CN107869156B - Parallel seismic wave method determines the detection method of foundation pile length - Google Patents

Parallel seismic wave method determines the detection method of foundation pile length Download PDF

Info

Publication number
CN107869156B
CN107869156B CN201711264724.7A CN201711264724A CN107869156B CN 107869156 B CN107869156 B CN 107869156B CN 201711264724 A CN201711264724 A CN 201711264724A CN 107869156 B CN107869156 B CN 107869156B
Authority
CN
China
Prior art keywords
foundation pile
host
trigger
wave
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711264724.7A
Other languages
Chinese (zh)
Other versions
CN107869156A (en
Inventor
吴宝杰
杨桦
侯宏伟
黄林伟
徐芫蕾
臧端
唐绍明
顾晓卫
钱志华
金鑫
郑威
刘博�
饶秋琛
凌捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Longzhou Construction Engineering Co Ltd
Original Assignee
Guangdong Longzhou Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Longzhou Construction Engineering Co ltd filed Critical Guangdong Longzhou Construction Engineering Co ltd
Priority to CN201711264724.7A priority Critical patent/CN107869156B/en
Publication of CN107869156A publication Critical patent/CN107869156A/en
Application granted granted Critical
Publication of CN107869156B publication Critical patent/CN107869156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The detection device of foundation pile length is determined based on parallel seismic wave method, it is hammered into shape including exciting, host, drilling device, drilling equipment and trigger under righting, trigger is placed on the cushion cap of the foundation pile, host and trigger are connected with data circuit group, it is characterized in that, the drilling device includes drill body, the bottom end of the drill body is provided with drill bit, top is equipped with motor, the screw rod that motor drives rotation is installed in the drill body, it is equipped between the screw rod and drill bit and pulverizes pillar, beneficial effects of the present invention: the present invention is structure as a whole by will test device laying, speed is fast when detection, can detect at any time do not need it is pre-perforated, reduce the construction time, it is suitble to promote the use of.

Description

Parallel seismic wave method determines the detection method of foundation pile length
Technical field
The present invention relates to one kind to detect foundation pile device for detecting length based on parallel seismic wave method, belongs to building detection technique neck Domain.
Background technique
With the rapid development of economic construction, high buildings and large mansions continue to bring out, and pile foundation engineering is developed on an unprecedented scale, pile foundation It is the base form being most widely used at present.Since pile foundation engineering construction has height concealment, discovery quality problems are opposite More difficult, industry is much due to caused by the quality problems of pile foundation engineering with the quality accident in civil buildings.
Test Technology of Pile Foundation has obtained significant progress in recent years, and coherent detection standard, specification are promulgated and implemented in succession, right It is good to guarantee that construction quality plays the role of.But conventional Test Technology of Pile Foundation at present, such as static load test, core drilling method, height Strain Method, low strain dynamic method and sound wave transmission method etc. are both needed to directly contact foundation pile stake top, thus its use occasion receive it is certain Limitation is generally only applicable to before top-out structure not yet constructs.
However, be frequently encountered in engineering construction under existing buildings or structures foundation pile length or integrality suspect And contradiction and disputes are generated, or since existing building is of the remote past, when lacking the long equal capsule information of stake in subsequent adaptation engineering, with And the later period caused to pile foundation and destroys and needs to build to existing because of situations such as having occurred the other reasons such as surface subsidence, earthquake Pile foundation under building is detected, but since top-out structure at this time has existed, and can not directly contact stake top, thus conventional Pile foundation inspection method is helpless.
Since the system research of Test Technology of Pile Foundation under current domestic existing buildings or structures still belongs to blank, research one Pile detection new technology that is kind adaptable, being restricted under the few existing buildings or structures of condition, to objectively and accurately evaluating work Cheng Zhiliang, the contradiction and disputes in engineering construction are solved and improve existing buildings or structures performance rating or dilapidated house secure authentication refers to Mark system etc. has biggish realistic meaning, will also push the further development of architecture foundation pile detection technique.
As one application No. is CN103255785A disclose it is a kind of using single tube normal beam technique carry out quality inspection of the piles and The technology of matter detection, it is characterised in that the longitudinal wave for generating and propagating downwards along pile body is tapped on foundation pile top surface, by sound detecting pipe The reaching time-difference of middle detection longitudinal wave, the longitudinal wave velocity of Accurate Determining foundation pile and stake are long, determine pile body concrete quality;In neighbour Stake pipeline or geotechnical boring in actual measurement longitudinal wave along be tapped pile body downwards and from Pile side soil propagate reaching time-difference, measure base Pile length, pile quality and reaming degree;And the situation for being capable of measuring the velocity of wave of geology soil layer, judging stake week geology soil layer, analysis Foundation pile enters rock situation.The present invention can match outside or be embedded in signal processing on the basis of the detection devices such as existing low strain dynamic, ultrasonic wave Device, realizes the technology of a kind of new pile quality non-destructive testing and geology detecting, and it is economical, ready-made nondestructive quality detection of pile foundation is auxiliary Verification method is helped, the accuracy and service level of pile foundation quality judgement can be significantly improved.
The problem of above-mentioned two documents are the immediate prior arts of pre- the application, but it has is as follows: preliminary examination It surveys more troublesome, needs to punch, infuse clear water, process is comparatively laborious.
Summary of the invention
The present invention overcomes problem of the existing technology, proposes and a kind of foundation pile length is determined based on parallel seismic wave method Detection device and its detection method, the present invention are structure as a whole by will test device laying, and speed is fast when detection, can be with When detection do not need it is pre-perforated, reduce the construction time.
The specific technical solution of the present invention is as follows:
It is determined based on parallel seismic wave method under the detection device of foundation pile length, including exciting hammer, host, drilling device, righting Drilling equipment and trigger, trigger are placed on the cushion cap of the foundation pile, and host and trigger are connected with data circuit group, It is characterized in that,
The drilling device includes drill body, and the bottom end of the drill body is provided with drill bit, top is equipped with motor, the drill body The screw rod that motor drives rotation is inside installed, is equipped between the screw rod and drill bit and pulverizes pillar, it is described to pulverize pillar Top be equipped with the upper planet wheel that is meshed with the gear one of screw rod, the bottom end for pulverizing pillar is equipped with the tooth with drill bit Wheel two is meshed lower planetary gear;It is equipped with protection pipe in the drill body, is placed with wave detector, the wave detector in the protection pipe Data circuit group two is connected with host;The exciting hammer is mounted on horizontal cross bar by guiding conduit into, and the cross bar is fixed Be set up in above foundation pile, described guide into is equipped with tripping gear between conduit and cross bar, for adjust exciting hammer fall away from.
Preferably, the drill bit be routed over it is multiple lead native hole one and be passed through in drill body, the top for pulverizing pillar is also Filtering is installed and leads native partition.
Preferably, the top of the drill body is also equipped with the unearthed pipe communicated with screw rod, the opening of the unearthed pipe to Under.
Preferably, drilling equipment includes car body under the righting, and one end of the car body is equipped with mobile fixing sleeve, car body The other end is equipped with rotary box, is equipped with pull ring on mobile fixing sleeve, the rotary box end of the car body is equipped with strander, described Wirerope is connected between pull ring and strander, the interlude of the wirerope is propped up by the support rod of installation on the car body.
Based on above-mentioned apparatus, the present invention also provides a kind of detection method for determining foundation pile length based on parallel seismic wave method, It is characterized by comprising the following steps:
1) test point is chosen, drilling device is placed under righting above drilling equipment, it is solid by mobile fixing sleeve and rotary box It lives calmly, in which: the mobile fixed top for entangling drilling device of fixing sleeve, rotary box entangle the lower end of drilling device;
2) it drives wirerope pull-up that drilling device is made vertically to attention by strander, unclamps mobile fixing sleeve, and start electricity Machine drives and bores set depth under drill bit;Wherein: in going down process, soil is by leading native hole one into drill body and being led by filtering Native partition, which enters in screw rod to be discharged to, to be unearthed outside pipe;
3) trigger is placed on the cushion cap of foundation pile, and by the data circuit group of the data circuit group of trigger and wave detector Two connection hosts, set up cross bar above foundation pile, exciting hammer are mounted below cross bar, Job readiness is completed before detecting;
4) wave detector is first placed in the nozzle or tube bottom of protection pipe when detecting, machine is generated on engineering pile by exciting mode While tool wave, vibration signal is detected in protection pipe, analyzes the quality of signal acquisition, and the resampling if quality is bad is no The waveform of the measuring point is then saved, and in an exciting-height of wave detector is declined to or promoted 0.5-1m after the detection period, Continue hammering sampling, until wave detector drop to tube bottom or on mention nozzle until;
5) host 400 exports image, by judging criterion to following: 1, when m- depth map in first arrival time slope Variation;2, the substantially decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judges pile body Length and integrality.
Beneficial effects of the present invention: the present invention is structure as a whole by will test device laying, and speed is fast when detection, It can detect at any time and not need pre-perforated, the reduction construction time, be suitble to promote the use of.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that the detection device of foundation pile length is determined the present invention is based on parallel seismic wave method;
Fig. 2 is the structural schematic diagram of drilling device;
Fig. 3 is the structural schematic diagram of drilling equipment under righting;
Structural schematic diagram when Fig. 4 is drilling equipment operation under righting.
Specific embodiment
Embodiment 1:
As shown, the detection device of foundation pile length is determined based on parallel seismic wave method, including exciting hammer 300, exciting hammer 300 For generating mechanical wave on engineering pile by exciting mode;The exciting hammer 300 is mounted on level by guiding conduit 301 into On cross bar 302,302 fixed frame of cross bar is set to 100 top of foundation pile, and described guide between conduit 301 and cross bar 302 is installed There is tripping gear 303, for guaranteeing that exciting hammer 300 is fallen away from every time identical.
Drilling equipment 600 and trigger 800, trigger 800 are placed on the base under host 400, drilling device 500, righting On the cushion cap of stake 100.
Host 400 and trigger 800 are connected with data circuit group.Wherein, drilling device 500 is by drilling equipment 600 under righting Auxiliary accomplishes vertically lower bore.
Drilling device 500 includes drill body 501, and the bottom end of the drill body 501 is provided with drill bit 1, top is equipped with motor 12, The screw rod 5 that motor 12 drives rotation is installed in the drill body 501, is equipped between the screw rod 5 and drill bit 1 and pulverizes column Son 7, the top for pulverizing pillar 7 is equipped with the upper planet wheel 8 being meshed with the gear 1 of screw rod 5, described to pulverize pillar 7 Bottom end be equipped with the lower planetary gear that is meshed with the gear 2 502 of drill bit 1;The drill body 501 is equipped with interior protection pipe, the protection Wave detector 4 is placed in pipe, the wave detector 4 is connected with data circuit group two with host 400.Motor 12 drives the spiral of rotation The rotation of bar 5 drives drill bit 1 to rotate by lower planetary gear again to pulverize the rotation of pillar 7 by the drive of upper planet wheel 8.
In addition, drill bit 1 be routed over it is multiple lead native hole 1 and be passed through in drill body 501, the top for pulverizing pillar 7 is also Filtering is installed and leads native partition 9.The top of the drill body 501 is also equipped with the unearthed pipe 11 communicated with screw rod 5, described to be unearthed Open Side Down for pipe 11.In lower brill, the soil body is by leading native hole 1 into drill body 501 and leading native partition 9 into spiral shell by filtering Be discharged in spinner handle 5 outside unearthed pipe 11, such drilling device 500 can quickly under get into up to designated depth.
Drilling equipment 600 includes car body 25 under righting, and one end of the car body 25 is equipped with mobile fixing sleeve 22, car body 25 The other end rotary box 28 is installed, pull ring 20,28 end of the rotary box installation of the car body 25 are installed on mobile fixing sleeve 22 There is strander 16, wirerope 19 is connected between the pull ring 20 and strander 16, the interlude of the wirerope 19 passes through peace Support rod on car body 25 is propped up.
Based on above-mentioned apparatus, the present invention also provides a kind of detection method for determining foundation pile length based on parallel seismic wave method, It is characterized by comprising the following steps:
1) test point is chosen, drilling device 500 is placed under righting above drilling equipment 600, passes through mobile 22 He of fixing sleeve Rotary box 28 is fixed, in which: the mobile fixed top for entangling drilling device 500 of fixing sleeve 22, rotary box 28 entangle drilling The lower end of equipment 500;
2) it drives 19 pull-up of wirerope that drilling device 500 is made vertically to attention by strander 16, unclamps mobile fixing sleeve 22, and start motor 12 and drive drill bit 1 is lower to bore set depth;Wherein: in going down process, soil enters brill by leading native hole 1 Body 501 is simultaneously discharged to outside unearthed pipe 11 by filtering to lead in the native entrance of partition 9 screw rod 5;
3) trigger 800 is placed on the cushion cap of foundation pile 100, and by the data circuit group of trigger 800 and wave detector 4 Data circuit group two connects host 400, and cross bar 302 is set up above foundation pile, exciting hammer 300 is mounted below cross bar, detection Preceding Job readiness is completed;
4) wave detector is first placed in the nozzle or tube bottom of protection pipe when detecting, is generated on engineering pile by exciting hammer 300 While mechanical wave, vibration signal is detected in protection pipe, analyzes the quality of signal acquisition, the resampling if quality is bad, Otherwise the waveform of the measuring point is saved, and in an exciting-height of wave detector 4 is declined to or promoted 0.5- after the detection period 1m, continue hammering sampling, until wave detector drop to tube bottom or on mention nozzle until;
5) host 400 exports image, by judging criterion to following: 1, when m- depth map in first arrival time slope Variation;2, the substantially decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judges pile body Length and integrality.
Embodiment 2:
The present embodiment difference from example 1 is that, the wave detector 4 with host 400 by being wirelessly connected, it is described Increase wireless transmitter module 41 on wave detector 4, also increasing in the trigger 800 has wireless transmitter module two, in host 400 Corresponding wireless receiving module is installed in inside,
Based on above-mentioned apparatus, the present invention also provides a kind of detection method for determining foundation pile length based on parallel seismic wave method, It is characterized by comprising the following steps:
1) test point is chosen, drilling device 500 is placed under righting above drilling equipment 600, passes through mobile 22 He of fixing sleeve Rotary box 28 is fixed, in which: the mobile fixed top for entangling drilling device 500 of fixing sleeve 22, rotary box 28 entangle drilling The lower end of equipment 500;
2) it drives 19 pull-up of wirerope that drilling device 500 is made vertically to attention by strander 16, unclamps mobile fixing sleeve 22, and start motor 12 and drive drill bit 1 is lower to bore set depth;Wherein: in going down process, soil enters brill by leading native hole 1 Body 501 is simultaneously discharged to outside unearthed pipe 11 by filtering to lead in the native entrance of partition 9 screw rod 5;
3) trigger 800 is placed on the cushion cap of foundation pile 100, and by the data circuit group of trigger 800 and wave detector 4 Data circuit group two connects host 400, and cross bar is set up above foundation pile, exciting hammer 300 is mounted below cross bar, before detection Job readiness is completed;
4) wave detector is first placed in the nozzle or tube bottom of protection pipe when detecting, is generated on engineering pile by exciting hammer 300 While mechanical wave, vibration signal is detected in protection pipe, analyzes the quality of signal acquisition, the resampling if quality is bad, Otherwise the waveform of the measuring point is saved, and in an exciting-height of wave detector 4 is declined to or promoted 0.5- after the detection period 1m, continue hammering sampling, until wave detector drop to tube bottom or on mention nozzle until;
5) host 400 exports image, by judging criterion to following: 1, when m- depth map in first arrival time slope Variation;2, the substantially decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judges pile body Length and integrality.
Embodiment 3:
As shown, the detection device of foundation pile length is determined based on parallel seismic wave method, including exciting hammer 300, exciting hammer 300 For generating mechanical wave on engineering pile by exciting mode;The exciting hammer 300 is mounted on level by guiding conduit 301 into On cross bar 302,302 fixed frame of cross bar is set to 100 top of foundation pile, and described guide between conduit 301 and cross bar 302 is installed There is tripping gear 303, for guaranteeing that exciting hammer 300 is fallen away from every time identical.
Drilling equipment 600 and trigger 800, trigger 800 are placed on the base under host 400, drilling device 500, righting On the cushion cap of stake 100.
Host 400 and trigger 800 are connected with data circuit group.Wherein, drilling device 500 is by drilling equipment 600 under righting Auxiliary accomplishes vertically lower bore.
Drilling device 500 includes drill body 501, and the bottom end of the drill body 501 is provided with drill bit 1, top is equipped with motor 12, The screw rod 5 that motor 12 drives rotation is installed in the drill body 501, is equipped between the screw rod 5 and drill bit 1 and pulverizes column Son 7, the top for pulverizing pillar 7 is equipped with the upper planet wheel 8 being meshed with the gear 1 of screw rod 5, described to pulverize pillar 7 Bottom end be equipped with the lower planetary gear that is meshed with the gear 2 502 of drill bit 1;Protection pipe, the protection are equipped in the drill body 501 Wave detector 4 is placed in pipe, the wave detector 4 is equipped with data circuit group two and is wrapped on lifting device 401, data line group two Terminal is connect with host 400.It is equipped with a control module in the lifting device 401, the control module passes through wireless device Connect host.Motor 12 drives the rotation of screw rod 5 of rotation to lead to again to pulverize the rotation of pillar 7 by the drive of upper planet wheel 8 Crossing lower planetary gear drives drill bit 1 to rotate.
In addition, drill bit 1 be routed over it is multiple lead native hole 1 and be passed through in drill body 501, the top for pulverizing pillar 7 is also Filtering is installed and leads native partition 9.The top of the drill body 501 is also equipped with the unearthed pipe 11 communicated with screw rod 5, described to be unearthed Open Side Down for pipe 11.In lower brill, the soil body is by leading native hole 1 into drill body 501 and leading native partition 9 into spiral shell by filtering Be discharged in spinner handle 5 outside unearthed pipe 11, such drilling device 500 can quickly under get into up to designated depth.
Drilling equipment 600 includes car body 25 under righting, and one end of the car body 25 is equipped with mobile fixing sleeve 22, car body 25 The other end rotary box 28 is installed, pull ring 20,28 end of the rotary box installation of the car body 25 are installed on mobile fixing sleeve 22 There is strander 16, wirerope 19 is connected between the pull ring 20 and strander 16, the interlude of the wirerope 19 passes through peace Support rod on car body 25 is propped up.
Based on above-mentioned apparatus, the present invention also provides a kind of detection method for determining foundation pile length based on parallel seismic wave method, It is characterized by comprising the following steps:
1) test point is chosen, drilling device 500 is placed under righting above drilling equipment 600, passes through mobile 22 He of fixing sleeve Rotary box 28 is fixed, in which: the mobile fixed top for entangling drilling device 500 of fixing sleeve 22, rotary box 28 entangle drilling The lower end of equipment 500;
2) it drives 19 pull-up of wirerope that drilling device 500 is made vertically to attention by strander 16, unclamps mobile fixing sleeve 22, and start motor 12 and drive drill bit 1 is lower to bore set depth;Wherein: in going down process, soil enters brill by leading native hole 1 Body 501 is simultaneously discharged to outside unearthed pipe 11 by filtering to lead in the native entrance of partition 9 screw rod 5;
3) trigger 800 is placed on the cushion cap of foundation pile 100, and by the data circuit group of trigger 800 and wave detector 4 Data circuit group two connects host 400, and cross bar 302 is set up above foundation pile, exciting hammer 300 is mounted below cross bar, detection Preceding Job readiness is completed;
4) wave detector is first placed in the nozzle or tube bottom of protection pipe when detecting, is generated on engineering pile by exciting hammer 300 While mechanical wave, vibration signal is detected in protection pipe, analyzes the quality of signal acquisition, the resampling if quality is bad, Otherwise the waveform of the measuring point is saved, and in an exciting-after the detection period, control module receives information, controls lifting device The height of wave detector 4 is declined or is promoted 0.5-1m by 401 startings, continues hammering sampling, until wave detector drop to tube bottom or on Until mentioning nozzle;
5) host 400 exports image, by judging criterion to following: 1, when m- depth map in first arrival time slope Variation;2, the substantially decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train, judges pile body Length and integrality.
In addition to the implementation, the present invention can also have other embodiments.It is all to use equivalent substitution or equivalent transformation shape At technical solution, fall within the scope of protection required by the present invention.

Claims (1)

1. the detection method that parallel seismic wave method determines foundation pile length, which is characterized in that
It is hammered into shape including exciting, exciting hammer is used to generate mechanical wave on engineering pile by exciting mode;The exciting hammer is by drawing It is mounted on horizontal cross bar to conduit, the cross bar fixed frame is set to above foundation pile, and described guide between conduit and cross bar is installed Have tripping gear, for guarantee exciting hammer fall away from every time identical;
Drilling equipment and trigger under host, drilling device, righting, trigger are placed on the cushion cap of the foundation pile;
Host and trigger are connected with data circuit group, wherein drilling device accomplishes vertically lower bore by drilling equipment auxiliary under righting;
Drilling device includes drill body, and the bottom end of the drill body is provided with drill bit, top is equipped with motor, installation in the drill body There is motor to drive the screw rod of rotation, is equipped between the screw rod and drill bit and pulverizes pillar, the top for pulverizing pillar Equipped with the upper planet wheel that the gear one with screw rod is meshed, the gear two-phase that the bottom end for pulverizing pillar is equipped with drill bit is nibbled The lower planetary gear of conjunction;It is equipped with protection pipe in the drill body, wave detector is placed in the protection pipe, the wave detector is equipped with number It is wrapped on lifting device according to route group two, the terminal of data line group two is connect with host;One is equipped in the lifting device Control module, the control module connect host by wireless device, and motor drives the screw rod rotation of rotation to by upper Planetary gear drive pulverizes pillar rotation and drives bit by lower planetary gear again;
It is described that detection method includes the following steps:
1) test point is chosen, drilling device is placed under righting above drilling equipment, is fixed by mobile fixing sleeve and rotary box, Wherein: the mobile fixed top for entangling drilling device of fixing sleeve, rotary box entangle the lower end of drilling device;
2) it drives wirerope pull-up that drilling device is made vertically to attention by strander, unclamps mobile fixing sleeve, and start motor band Set depth is bored under dynamic drill bit;Wherein: in going down process, soil is by leading native hole one into drill body and leading native partition by filtering It is outer that the pipe that is unearthed is discharged in into screw rod;
3) trigger is placed on the cushion cap of foundation pile, and by the data circuit group two of the data circuit group of trigger and wave detector Host is connected, cross bar is set up above foundation pile, exciting hammer is mounted below cross bar, Job readiness is completed before detecting;
4) wave detector is first placed in the nozzle or tube bottom of protection pipe when detecting, mechanical wave is generated on engineering pile by exciting hammer While, vibration signal is detected in protection pipe, analyzes the quality of signal acquisition, otherwise the resampling if quality is bad is protected The waveform of the measuring point is deposited, and in an exciting-after the detection period, control module receives information, and the starting of control lifting device will The height of wave detector declines or is promoted 0.5-1m, continues hammering sampling, until wave detector drop to tube bottom or on mention nozzle and be Only;
5) host exports image, by judging criterion to following: 1, when m- depth map in first arrival time slope variation; 2, The substantially decay amplitude of energy;The comprehensive analysis of first arrival time and amplitude i.e. to the seismic wave wave train judges pile body length and complete Whole property.
CN201711264724.7A 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length Active CN107869156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711264724.7A CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711264724.7A CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length
CN201610645232.1A CN106049567B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610645232.1A Division CN106049567B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length

Publications (2)

Publication Number Publication Date
CN107869156A CN107869156A (en) 2018-04-03
CN107869156B true CN107869156B (en) 2019-11-15

Family

ID=57481827

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201711264721.3A Expired - Fee Related CN107975076B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection device and its detection method of foundation pile length
CN201610645232.1A Active CN106049567B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length
CN201711264724.7A Active CN107869156B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection method of foundation pile length
CN201711264553.8A Pending CN107869155A (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201711264721.3A Expired - Fee Related CN107975076B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection device and its detection method of foundation pile length
CN201610645232.1A Active CN106049567B (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201711264553.8A Pending CN107869155A (en) 2016-08-09 2016-08-09 Parallel seismic wave method determines the detection means and its detection method of foundation pile length

Country Status (1)

Country Link
CN (4) CN107975076B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905012B (en) * 2018-05-12 2021-06-25 陕西秦军国防工业工程建设监理所 Building pile foundation detection method
CN108956766B (en) * 2018-06-09 2021-07-16 广东穗芳智慧建设科技有限公司 Pile foundation quality detection method
CN110779475B (en) * 2019-10-16 2021-05-14 广西电网有限责任公司电力科学研究院 Method for measuring size of power transmission tower foundation

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5099696A (en) * 1988-12-29 1992-03-31 Takechi Engineering Co., Ltd. Methods of determining capability and quality of foundation piles and of designing foundation piles, apparatus for measuring ground characteristics, method of making hole for foundation pile such as cast-in-situ pile and apparatus therefor
JP3641771B2 (en) * 1997-05-12 2005-04-27 株式会社竹中工務店 Method for detecting damage of foundation pile from ground surface and apparatus used for the method
KR100655479B1 (en) * 2004-05-20 2006-12-14 미승씨엔에스검사주식회사 The non-destruction test method for the measure pipe length with underground and the existence or nonexistence of pipe, and the hammer impactor of the non-destruction tester
JP4667228B2 (en) * 2005-12-21 2011-04-06 株式会社竹中工務店 Pile inspection method and sensor crimping device
JP4954729B2 (en) * 2007-01-29 2012-06-20 株式会社竹中工務店 Concrete pile soundness evaluation support device, soundness evaluation support method, and soundness evaluation support program
CN101074872A (en) * 2007-06-13 2007-11-21 南昌大学 Method and apparatus for determining pile length by reflective wave method
CN101477084B (en) * 2008-12-22 2010-11-17 铁道第三勘察设计院集团有限公司 Method for detecting integrality of concrete pile body by elastic wave transmission mode
CN101570974A (en) * 2009-03-26 2009-11-04 浙江省建筑科学设计研究院有限公司 Method for detecting quality of existing building foundation piles with parallel seismic method
CN101775959B (en) * 2009-12-25 2013-01-23 王来朋 Drilling machine of coaxial double-drill large-caliber multifunctional foundation pile
CN102296645B (en) * 2011-06-02 2013-10-23 朱德兵 Pile foundation quality detection method and device
CN202170756U (en) * 2011-07-18 2012-03-21 海城市石油机械制造有限公司 Lifting device of drilling machine headframe
CN202177602U (en) * 2011-07-27 2012-03-28 北京市康科瑞工程检测技术有限责任公司 Foundation pile integrity detection device utilizing acoustical wave transmission method
CN102535529A (en) * 2011-12-08 2012-07-04 中铁五局(集团)有限公司 Construction method of self-balancing method pile foundation bearing capacity test device
CN103255785A (en) * 2012-02-15 2013-08-21 陈彦平 Technology for performing foundation pile quality detection and geology survey by adopting single tube longitudinal wave method
CN203551516U (en) * 2013-10-30 2014-04-16 天津市建联工程勘测有限公司 Device for detecting integrality of pile body by using low strain method
CN203846537U (en) * 2014-04-10 2014-09-24 中国葛洲坝集团三峡建设工程有限公司 Portable pile foundation hole inspection device
CN103953076B (en) * 2014-05-06 2016-01-13 上海交通大学 Based on depth determination method at the bottom of the existing engineering pile stake of other hole transmitted wave bathmometry
CN104264722B (en) * 2014-09-30 2016-08-24 云南航天工程物探检测股份有限公司 Become bridge Nondestructive Pile-inspection Methods
CN104594395B (en) * 2015-01-15 2016-06-29 中铁第四勘察设计院集团有限公司 A kind of method utilizing railway in operation roadbed side Bored Pile Foundation detection structure to carry out pile measurement
CN204662519U (en) * 2015-04-02 2015-09-23 福建省建筑工程质量检测中心有限公司 A kind of checkout gear of foundation pile integrity and weight thereof
CN105155504B (en) * 2015-10-09 2017-06-06 铁道第三勘察设计院集团有限公司 The lateral seismic transmission nondestructive detection system of railway bed and detection method
CN205875237U (en) * 2016-08-09 2017-01-11 浙江省建设工程质量检验站有限公司 Detection apparatus for foundation pile length is confirmed to parallel seismic wave method

Also Published As

Publication number Publication date
CN107869156A (en) 2018-04-03
CN106049567A (en) 2016-10-26
CN107975076A (en) 2018-05-01
CN107975076B (en) 2019-10-11
CN107869155A (en) 2018-04-03
CN106049567B (en) 2018-01-05

Similar Documents

Publication Publication Date Title
CN106759216B (en) A kind of penetrometer and its measurement method having both dynamic sounding and static sounding
CN104181581B (en) Earthquake wave underground construction space observation system and method based on random arrangement
CN101570974A (en) Method for detecting quality of existing building foundation piles with parallel seismic method
Rausche Non-destructive evaluation of deep foundations
CN103255785A (en) Technology for performing foundation pile quality detection and geology survey by adopting single tube longitudinal wave method
CN106088170B (en) The detection means and its detection method of foundation pile length are determined based on parallel seismic wave method
JP4324126B2 (en) Underground observation system and underground observation method
NO344220B1 (en) System for measuring shear stress in well pipes
CN107869156B (en) Parallel seismic wave method determines the detection method of foundation pile length
CN105672371A (en) Existing engineering pile body completeness and defect type judging method
CN104652501A (en) Pile foundation quality detection device and pile foundation quality detection method of shock excitation in pile side prospect hole
CN104594395A (en) Operation railroad bed side drilling pile foundation detection structure and detection method
CN105735971A (en) Drilling hole depth detection system based on elastic waves and detection method thereof
CN101334368A (en) Steel tube centrifugal concrete pipe pile integrality endoscopic detection method
CN205875237U (en) Detection apparatus for foundation pile length is confirmed to parallel seismic wave method
CN106049566B (en) Side hole transmitted wave method determines the detection means and its detection method of foundation pile length
CN205954717U (en) Detection device based on foundation pile length is confirmed to parallel seismic wave method
CN108547332B (en) Building pile foundation detection technology
CN204435440U (en) Railway in operation roadbed side Bored Pile Foundation detection architecture
KR200179851Y1 (en) Device to measure stress waves inside a core hole of tunnel lining
CN205875236U (en) Detection apparatus for foundation pile length is confirmed to other hole penetrated wave method
CN111158043B (en) System and method for detecting hidden danger at pile bottom of bored pile
CN113279435A (en) Foundation pile quality nondestructive testing method based on side-hole diffraction wave analysis
CN114323140A (en) System and method for detecting pile length and integrity of precast tubular pile
CN108825136B (en) Building pile foundation detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191018

Address after: Room 1b, yuzhuge, building D, yujingtai garden, Dawang District, Zhaoqing City, Guangdong Province

Applicant after: Guangdong Longzhou Construction Engineering Co., Ltd

Address before: 310012 No. 28, Wen two road, Hangzhou, Zhejiang, China

Applicant before: Hou Hong Wei

GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20180403

Assignee: Zhaoqing high tech Zone Henghui decoration design Engineering Co.,Ltd.

Assignor: Guangdong Longzhou Construction Engineering Co.,Ltd.

Contract record no.: X2021980016943

Denomination of invention: Detection method for determining the length of foundation pile by parallel seismic method

Granted publication date: 20191115

License type: Common License

Record date: 20211230