CN1078284C - Impervious form layout and adhesive sealing method for post-pouring zone of basement - Google Patents

Impervious form layout and adhesive sealing method for post-pouring zone of basement Download PDF

Info

Publication number
CN1078284C
CN1078284C CN 97108661 CN97108661A CN1078284C CN 1078284 C CN1078284 C CN 1078284C CN 97108661 CN97108661 CN 97108661 CN 97108661 A CN97108661 A CN 97108661A CN 1078284 C CN1078284 C CN 1078284C
Authority
CN
China
Prior art keywords
hole
concrete
glue
pouring concrete
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 97108661
Other languages
Chinese (zh)
Other versions
CN1175650A (en
Inventor
鲁立平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 97108661 priority Critical patent/CN1078284C/en
Publication of CN1175650A publication Critical patent/CN1175650A/en
Application granted granted Critical
Publication of CN1078284C publication Critical patent/CN1078284C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a cloth mould glue sealing anti-seeping method for a post-pouring zone of a basement, which comprises the following steps: an integral cloth mould and an additional cloth mould, namely a cloth mould for a glue placing groove and a cloth mould for a prepared hole, are firstly set, wherein the additional cloth mould is tightly sewn on the integral cloth mould, and the integral cloth mould is fixed by a fixing device. Anti-seeping cement with micro expansion and puddle expanding in water are used, the puddle is pressed into the glue placing groove before post-pouring concrete is poured, or hydration reaction glue is poured into a prepared glue pouring hole from a glue pouring hole under high pressure. By solving the supporting problem of a side mould of the post-pouring zone, surface cavities in joints of new and old concrete and at both sides of the joints are eliminated by glue sealing seepage prevention, and reliable anti-seeping effect is obtained.

Description

A kind of basement percolation-proof method
The present invention relates to a kind of basement percolation-proof method.
In the background technology, careful percolation-proof measure is arranged, still have seepage problem in varying degrees after numerous basement post-pouring zone constructions, directly influence the normal use of basement although formulate in the basement construction.Both at home and abroad the waterproof measure of ater-casting mainly contains: 1. the back pouring concrete is with the cast of microdilatancy waterproof concrete, and its effect is to eliminate or reduce joint gap between the new-old concrete, increases the infiltration resistance; 2. the vertical joint with new-old concrete changes meander line into, increases the infiltration resistance by prolonging infiltration length; 3. steel plate or macromolecular material waterstop are being set across the new-old concrete seam, are making infiltration just can penetrate into waterstop top, increasing the infiltration resistance by the waterstop above and below.4. before the pouring concrete of back, formerly pouring concrete surface paste the water-swellable clay, be clipped in the clay in the new-old concrete seam, meet that water volume expands and penetrating passage (new-old concrete seam) is stuck, reach the purpose that resistance is oozed along the ater-casting length direction.Experimental results show that, as long as the side form of first pouring concrete is reliable, be that first pouring concrete side elevation is closely knit smooth, any one of above-mentioned four kinds of waterproof measures just can prevent that infiltration from taking place, but, numerous ater-castings even the above-mentioned four kinds of waterproof measures of dual-purpose several or all can not solve phreatic infiltration problem simultaneously.Basic reason just is that first pouring concrete side elevation place all directly adopts vertical row's muscle to prop up retaining, and does not adopt the template supporting.So, seek out reliable anti-seepage effect, just must solve the support problem of ater-casting side form, and then seal the hole that new-old concrete seam and seam both sides concrete surface layer are eliminated in antiseepage by glue.
The objective of the invention is to overcome the weak point of above-mentioned background technology, thoroughly solve the basement post-pouring zone seepage problem.
In order to solve above-mentioned the deficiencies in the prior art part; the technical solution that the present invention adopts is: make cloth die body 3 with the low elastic fibre cloth of high strength; its length is identical with ater-casting length; width is identical with the ater-casting height; on cloth; lower edge is rolled into the hole shape respectively; inserting inserted link 26 in its volume hole, top also tightens inserted link 26 with pull bar 24 with the ater-casting upper reinforcement and the pre-envelope lumps of wood 29; the pebbles bag 4 that sand grains or plastic grain are housed is put in volume hole, cloth die body 3 bottoms; be close to outer retaining muscle 30 and interior retaining muscle 31 and be pressed on whole cloth mould 5 lower ends; and it is fixing with pressing plate 27 and pull bar 28; begin plastic tank cloth mould then; promptly make the sand pocket 8 that diameter is identical with the plastic tank cross section earlier; in dress sand grains 9 or mould a particle; sand pocket 8 is laid on the whole cloth mould by the plastic tank desired location and sand pocket 8 subsides is sewn on the whole cloth mould with sand pocket stationary cloth 7; adopt expansion glue sealing method 34 at last; promptly adopt microdilatancy water-tight concrete and water-swellable clay, before the concrete pouring of ater-casting, clay is pressed into plastic tank.
Technical solution of the present invention also comprises:
Promptly behind whole cloth mould; make a sand pocket 12; interior dress sand grains or plastic grain; with sand pocket stationary cloth 13 its subsides are sewn on the whole cloth mould; after elder generation's pouring concrete pours; cloth mould of reservated hole makes side elevation place, first pouring concrete ater-casting half hole of hole to be provided occur; after cast before the pouring concrete; with welded wire fabric 16 hole to be provided half hole is sealed and tied up into injected rubber hose 17; formation is elongated and have the reservation injecting glue hole 18 of injected rubber hose 17 along the ater-casting, adopts hole to be provided encapsulating method 33 then, promptly adopt hydration reaction glue from hole for injecting glue to reserving injecting glue hole 18 inner high voltage encapsulatings; can displace the infiltration that may occur in the hole and make colloid be full of hole to be provided, uprightly end infiltration and continue continuity.
The present invention is promptly when the pouring concrete of back, can add a closedtop lumps of wood again on the closedtop lumps of wood 28 sides, side form as the concrete joint opposite side, adopt slightly expanded concrete cast ater-casting, back pouring concrete is than the low visible height of first pouring concrete, then with glue with joint seal, and with concrete joint seal glue is buried and to protect.
The present invention is after promptly formerly pouring concrete pours, adopt the side elevation spray glue of the high infiltration of organosilicon glue to first pouring concrete, with its top layer concrete micropore sealing, before the pouring concrete of back,, make it fill back pouring concrete at the microgap of concrete seam and with the interface micropore sealing of seam crossing once more to first pouring concrete surface spray glue.
The setting in reservation injecting glue of the present invention hole 18, promptly first pouring concrete side elevation formerly forms half hole, the bar shaped rubbery air pocket that to inflate before the pouring concrete construction of back is pressed in half hole, in concrete placement, from extracting and be set in the position of wanting pouring concrete out the pouring concrete, the segmentation step-by-step operation promptly forms a broad bean shape hole to be provided to the way of adopt venting, inflating in the new-old concrete of ater-casting with airbag.
Description of drawings of the present invention is as follows:
Fig. 1 is whole cloth mould schematic diagram.
Fig. 2 is a plastic tank cloth mould schematic diagram.
Fig. 3 reserves injecting glue hole cloth mould half hole schematic diagram.
Fig. 4 reserves injecting glue hole cavitation schematic diagram.
Fig. 5 is whole cloth mould support system figure.
Fig. 6 is an ater-casting glue envelope anti-seepage method sectional drawing.
Fig. 7 is the left view of Fig. 1.
Above-mentioned number in the figure is described as follows:
Volume hole, 1-top, 2-bar seam, 3-cloth die body, 4-pebbles bag, 5-whole cloth mould, 6-stitch bond, 7-sand pocket stationary cloth, 8-sand pocket, 9-sand grains, 10-after water slightly expanded concrete, 11-stitch bond, 12-sand pocket, 13-sand pocket stationary cloth, 14-wear the pre-buried iron wire of cloth, 15-the pre-buried iron wire of net tied up, 16-welded wire fabric, 17-injected rubber hose, 18-reservation injecting glue hole, 19-earlier water water-tight concrete, 20-top lower floor muscle, upper strata, 21-top muscle, 22-bottom lower floor muscle, upper strata, 23-bottom muscle, 24-pull bar A, 25-not assembling reinforcement, 26-inserted link, 27-pressing plate, 28-pull bar B, 29-closedtop lumps of wood, 30-outward keep off muscle, 31-interior retaining muscle, 32-closedtop anti-seepage method, 33-hole to be provided (vertical hole) encapsulating method, 34-expansion glue sealing method, 35-hole to be provided (horizontal hole) encapsulating method, 36-spray glue sealing method, 37-hole to be provided (vertical hole) encapsulating method.
Following adjoint is described in further detail: referring to Fig. 1; make whole cloth mould earlier; cloth die body 3 is selected the high strength, low elasticity cloth for use; length is identical with ater-casting length, and width is identical with the ater-casting height, is rolled into volume hole 1, top with the cloth top edge; be used for fixing cloth mould top; lower edge is rolled into volume hole, bottom, puts into the pebbles bag 4 that is equipped with sand grains or plastic grain, is used for fixing cloth mould bottom.Referring to Fig. 7, this is the left view of Fig. 1, and 2 are the bar seam.Fig. 5 is whole cloth mould support system figure, make cloth mould outside retaining muscle with moving on two lower rebar 22, and with this muscle and lower rebar 23 spot welding at a certain distance of hanging down and handing over, the parallel placement of bottom pebbles bag 4 edge retaining muscle of the whole cloth mould 5 that has made, other two retaining muscle 31 are close to pebbles bag 4 are pressed on the whole cloth mould 5, and fixing with pressing plate 27 and pull bar 28.The top of cloth mould is supported with inserted link 26, with the backguy that ties up on whole cloth mould in advance the cloth mould is mentioned, and from the ater-casting one inserts volume hole, cloth mould tops with inserted link 26, tightens with the ater-casting upper reinforcement 20 and the closedtop lumps of wood 29 with pull bar 28 then.The closedtop lumps of wood 29 is provided with along the ater-casting, and during back pouring concrete, pull bar 28 has been removed, thus by the closedtop lumps of wood, add a closedtop lumps of wood again, as the side form of concrete joint opposite side.When the upper reinforcement colligation, it is convenient for the closedtop lumps of wood and stationary cloth modulo operation are set, next-door neighbour's reinforcing bar 25 not colligations earlier with inboard, the other ater-casting of the closedtop lumps of wood, after the cloth mould supports, cast is watered mud earlier and is coagulated soil, when hardening of concrete to can form removal the time, carry out form removal work immediately, with instrument bottom pull bar 28 and pressing plate 27 are pried open taking-up, and with top pull bar 28 and inserted link 26 taking-ups, whole cloth mould is torn extraction, the position of not assembling reinforcement of top 25 is mixed up the back colligation, at last cast back pouring concrete.Referring to Fig. 2, this is a plastic tank cloth mould schematic diagram, behind the whole cloth mould, make the cloth bag 8 that a diameter and plastic tank cross section adapt, interior dress sand grains 9 or plastic grain, this bag is laid on the whole cloth mould 5 by the plastic tank desired location, and is fixed on the whole cloth mould with sand pocket stationary cloth 7, the 6th, stitch bond.Referring to Fig. 3, Fig. 4, Fig. 3 is for reserving injecting glue hole cloth mould half hole schematic diagram, Fig. 4 is for reserving injecting glue hole cavitation schematic diagram, behind the whole cloth mould, make a sand pocket 12 and fixing with stationary cloth 13, sew up then, the 11st, stitch bond, wear the pre-buried iron wire 14 of cloth, after first pouring concrete pours, the attached cloth mould of reservated hole of seam on whole cloth mould, make side elevation place, first pouring concrete ater-casting half hole of hole to be provided occur, before the pouring concrete of back, with hole to be provided sealing and tie up into injected rubber hose 17, formation is elongated and have a reservation injecting glue hole 18 of injected rubber hose along the ater-casting with welded wire fabric 16.Reserve the setting in injecting glue hole and also can use the airbag method, with reference to reserving injecting glue hole cloth mould half hole method, formerly the pouring concrete side forms half hole, half hole must have the bigger degree of depth, to avoid back pouring concrete excessive compression airbag, and the top should be vertical with concrete joint as far as possible up and down, the bar shaped rubbery air pocket of having inflated is pressed in half hole, can carry out the construction of back pouring concrete, in concrete placement, adopt venting, the method of inflation extracts and is set in airbag out want pouring concrete position from pouring concrete, so segmentation is progressively carried out, and promptly forms a broad bean shape hole to be provided in the new-old concrete of ater-casting.Referring to Fig. 6, this is an ater-casting glue envelope anti-seepage method sectional drawing, wherein back pouring concrete 10 all adopts the microdilatancy water-tight concrete with first pouring concrete 19,32 is the closedtop anti-seepage method, it is side form that the closedtop lumps of wood promptly is set, at the new-old concrete seam crossing with glue with joint seal, and with certain thickness concrete joint seal glue is buried and to protect, to prolong the aging period of sealing.Sealing compound is formed by three layers, and lower floor is a sealing compound, and the middle level is the fixing glue of lower floor's sealing compound, and the upper strata is the sealing glue of middle level glue.Three layers of sealing compound must could pour into layer concrete after the body contraction is all finished, adopt slightly expanded concrete that layer concrete is fully combined with the both sides concrete, and use plate vibrator jolt ramming.When cast ater-casting concrete, must make the back pouring concrete than the low visible height of first pouring concrete, make sealing compound be enclosed in true seam position and about extend a width, seal effect to reach desirable glue.When the pouring concrete of back, also can establish the seam lath at seam crossing.33,35,37 all represent hole to be provided encapsulating method among the figure, and 33 is the vertical hole vertical with seam, and 35 is the horizontal hole in parallel hole, 37 is the vertical hole in the parallel hole, vertical hole encapsulating effect is better than parallel hole, and it is not subjected to the colloid effect of contraction, can select the unexpansive glue of high strength for use.Hole to be provided encapsulating method is for pouring concrete construction back, back the method that infiltration is taked to take place, after the concrete construction of ater-casting, if not having infiltration takes place, encapsulating not, if seep water, can be successively from hole for injecting glue to hole to be provided inner high voltage encapsulating, owing to colloid has certain viscosity and cohesive strength, can displace infiltration and make colloid be full of hole to be provided, the employed hydration reaction glue of encapsulating can stand and end the infiltration continuity.34 are the only glue method that expands, promptly adopt the water-swellable clay, before the adhesive tape concrete pouring of back, clay is pressed into plastic tank, after the pouring concrete cast of back, the surface of expansion glue and the water in the concrete react to expand seam are blocked, colloid remains unchanged for a long time, when underground water when seam rises to expansion glue place, colloid continues to react infiltration is ended.Must before the concrete pouring of ater-casting, clay be pressed into plastic tank during construction, and can not after side form is removed, promptly embed clay, prevent the construction water etch and colloid was lost efficacy, guarantee that clay can not meet water before concrete pouring.36 are spray glue sealing method, promptly the organosilicon of the side elevation of pouring concrete spray formerly height permeates glue earlier, it can be with calcium hydroxide reaction in water and the concrete and produces gel, first pouring concrete side elevation top layer micropore is sealed, at back pouring concrete forward direction elder generation pouring concrete surface spray glue, spray glue is controlled at downward drip and exceeds, owing at first spray glue first pouring concrete surface micropore is all sealed, and institute sprays glue the following time and all stays first pouring concrete surface.When back pouring concrete is poured into a mould,, under the concrete lateral pressure effect, can not connect the face place and form glue-line at new-old concrete because the viscosity of colloid is very little.After the back pouring concrete cast, the water on colloid and pouring concrete surface, back and calcium hydroxide react and produce gel, gel is the slit of fill concrete seam crossing at first, and pouring concrete deep infiltration backward then is the interface micropore sealing of back pouring concrete at concrete seam.Like this, spray glue is both with the concrete surface micropore sealing of concrete joint both sides, and dimension one possibility passage---the joint sealing that will seep water again reaches the sealing purpose.
Advantage of the present invention and effect are as follows:
1, owing to adopted the cloth die support, solved the support problem of post-cast strip side form, no matter the post-cast strip chi Very little have muchly, and the post-cast strip place that can both formerly water coagulation figure arranges smooth and reliable side form, makes first pouring concrete Smooth-sided compression candles at the place, post-cast strip is closely knit, and rear pouring concrete can fully tamp the post-cast strip, and this is just reliable for obtaining The basement anti-seepage effect lay the first stone.
2, owing to adopted new post-cast strip rubber seal anti-seepage method, new-old concrete seam and seam two have been eliminated The hole of side concrete surface layer is sealed the passage that may seep water effectively, reaches reliable antiseepage Effect.
3, reserve the injecting glue hole the middle airbag method that adopts is set, in the new-old concrete of post-cast strip, form a silkworm Beans shape hole to be provided, this hole to be provided size is bigger, and it is wide to fill with material ranges, and important engineering is adapted to especially.
4, plastic tank cloth mould is formerly set up smooth smooth plastic tank in the side, post-cast strip of pouring concrete, will The expansion clay is pressed in the plastic tank reliably, has stopped the generation of rear pouring concrete parcel expansion clay, with passing The clay mounting method of system is completely different.
5, the closedtop anti-seepage method is taked twice construction of rear pouring concrete, and not only the colloid sealing effectiveness is better, and Simple to operate, the complex process may seep water the time becomes normal concrete construction.
6, glue spraying sealing method both with the concrete surface micropore sealing of concrete joint both sides, will seep water again Dimension one possibility passage---joint sealing, the seam between the very effective sealing new-old concrete of energy.
Very complicated processing became simple injecting glue when 7, concrete joint percolating water will take place the hole to be provided slip casting method, as convenient falling to starch in the bottle of going together, and this at home and abroad is beyond example.
8, method easy construction of the present invention, waterproof effect is reliable, but construction costs is lower than existing waterproof measure on the contrary, is best both at home and abroad at present ater-casting percolation-proof method.

Claims (5)

1; a kind of basement percolation-proof method; it is characterized in that: make cloth die body (3) with the low elastic fibre cloth of high strength; its length is identical with ater-casting length; width is identical with the ater-casting height; insert inserted link (26) and use pull bar (24) that inserted link (26) is tightened with the ater-casting upper reinforcement and the closedtop lumps of wood (29) in its volume hole, top; the pebbles bag (4) that sand grains or plastic grain are housed is put in volume hole, cloth die body (3) bottom; be close to outer retaining muscle (30) and interior retaining muscle (31) and be pressed on whole cloth mould (5) lower end; fixing with pressing plate (27) and pull bar (28); make a sand pocket (8) that diameter is identical with the plastic tank cross section then; in dress sand grains (9) or mould a particle; sand pocket (8) is laid on the whole cloth mould by the plastic tank desired location and sand pocket (8) subsides is sewn on the whole cloth mould with sand pocket stationary cloth (7); adopt expansion glue sealing method (34) at last; promptly adopt microdilatancy water-tight concrete and water-swellable clay, before the concrete pouring of ater-casting, clay is pressed into plastic tank.
2; a kind of basement percolation-proof method according to claim 1; it is characterized in that: promptly behind whole cloth mould; make a sand pocket (12); interior dress sand grains or plastic grain; with sand pocket stationary cloth (13) its subsides are sewn on the whole cloth mould; after elder generation's pouring concrete pours; cloth mould of reservated hole makes side elevation place, first pouring concrete ater-casting half hole of hole to be provided occur; after cast before the pouring concrete; with welded wire fabric (16) hole to be provided half hole is sealed and tied up into injected rubber hose (17); formation is elongated and have a reservation injecting glue hole (18) of injected rubber hose (17) along the ater-casting; adopt hole to be provided encapsulating method (33) then; promptly adopt hydration reaction glue to make colloid be full of hole to be provided from hole for injecting glue to reserving injecting glue hole (18) inner high voltage encapsulating, can displacing the infiltration that may occur in the hole, upright only infiltration continues continuity.
3, a kind of basement percolation-proof method according to claim 1 and 2, it is characterized in that: promptly when the pouring concrete of back, can add a closedtop lumps of wood again on the closedtop lumps of wood (28) side, side form as the concrete joint opposite side, adopt slightly expanded concrete cast ater-casting, back pouring concrete is than the low visible height of first pouring concrete, then with glue with joint seal, and with concrete joint seal glue is buried and to protect.
4, a kind of basement percolation-proof method according to claim 1 and 2 is characterized in that; After promptly formerly pouring concrete pours, adopt the side elevation spray glue of the high infiltration of organosilicon glue to first pouring concrete, with its top layer concrete micropore sealing, before the pouring concrete of back,, make it fill back pouring concrete at the microgap of concrete seam and with the interface micropore sealing of seam crossing once more to first pouring concrete surface spray glue.
5, a kind of basement percolation-proof method according to claim 2, it is characterized in that: the promptly first pouring concrete side elevation formerly of setting of reserving injecting glue hole (18) forms half hole, the bar shaped rubbery air pocket that to inflate before the pouring concrete construction of back is pressed in half hole, in concrete placement, adopt venting, from extracting and be set in the position of wanting pouring concrete out the pouring concrete, the segmentation step-by-step operation promptly forms a broad bean shape hole to be provided to the way of inflation in the new-old concrete of ater-casting with airbag.
CN 97108661 1997-09-25 1997-09-25 Impervious form layout and adhesive sealing method for post-pouring zone of basement Expired - Fee Related CN1078284C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97108661 CN1078284C (en) 1997-09-25 1997-09-25 Impervious form layout and adhesive sealing method for post-pouring zone of basement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97108661 CN1078284C (en) 1997-09-25 1997-09-25 Impervious form layout and adhesive sealing method for post-pouring zone of basement

Publications (2)

Publication Number Publication Date
CN1175650A CN1175650A (en) 1998-03-11
CN1078284C true CN1078284C (en) 2002-01-23

Family

ID=5170597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97108661 Expired - Fee Related CN1078284C (en) 1997-09-25 1997-09-25 Impervious form layout and adhesive sealing method for post-pouring zone of basement

Country Status (1)

Country Link
CN (1) CN1078284C (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101298781B (en) * 2008-06-13 2010-04-21 浙江省一建建设集团有限公司 Basement bottom plate rear pouring tape construction method
CN106284982A (en) * 2016-08-10 2017-01-04 北京首钢建设集团有限公司 A kind of reinforced concrete floor alter-pouring strips mould plate method for supporting
CN107795323A (en) * 2017-11-20 2018-03-13 中铁第四勘察设计院集团有限公司 A kind of waterproof method of constructing tunnel crack structure and corresponding construction joint
CN111549725A (en) * 2020-05-29 2020-08-18 大连理工大学 Waterproof horizontal water leakage structure for roller compacted concrete dam intermittent layer in severe cold area
CN111636385A (en) * 2020-06-15 2020-09-08 大连理工大学 Structure for preventing concrete dam bank slope dam section fracture water leakage
CN111980213A (en) * 2020-07-08 2020-11-24 中国十七冶集团有限公司 Construction method of novel square steel keel template system

Also Published As

Publication number Publication date
CN1175650A (en) 1998-03-11

Similar Documents

Publication Publication Date Title
CN108194136B (en) Lining construction method
CN104806272B (en) Tunnel shunting combined type guarded drainage integrated system and construction method and using method
CN111734457B (en) Construction method of tunnel water-drainage-preventing system
CN106836246B (en) Open trench tunnel crosses the construction method of section building enclosure
CN204000956U (en) A kind of basement bottom plate rear pouring tape structure
CN204572015U (en) A kind of tunnel shunting combined type waterproof and water drainage system
CN105002927B (en) A kind of construction method of execavated rockmass barricade loaded filter
CN1078284C (en) Impervious form layout and adhesive sealing method for post-pouring zone of basement
CN107327308A (en) A kind of Railway Tunnel waterproof method
CN110439612A (en) A kind of mould bag barricade and construction method
CN108180038A (en) A kind of pier stud type filling template and its application method
CN101694100A (en) Waterproof construction of basement soleplate and construction method thereof
CN105370315B (en) A kind of frost zone tunnel drainage construction technology
CN110761300B (en) Construction method for supporting impervious soft soil body on side slope of deep foundation pit of high-rise building through micro-expansion
JP3509744B2 (en) Ground injection method and injection pipe device
CN111441372A (en) Landslide foundation treatment embankment structure and construction method
JP2003105745A (en) Improvement work method of soft ground
US3383864A (en) Method of protecting or repairing scoured areas of a situs
CN113073656B (en) Soil protection structure between support piles and construction method thereof
CN213508499U (en) Narrow and small space upward formula full length bonding anchor rope downthehole segmentation of formula ends thick liquid structure
CN212335690U (en) Seepage-proof pavement joint structure
CN112252339A (en) Upward full-length bonding anchor cable hole subsection grout stopping structure and method
CN111042843A (en) Pre-anchoring method for underground excavated tunnel
CN110424202A (en) Border on the sea roadbed wave prevention structure and its construction method
CN211008743U (en) Mould bag retaining wall

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Lu Liping

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee