7) But, and the control of the pressure of high-pressure cooling water is in 1.4-1.6mpa.
Further, pouring material is filled in the gap in step 3) between spare cooling wall and spare furnace shell.
Further, spare cooling wall and spare furnace shell are installed to form shell wall one cooling wall by bolt.
Further, block is set on needing to change the last furnace shell below furnace shell in step 4).
Further, multiple make is provided in the edge of shell wall one cooling wall in step 7) serve as a contrast hole.
Further, the top of shell wall one cooling wall is equipped with hanging ring.
The present invention compared with the existing technology, has the advantages that
Last furnace shell Local Cracking processing method of the invention is by making spare cooling wall and standby boiler hull shape into shell wall Integrated cooling wall, and the weld seam of the two is staggered, and at work, spare cooling wall is made to be effectively protected the weldering of spare furnace shell Seam, installs blast furnace staying chance to the serious position of craze and transfiguration using shell wall one cooling wall, restores this after installation The refrigerating function of position, the present invention are fixed when removing after needing to change furnace shell and cutting first with stifled burnt plate and last furnace shell, effectively Avoid the outflow of furnace charge.The present invention, using the sintered strength support furnace charge of hydrous taphole loam, is avoided when inwardly removing furnace charge Furnace charge unexpected avalanche when cleaning.The present invention effectively reduce furnace shell again craze and transfiguration the phenomenon that, it is ensured that the safety of blast furnace Operation, extends blast furnace generation furnace service life.
Detailed description of the invention
Fig. 1 is the main view of shell wall one cooling wall of the present invention.
Fig. 2 is the side view of shell wall one cooling wall of the present invention.
Fig. 3 is that the present invention needs to change the schematic diagram that furnace shell is not removed.
Fig. 4 is the schematic diagram when present invention needs to change furnace shell dismounting.
Fig. 5 is the schematic diagram that the present invention inwardly removes furnace charge.
Fig. 6 is the schematic diagram of present invention installation shell wall one cooling wall.
Appended drawing reference meaning is as follows: 1. spare furnace shells;2. pouring material;3. spare cooling wall;4. hanging ring;5. shell wall one Body cooling wall;6. making lining hole;7. block;8. needing to change furnace shell;9. stifled coke plate;10. furnace charge;11. hydrous taphole loam.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and specific embodiments.
As shown in figures 1 to 6, a kind of last furnace shell Local Cracking processing method, comprising the following steps:
1) according to blast furnace situation and damping down time determine shell deformation position and the damaged cooling wall needed replacing and The furnace shell size of craze and transfiguration.
2) spare cooling wall 3 and spare furnace shell 1, and spare cooling wall 3 and spare furnace shell 1 are made according to the size after determination The relative production installation specification of cooling wall and furnace shell need to be followed strictly when production.
3) after spare cooling wall 3 and spare furnace shell 1 complete, spare cooling wall 3 is mounted on spare furnace shell 1 by bolt Inside, every side edge of spare cooling wall 3 is 30-50mm smaller than every side edge of spare furnace shell 1, spare cooling wall 3 with it is spare Pouring material 2 is filled in gap between furnace shell 1.And the weld seam of spare cooling wall 3 and spare furnace shell 1 is staggered, and forms shell wall Integrated cooling wall 5.
4) the furnace shell position scribing line confirmation after blast furnace staying to needing to change, needs to change and sets on the last furnace shell of 8 lower section of furnace shell Set block 7.It can prevent from needing to change the landing suddenly of furnace shell 8.It is cut off to furnace shell 8 is needed to change, is needing to change the upper of furnace shell 8 After portion's joint-cutting is cut, it must not will need to change furnace shell 8 and directly remove, and need that stifled burnt 9 level of plate will first be squeezed into furnace at the cutting line of top In material 10, block up the driving depth of coke plate 9 than shell wall one cooling wall 5 thickness more than 50-100mm, and by stifled burnt plate 9 and State of Blast Furnace Shell is welded and fixed, then will be needed to change furnace shell 8 and be rotated down and remove.
5) need to change after furnace shell 8 removes, from stifled burnt plate 9 and lower part cutting line according to need to change the size of furnace shell 8 to Interior removing furnace charge 10, inwardly remove furnace charge 10 thickness than shell wall one cooling wall 5 thickness more than 20-50mm, remove a part It is purged again after consolidating furnace charge with hydrous taphole loam 11 in time afterwards.
6) after furnace charge cleans out, the shell wall one cooling wall 5 of new production is installed, first by shell wall when installation Integrated cooling wall 5 and the lower joint after excision to just, after to just afterwards the lower part of shell wall one cooling wall 5 consolidated with lower joint Fixed, the top of shell wall one cooling wall 5 is equipped with hanging ring 4, and wearing hoisting rope from hanging ring 4 is rotated up shell wall one cooling wall 5, When the angle of shell wall one cooling wall 5 and last furnace shell is less than 15 °, excision step 4) in the stifled burnt plate 9 installed, then by shell Wall one cooling wall 5 and last furnace shell weld shell wall one cooling wall 5 with last furnace shell with welding rod all to just.
7) carrying out the position of opening that pressure makes lining, and makes lining hole 6 after welding on shell wall one cooling wall 5 is shell wall The marginal position of integrated cooling wall 5, make lining hole 6 be it is multiple, lining amount of making be 250-300kg, make lining with a thickness of 300-500mm, It makes and answers wind after serving as a contrast after health 6-8h.Restore the cooling of shell wall one cooling wall 5 when making health after serving as a contrast with high-pressure cooling water in time, and The pressure of high-pressure cooling water is controlled in 1.4-1.6mpa.
In addition, when determining the furnace shell size of shell deformation position and the damaged cooling wall needed replacing and craze and transfiguration, It need to consider to overhaul time and spare cooling wall and standby needed for troop replaces the furnace shell and damaged cooling wall of this block craze and transfiguration Weight when being installed with furnace shell.Because the working space of the type is generally more narrow, it is not available mechanization lifting, is needed when operation It is had bad luck with cooperations such as jacks to just, so weight general control, within 2t, size just not can guarantee weight greatly very much and furthermore replace Furnace shell cracking in position is generally accompanied with shell deformation, if too big, new shell wall one cooling wall 5 is unable to ensure after being installed in place With with regard to furnace shell in the same plane.

Claims (7)

1. a kind of last furnace shell Local Cracking processing method, characterized in that method includes the following steps:
1) damaged cooling wall and cracking for shell deformation position being determined according to blast furnace situation and damping down time and being needed replacing The furnace shell size of deformation;
2) spare cooling wall (3) and spare furnace shell (1) are made according to the size after determination;
3) after spare cooling wall (3) and spare furnace shell (1) complete, spare cooling wall (3) is mounted on the interior of spare furnace shell (1) Every side edge of side, spare cooling wall (3) is 30-50mm smaller than every side edge of spare furnace shell (1), and spare cooling wall (3) with The weld seam of spare furnace shell (1) is staggered, and is formed shell wall one cooling wall (5);
4) the furnace shell position scribing line confirmation after blast furnace staying to needing to change, cuts off to furnace shell (8) is needed to change, is needing to change furnace After the top joint-cutting of shell (8) is cut, it must not will need to change furnace shell (8) and directly remove, need first at the cutting line of top by stifled burnt plate (9) level is squeezed into furnace charge (10), and the driving depth for blocking up coke plate (9) is 50-100mm more than the thickness of shell wall one cooling wall (5), And stifled burnt plate (9) and last furnace shell are welded and fixed, then furnace shell (8) will be needed to change rotate down and remove;
5) it needs to change after furnace shell (8) removes, according to the size for needing to change furnace shell (8) from stifled burnt plate (9) and lower part cutting line Furnace charge (10) inwardly are removed, the thickness for inwardly removing furnace charge (10) is 20-50mm more than the thickness of shell wall one cooling wall (5), clearly Except after a part in time with hydrous taphole loam (11) consolidate furnace charge after be purged again;
6) after furnace charge cleans out, the shell wall one cooling wall (5) of new production is installed, first by shell wall one when installation Lower joint after cooling wall (5) and excision to just, after to just afterwards the lower part of shell wall one cooling wall (5) and lower joint is solid Fixed, shell wall one cooling wall (5) is rotated up, and when the angle of shell wall one cooling wall (5) and last furnace shell is less than 15 °, is cut Except the stifled burnt plate (9) installed in step 4), then by shell wall one cooling wall (5) and last furnace shell all to just, and welding rod is used Shell wall one cooling wall (5) is welded with last furnace shell;
7) carrying out the position of opening that pressure makes lining, and makes lining hole (6) after welding on shell wall one cooling wall (5) is shell wall The marginal position of integrated cooling wall (5), the lining amount of making for making lining hole (6) is 250-300kg, makes lining with a thickness of 300-500mm, makes lining Multiple wind after health 6-8h afterwards.
2. a kind of last furnace shell Local Cracking processing method according to claim 1, it is characterized in that: being made in the step 7) Restore the cooling of shell wall one cooling wall after lining when health with high-pressure cooling water in time, and the pressure control of high-pressure cooling water exists 1.4-1.6MPa。
3. a kind of last furnace shell Local Cracking processing method according to claim 1, it is characterized in that: in the step 3) Pouring material (2) are filled in gap between spare cooling wall (3) and spare furnace shell (1).
4. a kind of last furnace shell Local Cracking processing method according to claim 1, it is characterized in that: the spare cooling wall (3) and spare furnace shell (1) is installed to form shell wall one cooling wall (5) by bolt.
5. a kind of last furnace shell Local Cracking processing method according to claim 1, it is characterized in that: in the step 4) Need to change setting block (7) on the last furnace shell below furnace shell (8).
6. a kind of last furnace shell Local Cracking processing method according to claim 1, it is characterized in that: in the step 7) The edge of shell wall one cooling wall (5) is provided with multiple make and serves as a contrast hole (6).
7. a kind of last furnace shell Local Cracking processing method according to claim 1, it is characterized in that: the shell wall is integrally cold But the top of wall (5) is equipped with hanging ring (4).
CN201711217651.6A 2017-11-28 2017-11-28 A kind of last furnace shell Local Cracking processing method Active CN107893135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711217651.6A CN107893135B (en) 2017-11-28 2017-11-28 A kind of last furnace shell Local Cracking processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711217651.6A CN107893135B (en) 2017-11-28 2017-11-28 A kind of last furnace shell Local Cracking processing method

Publications (2)

Publication Number Publication Date
CN107893135A CN107893135A (en) 2018-04-10
CN107893135B true CN107893135B (en) 2019-08-06

Family

ID=61806941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711217651.6A Active CN107893135B (en) 2017-11-28 2017-11-28 A kind of last furnace shell Local Cracking processing method

Country Status (1)

Country Link
CN (1) CN107893135B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111702660A (en) * 2020-06-23 2020-09-25 宝武装备智能科技有限公司 Online ultrahigh-pressure water jet cutting method for blast furnace shell and cooling wall
CN114622045A (en) * 2021-12-01 2022-06-14 武汉科技大学 Method for reducing temperature of blast furnace shell by using cooling column and cooling plate

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57155304A (en) * 1981-03-19 1982-09-25 Kawasaki Steel Corp Operation of blast furnace
JP2007308747A (en) * 2006-05-17 2007-11-29 Nippon Steel Corp Stave cooler for blast furnace
CN101333569A (en) * 2007-06-28 2008-12-31 上海梅山钢铁股份有限公司 Repairing method for cooling staveleakage
CN101899540A (en) * 2010-07-29 2010-12-01 中国一冶集团有限公司 Construction method for overhauling blast furnace and keeping furnace shell and cooling wall
CN202519275U (en) * 2012-04-13 2012-11-07 中冶京诚工程技术有限公司 Combined cooling wall
CN102912051B (en) * 2012-10-26 2015-05-06 莱芜钢铁集团有限公司 Method for exchanging cooling wall of blast furnace taphole online
CN104789722A (en) * 2015-04-14 2015-07-22 江阴兴澄特种钢铁有限公司 Blast furnace body structure for facilitating lining making through grouting
CN105420432A (en) * 2015-12-04 2016-03-23 山东钢铁股份有限公司 Replacing method for cooling wall of blast furnace
CN106048120A (en) * 2016-07-26 2016-10-26 河北钢铁股份有限公司承德分公司 Taphole cooling wall capable of being replaced integrally and replacement method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57155304A (en) * 1981-03-19 1982-09-25 Kawasaki Steel Corp Operation of blast furnace
JP2007308747A (en) * 2006-05-17 2007-11-29 Nippon Steel Corp Stave cooler for blast furnace
CN101333569A (en) * 2007-06-28 2008-12-31 上海梅山钢铁股份有限公司 Repairing method for cooling staveleakage
CN101899540A (en) * 2010-07-29 2010-12-01 中国一冶集团有限公司 Construction method for overhauling blast furnace and keeping furnace shell and cooling wall
CN202519275U (en) * 2012-04-13 2012-11-07 中冶京诚工程技术有限公司 Combined cooling wall
CN102912051B (en) * 2012-10-26 2015-05-06 莱芜钢铁集团有限公司 Method for exchanging cooling wall of blast furnace taphole online
CN104789722A (en) * 2015-04-14 2015-07-22 江阴兴澄特种钢铁有限公司 Blast furnace body structure for facilitating lining making through grouting
CN105420432A (en) * 2015-12-04 2016-03-23 山东钢铁股份有限公司 Replacing method for cooling wall of blast furnace
CN106048120A (en) * 2016-07-26 2016-10-26 河北钢铁股份有限公司承德分公司 Taphole cooling wall capable of being replaced integrally and replacement method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宏发炼铁2号2500m3高炉炉壳裂纹修复;陶银等;《施工技术》;20120731;第41卷;第511-513页

Also Published As

Publication number Publication date
CN107893135A (en) 2018-04-10

Similar Documents

Publication Publication Date Title
CN107893135B (en) A kind of last furnace shell Local Cracking processing method
CN104357067B (en) Maintenance of coke oven method
CN111719029B (en) Method for repairing damaged cooling wall for blast furnace hearth and carbon brick after soaking or being brittle
KR101350466B1 (en) Apparatus for preventing crack of blast furnace steel
CN105441618B (en) A kind of blast funnace hot blast stove vault local route repair method
CN105586457B (en) It is a kind of to use as a servant the method that later stage local stove skin cooling wall breakage is repaired suitable for State of Blast Furnace
CN110643766B (en) Blast furnace taphole mud sleeve safety detection and repair operation method
CN107805679B (en) A kind of blast-furnace tuyere burn after rapid plugging method
CN203429129U (en) Device for clearing off brick residues broken holes in wall of coke oven hot repair carbonization chamber
CN104903027B (en) Refractory base portion
CN1473779A (en) Cooling mode for prolonging service life of glass pool furnace and reducing glass defect
CN105605924B (en) The method for repairing and mending of fixed anode copper metallurgical furnace bottom brick
CN103307878B (en) Vertical reduction jar
CN108659867B (en) Refractory brick reconstruction construction method for reconstructing drainage gradient at top of coke oven through hot repair
CN109055638A (en) A kind of method of last furnace shell and cooled bottom water crossed construction
CN115386669A (en) Method for establishing triple-hearth structure of blast furnace
CN214572067U (en) Solid-state steel slag quenching treatment device
CN210237674U (en) Masonry structure of RH stove lower part groove
CN207308957U (en) Improved continuous casting production
CN104031660B (en) Coke oven hot repair coking chamber wall broken hole position brick slag method for cleaning
CN207405191U (en) A kind of shell of blast furnace standard prosthetic device
CN206572002U (en) A kind of high temperature expansion valve
CN206717024U (en) Improved continuous casting production structure
CN204495065U (en) Heating furnace furnace roof anchored brick breaking part prevents the erecting by overhang of collapse of furnace's roof
CN110184402A (en) A method of it is online quickly to determine the specific leak source of blast furnace cooling stave

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant