CN107813906A - Super large gauge gantry crane complete machine shipping device - Google Patents

Super large gauge gantry crane complete machine shipping device Download PDF

Info

Publication number
CN107813906A
CN107813906A CN201710846307.7A CN201710846307A CN107813906A CN 107813906 A CN107813906 A CN 107813906A CN 201710846307 A CN201710846307 A CN 201710846307A CN 107813906 A CN107813906 A CN 107813906A
Authority
CN
China
Prior art keywords
side door
leg
gantry crane
door leg
complete machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710846307.7A
Other languages
Chinese (zh)
Inventor
张锋锋
张明海
富茂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN201710846307.7A priority Critical patent/CN107813906A/en
Publication of CN107813906A publication Critical patent/CN107813906A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/28Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for deck loads

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention provides a kind of super large gauge gantry crane complete machine shipping device, the super large gauge gantry crane complete machine shipping device includes land side door leg, extra large side door leg and shipping artificial leg, the land side door leg or the extra large side door leg are fixed to the end of ship board, the shipping artificial leg is arranged between the land side door leg and the extra large side door leg, and is fixed at the other end of the ship board;The shipping artificial leg is connected with the land side door leg or the extra large side door leg, for supporting the land side door leg or the extra large side door leg.Super large gauge gantry crane complete machine shipping device of the present invention is in the case of ships that transport restricted width system, realize the complete machine transport of super large gauge gantry crane, avoid after loose mail is shipped to user's harbour and assembled again, both the cost in user's harbour had been saved, the activity duration in user's harbour is shortened again, and more times have been won to deliver equipment.

Description

Super large gauge gantry crane complete machine shipping device
Technical field
The present invention relates to ports handling machine field, more particularly to a kind of super large gauge gantry crane complete machine shipping device.
Background technology
In ports handling machine field, gantry crane is the capital equipment during container handling, in container handling mistake Highly important role is play in journey.After China's accession to the WTO, foreign trade is continuously increased, and container gulps down The amount of telling climbs new peak every year.
With the fierceness that International Shipping Industry competes, to seek survival, larger-sized vessel, which turns into major shipping company, reduces operation Cost, the only way for keeping profitability.
Ship development strides into the 24000TEU epoch from 18000TEU, causes the highest attention of each Port in the whole world:Harbour The outreach of existing handling facilities --- gantry crane, lifting altitude are both needed to further maximize, and operating efficiency is efficient.To be more preferable Meet the market requirement, the outreach of gantry crane, lifting altitude, cart gauge etc. are both needed to upgrade again.
The distance between extra large side door leg and land side door leg of ultra-large type gantry crane, it may also be said to cart gauge up to 50 meters even more Greatly, considerably beyond more than 40 meters of transport beam of hull, gantry crane can not be integrally placed to carry out complete machine transport on boat deck, and Loose mail shipping will be faced user's harbour assembles the problem of.Not only taken in the assembling of user's harbour, and cost is higher, loses city Field competitiveness.
For that can meet that ship complete machine transports super large gauge gantry crane, those skilled in the art's super large gauge gantry crane urgently to be resolved hurrily is whole The problem of machine transports.
The content of the invention
The technical problem to be solved in the present invention is to overcome lacking for ultra-large type gantry crane complete machine transport difficult in the prior art Fall into, there is provided a kind of super large gauge gantry crane complete machine shipping device.
The present invention is that solve above-mentioned technical problem by following technical proposals:
A kind of super large gauge gantry crane complete machine shipping device, its feature be, the super large gauge gantry crane complete machine shipping device Including land side door leg, extra large side door leg and shipping artificial leg, the land side door leg or the extra large side door leg are fixed to ship board End, the shipping artificial leg is arranged between the land side door leg and the extra large side door leg, and is fixed to the cargo ship first At the other end of plate;
The shipping artificial leg is connected with the land side door leg or the extra large side door leg, for supporting the land side door leg or institute State extra large side door leg.
According to one embodiment of present invention, the extra large side door leg is fixed to the end of ship board, the shipping Artificial leg is connected with the land side door leg, and fixing hound by first supports the land side door leg.
According to one embodiment of present invention, the extra large side sill of the extra large side door leg is arranged on institute by extra large side cart group State on transport deck.
According to one embodiment of present invention, the location dimension between the shipping artificial leg and the extra large side cart group is less than The beam of hull size of the cargo ship.
According to one embodiment of present invention, the shipping artificial leg includes two short columns be arrangeding in parallel, connection level Strut, big flat crossbeam and small flat crossbeam, connected by the connection triatic stay between the short column, the big flat crossbeam and The small flat crossbeam is arranged on the lower section of the short column, and is fixed on the ship board.
According to one embodiment of present invention, it is solid by second between the sidepiece of the short column and the ship board Determine hound to be supported.
According to one embodiment of present invention, the short column lower end is additionally provided with shipping chassis, described to ship under chassis Face is laid with temporary track, and the temporary track is fixed on the ship board.
According to one embodiment of present invention, the top connection contact crossbeam of the short column, the contact crossbeam top Doorframe hound and doorframe is set to add strut.The doorframe adds the extended line of the center line lower end of strut and the short column Center line upper end extended line intersect at it is described contact crossbeam center line on.
According to one embodiment of present invention, the upper end of the additional strut of the doorframe is connected with the land side door leg, described The extended line that doorframe adds the center line upper end of strut is intersected on the center line of the land side door leg.
According to one embodiment of present invention, fixed between the extra large side door leg and the ship board by the 3rd oblique Strut is supported.
The positive effect of the present invention is:
Super large gauge gantry crane complete machine shipping device of the present invention realizes super large rail in the case of ships that transport restricted width system Complete machine transport away from gantry crane, avoid loose mail shipping to being assembled again after user's harbour, both saved user's harbour into This, shortens the activity duration in user's harbour again, and more times have been won to deliver equipment.
Super large gauge gantry crane complete machine shipping device of the present invention disclosure satisfy that gantry crane cart gauge is more than ships that transport width Complete machine loads shipping and required, realizes that super large gauge gantry crane complete machine ships.This example super large gauge gantry crane complete machine ships the knot of mode Configuration formula is simple, and gantry crane need not increase additional knot component in itself, and production cost is low.
Brief description of the drawings
The present invention the above and other feature, property and advantage will pass through description with reference to the accompanying drawings and examples And become apparent, identical reference represents identical feature all the time in the accompanying drawings, wherein:
Fig. 1 is the General Arrangement of super large gauge gantry crane complete machine shipping device of the present invention.
Fig. 2 is gantry crane and the layout drawing of hull colligation in super large gauge gantry crane complete machine shipping device of the present invention.
Fig. 3 is side views of the Fig. 2 along A to observation.
Fig. 4 is side views of the Fig. 2 along B to observation.
Embodiment
For the above objects, features and advantages of the present invention can be become apparent, the tool below in conjunction with accompanying drawing to the present invention Body embodiment elaborates.
Embodiments of the invention are described with detailed reference to accompanying drawing now.It is preferable to carry out now with detailed reference to the present invention Example, its example are shown in the drawings.In the case of any possible, will be marked in all of the figs using identical to represent phase Same or similar part.
In addition, although the term used in the present invention is selected from public term, but the present invention is said Some terms mentioned in bright book are probably that applicant carrys out selection by his or her judgement, and its detailed meanings is retouched this paper's Illustrate in the relevant portion stated.
In addition, it is desirable to not only by used actual terms, and be also to the meaning contained by each term To understand the present invention.
Fig. 1 is the General Arrangement of super large gauge gantry crane complete machine shipping device of the present invention.Fig. 2 is super large gauge gantry crane of the present invention Gantry crane and the layout drawing of hull colligation in complete machine shipping device.Fig. 3 is side views of the Fig. 2 along A to observation.Fig. 4 be Fig. 2 along B to The side view of observation.
As shown in Figures 1 to 4, the invention discloses a kind of super large gauge gantry crane complete machine shipping device 100, it includes land side Door leg 110, extra large side door leg 120 and shipping artificial leg 130, the side door leg 120 of land side door leg 110 or extra large are fixed to ship board 140 End, shipping artificial leg 130 is arranged between land side door leg 110 and extra large side door leg 120, and is fixed to ship board 140 The other end at.
Because the distance between the extra large side door leg of ultra-large type gantry crane and land side door leg are considerably beyond more than 40 meters of transport Beam of hull, will certainly cause a side door leg to be suspended on the outside of ship side, and another side door leg is placed on boat deck.The present invention is with land side Door leg is suspended on the outside of ship side, is illustrated exemplified by extra large side door leg placement on a ship 's.Similarly, extra large side door leg is suspended in outside ship side Side, land side door leg dispose on a ship 's.Preferably, artificial leg 130 and the side door leg of land side door leg 110 or extra large are shipped in the present embodiment 120 connections, for supporting the side door leg 120 of land side door leg 110 or extra large.
Further specifically, extra large side door leg 120 is fixed to the end of ship board 140, will shipping artificial leg 130 with Land side door leg 110 connects, and fixing hound 150 by first supports land side door leg 110, strengthens the company between short column and gantry crane Connect.The extra large side sill 121 of extra large side door leg 120 is arranged on ship board 140 by extra large side cart group 122.Herein, ship Location dimension D1 between artificial leg 130 and extra large side cart group 122 is less than the beam of hull dimension D 2 of cargo ship, realizes super by whole Big gauge gantry crane is loaded on ships that transport.
Especially, artificial leg 130 is shipped in the present embodiment includes two short columns 131 be arrangeding in parallel, connection triatic stay 132nd, big flat crossbeam 133 and small flat crossbeam 134, connected by connecting triatic stay 132 between short column 131, by the left and right sides Shipping artificial leg 130 be linked into one.Big flat crossbeam 133 and small flat crossbeam 134 are arranged on the lower section of short column 131, and fixed To ship board 140.
Meanwhile to prevent in transit, wave is splashed to the parts such as land side cart, so, the parts such as land side cart All remove, again reset the land side cart originally removed after the first gantry crane of user code is discharged on harbour.
Extra large side cart supports extra large side door leg jointly with shipping chassis, and interim rail is laid below extra large side cart and shipping chassis Road, temporary track are directly fixed on boat deck, are primarily subjected to the gravity of gantry crane sea side door leg vertical direction.In short column 131 Sidepiece and ship board 140 between be supported by the second fixation hound 151, gantry crane sea side door leg and hull are connected Integrally, firmly gantry crane is fixed on a ship 's.The lower end of short column 131 is additionally provided with shipping chassis 135, in shipping platform Car 135 is laid with temporary track 136 below, and temporary track 136 is fixed on ship board 140.
The top connection contact crossbeam 160 of short column 131, the He of doorframe hound 170 is set in the top of contact crossbeam 160 Doorframe adds strut 180.Especially, doorframe is added in extended line and the short column 131 of the center line lower end of strut 180 herein The extended line of heart line upper end is intersected on the center line of contact crossbeam 160.Doorframe adds upper end and the land side door leg of strut 180 110 connections, the extended line that doorframe adds the center line upper end of strut 180 are intersected on the center line of land side door leg 110.Extra large side door It is supported between leg 120 and ship board 140 by the 3rd fixation hound 123.
Super large gauge gantry crane complete machine shipping device of the present invention is related to ports handling machine field, when gantry crane extra large side door leg with The distance between land side door leg, i.e. cart gauge are even more big up to 50 meters, and when the beam over deck of cargo ship only has more than 40 meters, make It can not integrally load into whole gantry crane and aboard ship transport.If loose mail shipping to if being assembled after user's harbour again, with Family harbour not only needs to put into substantial amounts of human and material resources and financial resources, and needs to spend a lot of time in an assembling process, influences item Mesh delivery date.
In the case of hull restricted width system is transported, in order to realize that super large gauge gantry crane complete machine is transported, the present invention is logical Cross the additional strut of the doorframe used and shipping artificial leg is combined, a side door leg of gantry crane is fixed on a ship 's, another side door Leg is suspended in outside ship side, is supported whole gantry crane on a ship 's by the additional strut among doorframe and " shipping artificial leg ", can To realize in the case of cargo ship restricted width system, effectively solves super large gauge gantry crane complete machine transportation problem.
In summary, super large gauge gantry crane complete machine shipping device of the present invention is real in the case of ships that transport restricted width system Showed the complete machine transport of super large gauge gantry crane, avoided loose mail shipping to being assembled again after user's harbour, both saved with The cost of family harbour, the activity duration in user's harbour is shortened again, more times have been won to deliver equipment.
Super large gauge gantry crane complete machine shipping device of the present invention disclosure satisfy that gantry crane cart gauge is more than ships that transport width Complete machine loads shipping and required, realizes that super large gauge gantry crane complete machine ships.This example super large gauge gantry crane complete machine ships the knot of mode Configuration formula is simple, and gantry crane need not increase additional knot component in itself, and production cost is low.
Although the foregoing describing the embodiment of the present invention, it will be appreciated by those of skill in the art that these It is merely illustrative of, protection scope of the present invention is defined by the appended claims.Those skilled in the art is not carrying on the back On the premise of principle and essence from the present invention, various changes or modifications can be made to these embodiments, but these are changed Protection scope of the present invention is each fallen within modification.

Claims (10)

  1. A kind of 1. super large gauge gantry crane complete machine shipping device, it is characterised in that the super large gauge gantry crane complete machine shipping device bag Land side door leg, extra large side door leg and shipping artificial leg are included, the land side door leg or the extra large side door leg are fixed to the one of ship board At end, the shipping artificial leg is arranged between the land side door leg and the extra large side door leg, and is fixed to the ship board The other end at;
    The shipping artificial leg is connected with the land side door leg or the extra large side door leg, for supporting the land side door leg or the sea Side door leg.
  2. 2. super large gauge gantry crane complete machine shipping device as claimed in claim 1, it is characterised in that the extra large side door leg is fixed to The end of ship board, the shipping artificial leg are connected with the land side door leg, fixed by first described in hound support Land side door leg.
  3. 3. super large gauge gantry crane complete machine shipping device as claimed in claim 2, it is characterised in that the extra large side of the extra large side door leg Sill is arranged on the transport deck by extra large side cart group.
  4. 4. super large gauge gantry crane complete machine shipping device as claimed in claim 3, it is characterised in that the shipping artificial leg and described Location dimension between extra large side cart group is less than the beam of hull size of the cargo ship.
  5. 5. super large gauge gantry crane complete machine shipping device as claimed in claim 1, it is characterised in that the shipping artificial leg includes two Short column that root be arranged in parallel, connection triatic stay, big flat crossbeam and small flat crossbeam, pass through the connection between the short column Triatic stay connects, and the big flat crossbeam and the small flat crossbeam are arranged on the lower section of the short column, and are fixed to the fortune On defeated boat deck.
  6. 6. super large gauge gantry crane complete machine shipping device as claimed in claim 5, it is characterised in that the sidepiece of the short column and It is supported between the ship board by the second fixation hound.
  7. 7. super large gauge gantry crane complete machine shipping device as claimed in claim 6, it is characterised in that the short column lower end is also set Shipping chassis is equipped with, is laid with temporary track below the shipping chassis, the temporary track is fixed on the ship board On.
  8. 8. super large gauge gantry crane complete machine shipping device as claimed in claim 5, it is characterised in that connect above the short column Contact crossbeam is connect, sets doorframe hound and doorframe to add strut above the contact crossbeam.The doorframe is added in strut The extended line of heart line lower end and the extended line of the center line upper end of the short column are intersected on the center line for contacting crossbeam.
  9. 9. super large gauge gantry crane complete machine shipping device as claimed in claim 1, it is characterised in that the doorframe adds strut Upper end is connected with the land side door leg, and the extended line that the doorframe adds the center line upper end of strut intersects at the land side door leg Center line on.
  10. 10. the super large gauge gantry crane complete machine shipping device as described in claim 1-9 any one, it is characterised in that the sea It is supported between side door leg and the ship board by the 3rd fixation hound.
CN201710846307.7A 2017-09-19 2017-09-19 Super large gauge gantry crane complete machine shipping device Pending CN107813906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710846307.7A CN107813906A (en) 2017-09-19 2017-09-19 Super large gauge gantry crane complete machine shipping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710846307.7A CN107813906A (en) 2017-09-19 2017-09-19 Super large gauge gantry crane complete machine shipping device

Publications (1)

Publication Number Publication Date
CN107813906A true CN107813906A (en) 2018-03-20

Family

ID=61607672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710846307.7A Pending CN107813906A (en) 2017-09-19 2017-09-19 Super large gauge gantry crane complete machine shipping device

Country Status (1)

Country Link
CN (1) CN107813906A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112693565A (en) * 2020-12-25 2021-04-23 上海振华重工(集团)股份有限公司 Marine transportation binding mechanism and marine transportation method of crane
CN113879470A (en) * 2021-11-19 2022-01-04 上海振华重工(集团)股份有限公司 Shipping support binding device and method suitable for super-long steel structure bridge

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1184700A (en) * 1966-11-04 1970-03-18 Fruehauf Corp Bulk Loader, Unloader, and Cargo Container Handling Crane
CN2463370Y (en) * 2001-02-22 2001-12-05 杭州华新机电工程有限公司 Draw-crab type unshipping machine capable of trolleying push-harrower
CN2797296Y (en) * 2005-06-08 2006-07-19 杭州华新机电工程有限公司 Dual purpose machine for loading and unloading ship
CN101402390A (en) * 2008-05-29 2009-04-08 中铁大桥局股份有限公司 Temporary supporting and fixing device for long-distance transportation of large-scale precast beam on the sea
CN201914414U (en) * 2011-01-29 2011-08-03 左文龙 Joist barrow type dumping system stabilizing device for freighters
CN202765875U (en) * 2012-09-25 2013-03-06 上海振华重工(集团)股份有限公司 Oversized rail gauge crane transportation equipment
US20150122763A1 (en) * 2012-05-04 2015-05-07 Guillermo Bobenrieth Giglio System for loading and unloading in port operations , comprising of a crane; and a base located in the body of the crane that holds and stocks the hatch covers
CN105060093A (en) * 2015-07-03 2015-11-18 上海振华重工(集团)股份有限公司 Integral hoisting method of front and rear crossbeam assemblies of quayside container crane
CN205855466U (en) * 2016-07-29 2017-01-04 南通润邦重机有限公司 A kind of telescopic jib ship loader
CN208119369U (en) * 2017-09-19 2018-11-20 上海振华重工(集团)股份有限公司 Super large gauge gantry crane complete machine shipping device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1184700A (en) * 1966-11-04 1970-03-18 Fruehauf Corp Bulk Loader, Unloader, and Cargo Container Handling Crane
CN2463370Y (en) * 2001-02-22 2001-12-05 杭州华新机电工程有限公司 Draw-crab type unshipping machine capable of trolleying push-harrower
CN2797296Y (en) * 2005-06-08 2006-07-19 杭州华新机电工程有限公司 Dual purpose machine for loading and unloading ship
CN101402390A (en) * 2008-05-29 2009-04-08 中铁大桥局股份有限公司 Temporary supporting and fixing device for long-distance transportation of large-scale precast beam on the sea
CN201914414U (en) * 2011-01-29 2011-08-03 左文龙 Joist barrow type dumping system stabilizing device for freighters
US20150122763A1 (en) * 2012-05-04 2015-05-07 Guillermo Bobenrieth Giglio System for loading and unloading in port operations , comprising of a crane; and a base located in the body of the crane that holds and stocks the hatch covers
CN202765875U (en) * 2012-09-25 2013-03-06 上海振华重工(集团)股份有限公司 Oversized rail gauge crane transportation equipment
CN105060093A (en) * 2015-07-03 2015-11-18 上海振华重工(集团)股份有限公司 Integral hoisting method of front and rear crossbeam assemblies of quayside container crane
CN205855466U (en) * 2016-07-29 2017-01-04 南通润邦重机有限公司 A kind of telescopic jib ship loader
CN208119369U (en) * 2017-09-19 2018-11-20 上海振华重工(集团)股份有限公司 Super large gauge gantry crane complete machine shipping device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
符敦鉴 等: "《岸边集装箱起重机》", 湖北科学技术出版社, pages: 250 - 252 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112693565A (en) * 2020-12-25 2021-04-23 上海振华重工(集团)股份有限公司 Marine transportation binding mechanism and marine transportation method of crane
CN113879470A (en) * 2021-11-19 2022-01-04 上海振华重工(集团)股份有限公司 Shipping support binding device and method suitable for super-long steel structure bridge

Similar Documents

Publication Publication Date Title
KR101378897B1 (en) ship having eyeplate for container lashing ship
US4043285A (en) Container ship
CN104837725B (en) flat bracket
CN107813906A (en) Super large gauge gantry crane complete machine shipping device
CN102229392A (en) Lighterage operation bridge type loading and unloading ship machine
CN105658516B (en) For the lashing bridge of freighter
CN103282649A (en) Transportation and storage system for wind turbine blades
CN106946154B (en) Gantry crane flexible legs
CN108045594A (en) Large transport airplane unit nesting combined type aids in goods bridge and assembly and disassembly methods
CN208119369U (en) Super large gauge gantry crane complete machine shipping device
CN100482551C (en) Transporting platform and transporting unit
CN101723153A (en) Container
KR102214432B1 (en) Production support and storage vessel
US4496187A (en) Trailer construction
CN104144850B (en) Loading and uninstalling system for the counter at harbour
CN106005794B (en) Oil cargo tank for floating storage vessel unit
CN201010255Y (en) Transporting platform and transporting unit
CN104802932B (en) Spare anchor base and ship containing spare anchor base
CN101588956B (en) Trailer for the transportation by road of containers
CN208666546U (en) A kind of transition mechanism between high-speed rail freight container and platform
CN206202597U (en) A kind of two deck hatchcovers
WO1993004914A1 (en) Jumbo barge carrier fast sealift and port system
CN207875929U (en) A kind of modified form ocean lashing and securing assembly
CN206751208U (en) Gantry crane flexible legs
CN207482127U (en) Stable supporting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination