CN107806086A - Soil pressure cell fixing device after a kind of manually digging hole filling pile stake - Google Patents

Soil pressure cell fixing device after a kind of manually digging hole filling pile stake Download PDF

Info

Publication number
CN107806086A
CN107806086A CN201711049346.0A CN201711049346A CN107806086A CN 107806086 A CN107806086 A CN 107806086A CN 201711049346 A CN201711049346 A CN 201711049346A CN 107806086 A CN107806086 A CN 107806086A
Authority
CN
China
Prior art keywords
soil pressure
pressure cell
support body
fixing device
hole filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711049346.0A
Other languages
Chinese (zh)
Inventor
李雪
张军伟
何磊
曲宏略
李雕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201711049346.0A priority Critical patent/CN107806086A/en
Publication of CN107806086A publication Critical patent/CN107806086A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses soil pressure cell fixing device after a kind of manually digging hole filling pile stake, including the support body with being connected on the outside of concrete guard wall and the soil pressure cell installing plate on support body, attachment structure is provided between on the outside of the support body and concrete guard wall, the soil pressure cell installing plate is provided with the location division for being used for placing soil pressure cell, and the opening for arranging soil pressure cell lead is additionally provided with the support body.The present invention is by setting support body and soil pressure cell installing plate, and location division is set on soil pressure cell installing plate, on the outside of the support body and concrete guard wall between attachment structure is set, soil pressure cell is avoided shift in position occur after installing, ensure that soil pressure cell measures soil pressure force direction accuracy, opening is set on support body, soil pressure cell lead is drawn from support body and is arranged along on the outside of concrete guard wall, damage soil pressure cell lead when avoiding transferring steel reinforcement cage, ensure soil pressure measurement development working properly after stake.

Description

Soil pressure cell fixing device after a kind of manually digging hole filling pile stake
Technical field
The present invention relates to Geotechnical Engineering field, and in particular to soil pressure cell fixes dress after a kind of manually digging hole filling pile stake Put.
Background technology
The calculating of soil pressure is the important evidence of ground support structure design in Geotechnical Engineering, the soil pressure one of supporting construction The problem of being all ground worker concern since straight, field measurement soil pressure are one of effective means for obtaining soil pressure.
Manually digging hole filling pile, refer to use artificial shoveling pore-forming, then lay steel reinforcement cage, concrete perfusion pile.People During work excavation pile construction, using manually in underground work, therefore, it is necessary to take effective measures the stabilization for ensuring hole wall, at present Conventional retaining wall measure is cast-in-place concrete retaining wall.
In order to measure soil pressure after manually digging hole filling pile stake, frequently with arranging soil pressure cell to carry out after stake in construction Soil pressure measurement works after stake.Find that since soil pressure cell measure being installed to after stake, soil pressure cell through field practice and investigation Often there arises a problem that:
1st, soil pressure cell is rest directly upon on the outside of concrete guard wall, and it lacks effective fixed form, the position of soil pressure cell Put and change, can not ensure that soil pressure cell measures the accuracy of soil pressure force direction;
2nd, soil pressure cell lead is arranged along on the inside of concrete guard wall, and when transferring steel reinforcement cage, steel reinforcement cage can shake Shake pendulum with being collided on the inside of concrete guard wall, the situation that soil pressure cell lead is broken by steel reinforcement cage easily occur, and then lead Soil pressure measurement operating interruptions after cause stake.
In order to improve the reliability of soil pressure measurement after manually digging hole filling pile stake, it is necessary to which research is a kind of to be used to fix people The device of soil pressure cell after work digging hole filling pile stake, bury what measurement process was encountered to solve soil pressure cell after digging hole filling pile Problem.
The content of the invention
Present invention aims at:For at present after manually digging hole filling pile stake during soil pressure measurement, due to soil pressure It is improper that power box is fixed and protected, and soil pressure cell shift in position easily occurs, and the problem of soil pressure cell wire breaking, there is provided one Soil pressure cell fixing device after kind manually digging hole filling pile stake, it can have to soil pressure cell after manually digging hole filling pile stake Effect is fixed and protection, can avoid occurring soil pressure cell position in measurement process changing, and soil pressure cell lead is pressed Situations such as disconnected, so as to improve the reliability to soil pressure measurement.
To achieve these goals, the technical solution adopted by the present invention is:
Soil pressure cell fixing device after a kind of manually digging hole filling pile stake, including the support body with being connected on the outside of concrete guard wall With the soil pressure cell installing plate on support body, on the outside of the support body and concrete guard wall between be provided with attachment structure, the soil Pressure cell installing plate is provided with the location division for being used for placing soil pressure cell, is additionally provided with the support body for arranging that soil pressure cell draws The opening of line.
The present invention is set by setting support body and soil pressure cell installing plate being set on support body on soil pressure cell installing plate Put location division, on the outside of the support body and concrete guard wall between attachment structure is set, can avoid occurring after soil pressure cell is installed Shift in position, so as to ensure that soil pressure cell measures the accuracy of soil pressure force direction, while arrangement soil pressure is provided on support body The opening of power box lead, soil pressure cell lead can be made to be drawn from support body and along being arranged on the outside of concrete guard wall, can be with Destruction when avoiding transferring steel reinforcement cage to soil pressure cell lead, ensure the normal development of soil pressure measurement work after stake, while this Device makes simply, and cost is low, installation facility.
As the preferred scheme of the present invention, the attachment structure includes the wire lead slot on the outside of concrete guard wall, described The width of wire lead slot is adapted with the support body width.By setting wire lead slot on the outside of concrete guard wall, and the wire lead slot Width is adapted with support body width, very easily can so be realized by support body outside whole fixing device and concrete guard wall Side is connected, at the same the wire lead slot can also as the arrangement passage of soil pressure cell lead, can preferably protect lead not by Destroy.
As the preferred scheme of the present invention, the support body is in hollow rectangular parallelepiped structure, and the opening is arranged above and below support body On two sides.By the way that support body is designed into hollow rectangular parallelepiped structure, so facilitate the manufacture of support body, while opening is arranged at support body On upper and lower two sides, it can facilitate and arrangement is moved towards to soil pressure cell lead.
As the preferred scheme of the present invention, the location division is the locating slot being adapted with soil pressure cell profile.By setting The locating slot being adapted with soil pressure cell profile is put, it had both been easy to the placement of soil pressure cell, and and can is preferably entered to soil pressure cell Line position puts fixation.
The fairlead being connected with support body is provided with as the preferred scheme of the present invention, in the locating slot.By positioning The fairlead being connected with support body is set in groove, lead can be introduced directly into support body by fairlead after soil pressure cell placement It is interior, then led to by the opening above support body in ground survey instrument, be advantageous to optimization soil pressure cell lead and move towards arrangement.
As the preferred scheme of the present invention, both sides are respectively equipped with soil pressure cell protection to the soil pressure cell installing plate up and down Plate.By above and below soil pressure cell installing plate both sides soil pressure cell protection board is set respectively, the soil body that drops of top can be avoided Soil pressure cell is damaged, while after the soil pressure cell protection board of lower section contacts with the soil body, whole fixing device is also functioned to certain Supporting role.
In summary, by adopting the above-described technical solution, the beneficial effects of the invention are as follows:
1st, it is of the invention by setting support body and soil pressure cell installing plate being set on support body, and on soil pressure cell installing plate Location division is set, on the outside of the support body and concrete guard wall between attachment structure is set, can avoid going out after soil pressure cell is installed Existing shift in position, so as to ensure that soil pressure cell measures the accuracy of soil pressure force direction, while arrangement soil is provided on support body The opening of pressure cell lead, soil pressure cell lead can be made to draw from support body and be arranged along on the outside of concrete guard wall, can Destruction during avoiding transferring steel reinforcement cage to soil pressure cell lead, ensure the normal development of soil pressure measurement work after stake;
2nd, by setting wire lead slot on the outside of concrete guard wall, and the width of the wire lead slot is adapted with support body width, this Sample can very easily realize whole fixing device with being connected on the outside of concrete guard wall by support body, while the wire lead slot Preferably lead can be protected not to be damaged as the arrangement passage of soil pressure cell lead;
3rd, by setting the locating slot that is adapted with soil pressure cell profile, it had both been easy to the placement of soil pressure cell, and can compared with Good fixes to soil pressure cell progress position.
Brief description of the drawings
Fig. 1 is soil pressure cell fixing device general illustration after manually digging hole filling pile stake in the present invention.
Fig. 2 is the soil pressure cell installing plate schematic diagram in Fig. 1.
Fig. 3 is Fig. 2 cut-away diagram.
Fig. 4 is soil pressure cell fixing device scheme of installation after manually digging hole filling pile stake in the present invention.
Fig. 5 is close-up schematic view on the outside of the concrete guard wall in Fig. 4.
Marked in figure:1- concrete guard walls, 11- wire lead slots, 2- support bodys, 21- openings, 3- soil pressure cell installing plates, 31- are fixed Position groove, 32- fairleads, 4- soil pressure cell protection boards, 5- soil pressure cells, 51- soil pressure cell leads.
Embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
Embodiment
The present embodiment provides soil pressure cell fixing device after a kind of manually digging hole filling pile stake;
As Figure 1-Figure 5, soil pressure cell fixing device after the manually digging hole filling pile stake in the present embodiment, including with mixing The solidifying native outside of retaining wall 1 connected support body 2 and the soil pressure cell installing plate 3 on support body 2, the support body 2 and concrete guard wall 1 Attachment structure is provided between outside, the soil pressure cell installing plate 3 is provided with the location division for being used for placing soil pressure cell 5, described The opening 21 for arranging soil pressure cell lead 51 is additionally provided with support body 2.
In the present embodiment, the attachment structure includes the wire lead slot 11 located at the outside of concrete guard wall 1, the wire lead slot 11 Width be adapted with the width of support body 2.By setting wire lead slot on the outside of concrete guard wall, and the width of the wire lead slot with Support body width is adapted, and so can very easily realize whole fixing device with being connected on the outside of concrete guard wall by support body Connect, while the wire lead slot preferably can also can protect lead not to be damaged as the arrangement passage of soil pressure cell lead.
In the present embodiment, the support body 2 is in hollow rectangular parallelepiped structure, and the opening 21 is arranged at support body, and about 2 two sides On.By the way that support body is designed into hollow rectangular parallelepiped structure, so facilitate the manufacture of support body, while opening is arranged at two above and below support body On side, it can facilitate and arrangement is moved towards to soil pressure cell lead.
In the present embodiment, the location division is the locating slot 31 being adapted with the profile of soil pressure cell 5.Pass through setting and soil pressure The locating slot that power box profile is adapted, it had both been easy to the placement of soil pressure cell, and and can preferably carries out position to soil pressure cell and consolidated It is fixed.
The fairlead 32 being connected with support body 2 is provided with the present embodiment, in the locating slot 31.By being set in locating slot The fairlead being connected with support body is put, can be introduced directly into lead in support body by fairlead after soil pressure cell placement, then by Opening above support body is led in ground survey instrument, is advantageous to optimization soil pressure cell lead and is moved towards arrangement.
In the present embodiment, the soil pressure cell installing plate is respectively equipped with soil pressure cell protection board 4 in both sides about 3.By Soil pressure cell installing plate sets soil pressure cell protection board in both sides respectively up and down, the soil body damage soil pressure that top can be avoided to drop Box, while after the soil pressure cell protection board of lower section contacts with the soil body, certain supporting role is also functioned to whole fixing device.
Specifically, soil pressure measurement process is as follows after manually digging hole filling pile stake:
The position of soil pressure, excavates this section of stake holes after excavation arrives requirement peg, and soil pressure is installed in corresponding excavation section Box fixing device, and soil pressure cell is laid in locating slot, by soil pressure cell lead out of fairlead lead-in rack body, while in soil Pressure cell is uniformly filled with soil body part after stake with standard fine sand, and soil pressure cell lead is drawn by opening reserved above support body And led to along the wire lead slot on the outside of concrete guard wall in ground survey instrument.
The present embodiment is by setting support body and soil pressure cell installing plate being set on support body, and on soil pressure cell installing plate Location division is set, on the outside of the support body and concrete guard wall between attachment structure is set, can avoid going out after soil pressure cell is installed Existing shift in position, so as to ensure that soil pressure cell measures the accuracy of soil pressure force direction, while arrangement soil is provided on support body The opening of pressure cell lead, soil pressure cell lead can be made to draw from support body and be arranged along on the outside of concrete guard wall, can Destruction during avoiding transferring steel reinforcement cage to soil pressure cell lead, ensure the normal development of soil pressure measurement work after stake.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all originals in the present invention All any modification, equivalent and improvement made within reason etc., should be included in the scope of the protection.

Claims (6)

  1. A kind of 1. soil pressure cell fixing device after manually digging hole filling pile stake, it is characterised in that including with concrete guard wall on the outside of Connected support body and the soil pressure cell installing plate on support body, on the outside of the support body and concrete guard wall between be provided with connection knot Structure, the soil pressure cell installing plate are provided with the location division for being used for placing soil pressure cell, are additionally provided with the support body for arranging The opening of soil pressure cell lead.
  2. 2. soil pressure cell fixing device after manually digging hole filling pile stake according to claim 1, it is characterised in that the company Binding structure includes the wire lead slot on the outside of concrete guard wall, and the width of the wire lead slot is adapted with the support body width.
  3. 3. soil pressure cell fixing device after manually digging hole filling pile stake according to claim 2, it is characterised in that the frame Body is in hollow rectangular parallelepiped structure, and the opening is arranged above and below support body on two sides.
  4. 4. soil pressure cell fixing device after manually digging hole filling pile stake according to claim 3, it is characterised in that described fixed Position portion is the locating slot being adapted with soil pressure cell profile.
  5. 5. soil pressure cell fixing device after manually digging hole filling pile stake according to claim 4, it is characterised in that described fixed The fairlead being connected with support body is provided with the groove of position.
  6. 6. soil pressure cell fixing device after the manually digging hole filling pile stake according to one of claim 1-5, it is characterised in that The soil pressure cell installing plate is respectively equipped with soil pressure cell protection board in both sides up and down.
CN201711049346.0A 2017-10-31 2017-10-31 Soil pressure cell fixing device after a kind of manually digging hole filling pile stake Pending CN107806086A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711049346.0A CN107806086A (en) 2017-10-31 2017-10-31 Soil pressure cell fixing device after a kind of manually digging hole filling pile stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711049346.0A CN107806086A (en) 2017-10-31 2017-10-31 Soil pressure cell fixing device after a kind of manually digging hole filling pile stake

Publications (1)

Publication Number Publication Date
CN107806086A true CN107806086A (en) 2018-03-16

Family

ID=61583119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711049346.0A Pending CN107806086A (en) 2017-10-31 2017-10-31 Soil pressure cell fixing device after a kind of manually digging hole filling pile stake

Country Status (1)

Country Link
CN (1) CN107806086A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09111758A (en) * 1995-10-17 1997-04-28 Kajima Corp Cast-in-place concrete pile and construction method thereof
CN101487249A (en) * 2008-12-30 2009-07-22 中国科学院武汉岩土力学研究所 Embedding apparatus and method for earth pressure box
CN104929162A (en) * 2015-06-15 2015-09-23 上海交通大学 Outer side wall earth pressure cell hydraulic type burying device and method
CN204855242U (en) * 2015-06-16 2015-12-09 兰州交通大学 Bury fixing device of soil pressure cell underground
CN105155598A (en) * 2015-09-15 2015-12-16 东南大学 Precast pile body surface strain gauge and pile side soil pressure cell on-site layout method
CN105887943A (en) * 2016-04-22 2016-08-24 中南大学 Pressure test structure for long bored cast-in-situ pile and test method
CN207419446U (en) * 2017-10-31 2018-05-29 西南石油大学 Soil pressure cell fixing device after a kind of manually digging hole filling pile stake

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09111758A (en) * 1995-10-17 1997-04-28 Kajima Corp Cast-in-place concrete pile and construction method thereof
CN101487249A (en) * 2008-12-30 2009-07-22 中国科学院武汉岩土力学研究所 Embedding apparatus and method for earth pressure box
CN104929162A (en) * 2015-06-15 2015-09-23 上海交通大学 Outer side wall earth pressure cell hydraulic type burying device and method
CN204855242U (en) * 2015-06-16 2015-12-09 兰州交通大学 Bury fixing device of soil pressure cell underground
CN105155598A (en) * 2015-09-15 2015-12-16 东南大学 Precast pile body surface strain gauge and pile side soil pressure cell on-site layout method
CN105887943A (en) * 2016-04-22 2016-08-24 中南大学 Pressure test structure for long bored cast-in-situ pile and test method
CN207419446U (en) * 2017-10-31 2018-05-29 西南石油大学 Soil pressure cell fixing device after a kind of manually digging hole filling pile stake

Similar Documents

Publication Publication Date Title
WO2021000444A1 (en) Foundation reinforcement structure and method for hoisting heavy equipment close to unclosed building
RU2715585C1 (en) Module for connection of pipes in shaft
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN207419446U (en) Soil pressure cell fixing device after a kind of manually digging hole filling pile stake
CN109208615A (en) A kind of groove notch supporting construction, construction method and groove pouring procedure
KR100955753B1 (en) The method of vertical construction by leaving of the pile in advanced construction
CN107806086A (en) Soil pressure cell fixing device after a kind of manually digging hole filling pile stake
CN105297731B (en) Reverse construction method steel stand column positioning device and positioning method
CN104264682A (en) Anchor traction wall protection pile base layer concrete beam support pouring technology
CN201738251U (en) Box culvert
CN204825679U (en) A support stake for construction is contained to indisputable road bridge
CN104060598B (en) A kind of fastening devices of vertical layout earth pressure cell
CN107905259A (en) Box culvert advancing monitoring device and its construction method
CN218060412U (en) Utility tunnel enclosure wall construction structures
CN105715094A (en) Protecting device for high-voltage line pole
KR200486046Y1 (en) Apparatus of casing guide for a excavator
CN205134323U (en) Reverse construction method steel stand positioner
CN109555155A (en) The construction method of construction underground structure under building
CN114960742A (en) New and old pipe gallery connection construction method
CN108914997A (en) A kind of reinforced soil retaining wall lateral deformation test device and working method
CN209538185U (en) The deep foundation pit supporting construction structure of steel reinforcement cage and steel pipe column combination
CN107460832A (en) The deep existing bridge of cheuch disturbs ruggedized construction and construction method
CN107816039A (en) Soil pressure cell fixing device and application method after a kind of bored concrete pile
CN212692854U (en) Settlement observation device
JP6276152B2 (en) Construction girder removal method and earth retaining plate for construction girder removal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180316

RJ01 Rejection of invention patent application after publication