CN107881857A - Magnetic suspension tunnel draining of rail system - Google Patents

Magnetic suspension tunnel draining of rail system Download PDF

Info

Publication number
CN107881857A
CN107881857A CN201711101545.1A CN201711101545A CN107881857A CN 107881857 A CN107881857 A CN 107881857A CN 201711101545 A CN201711101545 A CN 201711101545A CN 107881857 A CN107881857 A CN 107881857A
Authority
CN
China
Prior art keywords
track plates
guide rail
rail
drainage channel
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711101545.1A
Other languages
Chinese (zh)
Other versions
CN107881857B (en
Inventor
钱振地
刘鹏清
姜猛进
陈逊
陈刚
王九庆
王九龙
黄廣
陈宝林
邓玉竹
王光亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Tianfu Rail Valley Science And Technology Co Ltd
Original Assignee
Chengdu Tianfu Rail Valley Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Tianfu Rail Valley Science And Technology Co Ltd filed Critical Chengdu Tianfu Rail Valley Science And Technology Co Ltd
Priority to CN201711101545.1A priority Critical patent/CN107881857B/en
Publication of CN107881857A publication Critical patent/CN107881857A/en
Application granted granted Critical
Publication of CN107881857B publication Critical patent/CN107881857B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/008Drainage of track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/002Ballastless track, e.g. concrete slab trackway, or with asphalt layers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/30Tracks for magnetic suspension or levitation vehicles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/07Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Control Of Vehicles With Linear Motors And Vehicles That Are Magnetically Levitated (AREA)

Abstract

The invention discloses a kind of magnetic suspension tunnel draining of rail system.It includes track plates base, track plates and guide rail, and track plates are arranged on track plates base, and rail support groove is provided with track plates, and rail support groove is used to install guide rail.Built-in transverse drainpipe in track plates base, transverse drain penetrating orbit plate base, and be connected with drainage channel.Present invention, avoiding guide rail on track plates it is raised and influence fire-fighting and construction, the water of track plate surface is drained in time, reduce function influence of the water to track plates, greatly simplify the drainage system of magnetic suspension traffic system, reduce construction of underground tunnel difficulty, the construction cost of underground engineering is saved, reduces influence of noise of the magnetic suspension system to surrounding environment.

Description

Magnetic suspension tunnel draining of rail system
Technical field
The present invention relates to technical field of rail traffic, especially a kind of magnetic suspension tunnel draining of rail system.
Background technology
As urban population pressure is increasing, traffic congestion is increasingly severe, and greatly developing track traffic can solve Urban transport problems.Urban track traffic includes rail on ground traffic and Underground Rail Transit, and wherein supply and drain water system is underground Important component in rail system, supply and drain water system are related to operation and the safety of whole system.Some big cities in recent years When accepting as unavoidable disaster in face of heavy rain, flood and waterlogging etc., City Rail Transit System has faced to be tested by its harm.If track The waterproof of the roadbed top surface of railway is bad, impeded drainage, and the water on track structure can be caused to penetrate into subgrade bed top layer, so as to Cause the diseases such as the consolidating settlement of roadbed.Either occur rainwater pour in down a chimney, seep water, leak, drain off floodwaters compensation etc. accident, all can be serious Influence the normal operation of track traffic.
Publication number:CN103016056A Chinese patent is related to infrastructure project construction field, and in particular to one kind is used for tunnel Say, the drainage structure of porch and its water discharge method, the osculum are long and narrow elongated hole, the elongated hole is in length side To center line and the tunnel inner road direction in 30 ° to -60 ° oblique angles arrangements.The advantages of invention is:Will be long and narrow on cover plate Perforated area along water (flow) direction tilt 30 ° -60 ° after, the hole that the current of process just can all be held is stopped, and some current can also Intercepted by multiple tracks perforate, block water effect and be significantly better than traditional open-cellular form, because perforated area has only turned 30 ° of -60 ° of degree left sides The right side, for whole cover plate, structure is safe and reliable.The technical scheme of the patent arranges drainage arrangement at the entry and exit in tunnel, By designing the angular relationship of osculum and tunnel inner road, improve and block water effect, belong to identical technology neck with the application Domain, but solve the problems, such as difference, the technical scheme taken is different, and can not reach the application convenient rescue, fire-fighting and reduction The technique effects such as noise.
Publication number:CN204899980U Chinese patent is related to a kind of non-fragment orbit substrate drainage system.Non-fragment orbit tunnel Groundwater infiltration can cause inverted arch filling and non-fragment orbit binding site cavity occur in road, cause non-fragment orbit cracking, sink. The utility model sets inverted arch to fill above inverted arch, and inverted arch filling surface sets horizontal non-fragment orbit bottom rhone, no tiny fragments of stone, coal, etc. Non-fragment orbit bed course and non-fragment orbit are followed successively by above the rhone of track bottom;Non-fragment orbit bottom rhone both ends, which are stretched out, to be tilted down Inverted arch fill surface spilled water hole, access inverted arch above both sides tunnel lateral sulcus in;The set location of non-fragment orbit bottom rhone with The construction joint of inverted arch filling is corresponding.The utility model timely drains the underground water of infiltration, is effectively prevented underground water Into inverted arch filling and non-fragment orbit binding site, and then prevent the generation of non-fragment orbit disease.The technical scheme of the patent Underground water is solved the problems, such as to packed layer and the corrosive effect of non-fragment orbit binding site, the setting inverted arch filling above inverted arch, Inverted arch filling surface sets horizontal non-fragment orbit bottom rhone, and non-fragment orbit bed course is followed successively by above the rhone of non-fragment orbit bottom With non-fragment orbit etc., it is different from the technical scheme of the application.
Publication number:CN204552818U Chinese patent discloses a kind of draining system of anti-tunnel side ditch bottom leaky System, including set gradually from tunnel base scar to road surface or orbital plane direction inverted arch preliminary bracing, inverted arch secondary lining, inverted arch Packed layer and supercrust, the Central drain extended along tunnel longitudinal direction is provided with inverted arch packed layer, is respectively equipped with both sides The side ditch extended along tunnel longitudinal direction, both sides ditch are connected by railway roadbed drainpipe with Central drain respectively, both sides ditch Bottom surface be below the top surface of inverted arch packed layer.It can avoid filling in the bottom surface in both sides ditch and inverted arch by the drainage system Longitudinal construction joint is formed between the top surface of layer, eliminates lateral sulcus bottom leaky hidden danger.What the technical scheme of the patent solved is to keep away Exempt to form longitudinal construction joint between the top surface of the bottom surface in both sides ditch and inverted arch packed layer, eliminate lateral sulcus bottom leaky hidden danger The problem of, (facilitate fire-fighting, rescue with the application problem to be solved, simplify drainage system, reduce noise, reduce underground work Journey difficulty of construction etc.) it is different, the technical scheme taken is different.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of magnetic suspension tunnel draining of rail system, keep away It is raised on track plates and influence fire-fighting and construction to have exempted from guide rail, the water of track plate surface is drained in time, reduces water to rail The function influence of guidance tape, prevent impeded drainage from causing to corrode to track structure and ballast bed structure, ensure that the resistance to of concrete structure Long property.Using new bogie passage is hewed out, drainage system is set thereunder, greatly simplifies the row of magnetic suspension traffic system Water system, construction of underground tunnel difficulty is reduced, saves Construction Cost., can in the U-shape structure that track plates are formed together So that noise caused by magnetic floating system, especially guidance system is farthest controlled into side in orbit, and then control and be oriented to system The noise of system is outwards propagated, and reduces influence of noise of the magnetic suspension system to the external world.
The purpose of the present invention is achieved through the following technical solutions:The a kind of of the present invention implements technical scheme, one kind Magnetic suspension tunnel draining of rail system, including:
Track plates base, track plates and guide rail, described track plates are arranged on track plates base, set on track plates There is rail support groove, described rail support groove is used to install guide rail;
The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
Be provided with the first guide rail barricade and the second guide rail barricade on described track plates, the first described guide rail barricade and Second guide rail barricade is separately fixed on track plates, and they form U-shape structure with track plates;
In the groove of described U-shape structure, the first weathering is provided with, is set in two outsides of described U-shape structure Have first in drainage channel and second drainage channel.
Another of the present invention implements technical scheme:
A kind of magnetic suspension tunnel draining of rail system, including:
Track plates base, track plates and guide rail, described track plates are arranged on track plates base, set on track plates There is rail support groove, described rail support groove is used to install guide rail;
The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
Be provided with the first guide rail barricade and the second guide rail barricade on described track plates, the first described guide rail barricade and Second guide rail barricade is separately fixed on track plates, and they form U-shape structure with track plates;
In the groove of described U-shape structure, the first weathering is provided with, is set in two outsides of described U-shape structure Have first in drainage channel and second drainage channel;
The first transverse drain, the first described transverse drain penetrating orbit are built-in with described track plates base Plate base, and with first in drainage channel and second drainage channel be connected.
Another of the present invention implements technical scheme:
A kind of magnetic suspension tunnel draining of rail system, including:
Track plates base, track plates and guide rail, described track plates are arranged on track plates base, set on track plates There is rail support groove, described rail support groove is used to install guide rail;
The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
Be provided with the first guide rail barricade and the second guide rail barricade on described track plates, the first described guide rail barricade and Second guide rail barricade is separately fixed on track plates, and they form U-shape structure with track plates;
In the groove of described U-shape structure, the first weathering is provided with, is set in two outsides of described U-shape structure Have first in drainage channel and second drainage channel;
Built-in first transverse drain, the first described transverse drain penetrating orbit plate in described track plates base Base, and with first in drainage channel and second drainage channel be connected;
Draining gap is provided between described track plates, drainpipe is provided with draining gap.
Preferably, described drainpipe respectively with first in drainage channel, second drainage channel and the first weathering connect Connect.
Preferably, the first draining slope aspect circuit both sides are provided with one side weathering, the gradient of one side weathering 0.6%~ Between 0.8%.
Preferably, track plates base is provided with the second weathering.
Preferably, the second described weathering is herringbone weathering, and the gradient is between 3%~5%.
Preferably, the first side drainage channel is arranged on the first bottom of U-shape structure laterally, and the second side drainage channel is set In the second bottom of U-shape structure laterally.
Preferably, the first transverse drainage passage is provided with below the first transverse drainage slope, and with the distance of setting It is disposed on track plates base, the position base of the first transverse drainage passage is provided with attachment strap.
Preferably, described attachment strap is armored concrete attachment strap, and the transverse width and track plates base of attachment strap are wide, in institute The second transverse drainage passage is provided with the armored concrete attachment strap stated, the second transverse drainage passage is used to water between line being incorporated into First transverse drainage passage.
The beneficial effects of the invention are as follows:
(1) present invention is improved drainage system on the basis of magnetic suspension tunnel railway is improved, and is completely embedded into rail Into rail support groove, it is raised on track plates and influence fire-fighting and construction to avoid guide rail.Meanwhile draining is set on track plates surface Slope, the water of track plate surface can be drained in time, reduce water to the function influence of track plates, prevent impeded drainage to track knot Structure and ballast bed structure cause to corrode, and ensure that the durability of concrete structure.Moreover, by setting guide rail to keep off on track plates Wall, the guiding magnet that magnetic can be floated to guidance system are arranged on the inner side of barricade so that close to bogie in magnetic floating system Side hews out new bogie passage, and drainage system is set below these bogie passages, greatly simplifies magnetic floating traffic The drainage system of system, construction of underground tunnel difficulty is reduced, saves Construction Cost.In the U that track plates are formed together Type structure, noise caused by magnetic floating system, especially guidance system can farthest be controlled to side in orbit, and then controlled The noise of guidance system processed is outwards propagated, and compared to the way of the external guiding magnet of routine, significantly reduces magnetic suspension system Influence of noise to the external world.
(2) present invention is built-in with transverse drain in track plates base, and makes transverse drain penetrating orbit plate base, By making the first drainage channel connection in drainage channel and second, draining circulation is enhanced, waterproof is effective, draining is unobstructed, The influence of external water source roadbed engineering structure is reduced, so as to ensure the safety of the ride comfort of rail line and driving Property.Moreover, by draining gap, it is not smooth to solve rail bed System drainage, influences the problem of serious to railway roadbed, can be effective The roadbed top surface of track railway is protected, prevents the water on track structure from penetrating into subgrade bed top layer, avoids the change of road structure Shape settle the problems such as, either occur rainwater pour in down a chimney, seep water, leak, drain off floodwaters compensation etc. accident, normal blowdown stream can be ensured The general character, ensure track traffic ground normal operation.
The technique effect of the present invention is not limited to the described above.Above technique effect is merely exemplary to illustrate, of the invention Other features and its effect etc. will be described in detail in subsequent specific embodiment part.Those skilled in the art can root Remaining technique effect etc. can directly or indirectly be known according to the description of the present application, here is omitted.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other accompanying drawings according to these accompanying drawings.
Fig. 1 is the structural representation of the first embodiment of the present invention.
Fig. 2 is the structural representation of the second embodiment of the present invention.
Fig. 3 is the structural representation of the third embodiment of the present invention.
In figure, 11- the first transverse drainage passages, 22- backbars, 41- the first guide rail barricades, 42- the second guide rail barricades, 91- first passages, 92- second channels, the first sides of 71- drainage channel, the passage of 72- the second side drainings two, 51- first are oriented to magnetic Body, the guiding magnets of 52- second, 53- magnetic-levitation trains.
Embodiment
Technical scheme is described in further detail below in conjunction with the accompanying drawings, but protection scope of the present invention is not limited to It is as described below.All features disclosed in this specification, or implicit disclosed all methods or during the step of, except mutual Beyond the feature and/or step of repulsion, it can combine in any way.
Any feature disclosed in this specification (including any accessory claim, summary and accompanying drawing), except non-specifically chatting State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature It is an example in a series of equivalent or similar characteristics.
As shown in figure 1, a kind of implementation technical scheme of the present invention, a kind of magnetic suspension tunnel draining of rail system, including:
Track plates base, track plates and guide rail, described track plates are arranged on track plates base, set on track plates There is rail support groove, described rail support groove is used to install guide rail;
The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
The first guide rail barricade 41 and the second guide rail barricade 42, the first described guide rail gear are provided with described track plates The guide rail barricade 42 of wall 41 and second is separately fixed on track plates, and they form U-shape structure with track plates;
In the groove of described U-shape structure, the first weathering is provided with, is set in two outsides of described U-shape structure Have first at drainage channel 71 and second drainage channel 72.
Another of the present invention implements technical scheme:
A kind of magnetic suspension tunnel draining of rail system, including:
Track plates base, track plates and guide rail, described track plates are arranged on track plates base, set on track plates There is rail support groove, described rail support groove is used to install guide rail;
The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
The first guide rail barricade 41 and the second guide rail barricade 42, the first described guide rail gear are provided with described track plates The guide rail barricade 42 of wall 41 and second is separately fixed on track plates, and they form U-shape structure with track plates;
In the groove of described U-shape structure, the first weathering is provided with, is set in two outsides of described U-shape structure Have first at drainage channel 71 and second drainage channel 72;
The first transverse drain 11 is built-in with described track plates base, the first described transverse drain 11 runs through Track plates base, and with first at drainage channel 71 and second drainage channel 72 be connected.
Another of the present invention implements technical scheme:
A kind of magnetic suspension tunnel draining of rail system, including:
Track plates base, track plates and guide rail, described track plates are arranged on track plates base, set on track plates There is rail support groove, described rail support groove is used to install guide rail;
The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
The first guide rail barricade 41 and the second guide rail barricade 42, the first described guide rail gear are provided with described track plates The guide rail barricade 42 of wall 41 and second is separately fixed on track plates, and they form U-shape structure with track plates;
In the groove of described U-shape structure, the first weathering is provided with, is set in two outsides of described U-shape structure Have first at drainage channel 71 and second drainage channel 72;
Built-in first transverse drain 11, the first described transverse drain 11 run through rail in described track plates base Guidance tape base, and with first at drainage channel 71 and second drainage channel 72 be connected;
Draining gap is provided between described track plates, drainpipe is provided with draining gap.
Alternatively, described drainpipe respectively with the first draining of drainage channel 72 and first in drainage channel 71, second Slope connects.
Alternatively, the first draining slope aspect circuit both sides are provided with one side weathering, the gradient of one side weathering 0.6%~ Between 0.8%.
Alternatively, track plates base is provided with the second weathering.
Alternatively, the second described weathering is herringbone weathering, and the gradient is between 3%~5%.
Alternatively, the first side drainage channel 71 is arranged on the first bottom of U-shape structure laterally, the second side drainage channel 72 It is arranged on the second bottom of U-shape structure laterally.
Alternatively, be provided with the first transverse drainage passage 11 below the first transverse drainage slope, and with setting away from From being disposed on track plates base, the position base of the first transverse drainage passage 11 is provided with attachment strap.
Alternatively, described attachment strap is armored concrete attachment strap, and the transverse width and track plates base of attachment strap are wide, in institute The second transverse drainage passage is provided with the armored concrete attachment strap stated, the second transverse drainage passage is used to water between line being incorporated into First transverse drainage passage.
【Embodiment one】
As shown in figure 1, implementing technical scheme as a kind of of the present invention, including track plates base, track plates are set and led Rail, track plates are arranged on track plates base, rail support groove are provided with track plates, rail support groove is used to install guide rail, by guide rail It is completely embedded into rail support groove, keeps plane in the upper surface of track plates, the He of the first guide rail barricade 41 is provided with track plates Second guide rail barricade 42, the first guide rail barricade 41 and the second guide rail barricade 42 are separately fixed on track plates, they and track plates Form U-shape structure;In the groove of U-shape structure, the first weathering is provided with, two outsides of U-shape structure are provided with the first side The side drainage channel 72 of drainage channel 71 and second.The first guiding magnet 51 and the second guiding magnet 52 of magnetic-levitation train 53 are pacified respectively Mounted in the inner side of U-shape structure, magnetic floating system can be especially oriented to system by the U-shape structure on the one hand formed together with track plates Noise caused by system farthest controls side in orbit, and then controls the noise of guidance system outwards to propagate, and reduces magnetic Influence of noise of the suspension system to the external world, the inner side of U-shape structure is on the other hand arranged on due to being directed to magnet, saves installation Normal practice on bogie so that the side close to bogie in magnetic floating system hews out new bogie passage, Drainage system is set below these bogie passages, greatly simplifies the drainage system of magnetic suspension traffic system, reduces underground tunnel Road difficulty of construction, saves Construction Cost.
【Embodiment two】
Alternatively, those skilled in the art can also have the embodiment, as shown in Fig. 2 track plates are arranged on into track On plate base, rail support groove is provided with track plates, rail support groove is used to install guide rail;The longitudinal direction height of rail support groove is not less than guide rail Height, the upper surface of the track plates is planar structure;The first guide rail barricade 41 and the second guide rail are provided with track plates Barricade 42, the first guide rail barricade 41 and the second guide rail barricade 42 are separately fixed on track plates, and they form U-shaped knot with track plates Structure;
In the groove of U-shape structure, the first weathering is provided with, two outsides of described U-shape structure are provided with first The drainage channel 72 at drainage channel 71 and second;It is built-in with the first transverse drain 11 in track plates base, described The penetrating orbit plate base of one transverse drain 11, and with first at drainage channel 71 and second drainage channel 72 be connected.At this In embodiment, built-in the first transverse drain 11 in track plates base can be connected with the first weathering, increased to row The circulation of water system.The first guiding magnet 51 and the second guiding magnet 52 of magnetic-levitation train 53 are separately mounted to U-shape structure Inner side, the U-shape structure on the one hand formed together with track plates can be by noises caused by magnetic floating system, especially guidance system most Side in orbit is controlled to big degree, and then controls the noise of guidance system outwards to propagate, reduces magnetic suspension system to the external world Influence of noise, on the other hand due to be directed to magnet be arranged on U-shape structure inner side, save normal on bogie Advise way so that the side close to bogie in magnetic floating system hews out new bogie passage, in these bogie passages Lower section sets drainage system, greatly simplifies the drainage system of magnetic suspension traffic system, reduces construction of underground tunnel difficulty, saves Construction Cost.
【Embodiment three】
Alternatively, those skilled in the art can also have the embodiment, as shown in figure 3, track plates are arranged on track plates On base, rail support groove is provided with track plates, described rail support groove is used to install guide rail;The longitudinal direction of rail support groove is highly not less than The height of guide rail, the upper surface of the track plates is planar structure;
The first guide rail barricade 41 and the second guide rail barricade 42 are provided with track plates, the first guide rail barricade 41 and second are led Rail barricade 42 is separately fixed on track plates, and they form U-shape structure with track plates;In the groove of U-shape structure, is provided with One weathering, the drainage channel 72 when two outsides of U-shape structure are provided with first in drainage channel 71 and second;
Built-in first transverse drain 11, the first transverse drain 11 are applied in track plates base in track plates base, And with first at drainage channel 71 and second drainage channel 72 be connected;Alternatively, draining seam can be provided between track plates Gap, it is provided with drainpipe again in draining gap, dredges base ponding, improves drainage effect.The first of magnetic-levitation train 53 is oriented to The guiding magnet 52 of magnet 51 and second is separately mounted to the inner side of U-shape structure, the U-shape structure on the one hand formed together with track plates Noise caused by magnetic floating system, especially guidance system can farthest be controlled to side in orbit, and then control and be oriented to The noise of system is outwards propagated, and reduces influence of noise of the magnetic suspension system to the external world, on the other hand due to being directed to magnet peace Mounted in the inner side of U-shape structure, the Normal practice on bogie is saved so that close to bogie in magnetic floating system Side hews out new bogie passage, and drainage system is set below these bogie passages, greatly simplifies magnetic floating traffic The drainage system of system, construction of underground tunnel difficulty is reduced, saves Construction Cost.
The present invention can avoid guide rail raised on track plates and influence fire-fighting and construction, by time track plates table The water in face is drained, and is reduced water to the function influence of track plates, is prevented impeded drainage from causing to corrode to track structure and ballast bed structure, It ensure that the durability of concrete structure.Using new bogie passage is hewed out, drainage system is set thereunder, greatly Simplify the drainage system of magnetic suspension traffic system, reduce construction of underground tunnel difficulty, save Construction Cost.In track plates The U-shape structure formed together, noise caused by magnetic floating system, especially guidance system can be farthest controlled in track Inner side, and then control the noise of guidance system outwards to propagate, reduce influence of noise of the magnetic suspension system to the external world.
The invention is not limited in foregoing embodiment.The present invention, which expands to, any in this manual to be disclosed New feature or any new combination, and any new method disclosed or new step or any new combination.
It is above-mentioned to be related to it is apparent to those skilled in the art that for convenience of description and succinctly The specific work process of system, device and unit module, the corresponding process in preceding method embodiment is may be referred to, herein no longer Repeat.
It should be noted that the embodiments described herein is served only for for example, being not intended to limit the invention.In above description In, in order to provide thorough understanding of the present invention, elaborate a large amount of specific details.However, for those of ordinary skill in the art It is evident that:The present invention need not be carried out using these specific details.In other instances, in order to avoid obscuring this hair It is bright, known technology, such as specific construction details, operating condition and other technical conditions etc. are not specifically described.
Described above is only the preferred embodiment of the present invention, it should be understood that the present invention is not limited to described herein Form, the exclusion to other embodiment is not to be taken as, and can be used for various other combinations, modification and environment, and can be at this In the text contemplated scope, it is modified by the technology or knowledge of above-mentioned teaching or association area.And those skilled in the art are entered Capable change and change does not depart from the spirit and scope of the present invention, then all should be in the protection domain of appended claims of the present invention It is interior.

Claims (10)

  1. A kind of 1. magnetic suspension tunnel draining of rail system, it is characterised in that including:
    Track plates base, track plates and guide rail, described track plates are arranged on track plates base, are provided with and are held on track plates Track slot, described rail support groove are used to install guide rail;
    The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
    The first guide rail barricade and the second guide rail barricade, the first described guide rail barricade and second are provided with described track plates Guide rail barricade is separately fixed on track plates, and they form U-shape structure with track plates;
    In the groove of described U-shape structure, the first weathering is provided with, two outsides of described U-shape structure are provided with the One side drainage channel and the second side drainage channel.
  2. A kind of 2. magnetic suspension tunnel draining of rail system, it is characterised in that including:
    Track plates base, track plates and guide rail, described track plates are arranged on track plates base, are provided with and are held on track plates Track slot, described rail support groove are used to install guide rail;
    The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
    The first guide rail barricade and the second guide rail barricade, the first described guide rail barricade and second are provided with described track plates Guide rail barricade is separately fixed on track plates, and they form U-shape structure with track plates;
    In the groove of described U-shape structure, the first weathering is provided with, two outsides of described U-shape structure are provided with the One side drainage channel and the second side drainage channel;
    The first transverse drain, the first described transverse drain penetrating orbit plate bottom are built-in with described track plates base Seat, and with first in drainage channel and second drainage channel be connected.
  3. A kind of 3. magnetic suspension tunnel draining of rail system, it is characterised in that including:
    Track plates base, track plates and guide rail, described track plates are arranged on track plates base, are provided with and are held on track plates Track slot, described rail support groove are used to install guide rail;
    The longitudinal direction height of the rail support groove is not less than the height of guide rail, and the upper surface of the track plates is planar structure;
    The first guide rail barricade and the second guide rail barricade, the first described guide rail barricade and second are provided with described track plates Guide rail barricade is separately fixed on track plates, and they form U-shape structure with track plates;
    In the groove of described U-shape structure, the first weathering is provided with, two outsides of described U-shape structure are provided with the One side drainage channel and the second side drainage channel;
    Built-in first transverse drain, the first described transverse drain penetrating orbit plate bottom in described track plates base Seat, and with first in drainage channel and second drainage channel be connected;
    Draining gap is provided between described track plates, drainpipe is provided with draining gap.
  4. A kind of 4. magnetic suspension tunnel draining of rail system according to claim 3, it is characterised in that including:
    Described drainpipe respectively with first in drainage channel, second drainage channel and the first weathering be connected.
  5. A kind of 5. magnetic suspension tunnel draining of rail system according to any one of Claims 1 to 4, it is characterised in that including:
    First draining slope aspect circuit both sides are provided with one side weathering, and the gradient of one side weathering is between 0.6%~0.8%.
  6. A kind of 6. magnetic suspension tunnel draining of rail system according to any one of Claims 1 to 4, it is characterised in that including:
    Track plates base is provided with the second weathering.
  7. A kind of 7. magnetic suspension tunnel draining of rail system according to claim 6, it is characterised in that including:
    The second described weathering is herringbone weathering, and the gradient is between 3%~5%.
  8. A kind of 8. magnetic suspension tunnel draining of rail system according to any one of Claims 1 to 4, it is characterised in that including:
    First side drainage channel is arranged on the first bottom of U-shape structure laterally, the second side drainage channel be arranged on U-shape structure to Second bottom in outside.
  9. A kind of 9. magnetic suspension tunnel draining of rail system according to claim 1,3 and 4 any one, it is characterised in that bag Include:
    The first transverse drainage passage is provided with below the first transverse drainage slope, track is disposed on the distance of setting On plate base, the position base of the first transverse drainage passage is provided with attachment strap.
  10. A kind of 10. magnetic suspension tunnel draining of rail system according to claim 9, it is characterised in that including:
    Described attachment strap is armored concrete attachment strap, and the transverse width and track plates base of attachment strap are wide, are mixed in described reinforcing bar Coagulate and the second transverse drainage passage is provided with native attachment strap, the second transverse drainage passage is used to water between line being incorporated into the first horizontal row Aquaporin.
CN201711101545.1A 2017-11-10 2017-11-10 Magnetic suspension tunnel track drainage system Active CN107881857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711101545.1A CN107881857B (en) 2017-11-10 2017-11-10 Magnetic suspension tunnel track drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711101545.1A CN107881857B (en) 2017-11-10 2017-11-10 Magnetic suspension tunnel track drainage system

Publications (2)

Publication Number Publication Date
CN107881857A true CN107881857A (en) 2018-04-06
CN107881857B CN107881857B (en) 2021-03-30

Family

ID=61779770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711101545.1A Active CN107881857B (en) 2017-11-10 2017-11-10 Magnetic suspension tunnel track drainage system

Country Status (1)

Country Link
CN (1) CN107881857B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111824188A (en) * 2019-04-19 2020-10-27 中国航天科工飞航技术研究院(中国航天海鹰机电技术研究院) Pipeline bearing structure of pipeline suspension transport means
CN113957755A (en) * 2021-09-24 2022-01-21 中铁二院工程集团有限责任公司 Medium-low speed magnetic levitation traffic combined U-shaped beam structure

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0241974A (en) * 1988-07-30 1990-02-13 Hitachi Ltd Track structure of float-type railroad
DE4100881A1 (en) * 1991-01-14 1992-07-16 Cronau Heinrich Gmbh Permanent way for railway high speed trains - consists of precast concrete trough sections laid end on end and filled with ballast bed
CN1919641A (en) * 2006-09-13 2007-02-28 李岭群 Concave permanent magnetic suspension mechanism and grooved rail road vehicle distribution technique
CN201843076U (en) * 2010-10-12 2011-05-25 中铁二院工程集团有限责任公司 Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN204059109U (en) * 2014-09-23 2014-12-31 上海市城市建设设计研究总院 Modern tram solid concrete roabed integral structure
CN204899980U (en) * 2015-08-21 2015-12-23 中铁第一勘察设计院集团有限公司 Ballastless track basement drainage system
CN205024544U (en) * 2015-09-30 2016-02-10 成都市新筑路桥机械股份有限公司 A embedded track system for in tunnel
CN205474895U (en) * 2016-01-18 2016-08-17 中铁第四勘察设计院集团有限公司 A space drainage structures that is arranged in low circuit double -line location of putting of low -speed maglev
CN206109879U (en) * 2016-09-07 2017-04-19 中铁第四勘察设计院集团有限公司 Be applicable to low circuit location space mole drainer of putting of moderate -low speed magnetic levitation
CN206219897U (en) * 2016-09-15 2017-06-06 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0241974A (en) * 1988-07-30 1990-02-13 Hitachi Ltd Track structure of float-type railroad
DE4100881A1 (en) * 1991-01-14 1992-07-16 Cronau Heinrich Gmbh Permanent way for railway high speed trains - consists of precast concrete trough sections laid end on end and filled with ballast bed
CN1919641A (en) * 2006-09-13 2007-02-28 李岭群 Concave permanent magnetic suspension mechanism and grooved rail road vehicle distribution technique
CN201843076U (en) * 2010-10-12 2011-05-25 中铁二院工程集团有限责任公司 Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN204059109U (en) * 2014-09-23 2014-12-31 上海市城市建设设计研究总院 Modern tram solid concrete roabed integral structure
CN204899980U (en) * 2015-08-21 2015-12-23 中铁第一勘察设计院集团有限公司 Ballastless track basement drainage system
CN205024544U (en) * 2015-09-30 2016-02-10 成都市新筑路桥机械股份有限公司 A embedded track system for in tunnel
CN205474895U (en) * 2016-01-18 2016-08-17 中铁第四勘察设计院集团有限公司 A space drainage structures that is arranged in low circuit double -line location of putting of low -speed maglev
CN206109879U (en) * 2016-09-07 2017-04-19 中铁第四勘察设计院集团有限公司 Be applicable to low circuit location space mole drainer of putting of moderate -low speed magnetic levitation
CN206219897U (en) * 2016-09-15 2017-06-06 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111824188A (en) * 2019-04-19 2020-10-27 中国航天科工飞航技术研究院(中国航天海鹰机电技术研究院) Pipeline bearing structure of pipeline suspension transport means
CN113957755A (en) * 2021-09-24 2022-01-21 中铁二院工程集团有限责任公司 Medium-low speed magnetic levitation traffic combined U-shaped beam structure

Also Published As

Publication number Publication date
CN107881857B (en) 2021-03-30

Similar Documents

Publication Publication Date Title
CN104695289B (en) A kind of put line construction for middle the low of low speed magnetic suspension traffic engineering embankment location
CN106192646B (en) Vcehicular tunnel car-driving shock-absorbing denoising structure and its construction method
KR100768777B1 (en) Earth reinforcement method for railway track on the concrete base
CN102182332B (en) Seam type intercepting drain system on ground in front of garage door with track
WO2016138776A1 (en) Lowly disposed line structure used in medium-low speed magnetic levitation traffic engineering fill section
CN204455725U (en) A kind ofly put line construction for middle the low of low speed magnetic suspension traffic engineering embankment location
CN110258221A (en) A kind of box frame roadbed
CN107881857A (en) Magnetic suspension tunnel draining of rail system
CN206666970U (en) A kind of temporary pavement laying apparatus for road construction
CN206070586U (en) Inspection well structure for sewage access comprehensive pipe rack
CN206529653U (en) A kind of underground railway track construction
CN207568626U (en) A kind of tunnel structure for expansive stratum
CN202440766U (en) Water-drainage open cut tunnel aqueduct of road cut section
CN203700880U (en) Floating type track bed turnout
CN208073552U (en) tunnel drainage structure
CN107964833B (en) Ground magnetic suspension track roadbed drainage system
CN113832782B (en) Foundation bed structure of high-speed railway and construction method
CN103603237B (en) A kind of floating type railway roadbed track switch
CN108547186A (en) The special expansion joint rubber water-proof connecting plate of high ferro
CN215482412U (en) Transverse drainage structure of general speed railway
CN214657217U (en) Transition section structure for connecting underground tunnel access and viaduct
CN208280731U (en) Physical isolation apparatus between a kind of Business Line construction line
CN107964873A (en) Magnetic suspension aerial conveyor bridge drainage system
CN203411895U (en) Drainage facility for highway bridge floor
CN208917611U (en) It is a kind of can anti-softening road structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant