CN107819323B - The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation - Google Patents

The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation Download PDF

Info

Publication number
CN107819323B
CN107819323B CN201710937811.8A CN201710937811A CN107819323B CN 107819323 B CN107819323 B CN 107819323B CN 201710937811 A CN201710937811 A CN 201710937811A CN 107819323 B CN107819323 B CN 107819323B
Authority
CN
China
Prior art keywords
pressing plate
soft pressing
intelligent
throwing
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710937811.8A
Other languages
Chinese (zh)
Other versions
CN107819323A (en
Inventor
房光华
李乃永
李磊
朱倩茹
李靖
王昕�
姜建平
惠杰
李超
万磊
赵斌超
李玉敦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Shandong Electric Power Co Ltd
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Shandong Electric Power Co Ltd, Maintenance Branch of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710937811.8A priority Critical patent/CN107819323B/en
Publication of CN107819323A publication Critical patent/CN107819323A/en
Application granted granted Critical
Publication of CN107819323B publication Critical patent/CN107819323B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/22Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions for distribution gear, e.g. bus-bar systems; for switching devices
    • H02J13/0062
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/04Processing captured monitoring data, e.g. for logfile generation
    • H04L43/045Processing captured monitoring data, e.g. for logfile generation for graphical visualisation of monitoring data
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Mining & Analysis (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of online O&M method and system of secondary equipment of intelligent converting station based on visual presentation, it is proposed the advanced application of the soft pressing plate of intelligent station, abnormal intelligent alarm is moved back including soft pressing plate standardized designs and the throwing of soft pressing plate, by the realization of this function, the complexity and uncertainty of the maintenance of intelligent substation O&M can be reduced.It is proposed protective device sequence operation simultaneously, realize that protection throws to move back and pacify and arrange " one-touch " sequence of isolation, by cure protective device throw regress it is rapid, effectively reduce pacify arrange during maloperation risk.Above technical scheme carries out pilot in certain 220kV intelligent substation, and operation conditions is preferable, and high degree improves the intelligent level of substation.It fully considers the configuration of expansion spacing intelligent apparatus at a specified future date and proposition " alternative " concept, reduces power off time during reorganization and expansion at a specified future date, and modeled based on 61850 standards of IEC, be this strategy implement based theoretical of later stage.

Description

The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation
Technical field
The present invention relates to the online O&M technical fields of secondary equipment of intelligent converting station more particularly to one kind to be based on visualization exhibition The online O&M method and system of secondary equipment of intelligent converting station shown.
Background technology
In recent years, communication network technology the application for developing into intelligent substation and popularization create condition so that power transformation The intelligence degree stood is continuously improved.Intelligent substation, instead of the hardwire of traditional substation, is relay by three layer of two net The maintenance and status monitoring for protecting equipment create good technique condition.
Intelligent substation replaces the hardwire of traditional substation by optical-fibre communications, and traditional second loop return wiring is expressed For sightless abstract network message, the workload of operation maintenance personnel and the possibility of maintenance error are increased.It is normally transported in power grid Row change working, peace arrange soft pressing plate when isolation, maintenance and reorganization and expansion to need frequent operation, and traditional substation passes through hard soft pressing plate Throwing is moved back moves back to complete the throwing of defencive function, and such mode of the soft pressing plate of intelligent station is no longer applicable under network traffic conditions, this causes Operation maintenance personnel is difficult in adapt to.
By transformer substation sequence control function, a series of breaker, disconnecting switch and ground connection back brake can be automatically performed Operation, the final conversion for realizing substation between operating status, hot stand-by duty, cold standby state and inspecting state.Although become Power station sequence is used widely, but the throwing of protective device is moved back and peace arranges execution still using operation order form, this mode work Make inefficiency and easily malfunction.
And substation sequence control operation at present is controlled primarily directed in terms of operating status for the operation order of protective device Aspect research is less.
In addition, current intelligent substation relay protection void secondary circuit is not intuitive, pressing plate state is not visible, it is impossible to intuitive The soft pressing plate of display equipment and overhaul pressing plate real-time status.
Invention content
The purpose of the present invention is exactly to solve the above-mentioned problems, to provide a kind of intelligent substation based on visual presentation The online O&M method and system of secondary device, this method and system propose that abnormal intelligence is moved back in soft pressing plate standardized designs and the throwing of soft pressing plate It can alarm, by the realization of this function, the complexity and uncertainty of the maintenance of intelligent substation O&M can be reduced.It proposes to protect simultaneously Protection unit sequence operation realizes that protection throws to move back and pacify and arranges " one-touch " sequence of isolation, is thrown by curing protective device and regressed suddenly, Effectively reduce the risk of maloperation during peace is arranged;Visualization exhibition is carried out to the Quadratic Imaginary circuit of secondary equipment of intelligent converting station Show, state is moved back in the throwing for getting information about current soft pressing plate.
To achieve the above object, concrete scheme of the invention is as follows:
The invention discloses a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation, including:
(1) the soft pressing plate of secondary equipment of intelligent converting station is subjected to Uniform Name and definition according to standard rule, to soft pressure Plate is standardized design;
(2) state of moving back is thrown to the soft pressing plate function declaration and normal operating mode of secondary equipment of intelligent converting station to examine Core, will audit the soft pressing plate function declaration after ratifying and state typing background monitoring system is moved back in normal operating mode throwing;
(3) the soft pressing plate timing automatic detecting of whole station or by hand tour carry out intelligence to out of repair soft pressing plate Alarm;
(4) all soft pressing plates of relay protection device of intelligent substation are controlled according to the operation logic and rule of setting, from The dynamic operation completed soft pressing plate throwing and moved back, changes the operating status of protective relaying device, realizes that the throwing of protective relaying device operation stops Sequence;
(5) using set in secondary equipment of intelligent converting station one protection equipment as core, show this equipment with it is other The switch position signal of equipment and soft pressing plate virtual terminator connection form Quadratic Imaginary circuit and are visualized;
(6) when soft pressing plate state changes, the above-mentioned Quadratic Imaginary circuit of automatic spring shows current soft pressing plate state simultaneously Automatic flicker.
Further, the online O&M method of secondary equipment of intelligent converting station disclosed by the invention, further includes not have a power failure and changes expansion Strategy is built, specially:
For the intelligent apparatus for not building line segregation of not yet type selecting, including:Route protection, intelligent terminal, combining unit;
Any satisfactory intelligent apparatus is set as " scapegoat's device ", it is only necessary to which configure the line protection, intelligence are eventually End and combining unit are sent to GOOSE, SV service of bus protection;
When carrying out the system configuration of reconstruction and extension project, new equipment is upper in the original location to replace scapegoat's device.
Further, before newly-built station puts into operation, soft pressing plate is moved back for all whole throwings for not building line segregation and is set as exiting shape State;
During the system configuration of development reconstruction and extension project, soft pressing plate will be moved back corresponding to the new upper whole throwing being spaced and be set as input shape State.
Further, the reorganization and expansion strategy that do not have a power failure is modeled the present invention is based on IEC 61850, concrete methods of realizing For:
Step 1:Logical node divides
Which function the requirement of route protection clear and definite first, intelligent terminal and combining unit scapegoat's device specifically has, then Determine which function of scapegoat's device needs to carry out data exchange with other intelligent apparatus, then by each data exchange that needs Function Decomposition is logical node (LN);
The data set of the fixed intelligent apparatus that GOOSE, SV information are sent out to bus protection, title, number including data set According to the sequence and quantity of set member;
Step 2:Construction logic equipment
After the function of specifying scapegoat's device, the logical device class mould of multiple logical nodes is included for scapegoat's device structure Type realizes the communication between multiple logical nodes;
Step 3:Establish server model
Scapegoat's device is modeled as a server model, during later stage reorganization and expansion, is directly replaced with new equipment Body device.
Further, in the step (1), state and configuration to soft pressing plate are patterned displaying:To different soft Pressing plate is distinguished using the icon of different colours;For easily obscuring soft pressing plate, special marking is done at soft pressing plate, and in soft pressure Ad hoc region is explained beside plate region.
Further, in the step (1), set soft pressing plate essential information have access to figure and soft pressing plate throwing move back component;
The soft pressing plate throwing is moved back component and is included:Operations staff's operating area, service personnel's operating area, soft pressing plate mark are said The bright and soft pressing plate function declaration that easily malfunctions;
The soft pressing plate essential information is had access to figure and is included:Title, soft pressing plate function are retouched in soft pressing plate background computer title, device It states, the throwing of soft pressing plate functional schematic, soft pressing plate normal operating mode is moved back.
Further, in the step (2), to the soft pressing plate function declaration and normal operation of secondary equipment of intelligent converting station Mode throws the method that the state of moving back is audited:
1) the typing soft pressing plate title consistent with scene, and indicate the soft pressing plate for needing to illustrate;
2) function declaration of all soft pressing plates is submitted, error-prone soft pressing plate is stressed;
3) it is whether complete accurate to check soft pressing plate information, if so, entering in next step;Otherwise, return to step 2);
4) it writes normal soft pressing plate throwing and moves back state diagram, whether the normal soft pressing plate throwing of review moves back correct;If so, into next Step;Otherwise, return to step 3);
5) whether audit is qualified comprising the soft pressing plate definition graph that soft pressing plate information and normal soft pressing plate throwing move back state, if It is that audit is completed;Otherwise, return to step 2).
Further, in the step (3), the soft pressing plate timing automatic detecting of whole station or by hand tour, and ratify with audit Normal operating mode throw the state of moving back be compared, if the normal condition from definition is different, pop up which window annunciator prompts soft Pressing plate is in abnormal state.
Further, the specific method of the step (4) is:
According to regulatory requirements, formulate secondary safety measure and perform flow;
It is examined through expert and cures safety measure and perform flow;
It is automatic by peace according to prespecified operation logic and rule by the single operation order of background monitoring system Full measure performs flow and completes the operation that soft pressing plate throwing is moved back, final to change protective relaying device operating status.
The invention also discloses a kind of online operational system of the secondary equipment of intelligent converting station based on visual presentation, packets It includes:
For the soft pressing plate of secondary equipment of intelligent converting station to be carried out Uniform Name and definition according to standard rule, to soft pressure Plate is standardized the device of design;
It is examined for throwing the state of moving back to the soft pressing plate function declaration and normal operating mode of secondary equipment of intelligent converting station The device of core moves back state typing background monitoring system for will audit the soft pressing plate function declaration after ratifying and normal operating mode throwing The device of system;
For pressing plate timing automatic detecting soft to whole station or manual tour, intelligence is carried out to out of repair soft pressing plate The device that can be alarmed;
For controlling all soft pressing plates of relay protection device of intelligent substation according to the operation logic and rule of setting, from The dynamic operation completed soft pressing plate throwing and moved back, changes the operating status of protective relaying device, realizes that the throwing of protective relaying device operation stops The device of sequence;
For using set in secondary equipment of intelligent converting station one protection equipment as core, show this equipment with it is other The switch position signal of equipment and soft pressing plate virtual terminator connection form Quadratic Imaginary circuit and the dress visualized It puts;
For when soft pressing plate state changes, the above-mentioned Quadratic Imaginary circuit of automatic spring to show current soft pressing plate state And the device flickered automatically.
Further, for the intelligent apparatus for not building line segregation of not yet type selecting, intelligent substation secondary of the present invention is set Standby online operational system further includes:
Scapegoat's device, scapegoat's device are any satisfactory intelligent apparatus, including:Route protection, intelligence Terminal, combining unit;
Scapegoat's device only need configure the line protection, intelligent terminal and combining unit be sent to bus protection GOOSE, SV is serviced;
In the system configuration for carrying out reconstruction and extension project, new equipment is above replaced to the device of scapegoat's device in the original location.
Beneficial effects of the present invention:
The present invention proposes the state of soft pressing plate and the graphical representation of configuration, throws that move back the soft pressing plate such as abnormal intelligent alarm advanced Using to reduce the complexity and uncertainty of the maintenance of intelligent substation O&M.
The present invention proposes " one-touch " sequence, by curing a series of operation of soft pressing plates, completes the automatic of protective device Throwing moves back and pacifies the automatic execution arranged;Operating personnel can be helped to perform complicated operation task by sequential control, by traditional behaviour It is transformed into task ticket as ticket, realizes complex operations one-key operation, operating efficiency can be greatly improved and reduces the risk of maloperation, contracting Short handling time, especially effect is more notable in extensive high voltage intelligent substation.
" scapegoat's device " (route protection, intelligence is configured in newly-built station period, the concept of proposition " scapegoat's device " in the present invention Terminal and combining unit) GOOSE, SV for being sent to bus protection service and cure the data set for issuing bus protection, while base It is modeled in IEC61850 standards;During later stage reorganization and expansion, " scapegoat's device " directly is replaced with new equipment, and continue to use " scapegoat The title of device " and all kinds of services etc., to ensure to reduce power off time during reorganization and expansion.
The present invention visualizes Quadratic Imaginary circuit, and state is moved back in the throwing that can intuitively understand current soft pressing plate.
Description of the drawings
Fig. 1 moves back state approval process figure for soft pressing plate function declaration and normal operating mode throwing;
Fig. 2 forms schematic diagram for standby spacing modeler model;
Fig. 3 has access to figure for soft pressing plate essential information;
Fig. 4 is soft pressing plate inspection alarm figure;
Fig. 5 transports row sequence operation figure for line maintenance;
Fig. 6 is single -step operation state diagram during sequence;
Fig. 7 visualizes schematic diagram for Quadratic Imaginary circuit.
Specific embodiment:
The present invention is described in detail below in conjunction with the accompanying drawings:
The invention discloses a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation, including:
(1) the soft pressing plate of secondary equipment of intelligent converting station is subjected to Uniform Name and definition according to standard rule, to soft pressure Plate is standardized design;
(2) state of moving back is thrown to the soft pressing plate function declaration and normal operating mode of secondary equipment of intelligent converting station to examine Core, will audit the soft pressing plate function declaration after ratifying and state typing background monitoring system is moved back in normal operating mode throwing;
(3) the soft pressing plate timing automatic detecting of whole station or by hand tour carry out intelligence to out of repair soft pressing plate Alarm;
(4) all soft pressing plates of relay protection device of intelligent substation are controlled according to the operation logic and rule of setting, from The dynamic operation completed soft pressing plate throwing and moved back, changes the operating status of protective relaying device, realizes that the throwing of protective relaying device operation stops Sequence;
(5) using set in secondary equipment of intelligent converting station one protection equipment as core, show this equipment with it is other The switch position signal of equipment and soft pressing plate virtual terminator connection form Quadratic Imaginary circuit and are visualized;
(6) when soft pressing plate state changes, the above-mentioned Quadratic Imaginary circuit of automatic spring shows current soft pressing plate state simultaneously Automatic flicker.
In addition, for the intelligent apparatus for not building line segregation of not yet type selecting, including:Route protection, intelligent terminal, merging Unit;
Any satisfactory intelligent apparatus is set as " scapegoat's device ", it is only necessary to which configure the line protection, intelligence are eventually End and combining unit are sent to GOOSE, SV service of bus protection;
When carrying out the system configuration of reconstruction and extension project, new equipment is upper in the original location to replace scapegoat's device.
The method of the present invention is specifically described as follows below:
The advanced application of the soft pressing plate of 1 intelligent station
The soft pressing plate of secondary equipment of intelligent converting station can be divided into the soft pressing plate of function, the soft pressing plate in outlet and connect according to function to divide Soft three kinds of the pressing plate of mouth.Compared with conventional substation, intelligent station, which increases, receives soft pressing plate, receives soft pressing plate and is divided into and is connect for GOOSE It receives soft pressing plate and SV receives soft pressing plate, which determines that can intelligent station secondary device correctly handle GOOSE information and SV Information.
By the graphical treatment to soft pressing plate and soft pressing plate timing automatic detecting, operation maintenance personnel can be grasped comprehensively in time In intelligent substation protective device soft pressing plate throwing move back situation, by with practical operation situation comparative analysis, can be timely and accurately It was found that soft pressing plate miscarrying, situation about accidentally moving back, and then inspection operation is completed in time, improve intelligent substation O&M efficiency.
1.1 standardized designs
Soft pressing plate is named and defined according to standard rule, whole station is unified, avoids because of similar soft pressing plate naming method Difference causes operating personnel to understand maloperation caused by error.
Each interval picture carries out arranged according to unified standard, and the soft pressing plate of function uses yellow mark, the soft pressing plate in outlet It is distinguished using red icon, for easily obscuring soft pressing plate, special marking is done at soft pressing plate, and beside soft platen region Ad hoc region is explained.In view of multiple lists such as the soft pressing plate management of intelligent station is related to regulating and controlling, run, overhauling, unit in charge of construction Position, achievement technically in each interval picture, strictly, clearly divides O&M, monitoring personnel operates soft platen region and maintenance Personnel operate soft platen region, and operations staff and service personnel have soft clamp operation permission corresponding with its job duty, in work Each performs its own functions in work, not heavy not leak.
And single soft pressing plate explanation is set to have access to function, mouse, which parks soft press plate position, can have access to soft pressing plate information, wrap Include that background computer title, title, function description, functional schematic, normal operating mode throwing such as move back at the states in device.
Abnormal intelligent alarm is moved back in 1.2 soft pressing plate throwings
Relay protection device put into operation before (protection infrastructure project new equipment put into operation before, technological transformation replace after new equipment put into operation before, it is double Differential apparatus upgrading has been checked and accepted put into operation before, the equipment acceptance that put into operation is complete put into operation before etc.), constituent parts protect special work to examine, approval originally State is moved back in soft pressing plate function declaration and the normal operating mode throwing of all devices of the administrative substation of unit.Pay special attention to examine and overlap The soft pressing plate of lock links up that state is moved back in three throwings for jumping the error-prone soft pressing plate for leading to protection act abnormal behavior such as soft pressing plates and function is said It is bright.State diagram approval process figure is moved back in soft pressing plate function declaration and normal operating mode throwing as shown in Figure 1, O&M and overhaul unit point Work is clear and definite, specially:
1) the typing soft pressing plate title consistent with scene, and indicate the soft pressing plate for needing to illustrate;
2) function declaration of all soft pressing plates is submitted, error-prone soft pressing plate is stressed;
3) it is whether complete accurate to check soft pressing plate information, if so, entering in next step;Otherwise, return to step 2);
4) it writes normal soft pressing plate throwing and moves back state diagram, whether the normal soft pressing plate throwing of review moves back correct;If so, into next Step;Otherwise, return to step 3);
5) whether qualified soft pressing plate definition graph is audited, if so, audit is completed;Otherwise, return to step 2).The soft pressure Plate definition graph contains soft pressing plate pressing plate function declaration and state is moved back in the throwing of soft pressing plate normal operating mode.
State typing background monitoring system is moved back in soft pressing plate function declaration and normal operating mode throwing after audit is ratified.Whole station Soft pressing plate timing automatic detecting is maked an inspection tour by hand, and is thrown the state of moving back with the normal operating mode of audit approval and be compared, if with The normal condition of definition is different, then pops up window annunciator and which soft pressing plate is prompted to be in abnormal state.To being in inspecting state Device, suspension maintenance bridge queen are not involved in a key and make an inspection tour warning function.
2 protective device sequences
In running equipment and Awaiting Overhaul equipment by network connection in intelligent substation, in view of being different from traditional substation Hardwire connection mode, under the premise of intelligent station network structure is not destroyed, it is difficult to will running equipment and Awaiting Overhaul equipment into Row physical isolation.Can only by changing the state of smart machine sender and recipient, sampling arranges isolation to perform peace, this is to transporting Dimension personnel propose requirements at the higher level, while also increase the possibility of safety measure implementation error during O&M.Set forth herein one Kind of " one-touch " sequence operation the step of according to presetting, realizes that protective device sends soft pressing plate, receives soft pressing plate, function The soft pressing plate such as soft pressing plate sequentially performs automatically.Therefore " one-touch " sequence can realize that equipment throwing stops sequence and secondary peace arranges sequence." one Keyed " peace arranges sequence to examine curing peace by expert and arranges implementing procedure, then carries out sequence and thing occurs during O&M to reduce Therefore risk.
First according to regulatory requirements, formulate secondary safety measure and perform flow;Then it is examined through expert and cures peace and arrange stream Journey;It is automatic by rule according to prespecified operation logic and rule finally by the single operation order of background monitoring system A series of operation that soft pressing plate throwings are moved back is completed, it is final to change protective relaying device operating status, so as to fulfill a safety measure " key Formula " performs.Soft pressing plate sequential control function can continue the operating mode using typical operation ticket.It is a certain that sequence goes to operation During soft pressing plate, the picture where it should be called automatically, to show that state is moved back in the front and rear throwing of its operation.More particularly to more protection dresses The operation order put, the picture of each device all answer normal call.
Operating personnel can be helped to perform complicated operation task by sequential control, traditional operation order is transformed into task Ticket realizes complex operations one-key operation, can greatly improve operating efficiency and reduce the risk of maloperation, when shortening manual operation Between, especially effect is more notable in extensive high voltage intelligent substation.
3 do not have a power failure reorganization and expansion
3.1 do not have a power failure reorganization and expansion technical solution
In intelligent substation reorganization and expansion works, because needing to bus protection (by taking 220kV double bus scheme situations as an example) The lower dress of configuration is performed, the route protection at other intervals of putting into operation is caused to be forced to carry out verification work, is increasing workload, complexity While degree, difficulty, the security risk for the related work that more increased severely makes the reorganization and expansion of intelligent substation work than normal station difficulty Much, it has to arrange " whole station power failure " cooperation reorganization and expansion work, affect production run.
During reorganization and expansion, avoid dress and the technical solution of expanded scope verification under unnecessary bus protection as follows:
(1) the transformer substation system configuration (SCD configurations) during newly-built station by considering together on long term all line segregations.For still The intelligent apparatus (route protection, intelligent terminal, combining unit) for not building line segregation of non-type selecting proposes that " scapegoat's device " is general Read, any satisfactory intelligent apparatus is set as " scapegoat's device ", and only need configure the line protection, intelligent terminal, Combining unit is sent to GOOSE, SV service of bus protection, other services wouldn't use configuration.The debugging efforts of newly-built station also should Debugging and verification including scapegoat's device Yu bus protection mutual communication.
(2) bus protection, which should have to be spaced integrally to throw, moves back soft pressing plate.Before newly-built station puts into operation, line segregation is not built for all Whole throw move back soft pressing plate and be set as exiting state, such interval is considered as by bus protection to be not present, and is not involved in operation and alarm.
(3) when carrying out the system configuration of reconstruction and extension project, new equipment is upper in the original location to replace scapegoat's device, that is, continues to use scapegoat Device IED titles, MAC Address, the control block title for having matched service and application identities etc., and good all kinds of services are configured, but IED Description attribute can change.Debugging and later stage will move back soft pressing plate (bus protection corresponding to new upper whole throw being spaced On) it is set as input state.
3.2 it is modeled based on IEC 61850
Standby spacing modeler model is formed as shown in Fig. 2, concrete methods of realizing is:
Step 1:Logical node divides
Which function the requirement of route protection clear and definite first, intelligent terminal and combining unit scapegoat's device specifically has, then Determine which function of scapegoat's device needs to carry out data exchange with other intelligent apparatus, then by each data exchange that needs Function Decomposition is logical node (LN).
To avoid filling under bus protection after the completion of reorganization and expansion, the intelligence that GOOSE, SV information are sent out to bus protection need to be fixed The data set of device, the title including data set, the sequence and quantity of data set member.Such as route protection is sent to after fixing The GOOSE data sets of bus protection are as shown in table 1.
1 route protection GOOSE data sets of table
Step 2:Construction logic equipment
After the function of specifying scapegoat's device, between the multiple logical nodes of scapegoat's device construction logic equipment class model realization Communication.Logical device has merged multiple logical nodes and related service (such as GOOSE, SV service).Logical device is generally wrapped Include three logical nodes:The one logical physical equipment (LPHD) for representing facility information and health status;One provides GOOSE controls The logical node 0 (LLN0) of the communication services such as clamp dog, SV control blocks;N number of logical node (LN) comprising concrete function.
Step 3:Establish server model
Scapegoat's device is modeled as a server model, during later stage reorganization and expansion, is directly replaced with new equipment Body device.According to 61850 standards of IEC, P2P (Publish-subscribe) patterns or Client-Server (visitors can be used in server model Family end-server) pattern, so as to the transmitting of GOOSE information and SV information between complete intelligent apparatus.
By " do not have a power failure reorganization and expansion strategy " to reduce the hourage that has a power failure during reorganization and expansion at a specified future date, while avoid other throwings Fortune interval repeats verification experimental verification, reduces workload and O&M complexity, the reality for the reorganization and expansion work that do not have a power failure in next step It applies and has established theoretical foundation.
4 Quadratic Imaginary circuits visualize
Quadratic Imaginary circuit visual presentation figure preferably meets claimed below:
1) using a protection equipment as core, the switch position signal of this equipment and miscellaneous equipment and soft pressure are clearly shown The virtual terminators connection such as plate.
2) soft pressing plate figure should be embodied on corresponding virtual terminator connecting line, and with the soft pressing plate of different graphic visual representation Throwing move back state.
3) it should be understood that the sender and recipient of virtual terminator connection in figure.
4) the maintenance pressing plate figure of all devices should be labeled in equipment frame in figure, and is overhauled with different graphic visual representation State is moved back in the throwing of pressing plate.
When pressing plate state changes, the automatic spring void circuit is answered, pressing plate state flickers automatically.Protection throwing stops sequence and holds Row answers the picture where automatic calling device to when operating a certain soft pressing plate, and with real-time display, it operates front and rear throwing and moves back state. Secondary safety measure sequence go to operate a certain soft pressing plate when, answer the picture where automatic calling device, with real-time display its State is moved back in the front and rear throwing of operation, and the pressing plate is done special identifier (can be used and add the apparent mark such as frame, overstriking) after operating successfully, His lack of competence personnel can not operate.
5 secondary circuit automatic-callings intelligently compare, and connect abnormal push alarm
The final version SCD file of the special work approval of relay protection is stored in background monitoring machine, whole station automatic or manual calling institute There are the files such as CID, CCD of IED devices, carrying out Quadratic Imaginary circuit by following two methods intelligently compares:
Method 1:The whole station SCD of reverse generation actual motion, the final version SCD file of work approval special with relay protection carry out It compares, once discovery is inconsistent, which loop configuration mistake of pop-up alarm, and being visualized in Quadratic Imaginary circuit immediately The intuitive display of the red flicker of schematic diagram subscript.
Method 2:Using corresponding configuration tool whole station IED is exported from the final version SCD file that the special work of relay protection is ratified The files such as CID, CCD of device are compared respectively in real time from files such as CID, CCD of the calling of IED devices, once it finds not Unanimously, which loop configuration mistake of pop-up alarm, and the red sudden strain of a muscle of schematic diagram subscript is visualized in Quadratic Imaginary circuit immediately Bright intuitive display.
For enhance process trace management, it is necessary that all Quadratic Imaginary circuits compare (self-timing compares and triggering compares manually) There is comparison to record, including comparison time, compare the information such as personnel, comparison result, record, which should give, to be preserved and can according to keywords sieve Choosing inquiry.
It is sent on 6 pressing plate information remotes.
All pressing plates of substation, empty circuit compare abnormality alarming information etc. by dispatch data net Shang Song main websites, and protection is special Work stay indoors can supervise our unit's all intelligent station protective device pressing plates throwing move back situation, monitoring secondary circuit configuration connection and Secondary safety measure executive condition can be realized directly after ripe from main website and background computer biconditional operation Interface Control, permission be set It postpones, runs, regulation and control personnel can carry out remote control, realize the operation realization with execute-in-place background computer as remotely to pressing plate Control.
7 case histories
By taking Shandong Power 220kV intelligent substations as an example, this 220kV intelligent substation realizes the soft pressing plate standard of intelligence Change design, soft pressing plate throwing move back abnormal intelligent alarm, protective device " one-touch " sequence and intelligent apparatus peace arrange visualization etc. functions
The 7.1 soft pressing plate standardized designs of intelligence
By taking certain 110kV route protection in this intelligent substation as an example, design the throwing after soft pressing plate standardized designs and move back component Figure is had access to soft pressing plate essential information;
Wherein, soft pressing plate throwing moves back component mainly including operations staff's operating area, service personnel's operating area, soft pressing plate mark Know explanation and soft pressing plate specific function explanation.And by taking tripping exports soft pressing plate as an example, when parked " tripping outlet " the soft pressing plate of mouse On, the soft pressing plate essential information of display is as shown in Figure 3.Known by Fig. 3, be separately provided soft pressing plate picture and protection signal picture, two Person's difference is clear, avoids operating space and checks that area intersects.
Abnormal intelligent alarm is moved back in 7.2 soft pressing plate throwings
After the soft pressing plate timing automatic detecting of whole station or by hand tour, if find the normal condition difference with definition, bullet Go out alarm figure as shown in Figure 4.
In Fig. 4, when soft pressing plate normal operating condition and soft pressing plate current operating conditions are inconsistent, alarm signal is sent out.Though Right soft pressing plate inspection cannot reduce the probability that device breaks down, but can reduce the power outage caused by soft pressing plate is thrown and moved back extremely Probability.The realization of abnormal alarm function is moved back by the throwing of soft pressing plate, can find that soft pressing plate is thrown extremely in a relatively short period of time and move back problem, Improve automation of transformation substations operation level and O&M efficiency.
7.3 one-touch peaces arrange sequence
By taking certain 220kV route protection is by the soft pressing plate sequence of maintenance transhipment row as an example, typical sequence operation is as shown in Figure 5. Known by Fig. 5, line maintenance transhipment row sequence operation one is divided into 9 steps, current to carry out to the 5th step.According to this in operation Method of operation conversion needs, and step carries out soft clamp operation in sequence, each operation can suspend or emergency stop, each has been operated Confirm into rear automatically into next step, completed until operating, as shown in Figure 6.
7.4 Quadratic Imaginary circuits visualize
By taking certain 220kV circuit intelligent substation relay protection void secondary circuit as an example, Quadratic Imaginary circuit visualization schematic diagram As shown in Figure 7.
The realization of intelligent alarm function is moved back in soft pressing plate standardized designs and the throwing of soft pressing plate, and O&M pressure can be greatly reduced, Improve the soft pressing plate management of intelligent station it is controllable, can control, control property, while reduce intelligent substation O&M overhaul complexity with It is uncertain.Protective device throwing is moved back and peace arranges the realization of isolation " one-touch " sequence, effectively reduces operation maintenance personnel in operation behaviour Make the risk to malfunction in the process, improve intelligent substation degree.Above technical scheme is in Shandong Power 220kV intelligence Substation carries out pilot, and operation conditions is preferable, and high degree improves the intelligent level of substation.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (8)

1. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation, which is characterized in that including:
(1) the soft pressing plate of secondary equipment of intelligent converting station is subjected to Uniform Name and definition according to standard rule, to soft pressing plate into Row standardized designs;
(2) state of moving back is thrown to the soft pressing plate function declaration and normal operating mode of secondary equipment of intelligent converting station to audit, it will Soft pressing plate function declaration and normal operating mode throwing after audit approval move back state typing background monitoring system;
(3) the soft pressing plate timing automatic detecting of whole station or by hand tour carry out intelligent alarm to out of repair soft pressing plate;
(4) all soft pressing plates of relay protection device of intelligent substation are controlled according to the operation logic and rule of setting, it is automatic complete The operation moved back into the throwing of soft pressing plate changes the operating status of protective relaying device, realizes that the throwing of protective relaying device operation stops sequence;
(5) using the protection equipment set in secondary equipment of intelligent converting station as core, this equipment and miscellaneous equipment are shown Switch position signal and soft pressing plate virtual terminator connection, formed Quadratic Imaginary circuit simultaneously visualized;
(6) when soft pressing plate state changes, the above-mentioned Quadratic Imaginary circuit of automatic spring, currently soft pressing plate state is simultaneously automatic for display Flicker;
The reorganization and expansion strategy that do not have a power failure is further included, specially:
For the intelligent apparatus for not building line segregation of not yet type selecting, including:Route protection, intelligent terminal, combining unit;
Any satisfactory intelligent apparatus is set as " scapegoat's device ", it is only necessary to configure the line protection, intelligent terminal and Combining unit is sent to GOOSE, SV service of bus protection;
When carrying out the system configuration of reconstruction and extension project, new equipment is upper in the original location to replace scapegoat's device.
2. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation as described in claim 1, It is characterized in that, before newly-built station puts into operation, soft pressing plate is moved back for all whole throwings for not building line segregation and is set as exiting state;
During the system configuration of development reconstruction and extension project, soft pressing plate will be moved back corresponding to the new upper whole throwing being spaced and be set as input state.
3. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation as described in claim 1, It is characterized in that, the reorganization and expansion strategy that do not have a power failure is modeled based on IEC 61850, concrete methods of realizing is:
Step 1:Logical node divides
Which function the requirement of route protection clear and definite first, intelligent terminal and combining unit scapegoat's device specifically has, and then determines Which function of scapegoat's device needs to carry out data exchange with other intelligent apparatus, then by each function of needing data exchange It is decomposed into logical node LN;
The data set of the fixed intelligent apparatus that GOOSE, SV information are sent out to bus protection, title, data set including data set The sequence and quantity of member;
Step 2:Construction logic equipment
After the function of specifying scapegoat's device, the logical device class model of multiple logical nodes is included for scapegoat's device structure, it is real Communication between existing multiple logical nodes;
Step 3:Establish server model
Scapegoat's device is modeled as a server model, during later stage reorganization and expansion, directly scapegoat is replaced with new equipment and fills It puts.
4. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation as described in claim 1, It is characterized in that, in the step (1), state and configuration to soft pressing plate are patterned displaying:Different soft pressing plates is used The icon of different colours distinguishes;For easily obscuring soft pressing plate, special marking is done at soft pressing plate, and by soft platen region The ad hoc region in side is explained.
5. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation as described in claim 1, Be characterized in that, in the step (1), set soft pressing plate essential information have access to figure and soft pressing plate throwing move back component;
The soft pressing plate throwing is moved back component and is included:Operations staff's operating area, service personnel's operating area, soft pressing plate identifier declaration and Easily malfunction soft pressing plate function declaration;
The soft pressing plate essential information is had access to figure and is included:Title in soft pressing plate background computer title, device, the description of soft pressing plate function, Soft pressing plate functional schematic, the throwing of soft pressing plate normal operating mode are moved back.
6. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation as described in claim 1, It is characterized in that, in the step (2), soft pressing plate function declaration and the normal operating mode throwing of secondary equipment of intelligent converting station is moved back The method that state is audited is specially:
1) the typing soft pressing plate title consistent with scene, and indicate the soft pressing plate for needing to illustrate;
2) function declaration of all soft pressing plates is submitted, error-prone soft pressing plate is stressed;
3) it is whether complete accurate to check soft pressing plate information, if so, entering in next step;Otherwise, return to step 2);
4) it writes normal soft pressing plate throwing and moves back state diagram, whether the normal soft pressing plate throwing of review moves back correct;If so, enter in next step; Otherwise, return to step 3);
5) whether audit is qualified comprising the soft pressing plate definition graph that soft pressing plate information and normal soft pressing plate throwing move back state, if so, Audit is completed;Otherwise, return to step 2).
7. a kind of online O&M method of secondary equipment of intelligent converting station based on visual presentation as described in claim 1, It is characterized in that, in the step (3), the soft pressing plate timing automatic detecting of whole station or by hand tour, and the normal fortune ratified with audit Line mode is thrown the state of moving back and is compared, if the normal condition from definition is different, pops up window annunciator and which soft pressing plate is prompted to be in Abnormal state;
Alternatively,
The specific method of the step (4) is:
According to regulatory requirements, formulate secondary safety measure and perform flow;
It is examined through expert and cures safety measure and perform flow;
By the single operation order of background monitoring system, according to prespecified operation logic and rule, arranged automatically by safety It applies and performs the operation that the soft pressing plate throwing of flow completion is moved back, it is final to change protective relaying device operating status.
8. a kind of online operational system of secondary equipment of intelligent converting station based on visual presentation, which is characterized in that including:
For the soft pressing plate of secondary equipment of intelligent converting station to be carried out Uniform Name and definition according to standard rule, to soft pressing plate into The device of row standardized designs;
For throwing what the state of moving back was audited to the soft pressing plate function declaration and normal operating mode of secondary equipment of intelligent converting station Device moves back state typing background monitoring system for will audit the soft pressing plate function declaration after ratifying and normal operating mode throwing Device;
For pressing plate timing automatic detecting soft to whole station or manual tour, intelligent report is carried out to out of repair soft pressing plate Alert device;
It is automatic complete for controlling all soft pressing plates of relay protection device of intelligent substation according to the operation logic and rule of setting The operation moved back into the throwing of soft pressing plate changes the operating status of protective relaying device, realizes that the throwing of protective relaying device operation stops sequence Device;
For using set in secondary equipment of intelligent converting station a protection equipment as core, showing this equipment and miscellaneous equipment Switch position signal and soft pressing plate virtual terminator connection, form Quadratic Imaginary circuit and the device that is visualized;
For when soft pressing plate state changes, the above-mentioned Quadratic Imaginary circuit of automatic spring to show current soft pressing plate state simultaneously certainly The device of dynamic flicker;
It further includes:
Scapegoat's device, scapegoat's device are any satisfactory intelligent apparatus, including:Route protection, intelligent terminal, Combining unit;
GOOSE, SV that scapegoat's device only needs configure the line protection, intelligent terminal and combining unit to be sent to bus protection take Business;
In the system configuration for carrying out reconstruction and extension project, new equipment is above replaced to the device of scapegoat's device in the original location.
CN201710937811.8A 2017-09-30 2017-09-30 The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation Active CN107819323B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710937811.8A CN107819323B (en) 2017-09-30 2017-09-30 The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710937811.8A CN107819323B (en) 2017-09-30 2017-09-30 The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation

Publications (2)

Publication Number Publication Date
CN107819323A CN107819323A (en) 2018-03-20
CN107819323B true CN107819323B (en) 2018-06-22

Family

ID=61607984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710937811.8A Active CN107819323B (en) 2017-09-30 2017-09-30 The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation

Country Status (1)

Country Link
CN (1) CN107819323B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108923529B (en) * 2018-05-14 2020-10-27 许继集团有限公司 Intelligent substation secondary safety measure diagnosis method and system
CN108847655B (en) * 2018-06-04 2020-03-06 国网山东省电力公司 Sequence control method and system for intelligent substation protection device based on operation task
CN108963841B (en) * 2018-06-04 2020-03-06 国网山东省电力公司 Secondary equipment sequence control method and system related to running state of primary equipment
CN108931972B (en) * 2018-06-25 2019-08-23 国电南瑞科技股份有限公司 A kind of substation secondary device condition intelligent diagnostic method based on model-driven
CN109325950A (en) * 2018-10-19 2019-02-12 国网黑龙江省电力有限公司电力科学研究院 The intelligent inspection system of electrical secondary system based on image recognition
CN109756030B (en) * 2019-01-25 2021-04-23 国网河北省电力有限公司电力科学研究院 Visual online monitoring and intelligent operation and maintenance method for secondary circuit of intelligent substation
CN110109713B (en) * 2019-04-18 2022-06-03 北京四方继保自动化股份有限公司 Method for realizing secondary equipment visual plug-in
CN111211619B (en) * 2020-01-22 2022-03-01 广东电网有限责任公司 Reclosing switch on-off state monitoring method
CN112116305A (en) * 2020-06-17 2020-12-22 中国电力科学研究院有限公司 Power grid probability visualization model construction method and system for machine learning
CN114421613B (en) * 2021-12-24 2023-11-14 国网湖北省电力有限公司宜昌供电公司 Method for judging and processing running state of secondary protection equipment of transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104810925A (en) * 2015-05-05 2015-07-29 北京四方继保自动化股份有限公司 Intelligent substation line redundancy protection point-to-point manner implementation method
CN104852469A (en) * 2015-05-07 2015-08-19 国家电网公司 Equipment real-time status-based smart substation soft strap remote anti-misoperation method
EP2977838A1 (en) * 2014-07-25 2016-01-27 Alstom Technology Ltd Process of monitoring intelligent electronic devices installed in an electrical power system
CN105429027A (en) * 2015-11-12 2016-03-23 国网宁夏电力公司 Secondary safety measure support system in operation and maintenance of intelligent substation and construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105044524B (en) * 2015-08-10 2018-12-04 许继集团有限公司 A kind of arrester monitoring method and system suitable for intelligent substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2977838A1 (en) * 2014-07-25 2016-01-27 Alstom Technology Ltd Process of monitoring intelligent electronic devices installed in an electrical power system
CN104810925A (en) * 2015-05-05 2015-07-29 北京四方继保自动化股份有限公司 Intelligent substation line redundancy protection point-to-point manner implementation method
CN104852469A (en) * 2015-05-07 2015-08-19 国家电网公司 Equipment real-time status-based smart substation soft strap remote anti-misoperation method
CN105429027A (en) * 2015-11-12 2016-03-23 国网宁夏电力公司 Secondary safety measure support system in operation and maintenance of intelligent substation and construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
智能站二次检修安措可视化及一键式操作***设计与实现;许家焰等;《电力***保护与控制》;20170816;第45卷(第16期);第136-144页 *
智能站软压板状态正确性校验的研究;黄少雄等;《电网与清洁能源》;20160625;第32卷(第6期);第95-100页 *

Also Published As

Publication number Publication date
CN107819323A (en) 2018-03-20

Similar Documents

Publication Publication Date Title
CN107819323B (en) The online O&M method and system of secondary equipment of intelligent converting station based on visual presentation
CN107706889B (en) Based on the online O&M method and system of secondary equipment of intelligent converting station intelligently compared
CN107332349B (en) A kind of online O&M method and system of secondary equipment of intelligent converting station
CN106157167B (en) Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket
CN106159759B (en) A kind of method for automatically generating secondary system of intelligent substation maintenance safety measure
CN102723775A (en) Reliability assessment method for secondary system of intelligent substation
CN106130185B (en) A kind of monitoring system of electric substation modeling method based on status monitoring information
CN107591892B (en) Intelligent substation operation and maintenance method and system
CN108233536A (en) A kind of intelligent program remote handling system
CN102025195B (en) Distribution network simulation dispatching and management system
CN104463696A (en) Power grid operating risk recognition and prevention method and system
CN107834699A (en) Dispatching of power netwoks based on the regulation and control integration of ground county integrates anti-error system
CN108320104B (en) Method for realizing protection fixed value on-line verification function obtaining model based on RelayCAC relay protection setting software
CN104993597A (en) Anti-misoperation system
CN110428533A (en) One kind realizing the anti-error integrated intelligent lock management system of lock control based on Internet of Things
CN106570781B (en) Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure
CN109919451A (en) Based on true power network topology analysis and security knowledge base digital electric network system and method
CN106779508A (en) Secondary system of intelligent substation safety measure analogue simulation and O&M control platform
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
CN204270285U (en) A kind of error proof locking system of microcomputer being applied to transformer station
CN103545917A (en) Scheduling-automation sub-station simulation system
CN101364733A (en) Electric power digital integrated management system
CN107563717A (en) A kind of secondary system of intelligent substation safety measure visualization system
CN108448718A (en) One key sequence method and system of intelligent substation protective device
CN107482772B (en) Measurement and control device and anti-misoperation lockout logic display method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant