CN107829955A - A kind of coal bed gas well automatic water drainage gas production device - Google Patents

A kind of coal bed gas well automatic water drainage gas production device Download PDF

Info

Publication number
CN107829955A
CN107829955A CN201711286154.1A CN201711286154A CN107829955A CN 107829955 A CN107829955 A CN 107829955A CN 201711286154 A CN201711286154 A CN 201711286154A CN 107829955 A CN107829955 A CN 107829955A
Authority
CN
China
Prior art keywords
gear
gas well
coal bed
pipe
draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711286154.1A
Other languages
Chinese (zh)
Inventor
倪其棍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711286154.1A priority Critical patent/CN107829955A/en
Publication of CN107829955A publication Critical patent/CN107829955A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D15/00Control, e.g. regulation, of pumps, pumping installations or systems
    • F04D15/02Stopping of pumps, or operating valves, on occurrence of unwanted conditions
    • F04D15/0209Stopping of pumps, or operating valves, on occurrence of unwanted conditions responsive to a condition of the working fluid
    • F04D15/0218Stopping of pumps, or operating valves, on occurrence of unwanted conditions responsive to a condition of the working fluid the condition being a liquid level or a lack of liquid supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The invention discloses a kind of coal bed gas well automatic water drainage gas production device,Its structure includes gas well main body,Outlet pipe,Rock stratum,Automatic draining mechanism,Coal seam,CBM Drainage outlet pipe,Pipe outlet,The gas well main body is connected through rock stratum with underseam,The outlet pipe is through gas well body interior,The pipe outlet is at the top of outlet pipe,And it is fixedly connected by connector,The coal seam is below rock stratum,The CBM Drainage outlet pipe is above gas well main body,And it is bolted,The automatic draining mechanism is by waterproof protective case,Water intake mechanism,Transmission mechanism,Closing of circuit device,Draining pump forms,The waterproof protective case is welded in draining pump side,The present invention, which realizes the coal bed gas well automatic water drainage gas production device, can accurately detect whether coal bed gas well bottom has infiltration water outlet situation,And automatic start draining pump carries out draining,Avoid because detection draining caused water logging and damage not in time,The effective normal work for ensureing coal bed gas well,Be advantageous to improve yield.

Description

A kind of coal bed gas well automatic water drainage gas production device
Technical field
The present invention is a kind of coal bed gas well automatic water drainage gas production device, belongs to coal bed gas well automatic water drainage gas production device neck Domain.
Background technology
Coal bed gas, also known as coal seam adsorbed gas, coal bed methane or colliery this.Coal bed gas is that one kind is adsorbed in coal point from storage is born from A kind of Unconventional gas in sublist face, it is a kind of huge emerging potential energy source of reserves, it is stored in, and coal seam is complicated to be split In seam-pore system.
Coal seam is not only the reservoir of storing methane, and is the source rock for generating methane.The physical arrangement in coal seam is one double There is the pore system by matrix pores and fracture pore in repeated hole gap, i.e. coal seam, its fracture pore is again by headway (face cleat) Formed with secondary hugger (end hugger).Coal bed methane is present in coal in three kinds of states, i.e., is adsorbed with molecular state in matrix hole On the inner surface of gap;Hole and crack are present in free gas state;Or it is dissolved in the stratum water in coal seam.Due to the thing in coal seam Manage storage, migration of structure and coal bed gas (methane) etc. and be different from conventional gas, thus traditional conventional gas The evaluation method of reservoir is not suitable for evaluating grey association cluster.
With the development of prior art, coal bed gas increasingly obtains the concern of people, and the exploitation industry development of coal bed gas becomes Gesture is preferable, but is building coal bed gas well gas production constantly, infiltration phenomenon easily occurs, and in existing technology, to pumping operation Job execution is complicated, detects inaccuracy to water outlet phenomenon, well water outlet water logging may be caused when serious and influences normally to produce.
The content of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of coal bed gas well automatic water drainage gas production device, To solve accurately to detect regimen condition, and the problem of Auto-drainage.
To achieve these goals, the present invention is to realize by the following technical solutions:A kind of coal bed gas well is arranged automatically Hydromining device of air, its structure include gas well main body, outlet pipe, rock stratum, automatic draining mechanism, coal seam, CBM Drainage outlet pipe, water pipe Outlet, the gas well main body is connected through rock stratum with underseam, and the outlet pipe is through gas well body interior, the water Pipe outlet is fixedly connected at the top of outlet pipe by connector, and the coal seam is below rock stratum, the coal bed gas discharge Pipe is bolted above gas well main body, and the automatic draining mechanism is by waterproof protective case, water intake mechanism, transmission Mechanism, closing of circuit device, draining pump composition, the waterproof protective case are welded in draining pump side, and the water intake mechanism is located at Side-lower on the inside of waterproof protective case, the transmission mechanism are secured by bolts in inside waterproof protective case, and by water intake mechanism with Closing of circuit device links together, and the closing of circuit device passes through circuit inside waterproof protective case with draining pump Close connection, the water intake mechanism are made up of elevating bar, fixing pipe, buoyant mass, water inlet pipe, hairspring, spring dead plate, The elevating bar is brought into close contact in buoyant mass overhead surface, the buoyancy liter at the top of fixing pipe by binding agent Drop bar surface is evenly distributed with screw thread, and the buoyant mass is inside fixing pipe, the buoyant mass diameter and fixed bore one Cause, the buoyant mass cross section be circular configuration, the transmission mechanism by first gear, second gear, the first driving chain, consolidate Determine block, the second driving chain, rotary turnplate, fixed mount composition, sawtooth, first tooth are evenly distributed with the first gear Wheel side is meshed by sawtooth with the screw thread on elevating bar to be connected, and the first gear is provided with 2, another first tooth Wheel is fixed on fixed block by axle, and second gear centre is provided with connecting shaft, and the connecting shaft is by first gear and the second tooth Wheel is closely joined together, and the second gear is provided with 2, and sawtooth is distributed with the second gear surface, and described first passes Dynamic chain is provided with perforation, and the perforation is meshed with the sawtooth in second gear, passes through the first transmission between the second gear Chain is connected, and second driving chain links together rotary turnplate and the second gear on fixed block, the rotation Rotating disk is provided with the 3rd gear, limited block, applies weight bar, and the limited block is fixed in rotary turnplate by bearing, and with applying weight Bar, which cooperates, to be connected, and the limited block cross section is circular configuration, and the 3rd gear is connected with rotary turnplate by axle, Described weight bar one end of applying is nested on rotary turnplate jackshaft, and the weight bar of applying coordinates with rotary turnplate for gap, described to apply weight The bar other end cooperates with closing of circuit device and connected.
Further, two hairsprings are provided with below the buoyant mass, the hairspring bottom passes through with spring dead plate High temperature fusion connection, the spring dead plate are connected to one end inside water inlet pipe, and the spring dead plate is with water inlet pipe in one Molding structure, the upward power of buoyant mass when hairspring can increase water inlet, avoid into buoyant mass during water but without the feelings risen Condition.
Further, the closing of circuit device by pressure block, set casing, terminals, connecting spring, upper movable contact, Lower fixed contact, circuit connecting wire composition, the pressure block are connected through set casing with connecting spring, the connecting spring bottom Portion one end is fixed with upper movable contact by nut, and upper movable contact and pressure block are linked together, and is easy to pressure block to push.
Further, the circuit connecting wire is divided into circuit A and circuit B, and the terminals are provided with 2, the terminals Closely it is connected located at draining pump side, and with draining pump motor internal, described circuit A one end is connected with terminals, the other end It is connected with lower fixed contact, described circuit B one end is connected with side terminal on draining pump, the other end and upper movable contact phase Connect, when upper movable contact is connected with lower fixed contact, connect power supply, just deenergization during disconnection, realize the control to power supply.
Further, head rod and the second connecting rod are sequentially provided with the fixed mount, the head rod will Fixed mount links together with first gear, and the second connecting rod top links together provided with axle with rotary turnplate, passes through The connection and fixation of head rod and the second connecting rod, the connection between part is more firm, avoids rocking and comes off.
Further, the closing of circuit device, which is additionally provided with, recovers spring and fixture block, and the fixture block is with set casing in one Molding structure, and be connected in set casing side edge surface, described recovery spring bottom one end is fixed with fixture block by nut, described Recover spring top one end to be against on pressure block, after pressure bar leaves, pressure block can speed away deenergization, help to realize The automatic switch of draining pump.
Beneficial effect
When in use, equipment is placed on the place that coal bed gas well bottom has water to ooze out, once there is infiltration situation, water is from entering The mouth of a river enters, by the way that under the double-deck effect of the buoyancy of the upward active force and water of hairspring, buoyant mass is floated upwards, above buoyant mass Floating lever surface be provided with screw thread, first gear starts to be rotated down from left to right while floating, second gear and the first tooth For wheel on same axis, then first gear drives second gear to rotate down from left to right, passes through the first driving chain Transmission, the first gear at the top of fixed block starts to do with second gear rotates down motion from left to right, then passes through second Driving chain drives rotary turnplate to be rotated down from left to right, and while rotation, the limited block in rotary turnplate rotates downwards, Then apply weight bar to be pressed in and applied on pouring weight to tenesmus, apply pouring weight and push to push upper movable contact being close-coupled at lower fixed contact Together, the closure of circuit is realized, power on, draining pump is started working, after taking water away discharge, water level decreasing, without water Buoyancy, hairspring can not support the weight of buoyant mass and elevating bar, and then tenesmus drives first gear upward from left to right Motion, then by the transmission between the first driving chain and the second driving chain, then rotary turnplate is moved upwards from left to right, Limited block moves upwards, will apply weight bar tilt, apply pouring weight by recover spring elastic force pop up, upper movable contact with it is lower solid Fixed contact separates, and realizes the disconnection of circuit, and power supply disconnects, and draining pump is stopped, by automatic draining mechanism to reach draining Pump can detect whether water source and self-draining purpose.
The present invention, which realizes the coal bed gas well automatic water drainage gas production device, accurately to detect whether coal bed gas well bottom has Seep water water outlet situation, and automatic start draining pump carries out draining, avoids because detection draining caused water logging and damage not in time, The effective normal work for ensureing coal bed gas well, be advantageous to improve yield.
Brief description of the drawings
The detailed description made by reading with reference to the following drawings to non-limiting example, further feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural representation of coal bed gas well automatic water drainage gas production device of the present invention.
Fig. 2 is the structural representation of automatic draining mechanism of the present invention.
Fig. 3 is structural representation when automatic draining mechanism of the present invention is opened.
Fig. 4 is the structural representation of closing of circuit device of the present invention.
In figure:Gas well main body -1, outlet pipe -2, rock stratum -3, automatic draining mechanism -4, coal seam -5, CBM Drainage outlet pipe -6, It is pipe outlet -7, waterproof protective case -40, water intake mechanism -41, transmission mechanism -42, closing of circuit device -43, draining pump -44, floating Power elevating lever -410, fixing pipe -411, buoyant mass -412, water inlet pipe -413, hairspring -414, spring dead plate -415, first Gear -420, second gear -421, the first driving chain -422, fixed block -423, the second driving chain -424, rotary turnplate - 425th, fixed mount -426, the 3rd gear -4250, limited block -4251, apply weight bar -4252, pressure block -430, set casing -431, connect Line end -432, connecting spring -433, upper movable contact -434, lower fixed contact -435, circuit connecting wire -436, the first connection Bar -4260 and the second connecting rod -4261, recover spring -437 and fixture block -438.
Embodiment
To be easy to understand the technical means, the inventive features, the objects and the advantages of the present invention, with reference to Embodiment, the present invention is expanded on further.
Fig. 1-Fig. 4 is referred to, the present invention provides a kind of technical scheme of coal bed gas well automatic water drainage gas production device:Its structure It is described including gas well main body 1, outlet pipe 2, rock stratum 3, automatic draining mechanism 4, coal seam 5, CBM Drainage outlet pipe 6, pipe outlet 7 Gas well main body 1 is connected through rock stratum 3 with underseam 5, and through inside gas well main body 1, the water pipe goes out the outlet pipe 2 Mouth 7 is fixedly connected located at the top of outlet pipe 2 by connector, and the coal seam 5 is discharged located at the lower section of rock stratum 3, the coal bed gas Pipe 6 is bolted located at the top of gas well main body 1, and the automatic draining mechanism 4 is by waterproof protective case 40, water intake mechanism 41st, transmission mechanism 42, closing of circuit device 43, draining pump 44 form, and the waterproof protective case 40 is welded in the side of draining pump 44, The water intake mechanism 41 is located at the inner side side-lower of waterproof protective case 40, and the transmission mechanism 42 is secured by bolts in waterproofing protection Inside shell 40, and water intake mechanism 41 and closing of circuit device 43 are linked together, the closing of circuit device 43 is located at waterproof Inside containment vessel 40, and it is connected with draining pump 44 by circuitry in close, the water intake mechanism 41 is by elevating bar 410, fixation Pipe 411, buoyant mass 412, water inlet pipe 413, hairspring 414, spring dead plate 415 form, and the elevating bar 410 is through solid The top of fixed tube 411, and be brought into close contact by binding agent uniform in the overhead surface of buoyant mass 412, the surface of elevating bar 410 Screw thread is distributed with, the buoyant mass 412 is inside fixing pipe 411, the diameter of buoyant mass 412 and the internal diameter one of fixing pipe 411 Cause, the cross section of buoyant mass 412 is circular configuration, and the transmission mechanism 42 is by first gear 420, second gear 421, first Driving chain 422, fixed block 423, the second driving chain 424, rotary turnplate 425, fixed mount 426 form, the first gear Sawtooth is evenly distributed with 420, the side of first gear 420 is meshed by sawtooth with the screw thread on elevating bar 410 Connection, the first gear 420 are provided with 2, and another first gear 420 is fixed on fixed block 423 by axle, and described second Connecting shaft is provided among gear 420, first gear 420 and second gear 421 are closely joined together by the connecting shaft, and described the Two gears 421 are provided with 2, and sawtooth is distributed with the surface of second gear 421, and first driving chain 422 is provided with and worn Hole, the perforation are meshed with the sawtooth in second gear 412, pass through the phase of the first driving chain 422 between the second gear 420 Connection, second driving chain 424 link together rotary turnplate 425 and the second gear 420 on fixed block 423, institute State rotary turnplate 425 to be provided with the 3rd gear 4250, limited block 4251, apply weight bar 4252, the limited block 4251 passes through bearing It is fixed in rotary turnplate 425, and is connected with applying the mutual cooperation of weight bar 4252, the cross section of limited block 4251 is tied to be circular Structure, the 3rd gear 4250 are connected with rotary turnplate 425 by axle, and described one end of weight bar 4252 of applying is nested in rotary turnplate On 425 jackshafts, the weight bar 4252 of applying coordinates with rotary turnplate 425 for gap, described to apply the other end of weight bar 4252 and circuit Closing device 43 cooperates connection, and the lower section of the buoyant mass 412 is provided with two hairsprings 414, the bottom of hairspring 414 and For spring dead plate 415 by high temperature fusion connection, the spring dead plate 415 is connected to the inside one end of water inlet pipe 413, the bullet Spring fixed plate 415 and water inlet pipe 413 are in integrated formed structure, the closing of circuit device 43 by pressure block 430, set casing 431, Terminals 432, connecting spring 433, upper movable contact 434, lower fixed contact 435, circuit connecting wire 436 form, the pressure Block 430 is connected through set casing 431 with connecting spring 433, the bottom end of connecting spring 433 and upper movable contact 434 Fixed by nut, the circuit connecting wire 436 is divided into circuit A and circuit B, and the terminals 432 are provided with 2, the wiring End 432 is located at the side of draining pump 44, and is closely connected with the motor internal of draining pump 44, described circuit A one end and the phase of terminals 432 Connection, the other end are connected with lower fixed contact 435, and described circuit B one end is connected with side terminal 432 on draining pump 44, The other end connects with upper movable contact 434, and the connecting rod of head rod 4260 and second is sequentially provided with the fixed mount 426 4261, the head rod 4260 links together fixed mount 426 and first gear 420, second connecting rod 4261 Top links together provided with axle with rotary turnplate 425, and the closing of circuit device 43, which is additionally provided with, recovers spring 437 and fixture block 438, the fixture block 438 and set casing 431 are in integrated formed structure, and are connected in the side edge surface of set casing 431, the recovery The bottom end of spring 437 is fixed with fixture block 438 by nut, and described recovery spring 437 top one end is against on pressure block 430.
Coal bed gas of the present invention refers to be stored in coal seam using methane as main component, with absorption in matrix of coal particle Based on surface, partly hydrocarbon gas in coal seam water is free in coal hole or be dissolved in, be the associated minerals resource of coal, category is non- Conventional gas, it is cleaning, high-grade energy and the industrial chemicals to emerge in the world in nearly ten or twenty year.It is commonly called as " gas ", calorific value It is 2-5 times of general coal, the calorific value of 1 cubic metre of pure coal bed gas is equivalent to 1.13kg gasoline, 1.21kg standard coals, its calorific value and day Right gas phase is worked as, and can be mixed with natural gas defeated mixed and very clean after burning, and [1] is nearly free from any waste gas, is first-class Industry, chemical industry, generating and resident living fuel.When coal bed gas air concentration reaches 5%-16%, meeting naked light will explode, and this is The root of Gas Explosion Accidents in Coal Mines.Coal bed gas is directly discharged in air, and its greenhouse effects is about 21 times of carbon dioxide, right Environmental destruction is extremely strong.If first exploiting coal bed methane before coal mining, coal mine gas from explosion rate will reduce by 70% to 85%. The utilization of coal bed gas have the effect of achieving many things at one stroke:Clear energy sources, commercialization can produce huge economic benefit.For country Strategic resource.
Draining pump described in this patent, when in use water rotate quickly, the water being rotating is under the influence of centrifugal force from leaf Flown in wheel, after the water in pump is spilled over, the core of impeller forms vacuum area.The water at water source is in atmospheric pressure (or water Pressure) in the presence of be pressed onto by pipe network in water inlet pipe.So circulate endlessly, it is possible to realize continuous pumpage.It is worth one herein It is mentioned that:Centrifugation pump startup is previous will to be full of after water into pump case surely, can be started, otherwise the pump housing will be caused to generate heat, shake, Water yield is reduced, and water pump is caused to damage, and referred to as " cavitation erosion ", causes equipment breakdown!So-called cavitation erosion refers to:Centrifuge pump startup When, if air in pump be present, because the density of air is very low, caused centrifugal force very little after rotation, thus institute of impeller central area The low pressure of formation is not enough to liquid level less than in the liquid suction pump of pump inlet, it is impossible to the phenomenon of trandfer fluid.
First check for whether each several part is stably connected with when being used, confirm equipment components it is complete, well-tended appearance it Afterwards, equipment is placed on the place that coal bed gas well bottom has water to ooze out, once there is infiltration situation, water enters from water inlet 413, leads to Cross under the double-deck effect of buoyancy of the upward active force and water of hairspring 414, buoyant mass 412 is floated upwards, the top of buoyant mass 412 The surface of floating lever 410 is provided with screw thread, and first gear 420 starts to be rotated down from left to right while floating, second gear 321 with For first gear 420 on same axis, then first gear 320 drives second gear 421 to rotate down from left to right, passes through The transmission of first driving chain 422, first gear 420 and second gear 421 located at the top of fixed block 423 start to do from a left side to Rotational motion under dextrad, then drive rotary turnplate 425 to be rotated down from left to right by the second driving chain 424, in rotation Meanwhile the limited block 4251 in rotary turnplate 425 rotates downwards, then apply weight bar 4252 and be pressed in tenesmus and applied on pouring weight 430, applied Pouring weight 430 is pushed to push upper movable contact 434 and is closely joined together with lower fixed contact 435, realizes the closure of circuit, electricity Source is connected, and draining pump 44 is started working, and after taking water away discharge, water level decreasing, without the buoyancy of water, hairspring 414 can not prop up Buoyant mass 412 and the weight of elevating bar 411 are supportted, then tenesmus drives the motion, then lead to upwards from left to right of first gear 420 The transmission crossed between the first driving chain 422 and the second driving chain 424, the then motion upwards from left to right of rotary turnplate 425, Limited block 4251 moves upwards, will apply weight bar 4252 and tilts, and applies pouring weight 430 and is popped up by the elastic force for recovering spring 437, on Movable contact 434 separates with lower fixed contact 435, realizes the disconnection of circuit, and power supply disconnects, and draining pump 44 is stopped;Pass through Automatic draining mechanism can detect whether water source and self-draining purpose to reach draining pump, be arranged automatically in practical coal bed gas well Hydromining device of air is in use, can detect that whether coal bed gas well bottom has infiltration water outlet situation, and automatic start draining pump is carried out Draining, avoid because detection draining caused water logging and damage not in time, the effective normal work for ensureing coal bed gas well, favorably In raising yield.
The present invention solves the problems, such as be coal bed gas well automatic water drainage gas production device can not possess accurately and timely detect seep water out Water and self-draining function, well water outlet water logging may be caused when serious and influences normally to produce.The present invention passes through above-mentioned part Be combined with each other, realizing can accurately detect whether coal bed gas well bottom has infiltration water outlet situation, and automatic start draining pump Draining is carried out, is avoided because detection draining caused water logging and damage not in time, the effective normal work for ensureing coal bed gas well, Be advantageous to improve yield.
In embodiments of the invention 1, the fixed mount 426 is plastic material;
In embodiments of the invention 2, the fixed mount 426 is metal material;
In summary, when the fixed mount of the present invention is metal material, service life of the invention is longer, can bear gravity Bigger, corrosion resistance is preferable, and using effect reaches optimal.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above, for this area skill For art personnel, it is clear that the invention is not restricted to the details of above-mentioned one exemplary embodiment, and without departing substantially from the present invention spirit or In the case of essential characteristic, the present invention can be realized in other specific forms.Which point therefore, no matter from the point of view of, all should incite somebody to action Embodiment regards exemplary as, and be it is nonrestrictive, the scope of the present invention by appended claims rather than on state Bright restriction, it is intended that all changes fallen in the implication and scope of the equivalency of claim are included in the present invention It is interior.Any reference in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (6)

1. a kind of coal bed gas well automatic water drainage gas production device, its structure include gas well main body (1), outlet pipe (2), rock stratum (3), from Dynamic drainage mechanism (4), coal seam (5), CBM Drainage outlet pipe (6), pipe outlet (7), the gas well main body (1) run through rock stratum (3) It is connected with underseam (5), the outlet pipe (2) is internal through gas well main body (1), and the pipe outlet (7) is located at out At the top of water pipe (2), and it is fixedly connected by connector, the coal seam (5) is below rock stratum (3), the CBM Drainage outlet pipe (6) above gas well main body (1), and it is bolted, it is characterised in that:
The automatic draining mechanism (4) is filled by waterproof protective case (40), water intake mechanism (41), transmission mechanism (42), closing of circuit (43), draining pump (44) composition are put, the waterproof protective case (40) is welded in draining pump (44) side, the water intake mechanism (41) Located at side-lower on the inside of waterproof protective case (40), the transmission mechanism (42) is secured by bolts in waterproof protective case (40) Portion, and water intake mechanism (41) and closing of circuit device (43) are linked together, the closing of circuit device (43) is located at waterproof Containment vessel (40) is internal, and is connected with draining pump (44) by circuitry in close;
The water intake mechanism (41) is by elevating bar (410), fixing pipe (411), buoyant mass (412), water inlet pipe (413), thin Spring (414), spring dead plate (415) composition, the elevating bar (410) are run through at the top of fixing pipe (411), and by viscous Knot agent is brought into close contact in buoyant mass (412) overhead surface, and elevating bar (410) surface is evenly distributed with screw thread, described Buoyant mass (412) is internal located at fixing pipe (411), and buoyant mass (412) diameter is consistent with fixing pipe (411) internal diameter, described Buoyant mass (412) cross section is circular configuration;
The transmission mechanism (42) is by first gear (420), second gear (421), the first driving chain (422), fixed block (423), the second driving chain (424), rotary turnplate (425), fixed mount (426) form, on the first gear (420) uniformly Sawtooth is distributed with, first gear (420) side is meshed by sawtooth with the screw thread on elevating bar (410) to be connected, The first gear (420) is provided with 2, and another first gear (420) is fixed on fixed block (423) by axle, and described the Connecting shaft is provided among two gears (420), first gear (420) and second gear (421) are close-coupled at one by the connecting shaft Rise, the second gear (421) is provided with 2, and sawtooth, first driving-chain is distributed with second gear (421) surface Bar (422) is provided with perforation, and the perforation is meshed with the sawtooth in second gear (412), leads between the second gear (420) Cross the first driving chain (422) to be connected, second driving chain (424) is by rotary turnplate (425) and fixed block (423) Second gear (420) link together;
The rotary turnplate (425) is provided with the 3rd gear (4250), limited block (4251), applies weight bar (4252), described spacing Block (4251) is fixed in rotary turnplate (425) by bearing, and is connected with applying weight bar (4252) mutual cooperation, the limited block (4251) cross section is circular configuration, and the 3rd gear (4250) is connected with rotary turnplate (425) by axle, described to apply weight Bar (4252) one end is nested on rotary turnplate (425) jackshaft, and the weight bar (4252) and rotary turnplate (425) applied is gap Coordinate, weight bar (4252) other end of applying connects with closing of circuit device (43) mutual cooperation.
A kind of 2. coal bed gas well automatic water drainage gas production device according to claim 1, it is characterised in that:The buoyant mass (412) lower section is provided with two hairsprings (414), and hairspring (414) bottom is merged with spring dead plate (415) by high temperature Connection, the spring dead plate (415) are connected to the internal one end of water inlet pipe (413), the spring dead plate (415) and water inlet pipe (413) it is in integrated formed structure.
A kind of 3. coal bed gas well automatic water drainage gas production device according to claim 1, it is characterised in that:The closing of circuit Device (43) by pressure block (430), set casing (431), terminals (432), connecting spring (433), upper movable contact (434), Lower fixed contact (435), circuit connecting wire (436) composition, the pressure block (430) pass through set casing (431) and connecting spring (433) it is connected, connecting spring (433) bottom end is fixed with upper movable contact (434) by nut.
A kind of 4. coal bed gas well automatic water drainage gas production device according to claim 3, it is characterised in that:The circuit connection Line (436) is divided into circuit A and circuit B, and the terminals (432) are provided with 2, and the terminals (432) are located at draining pump (44) Side, and being closely connected with draining pump (44) motor internal, described circuit A one end is connected with terminals (432), the other end with Lower fixed contact (435) is connected, and described circuit B one end is connected with side terminal (432) on draining pump (44), the other end with Upper movable contact (434) connects.
A kind of 5. coal bed gas well automatic water drainage gas production device according to claim 1, it is characterised in that:The fixed mount (426) head rod (4260) and the second connecting rod (4261) are sequentially provided with, the head rod (4260) will be fixed Frame (426) links together with first gear (420), and the second connecting rod (4261) top is provided with axle and rotary turnplate (425) link together.
A kind of 6. coal bed gas well automatic water drainage gas production device according to claim 3, it is characterised in that:The closing of circuit Device (43), which is additionally provided with, recovers spring (437) and fixture block (438), and the fixture block (438) is in be integrally formed knot with set casing (431) Structure, and be connected in set casing (431) side edge surface, recovery spring (437) bottom end passes through nut with fixture block (438) Fixed, one end is against on pressure block (430) at the top of the recovery spring (437).
CN201711286154.1A 2017-12-07 2017-12-07 A kind of coal bed gas well automatic water drainage gas production device Withdrawn CN107829955A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711286154.1A CN107829955A (en) 2017-12-07 2017-12-07 A kind of coal bed gas well automatic water drainage gas production device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711286154.1A CN107829955A (en) 2017-12-07 2017-12-07 A kind of coal bed gas well automatic water drainage gas production device

Publications (1)

Publication Number Publication Date
CN107829955A true CN107829955A (en) 2018-03-23

Family

ID=61641876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711286154.1A Withdrawn CN107829955A (en) 2017-12-07 2017-12-07 A kind of coal bed gas well automatic water drainage gas production device

Country Status (1)

Country Link
CN (1) CN107829955A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108892291A (en) * 2018-07-27 2018-11-27 芜湖慧宇商贸有限公司 A kind of sewage disposal device
CN109882132A (en) * 2019-03-19 2019-06-14 中国地质大学(北京) A kind of coal bed gas self-draining arrangement
CN112392544A (en) * 2020-11-13 2021-02-23 温小龙 Underground monitoring and early warning device for drainage and gas production of coal bed gas

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108892291A (en) * 2018-07-27 2018-11-27 芜湖慧宇商贸有限公司 A kind of sewage disposal device
CN109882132A (en) * 2019-03-19 2019-06-14 中国地质大学(北京) A kind of coal bed gas self-draining arrangement
CN112392544A (en) * 2020-11-13 2021-02-23 温小龙 Underground monitoring and early warning device for drainage and gas production of coal bed gas
CN112392544B (en) * 2020-11-13 2023-11-03 吕梁腾翼信息科技有限公司 Underground monitoring and early warning device for coal bed gas drainage and gas production

Similar Documents

Publication Publication Date Title
CN107829955A (en) A kind of coal bed gas well automatic water drainage gas production device
CN101190743B (en) Carbon dioxide geological sequestration method based on mixed fluid self-detaching
US20050084393A1 (en) Methods and apparatus for increasing and extending oil production from underground formations nearly depleted of natural gas drive
CN201618545U (en) Movable type yellow mud pulp automatic stirring apparatus
CN106351814B (en) Underground booster, downhole pressure increasing fracturing tool and downhole pressure increasing fracturing process
CN104909419B (en) A kind of gas well fracturing returns discharge opeing separator
CN103410463A (en) Deep hole inner pipe in-place alarming rope coring drilling tool and pressure detection system used by same
CN204511348U (en) A kind of abandoned well novel multi-layer casing cutting device
CN201013344Y (en) Corollary equipment for bottom water reservoir potential equilibrium dislodging
CN219431806U (en) Blowout prevention box for petroleum exploitation
CN103449063B (en) Zero-pollution underwater oil storage system with oil and water displacement function
CN110979899A (en) Telescopic petroleum barrel capable of triggering leakage early warning based on capacitance change principle
CN204663500U (en) A kind of automatic intermittent CBM Drainage aquatic products device of air
CN102287158A (en) Method for preventing leakage of sea drilling oil conveying pipe
CN213087962U (en) Oil exploitation device
CN205605181U (en) Shale air water horizontal well operation device based on pressure oscillation
CN107630693A (en) A kind of electro-hydrodynamic fracturing device applied to shale gas exploitation
CN2553107Y (en) Beam-pumping unit power-aid wellhead chemicals-feeder
CN2777192Y (en) Water shut off tube column
CN202718663U (en) Casing gas recovery device for mechanized oil well
CN207750074U (en) A kind of electro-hydrodynamic fracturing device applied to shale gas exploitation
CN104863548A (en) Automatic intermittent coalbed methane water draining and gas producing device
CN103255750B (en) Spilled oil on water surface retracting device
CN203066941U (en) Underground driving type screw pump oil extraction device
CN201013586Y (en) Waterpower screw pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180323

WW01 Invention patent application withdrawn after publication