CN107830293A - A kind of Pipe installing drilling equipment - Google Patents

A kind of Pipe installing drilling equipment Download PDF

Info

Publication number
CN107830293A
CN107830293A CN201710947610.6A CN201710947610A CN107830293A CN 107830293 A CN107830293 A CN 107830293A CN 201710947610 A CN201710947610 A CN 201710947610A CN 107830293 A CN107830293 A CN 107830293A
Authority
CN
China
Prior art keywords
bottom plate
bar
sliding sleeve
motor
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710947610.6A
Other languages
Chinese (zh)
Other versions
CN107830293B (en
Inventor
陈家林
邹丽清
熊美钗
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shenxin Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710947610.6A priority Critical patent/CN107830293B/en
Publication of CN107830293A publication Critical patent/CN107830293A/en
Application granted granted Critical
Publication of CN107830293B publication Critical patent/CN107830293B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/04Tapping pipe walls, i.e. making connections through the walls of pipes while they are carrying fluids; Fittings therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of drilling equipment, more particularly to a kind of Pipe installing drilling equipment.Unitized the technical problem to be solved in the present invention is to provide a kind of pipeline that can be accurately positioned, drilled to pipeline bore position, the Pipe installing drilling equipment of raising drilling efficiency.In order to solve the above-mentioned technical problem, the invention provides such a Pipe installing drilling equipment, bottom plate etc. is included;Left side at the top of bottom plate is provided with the first mechanism, center-left position at the top of bottom plate is provided with supporting mechanism, bottom plate top vertical is connected with the first supporting plate, and for the first supporting plate between the first mechanism and supporting mechanism, the installed in front at the top of the first supporting plate has borehole drill construction.The present invention realizes the drilling operation to pipeline by the mutual cooperation of the first mechanism, supporting mechanism and borehole drill construction, reached pipeline bore position can be accurately positioned, the pipeline that drills is unitized, improves the effect of drilling efficiency.

Description

A kind of Pipe installing drilling equipment
Technical field
The present invention relates to a kind of drilling equipment, more particularly to a kind of Pipe installing drilling equipment.
Background technology
Natural gas line refers to natural gas(Include the associated gas of oil field production)City is transported to from exploitation ground or treatment plant The pipeline of city's air distribution center or Industry enterprise customer, also known as gas pipeline.
Natural gas is conveyed using natural gas line, is the sole mode that land largely conveys natural gas.In world's pipeline In overall length, natural gas line accounts for half.
Natural gas line is because the particularity of construction to the pipeline for transporting natural gas, it is necessary to carry out certain drilling operation When, man-hour manually hand-held rig pipeline is carried out drilling operation it is cumbersome, it is inaccurate to pipeline location, drill pipe can not be unified Standard, while manual operation is unstable, therefore needs research and development one kind badly and pipeline bore position can be accurately positioned, drilled Pipeline it is unitized, improve the Pipe installing drilling equipment of drilling efficiency.
The content of the invention
(1)Technical problems to be solved
The present invention is cumbersome, inaccurate to pipeline location, no in order to overcome man-hour manually hand-held rig to carry out drilling operation to pipeline The shortcomings that standard of drill pipe can be unified, can be to pipeline drilling position the technical problem to be solved in the present invention is to provide one kind Put be accurately positioned, the pipeline that drills is unitized, improves the Pipe installing drilling equipment of drilling efficiency.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a Pipe installing drilling equipment, bottom plate, are included One supporting plate, the first mechanism, supporting mechanism and borehole drill construction, the left side at the top of bottom plate are provided with the first mechanism, at the top of bottom plate Center-left position is provided with supporting mechanism, and bottom plate top vertical is connected with the first supporting plate, and the first supporting plate is located at the first machine Between structure and supporting mechanism, the installed in front at the top of the first supporting plate has borehole drill construction.
Preferably, the first mechanism includes the first motor, rotary shaft, the first disk, head rod, the second disk, solid Fixed pole and fixed mechanism, the left side central portion at the top of bottom plate are provided with the first motor, rotation are connected with the output shaft of the first motor Axle, the left end of rotary shaft are connected with the first disk, and the eccentric position on the left of the first disk is hinged with head rod, at the top of bottom plate Vertical to be connected with fix bar, fix bar is in same position with the first motor, and the top of fix bar is provided with the second disk, and first connects The other end of extension bar is hinged with the eccentric position on the left of the second disk, and the same horizontal position that base top portion is located at motor is provided with Fixed mechanism.
Preferably, fixed mechanism includes the first N-type slide bar, the first sliding sleeve, the second connecting rod and the first U-shaped folder arm, bottom Left side vertical at the top of plate is connected with the first N-type slide bar, and the first N-type slide bar is located at the surface of fix bar, the first N-type slide bar water The equal slidingtype in front and rear side of flat position inwards is provided with the first sliding sleeve, and the bottom of the first sliding sleeve of front and rear side is hinged with the second connection Bar, the top and bottom of the other end of the second connecting rod of front and rear side respectively with eccentric position on front side of the second disk are hinged, front and rear The first U-shaped folder arm is respectively connected with the top of first sliding sleeve of side.
Preferably, also include supporting mechanism, supporting mechanism be installed at the top of bottom plate, supporting mechanism include support bar, First bearing seat, the first bull stick and U-shaped seat, the center vertical at the top of bottom plate are provided with support bar, at support bar and the first supporting plate In same linear position, support bar top is provided with first bearing seat, and the first bull stick is provided with first bearing seat, the first bull stick Top is provided with U-shaped seat, and U-shaped seat and the first U-shaped folder arm are in same level height.
Preferably, borehole drill construction includes base, electric pushrod, the second motor and drill bit, at the top of the first supporting plate before Side is provided with base, and the bottom of base is provided with electric pushrod, and the telescopic rod bottom of electric pushrod is provided with the second motor, the second electricity Drill bit is connected with the output shaft of machine.
Preferably, clamping device is also included, the center-right position at the top of bottom plate is provided with clamping device, clamping device Include the first pole, the second sliding sleeve, the second bull stick, the second N-type slide bar, the 3rd sliding sleeve, connecting plate, gear, the second pole, tooth Bar, T-bar and the second U-shaped folder arm, the center vertical at the top of bottom plate are provided with multiple first poles, and the first pole is in fix bar Same linear position, the first pole are provided with the second sliding sleeve, are provided with the second bull stick in the second sliding sleeve, the left end of the second bull stick and the Middle part on rear side of two disks is connected, and the center-right position at the top of bottom plate is provided with the second N-type slide bar, the second N-type slide bar vertically The equal slidingtype in front and rear side of horizontal position inwards is provided with the 3rd sliding sleeve, is connected between the vertical position of the second N-type slide bar Fishplate bar, the right-hand member of the second bull stick is through the right side of connecting plate and is provided with gear, and the bottom of the 3rd sliding sleeve of rear side is vertical provided with the Two poles, the second pole have the rack engaged with gear with the opposite position horizontal connection of the 3rd sliding sleeve of front side, front and rear side The top of 3rd sliding sleeve is connected with T-bar vertically, and the opposite position of T-bar is provided with the second U-shaped folder arm.
Preferably, pushing mechanism is also included, bottom plate top right side is provided with pushing mechanism, and pushing mechanism includes second Supporting plate, transverse slat, the second slide rail, the second sliding block, second bearing seat, screw mandrel, the 3rd motor, nut and push pedal, at the top of bottom plate Right vertical is connected with the second supporting plate, and the left side horizontal connection at the top of the second supporting plate has transverse slat, and transverse slat bottom level is provided with Second slide rail, slidingtype is provided with the second sliding block on the second slide rail, and the left and right ends of the second slide rail are provided with second bearing seat, the second axle Bearing is arranged on transverse slat, is provided with screw mandrel in second bearing seat, screw mandrel is provided with matched nut, the bottom of the second sliding block It is connected with nut, the bottom of nut is provided with push pedal vertically.
Preferably, rubber blanket is also included, the madial wall of the first U-shaped folder arm is provided with rubber blanket.
Preferably, also include ball, multiple balls are uniformly provided with the top of the madial wall of U-shaped seat.
Operation principle:When needing to carry out drilling operation to pipeline, pipeline is placed on the first mechanism and supporting mechanism On Support Position, the first mechanism and supporting mechanism can start borehole drill construction after pipeline is fixed and carry out drilling behaviour to pipeline Make, borehole drill construction can be closed after drilling, make the first mechanism can be by after drilling after being in the state for not blocking pipeline Pipeline is removed, and aforesaid operations step is repeated when needing to drill to pipeline again.
Because the first mechanism includes the first motor, rotary shaft, the first disk, head rod, the second disk, fix bar And fixed mechanism, the left side central portion at the top of bottom plate are provided with the first motor, rotary shaft are connected with the output shaft of the first motor, revolve The left end of rotating shaft is connected with the first disk, and the eccentric position on the left of the first disk is hinged with head rod, bottom plate top vertical Fix bar is connected with, fix bar is in same position with the first motor, and the top of fix bar is provided with the second disk, the first downlink connection The other end of bar is hinged with the eccentric position on the left of the second disk, and the same horizontal position that base top portion is located at motor is provided with admittedly Determine mechanism.After one end of pipeline is placed on supporting mechanism, the other end starts the first motor work after being placed on fixed mechanism Make, first the first disk rotational of motor driven, the first disk drives the second disk rotational by head rod, and the second disk is It can drive fixed mechanism that pipeline is clamped into operation, borehole drill construction can be started after clamping drilling processing is carried out to pipeline, bore Reset borehole drill construction after hole, control again the first motor driven fixed mechanism reset after can no longer fixed -piping, will Pipeline after drilling is removed, the i.e. repeatable aforesaid operations step when needing drilling again.
Because fixed mechanism includes the first N-type slide bar, the first sliding sleeve, the second connecting rod and the first U-shaped folder arm, base top The left side vertical in portion is connected with the first N-type slide bar, and the first N-type slide bar is located at the surface of fix bar, the first N-type slide bar level to In the equal slidingtype in front and rear side of position be provided with the first sliding sleeve, the bottom of the first sliding sleeve of front and rear side is hinged with the second connecting rod, Top and bottom of the other end of second connecting rod of front and rear side respectively with eccentric position on front side of the second disk are hinged, front and rear side The first U-shaped folder arm is respectively connected with the top of first sliding sleeve.During first the second disk rotational of motor driven of the first mechanism, the second disk The second connecting rod is driven to move, the second connecting rod drives middle slip of first sliding sleeve to the first N-type slide bar, and the first sliding sleeve is band Dynamic first U-shaped folder arm is clamped operation to pipeline, can start borehole drill construction after clamping and drilling operation, drilling are carried out to pipeline After control again the first motor rotate backward drive the second disk reset, the second disk reset i.e. drive the first U-shaped folder arm Resetting, the first U-shaped folder arm can close the first motor after resetting, and no longer the pipeline after drilling is fixed for the first U-shaped folder arm, So the pipeline after drilling can both be taken out.
Because also including supporting mechanism, supporting mechanism is installed at the top of bottom plate, supporting mechanism includes support bar, first Bearing block, the first bull stick and U-shaped seat, the center vertical at the top of bottom plate are provided with support bar, and support bar and the first supporting plate are in same One linear position, support bar top are provided with first bearing seat, the first bull stick, the top of the first bull stick are provided with first bearing seat Provided with U-shaped seat, U-shaped seat and the first U-shaped folder arm are in same level height.When needing that pipeline is fixed, first by pipeline One end be placed at the top of the madial wall of U-shaped seat, the other end of pipeline is placed on fixed mechanism, starts fixed mechanism operating Pipeline can be fixed.
Because borehole drill construction includes base, electric pushrod, the second motor and drill bit, the front side at the top of the first supporting plate is set There is base, the bottom of base is provided with electric pushrod, and the telescopic rod bottom of electric pushrod is provided with the second motor, the second motor Drill bit is connected with output shaft.Electric pushrod and the work of the second motor can be started after pipeline is fixed, electric pushrod stretches Bar drives the second motor to move down, and the work of the second motor drives drill bit to rotate, and the expansion link of electric pushrod constantly extends drive Drill bit carries out drilling operation to pipeline, controls electric pushrod now to need the second reset motor to this after drilling again Pipeline is drilled again, the state for controlling the first mechanism to make fixed mechanism be not at clamping pipe, manually adjusts the position of pipeline Put and by drilling of the i.e. repeatable aforesaid operations step to pipeline progress again after pipeline is fixed again by fixed mechanism Operation, is first shut off the second motor after all drilling operations terminate, and control electric pushrod will close after the second reset motor Electric pushrod.
Because also including clamping device, the center-right position at the top of bottom plate is provided with clamping device, clamping device bag The first pole, the second sliding sleeve, the second bull stick, the second N-type slide bar, the 3rd sliding sleeve, connecting plate, gear, the second pole, tooth are included Bar, T-bar and the second U-shaped folder arm, the center vertical at the top of bottom plate are provided with multiple first poles, and the first pole is in fix bar Same linear position, the first pole are provided with the second sliding sleeve, are provided with the second bull stick in the second sliding sleeve, the left end of the second bull stick and the Middle part on rear side of two disks is connected, and the center-right position at the top of bottom plate is provided with the second N-type slide bar, the second N-type slide bar vertically The equal slidingtype in front and rear side of horizontal position inwards is provided with the 3rd sliding sleeve, is connected between the vertical position of the second N-type slide bar Fishplate bar, the right-hand member of the second bull stick is through the right side of connecting plate and is provided with gear, and the bottom of the 3rd sliding sleeve of rear side is vertical provided with the Two poles, the second pole have the rack engaged with gear with the opposite position horizontal connection of the 3rd sliding sleeve of front side, front and rear side The top of 3rd sliding sleeve is connected with T-bar vertically, and the opposite position of T-bar is provided with the second U-shaped folder arm.Pipeline is placed on U-shaped Start the first mechanism after on seat and drive fixed mechanism first disk rotational while pipeline is fixed, the first disk rotational drives the Two bar rotations, the second bar rotation drive pinion rotation, and pinion rotation moves with carry-over bar to the middle part of the second N-type slide bar, Therefore rack drives the movement of the 3rd sliding sleeve, the 3rd sliding sleeve drives T-bar and the second U-shaped folder arm to move towards, and the second U-shaped folder arm is Pipeline can preferably be fixed, borehole drill construction can be started after fixed drilling operation is carried out to pipeline, controlled after drilling The operating of the first mechanism is made, the first mechanism drives fixed mechanism and clamping device that no longer the pipeline after drilling is fixed, so The pipeline after drilling can be removed.
Because also including pushing mechanism, bottom plate top right side is provided with pushing mechanism, and pushing mechanism includes second Fagging, transverse slat, the second slide rail, the second sliding block, second bearing seat, screw mandrel, the 3rd motor, nut and push pedal, the right side at the top of bottom plate Side is connected with the second supporting plate vertically, and the left side horizontal connection at the top of the second supporting plate has a transverse slat, and transverse slat bottom level is provided with the Two slide rails, slidingtype is provided with the second sliding block on the second slide rail, and the left and right ends of the second slide rail are provided with second bearing seat, second bearing Seat is arranged on transverse slat, is provided with screw mandrel in second bearing seat, and screw mandrel is provided with matched nut, the bottom of the second sliding block and Nut is connected, and the bottom of nut is provided with push pedal vertically.Needed after the pipeline drilling placed on U-shaped seat to same level direction not When carrying out drilling operation with position, you can control clamping device and fixed mechanism to pipeline without fully fixed after turn hole, At this moment the 3rd motor can be started, the operating of the 3rd motor drives screw mandrel to rotate, and screw mandrel, which rotates, drives nut movement, nut moving belt Dynamic push pedal movement, push pedal, which is moved to the left, can promote pipeline to be moved to the left on U-shaped seat, and the can be closed after moving a certain distance Three motors, control clamping device and fixed mechanism that pipeline is fixed again, carry out drilling operation again, constantly repeat above-mentioned Operating procedure, you can realize and handle the multidirectional drilling of pipeline, improve the using effect of the present invention.
Because also including rubber blanket, the madial wall of the first U-shaped folder arm is provided with rubber blanket.Rubber blanket can preferably make Fixation of the one U-shaped folder arm to pipeline.
Because also including ball, multiple balls are uniformly provided with the top of the madial wall of U-shaped seat.Ball can make pipeline more preferable Moved on U-shaped seat, the work of auxiliary pushing mechanism, make the present invention use after it is better.
(3)Beneficial effect
The present invention realizes the drilling operation to pipeline, together by the mutual cooperation of the first mechanism, supporting mechanism and borehole drill construction The optimization of Shi Liyong clamping devices and pushing mechanism, the pipe that can be accurately positioned, drilled to pipeline bore position is reached Road is unitized, improves the effect of drilling efficiency.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the left view structural representation of the first mechanism of the invention.
Fig. 3 is the left view structural representation of supporting mechanism of the present invention.
Fig. 4 is the main structure diagram of borehole drill construction of the present invention.
Fig. 5 is second of main structure diagram of the present invention.
Fig. 6 is the left view structural representation of clamping device of the present invention.
Fig. 7 is the main structure diagram of pushing mechanism of the present invention.
Fig. 8 is the left view structural representation of rubber blanket of the present invention.
Fig. 9 is the left view structural representation of ball of the present invention.
Mark in accompanying drawing for:1- bottom plates, the supporting plates of 2- first, the mechanisms of 3- first, the motors of 31- first, 32- rotary shafts, The disks of 33- first, 34- head rods, 35- fix bars, the disks of 36- second, 30- fixed mechanisms, 301- the first N-type slide bars, The sliding sleeves of 302- first, the connecting rods of 303- second, 304- the first U-shaped folder arms, 4- supporting mechanisms, 41- support bars, 42- clutch shaft bearings Seat, the bull sticks of 43- first, 44-U type seats, 5- borehole drill constructions, 51- bases, 52- electric pushrods, the motors of 53- second, 54- drill bits, 6- Pipeline, 7- clamping devices, the poles of 701- first, the sliding sleeves of 702- second, the bull sticks of 703- second, 704- the second N-type slide bars, 705- Three sliding sleeves, 706- connecting plates, 707- gears, the poles of 708- second, 709- racks, 710-T type bars, 711- the second U-shaped folder arms, 8- Pushing mechanism, the supporting plates of 81- second, 82- transverse slats, the slide rails of 83- second, the sliding blocks of 84- second, 85- second bearing seats, 86- screw mandrels, The motors of 87- the 3rd, 88- nuts, 89- push pedals, 9- rubber blankets, 10- balls.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of Pipe installing drilling equipment, as shown in figs 1-9, include bottom plate 1, the first supporting plate 2, the first mechanism 3, support Mechanism 4 and borehole drill construction 5, the left side at the top of bottom plate 1 are provided with the first mechanism 3, and the center-left position at the top of bottom plate 1 is provided with Supporting mechanism 4, the top vertical of bottom plate 1 are connected with the first supporting plate 2, and the first supporting plate 2 is located at the first mechanism 3 and supporting mechanism 4 Between, the installed in front at the top of the first supporting plate 2 has borehole drill construction 5.
Embodiment 2
A kind of Pipe installing drilling equipment, as shown in figs 1-9, include bottom plate 1, the first supporting plate 2, the first mechanism 3, support Mechanism 4 and borehole drill construction 5, the left side at the top of bottom plate 1 are provided with the first mechanism 3, and the center-left position at the top of bottom plate 1 is provided with Supporting mechanism 4, the top vertical of bottom plate 1 are connected with the first supporting plate 2, and the first supporting plate 2 is located at the first mechanism 3 and supporting mechanism 4 Between, the installed in front at the top of the first supporting plate 2 has borehole drill construction 5.
First mechanism 3 includes the first motor 31, rotary shaft 32, the first disk 33, head rod 34, the second disk 36th, fix bar 35 and fixed mechanism 30, the left side central portion at the top of bottom plate 1 are provided with the first motor 31, the output of the first motor 31 Rotary shaft 32 is connected with axle, the left end of rotary shaft 32 is connected with the first disk 33, the eccentric position hinge in the left side of the first disk 33 Head rod 34 is connected to, the top vertical of bottom plate 1 is connected with fix bar 35, and the motor 31 of fix bar 35 and first is in same position Put, the top of fix bar 35 is provided with the eccentric position of the second disk 36, the other end of head rod 34 and the left side of the second disk 36 Put be hinged, the top of bottom plate 1 is provided with fixed mechanism 30 positioned at the same horizontal position of motor.
Embodiment 3
A kind of Pipe installing drilling equipment, as shown in figs 1-9, include bottom plate 1, the first supporting plate 2, the first mechanism 3, support Mechanism 4 and borehole drill construction 5, the left side at the top of bottom plate 1 are provided with the first mechanism 3, and the center-left position at the top of bottom plate 1 is provided with Supporting mechanism 4, the top vertical of bottom plate 1 are connected with the first supporting plate 2, and the first supporting plate 2 is located at the first mechanism 3 and supporting mechanism 4 Between, the installed in front at the top of the first supporting plate 2 has borehole drill construction 5.
First mechanism 3 includes the first motor 31, rotary shaft 32, the first disk 33, head rod 34, the second disk 36th, fix bar 35 and fixed mechanism 30, the left side central portion at the top of bottom plate 1 are provided with the first motor 31, the output of the first motor 31 Rotary shaft 32 is connected with axle, the left end of rotary shaft 32 is connected with the first disk 33, the eccentric position hinge in the left side of the first disk 33 Head rod 34 is connected to, the top vertical of bottom plate 1 is connected with fix bar 35, and the motor 31 of fix bar 35 and first is in same position Put, the top of fix bar 35 is provided with the eccentric position of the second disk 36, the other end of head rod 34 and the left side of the second disk 36 Put be hinged, the top of bottom plate 1 is provided with fixed mechanism 30 positioned at the same horizontal position of motor.
Fixed mechanism 30 includes the first N-type slide bar 301, the first sliding sleeve 302, the second connecting rod 303 and the first U-shaped folder arm 304, the left side vertical at the top of bottom plate 1 is connected with the first N-type slide bar 301, the first N-type slide bar 301 be located at fix bar 35 just on Side, the equal slidingtype in front and rear side of the horizontal position inwards of the first N-type slide bar 301 are provided with the first sliding sleeve 302, and the first of front and rear side slides The bottom of set 302 is hinged with the second connecting rod 303, the other end of the second connecting rod 303 of front and rear side respectively with the second disk 36 The top and bottom of front side eccentric position are hinged, and the top of the first sliding sleeve 302 of front and rear side is respectively connected with the first U-shaped folder arm 304.
Embodiment 4
A kind of Pipe installing drilling equipment, as shown in figs 1-9, include bottom plate 1, the first supporting plate 2, the first mechanism 3, support Mechanism 4 and borehole drill construction 5, the left side at the top of bottom plate 1 are provided with the first mechanism 3, and the center-left position at the top of bottom plate 1 is provided with Supporting mechanism 4, the top vertical of bottom plate 1 are connected with the first supporting plate 2, and the first supporting plate 2 is located at the first mechanism 3 and supporting mechanism 4 Between, the installed in front at the top of the first supporting plate 2 has borehole drill construction 5.
First mechanism 3 includes the first motor 31, rotary shaft 32, the first disk 33, head rod 34, the second disk 36th, fix bar 35 and fixed mechanism 30, the left side central portion at the top of bottom plate 1 are provided with the first motor 31, the output of the first motor 31 Rotary shaft 32 is connected with axle, the left end of rotary shaft 32 is connected with the first disk 33, the eccentric position hinge in the left side of the first disk 33 Head rod 34 is connected to, the top vertical of bottom plate 1 is connected with fix bar 35, and the motor 31 of fix bar 35 and first is in same position Put, the top of fix bar 35 is provided with the eccentric position of the second disk 36, the other end of head rod 34 and the left side of the second disk 36 Put be hinged, the top of bottom plate 1 is provided with fixed mechanism 30 positioned at the same horizontal position of motor.
Fixed mechanism 30 includes the first N-type slide bar 301, the first sliding sleeve 302, the second connecting rod 303 and the first U-shaped folder arm 304, the left side vertical at the top of bottom plate 1 is connected with the first N-type slide bar 301, the first N-type slide bar 301 be located at fix bar 35 just on Side, the equal slidingtype in front and rear side of the horizontal position inwards of the first N-type slide bar 301 are provided with the first sliding sleeve 302, and the first of front and rear side slides The bottom of set 302 is hinged with the second connecting rod 303, the other end of the second connecting rod 303 of front and rear side respectively with the second disk 36 The top and bottom of front side eccentric position are hinged, and the top of the first sliding sleeve 302 of front and rear side is respectively connected with the first U-shaped folder arm 304.
Also include supporting mechanism 4, the top of bottom plate 1 is provided with supporting mechanism 4, and supporting mechanism 4 includes support bar 41, the One bearing block 42, the first bull stick 43 and U-shaped seat 44, the center vertical at the top of bottom plate 1 are provided with support bar 41, support bar 41 and first Supporting plate 2 is in same linear position, and the top of support bar 41 is provided with first bearing seat 42, first is provided with first bearing seat 42 Bull stick 43, the top of the first bull stick 43 are provided with U-shaped seat 44, and the U-shaped U-shaped folder arm 304 of seat 44 and first is in same level height.
Borehole drill construction 5 includes base 51, electric pushrod 52, the second motor 53 and drill bit 54, the top of the first supporting plate 2 Front side is provided with base 51, and the bottom of base 51 is provided with electric pushrod 52, and the telescopic rod bottom of electric pushrod 52 is provided with second Motor 53, drill bit 54 is connected with the output shaft of the second motor 53.
Also include clamping device 7, the center-right position at the top of bottom plate 1 is provided with clamping device 7, and clamping device 7 wraps Included the first pole 701, the second sliding sleeve 702, the second bull stick 703, the second N-type slide bar 704, the 3rd sliding sleeve 705, connecting plate 706, Gear 707, the second pole 708, rack 709, the U-shaped folder arm 711 of T-bar 710 and second, the center vertical at the top of bottom plate 1 are provided with Multiple first poles 701, the first pole 701 are in same linear position with fix bar 35, and the first pole 701 is provided with second and slided 702 are covered, the second bull stick 703, the left end of the second bull stick 703 and the middle part phase of the rear side of the second disk 36 are provided with the second sliding sleeve 702 Connection, the center-right position at the top of bottom plate 1 is vertical to be provided with the second N-type slide bar 704, the horizontal position inwards of the second N-type slide bar 704 The equal slidingtype in front and rear side put is provided with the 3rd sliding sleeve 705, and connecting plate is connected between the vertical position of the second N-type slide bar 704 706, the right-hand member of the second bull stick 703 through the right side of connecting plate 706 and is provided with gear 707, the bottom of the 3rd sliding sleeve 705 of rear side Vertical to be provided with the second pole 708, the opposite position horizontal connection of the second pole 708 and the 3rd sliding sleeve 705 of front side has and gear The racks 709 of 707 engagements, the top of the 3rd sliding sleeve 705 of front and rear side are connected with T-bar 710 vertically, T-bar 710 it is opposite Position is provided with the second U-shaped folder arm 711.
Also include pushing mechanism 8, the top right side of bottom plate 1 is provided with pushing mechanism 8, and pushing mechanism 8 includes second Fagging 81, transverse slat 82, the second slide rail 83, the second sliding block 84, second bearing seat 85, screw mandrel 86, the 3rd motor 87, nut 88 and push away Plate 89, the right vertical at the top of bottom plate 1 are connected with the second supporting plate 81, and the left side horizontal connection at the top of the second supporting plate 81 has horizontal stroke Plate 82, the bottom level of transverse slat 82 are provided with the second slide rail 83, and slidingtype is provided with the second sliding block 84, the second slide rail 83 on the second slide rail 83 Left and right ends be provided with second bearing seat 85, second bearing seat 85 is arranged on transverse slat 82, and screw mandrel is provided with second bearing seat 85 86, screw mandrel 86 is provided with matched nut 88, and the bottom of the second sliding block 84 is connected with nut 88, and the bottom of nut 88 is erected Directly it is provided with push pedal 89.
Also include rubber blanket 9, the madial wall of the first U-shaped folder arm 304 is provided with rubber blanket 9.
Also include ball 10, multiple balls 10 are uniformly provided with the top of the madial wall of U-shaped seat 44.
Operation principle:When needing to carry out drilling operation to pipeline 6, pipeline 6 is placed on the first mechanism 3 and supporting mechanism On 4 Support Position, the first mechanism 3 and supporting mechanism 4 can start borehole drill construction 5 after pipeline 6 is fixed and pipeline 6 entered Row drilling operation, borehole drill construction 5 can be closed after drilling, after the first mechanism 3 is in the state for not blocking pipeline 6 Pipeline 6 after drilling is removed, aforesaid operations step is repeated when needing to drill to pipeline 6 again.
Justify because the first mechanism 3 includes the first motor 31, rotary shaft 32, the first disk 33, head rod 34, second Disk 36, fix bar 35 and fixed mechanism 30, the left side central portion at the top of bottom plate 1 are provided with the first motor 31, the first motor 31 it is defeated Rotary shaft 32 is connected with shaft, the left end of rotary shaft 32 is connected with the first disk 33, the eccentric position in the left side of the first disk 33 Head rod 34 is hinged with, the top vertical of bottom plate 1 is connected with fix bar 35, and the motor 31 of fix bar 35 and first is in same position Put, the top of fix bar 35 is provided with the eccentric position of the second disk 36, the other end of the first connecting rod and the left side of the second disk 36 Put be hinged, the top of bottom plate 1 is provided with fixed mechanism 30 positioned at the same horizontal position of motor.One end of pipeline 6 is placed on branch After on support mechanism 4, the other end starts the first motor 31 after being placed on fixed mechanism 30 and worked, and the first motor 31 drives the first circle Disk 33 rotates, and the first disk 33 drives the second disk 36 to rotate by head rod 34, and the second disk 36 can drive fixation Pipeline 6 is clamped operation by mechanism 30, can be started borehole drill construction 5 after clamping and be carried out drilling processing to pipeline 6, drilling finishes After reset borehole drill construction 5, control again the first motor 31 drive fixed mechanism 30 reset after can no longer fixed -piping 6, will Pipeline 6 after drilling is removed, the i.e. repeatable aforesaid operations step when needing drilling again.
Because it is U-shaped that fixed mechanism 30 includes the first N-type slide bar 301, the first sliding sleeve 302, the second connecting rod 303 and first Jig arm 304, the left side vertical at the top of bottom plate 1 are connected with the first N-type slide bar 301, and the first N-type slide bar 301 is located at fix bar 35 Surface, the equal slidingtype in front and rear side of the horizontal position inwards of the first N-type slide bar 301 are provided with the first sliding sleeve 302, and the of front and rear side The bottom of one sliding sleeve 302 is hinged with the second connecting rod 303, and the other end of the second connecting rod 303 of front and rear side is justified with second respectively The top and bottom of the front side eccentric position of disk 36 are hinged, and the top of the first sliding sleeve 302 of front and rear side is respectively connected with the first U-shaped folder arm 304.When first motor 31 of the first mechanism 3 drives the rotation of the second disk 36, the second disk 36 drives the second connecting rod 303 to move Dynamic, the second connecting rod 303 drives middle slip of first sliding sleeve 302 to the first N-type slide bar 301, and the first sliding sleeve 302 drives the One U-shaped folder arm 304 is clamped operation to pipeline 6, can start borehole drill construction 5 after clamping and carry out drilling operation to pipeline 6, bore Again controlling the first motor 31 to rotate backward after hole drives the second disk 36 to reset, and the second disk 36, which resets, drives first U-shaped folder arm 304 resets, and the first U-shaped folder arm 304 can close the first motor 31 after resetting, the first U-shaped folder arm 304 is no longer to boring Pipeline 6 behind hole is fixed, and so can both take out the pipeline 6 after drilling.
Because also including supporting mechanism 4, the top of bottom plate 1 is provided with supporting mechanism 4, and supporting mechanism 4 includes support bar 41st, first bearing seat 42, the first bull stick 43 and U-shaped seat 44, the center vertical at the top of bottom plate 1 are provided with support bar 41, support bar 41 Same linear position is in the first supporting plate 2, the top of support bar 41 is provided with first bearing seat 42, set in first bearing seat 42 There is the first bull stick 43, the top of the first bull stick 43 is provided with U-shaped seat 44, and the U-shaped U-shaped folder arm 304 of seat 44 and first is in same level Highly.When needing that pipeline 6 is fixed, first one end of pipeline 6 is placed at the top of the madial wall of U-shaped seat 44, will managed The other end in road 6 is placed on fixed mechanism 30, and starting the operating of fixed mechanism 30, pipeline 6 can be fixed.
Because borehole drill construction 5 includes base 51, electric pushrod 52, the second motor 53 and drill bit 54, the first supporting plate 2 is pushed up The front side in portion is provided with base 51, and the bottom of base 51 is provided with electric pushrod 52, and the telescopic rod bottom of electric pushrod 52 is provided with Second motor 53, drill bit 54 is connected with the output shaft of the second motor 53.The He of electric pushrod 52 can be started after pipeline 6 is fixed Second motor 53 works, and the expansion link of electric pushrod 52 drives the second motor 53 to move down, and the work of the second motor 53, which drives, bores First 54 rotate, and the expansion link of electric pushrod 52, which constantly extends, drives drill bit 54 to carry out drilling operation to pipeline 6, weight after drilling New control electric pushrod 52 resets the second motor 53, now needs to drill to the pipeline 6 again, controls the first mechanism 3 Fixed mechanism 30 is not at the state of clamping pipe 6, manually adjust the position of pipeline 6 and by again by fixed mechanism 30 I.e. repeatable aforesaid operations step carries out drilling operation again to pipeline 6 after pipeline 6 is fixed, when all drilling operation knots The second motor 53 is first shut off after beam, control electric pushrod 52 closes electric pushrod 52 after second motor 53 is resetted.
Because also including clamping device 7, the center-right position at the top of bottom plate 1 is provided with clamping device 7, clamping device 7 include the first pole 701, the second sliding sleeve 702, the second bull stick 703, the second N-type slide bar 704, the 3rd sliding sleeve 705, connecting plate 706th, gear 707, the second pole 708, rack 709, the U-shaped folder arm 711 of T-bar 710 and second, the center vertical at the top of bottom plate 1 Provided with multiple first poles 701, the first pole 701 and fix bar 35 be in same linear position, and the first pole 701 is provided with the Two sliding sleeves 702, are provided with the second bull stick 703 in the second sliding sleeve 702, on rear side of the left end and the second disk 36 of the second bull stick 703 in Portion is connected, and the center-right position at the top of bottom plate 1 is vertical to be provided with the second N-type slide bar 704, and the second N-type slide bar 704 is horizontal inwards The equal slidingtype in front and rear side of position be provided with the 3rd sliding sleeve 705, be connected with connection between the vertical position of the second N-type slide bar 704 Plate 706, the right-hand member of the second bull stick 703 through the right side of connecting plate 706 and are provided with gear 707, the bottom of the 3rd sliding sleeve 705 of rear side Portion is provided with the second pole 708 vertically, and the opposite position horizontal connection of the second pole 708 and the 3rd sliding sleeve 705 of front side has and tooth The rack 709 of the engagement of wheel 707, the top of the 3rd sliding sleeve 705 of front and rear side is connected with T-bar 710, the phase of T-bar 710 vertically The second U-shaped folder arm 711 is provided with to position.Pipeline 6 starts the first mechanism 3 and drives fixed mechanism 30 will after being placed on U-shaped seat 44 The first disk 33 rotates while pipeline 6 is fixed, and the first disk 33, which rotates, drives the second bull stick 703 to rotate, the second 703 turns of bull stick Dynamic band moving gear 707 rotates, and the rotational band carry-over bar 709 of gear 707 moves to the middle part of the second N-type slide bar 704, rack 709 because This drives the 3rd sliding sleeve 705 to move, and the 3rd sliding sleeve 705 drives the U-shaped folder arm 711 of T-bar 710 and second to move towards, and second is U-shaped Jig arm 711 can preferably fix pipeline 6, can start borehole drill construction 5 after fixed and carry out drilling operation to pipeline 6, The first mechanism 3 is controlled to operate after drilling, after the first mechanism 3 drives fixed mechanism 30 and clamping device 7 no longer to drilling Pipeline 6 is fixed, and can so remove the pipeline 6 after drilling.
Because also including pushing mechanism 8, the top right side of bottom plate 1 is provided with pushing mechanism 8, and pushing mechanism 8 includes Two supporting plates 81, transverse slat 82, the second slide rail 83, the second sliding block 84, second bearing seat 85, screw mandrel 86, the 3rd motor 87, nut 88 With push pedal 89, the right vertical at the top of bottom plate 1 is connected with the second supporting plate 81, the left side horizontal connection at the top of the second supporting plate 81 There is transverse slat 82, the bottom level of transverse slat 82 is provided with the second slide rail 83, and slidingtype is provided with the second sliding block 84 on the second slide rail 83, and second slides The left and right ends of rail 83 are provided with second bearing seat 85, and second bearing seat 85 is arranged on transverse slat 82, is provided with second bearing seat 85 Screw mandrel 86, screw mandrel 86 are provided with matched nut 88, and the bottom of the second sliding block 84 is connected with nut 88, the bottom of nut 88 Portion is provided with push pedal 89 vertically.The pipeline 6 placed on U-shaped seat 44 needs to drill to same level direction diverse location after drilling During operation, you can control clamping device 7 and fixed mechanism 30 without fully fixing, at this moment can open pipeline 6 after turn hole Dynamic 3rd motor 87, the operating of the 3rd motor 87 drive screw mandrel 86 to rotate, and screw mandrel 86, which rotates, drives nut 88 to move, and nut 88 moves Push pedal 89 is driven to move, push pedal 89, which is moved to the left, can promote pipeline 6 to be moved to the left on U-shaped seat 44, after moving a certain distance The 3rd motor 87 can be closed, controls clamping device 7 and fixed mechanism 30 that pipeline 6 is fixed again, is drilled again Operation, constantly repeatedly aforesaid operations step, you can realize and handle the multidirectional drilling of pipeline 6, improve the use effect of the present invention Fruit.
Because also including rubber blanket 9, the madial wall of the first U-shaped folder arm 304 is provided with rubber blanket 9.Rubber blanket 9 can be more preferable Make fixation of the first U-shaped folder arm 304 to pipeline 6.
Because also including ball 10, multiple balls 10 are uniformly provided with the top of the madial wall of U-shaped seat 44.Ball 10 can make Pipeline 6 preferably moves on U-shaped seat 44, the work of auxiliary pushing mechanism 8, make the present invention use after it is better.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

1. a kind of Pipe installing drilling equipment, it is characterised in that include bottom plate(1), the first supporting plate(2), the first mechanism (3), supporting mechanism(4)And borehole drill construction(5), bottom plate(1)First mechanism is installed on the left of top(3), bottom plate(1)Top Center-left position is provided with supporting mechanism(4), bottom plate(1)Top vertical is connected with the first supporting plate(2), the first supporting plate (2)Positioned at the first mechanism(3)And supporting mechanism(4)Between, the first supporting plate(2)The installed in front at top has borehole drill construction(5).
A kind of 2. Pipe installing drilling equipment according to claim 1, it is characterised in that the first mechanism(3)Include First motor(31), rotary shaft(32), the first disk(33), head rod(34), the second disk(36), fix bar(35)With Fixed mechanism(30), bottom plate(1)The left side central portion at top is provided with the first motor(31), the first motor(31)Output shaft on connect It is connected to rotary shaft(32), rotary shaft(32)Left end be connected with the first disk(33), the first disk(33)The eccentric position in left side It is hinged with head rod(34), bottom plate(1)Top vertical is connected with fix bar(35), fix bar(35)With the first motor(31) In same position, fix bar(35)Top be provided with the second disk(36), head rod(34)The other end and second circle Disk(36)The eccentric position in left side is hinged, bottom plate(1)The same horizontal position that top is located at motor is provided with fixed mechanism(30).
A kind of 3. Pipe installing drilling equipment according to claim 2, it is characterised in that fixed mechanism(30)Include First N-type slide bar(301), the first sliding sleeve(302), the second connecting rod(303)With the first U-shaped folder arm(304), bottom plate(1)Top Left side vertical be connected with the first N-type slide bar(301), the first N-type slide bar(301)Positioned at fix bar(35)Surface, the first N Type slide bar(301)The equal slidingtype in front and rear side of horizontal position inwards is provided with the first sliding sleeve(302), the first sliding sleeve of front and rear side (302)Bottom be hinged with the second connecting rod(303), the second connecting rod of front and rear side(303)The other end respectively with second circle Disk(36)The top and bottom of front side eccentric position are hinged, the first sliding sleeve of front and rear side(302)Top is respectively connected with the first U-shaped folder Arm(304).
4. a kind of Pipe installing drilling equipment according to claim 3, it is characterised in that also include supporting mechanism (4), bottom plate(1)Top is provided with supporting mechanism(4), supporting mechanism(4)Include support bar(41), first bearing seat(42)、 First bull stick(43)With U-shaped seat(44), bottom plate(1)The center vertical at top is provided with support bar(41), support bar(41)With first Supporting plate(2)In same linear position, support bar(41)Top is provided with first bearing seat(42), first bearing seat(42)It is interior Provided with the first bull stick(43), the first bull stick(43)Top be provided with U-shaped seat(44), U-shaped seat(44)With the first U-shaped folder arm(304) In same level height.
A kind of 5. Pipe installing drilling equipment according to claim 4, it is characterised in that borehole drill construction(5)Include Base(51), electric pushrod(52), the second motor(53)And drill bit(54), the first supporting plate(2)The front side at top is provided with base (51), base(51)Bottom electric pushrod is installed(52), electric pushrod(52)Telescopic rod bottom the second motor is installed (53), the second motor(53)Output shaft on be connected with drill bit(54).
6. a kind of Pipe installing drilling equipment according to claim 5, it is characterised in that also include clamping device (7), bottom plate(1)The center-right position at top is provided with clamping device(7), clamping device(7)Include the first pole (701), the second sliding sleeve(702), the second bull stick(703), the second N-type slide bar(704), the 3rd sliding sleeve(705), connecting plate(706)、 Gear(707), the second pole(708), rack(709), T-bar(710)With the second U-shaped folder arm(711), bottom plate(1)Top Center vertical is provided with multiple first poles(701), the first pole(701)With fix bar(35)In same linear position, first Pole(701)It is provided with the second sliding sleeve(702), the second sliding sleeve(702)Inside it is provided with the second bull stick(703), the second bull stick(703)'s Left end and the second disk(36)It is connected in the middle part of rear side, bottom plate(1)The center-right position at top is provided with the second N-type and slided vertically Bar(704), the second N-type slide bar(704)The equal slidingtype in front and rear side of horizontal position inwards is provided with the 3rd sliding sleeve(705), the 2nd N Type slide bar(704)Vertical position between be connected with connecting plate(706), the second bull stick(703)Right-hand member pass through connecting plate(706) Right side and be provided with gear(707), the 3rd sliding sleeve of rear side(705)Bottom be provided with the second pole vertically(708), the second pole (708)With the 3rd sliding sleeve of front side(705)Opposite position horizontal connection have and gear(707)The rack of engagement(709), it is front and rear 3rd sliding sleeve of side(705)Top be connected with T-bar vertically(710), T-bar(710)Opposite position be provided with it is second U-shaped Jig arm(711).
7. a kind of Pipe installing drilling equipment according to claim 6, it is characterised in that also include pushing mechanism (8), bottom plate(1)Top right side is provided with pushing mechanism(8), pushing mechanism(8)Include the second supporting plate(81), transverse slat (82), the second slide rail(83), the second sliding block(84), second bearing seat(85), screw mandrel(86), the 3rd motor(87), nut(88) And push pedal(89), bottom plate(1)The right vertical at top is connected with the second supporting plate(81), the second supporting plate(81)The left side at top Horizontal connection has transverse slat(82), transverse slat(82)Bottom level is provided with the second slide rail(83), the second slide rail(83)Upper slidingtype is provided with Second sliding block(84), the second slide rail(83)Left and right ends be provided with second bearing seat(85), second bearing seat(85)Installed in horizontal stroke Plate(82)On, second bearing seat(85)It is interior to be provided with screw mandrel(86), screw mandrel(86)It is provided with matched nut(88), second slides Block(84)Bottom and nut(88)It is connected, nut(88)Bottom be provided with push pedal vertically(89).
8. a kind of Pipe installing drilling equipment according to claim 7, it is characterised in that also include rubber blanket(9), First U-shaped folder arm(304)Madial wall be provided with rubber blanket(9).
9. a kind of Pipe installing drilling equipment according to claim 8, it is characterised in that also include ball(10), U Type seat(44)Madial wall at the top of be uniformly provided with multiple balls(10).
CN201710947610.6A 2017-10-12 2017-10-12 A kind of Pipe installing drilling equipment Expired - Fee Related CN107830293B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710947610.6A CN107830293B (en) 2017-10-12 2017-10-12 A kind of Pipe installing drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710947610.6A CN107830293B (en) 2017-10-12 2017-10-12 A kind of Pipe installing drilling equipment

Publications (2)

Publication Number Publication Date
CN107830293A true CN107830293A (en) 2018-03-23
CN107830293B CN107830293B (en) 2019-08-16

Family

ID=61647936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710947610.6A Expired - Fee Related CN107830293B (en) 2017-10-12 2017-10-12 A kind of Pipe installing drilling equipment

Country Status (1)

Country Link
CN (1) CN107830293B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108568861A (en) * 2018-05-15 2018-09-25 芜湖君如保温材料有限公司 A kind of polyurethane tube is got into the cave mechanism
CN108772581A (en) * 2018-07-18 2018-11-09 重庆任翔科技有限公司 Motorcycle welding equipment
CN108788227A (en) * 2018-06-06 2018-11-13 龚仁乐 A kind of tube wall finishing attachment device
CN108908483A (en) * 2018-06-06 2018-11-30 李娜 A kind of effective drilling device of plastics
CN113018880A (en) * 2021-03-24 2021-06-25 广州趣童玩具有限公司 Anti-collision buffer protection device for remote control toy car

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101549410A (en) * 2009-05-15 2009-10-07 浙江华尔达汽车空调有限公司 A drilling mechanism for machining condenser collecting pipe
CN204294990U (en) * 2014-11-27 2015-04-29 嘉兴蓝森机械有限公司 A kind of steel tube drilling machine of Novel belt chuck
CN204413201U (en) * 2014-12-16 2015-06-24 天津市诚田丰金属制品有限公司 A kind of stainless-steel pipe punching machine
CN104827075A (en) * 2015-04-22 2015-08-12 雍自玲 Tool structure for fixation and drilling of round steel
CN204565196U (en) * 2015-04-17 2015-08-19 重庆望江工业有限公司 A kind of inner spiral groove location drilling device of tube piece
CN204673008U (en) * 2014-12-30 2015-09-30 贵阳碧野厨具成套设备有限公司 A kind of processing unit (plant) for the symmetrical waist-shaped hole of large scale outer pipe wall
CN105081406A (en) * 2015-09-15 2015-11-25 沈阳飞机工业(集团)有限公司 Mechanism capable of drilling radial holes in indexing manner and drilling method
CN105195782A (en) * 2015-09-10 2015-12-30 芜湖精钻机电技术有限公司 Steel tube drilling device provided with multiple drill heads
CN105522192A (en) * 2016-02-01 2016-04-27 济南光先数控机械有限公司 Numerical control drilling production line
CN105855593A (en) * 2016-05-09 2016-08-17 成都市松川金属材料有限公司 Pipe punching machine with lifting device
CN105855594A (en) * 2016-05-09 2016-08-17 宁波斯贝科技缸套有限公司 Vertical-horizontal two-way drilling device of cylinder pipe joint
CN205552129U (en) * 2016-04-15 2016-09-07 何华琼 Pipeline punch
CN205587711U (en) * 2016-03-24 2016-09-21 张炳源 Oil steel pipe link drilling equipment
CN105965058A (en) * 2016-06-24 2016-09-28 国网山东省电力公司宁津县供电公司 Pipe fitting drilling machine
CN106041166A (en) * 2016-08-08 2016-10-26 无锡市汇鼎金属制管有限公司 Steel pipe perforating machine
CN106346044A (en) * 2016-11-29 2017-01-25 郑州经度知识产权代理服务有限公司 Steel plate drilling device
CN106914640A (en) * 2017-02-07 2017-07-04 江西理工大学应用科学学院 Intelligent steel pipe drilling equipment
CN206366670U (en) * 2016-12-26 2017-08-01 南昌职业学院 A kind of steel plate processing drilling machine of accurate adjustment
CN206500650U (en) * 2016-11-15 2017-09-19 惠州市联达金电子有限公司 A kind of Copper fabrication equidistant drilling machine of copper pipe

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101549410A (en) * 2009-05-15 2009-10-07 浙江华尔达汽车空调有限公司 A drilling mechanism for machining condenser collecting pipe
CN204294990U (en) * 2014-11-27 2015-04-29 嘉兴蓝森机械有限公司 A kind of steel tube drilling machine of Novel belt chuck
CN204413201U (en) * 2014-12-16 2015-06-24 天津市诚田丰金属制品有限公司 A kind of stainless-steel pipe punching machine
CN204673008U (en) * 2014-12-30 2015-09-30 贵阳碧野厨具成套设备有限公司 A kind of processing unit (plant) for the symmetrical waist-shaped hole of large scale outer pipe wall
CN204565196U (en) * 2015-04-17 2015-08-19 重庆望江工业有限公司 A kind of inner spiral groove location drilling device of tube piece
CN104827075A (en) * 2015-04-22 2015-08-12 雍自玲 Tool structure for fixation and drilling of round steel
CN105195782A (en) * 2015-09-10 2015-12-30 芜湖精钻机电技术有限公司 Steel tube drilling device provided with multiple drill heads
CN105081406A (en) * 2015-09-15 2015-11-25 沈阳飞机工业(集团)有限公司 Mechanism capable of drilling radial holes in indexing manner and drilling method
CN105522192A (en) * 2016-02-01 2016-04-27 济南光先数控机械有限公司 Numerical control drilling production line
CN205587711U (en) * 2016-03-24 2016-09-21 张炳源 Oil steel pipe link drilling equipment
CN205552129U (en) * 2016-04-15 2016-09-07 何华琼 Pipeline punch
CN105855593A (en) * 2016-05-09 2016-08-17 成都市松川金属材料有限公司 Pipe punching machine with lifting device
CN105855594A (en) * 2016-05-09 2016-08-17 宁波斯贝科技缸套有限公司 Vertical-horizontal two-way drilling device of cylinder pipe joint
CN105965058A (en) * 2016-06-24 2016-09-28 国网山东省电力公司宁津县供电公司 Pipe fitting drilling machine
CN106041166A (en) * 2016-08-08 2016-10-26 无锡市汇鼎金属制管有限公司 Steel pipe perforating machine
CN206500650U (en) * 2016-11-15 2017-09-19 惠州市联达金电子有限公司 A kind of Copper fabrication equidistant drilling machine of copper pipe
CN106346044A (en) * 2016-11-29 2017-01-25 郑州经度知识产权代理服务有限公司 Steel plate drilling device
CN206366670U (en) * 2016-12-26 2017-08-01 南昌职业学院 A kind of steel plate processing drilling machine of accurate adjustment
CN106914640A (en) * 2017-02-07 2017-07-04 江西理工大学应用科学学院 Intelligent steel pipe drilling equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108568861A (en) * 2018-05-15 2018-09-25 芜湖君如保温材料有限公司 A kind of polyurethane tube is got into the cave mechanism
CN108788227A (en) * 2018-06-06 2018-11-13 龚仁乐 A kind of tube wall finishing attachment device
CN108908483A (en) * 2018-06-06 2018-11-30 李娜 A kind of effective drilling device of plastics
CN108772581A (en) * 2018-07-18 2018-11-09 重庆任翔科技有限公司 Motorcycle welding equipment
CN113018880A (en) * 2021-03-24 2021-06-25 广州趣童玩具有限公司 Anti-collision buffer protection device for remote control toy car

Also Published As

Publication number Publication date
CN107830293B (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN107830293A (en) A kind of Pipe installing drilling equipment
CN107336366A (en) A kind of construction and decoration wall construction automatic slotting equipment
CN110439461A (en) A kind of geotechnical investigation drilling rig
CN107336367A (en) A kind of interior architecture decoration construction is automatically positioned groover with metope
CN109085014B (en) High-efficiency rock soil sampling device and sampling method
CN106914885A (en) A kind of existing railway Tunnel Water Leakage renovates manipulator
CN114541963B (en) Vertical slope punching device and method for ecological restoration of mine
CN104625143B (en) Drilling machine with multiple drill bits in linkage
CN207092048U (en) It is a kind of to be fetched earth deviation correcting device for basement
CN112049569A (en) High road of stability and rig for architectural exploration
CN115575165A (en) Geological prospecting rock core sampling device
CN215518702U (en) Sampling device for roadbed detection
CN108848771B (en) Tea seedling planting equipment
CN218526733U (en) Digging device for greening planting
CN108146845B (en) A kind of physical chemistry detection geological sample storage device
CN208258359U (en) A kind of frame-type pit-picker with clear soil structure
CN203640602U (en) Pneumatic and hydraulic hybrid roadway construction drilling jumbo
CN204163627U (en) A kind of remote control caterpillar sampling surface rig
CN217331692U (en) Multifunctional sampling device for environmental monitoring
CN205117248U (en) Oil field machine of breaking out
CN212743878U (en) Blasting drilling equipment is used in high gas district tunnel construction
CN204609761U (en) Many drill bits trepan
CN104895551B (en) Micro- camera trepan
CN107178313A (en) A kind of mining high-efficiency drilling equipment
CN106555553A (en) A kind of oil platform depth drill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190712

Address after: No. 16, Qingshan New Village, Binhu District, Wuxi City, Jiangsu Province, 214000

Applicant after: Jiangsu Shenxin Engineering Co., Ltd.

Address before: 330000 Jiangxi Hongming Building Gas Engineering Research Institute, No. 189 Yuming Avenue, Linchuan District, Fuzhou City, Jiangxi Province

Applicant before: Wang Jian

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190816

Termination date: 20191012

CF01 Termination of patent right due to non-payment of annual fee