CN107795129A - A kind of construction is implanted into point aid with tie wall bar - Google Patents
A kind of construction is implanted into point aid with tie wall bar Download PDFInfo
- Publication number
- CN107795129A CN107795129A CN201711011497.7A CN201711011497A CN107795129A CN 107795129 A CN107795129 A CN 107795129A CN 201711011497 A CN201711011497 A CN 201711011497A CN 107795129 A CN107795129 A CN 107795129A
- Authority
- CN
- China
- Prior art keywords
- main rod
- rod body
- easy
- screw thread
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Point aid is implanted into tie wall bar the invention provides a kind of construction, belongs to the realm of building construction.Including main rod body;The main rod body upper end is socketed with secondary bar body;Level is connected with spring on the right side of the main rod body upper end;The main rod body by-level passes through screw thread bull stick;Circular switch block is socketed among the screw thread bull stick;The circular switch block surface is socketed with square scale plate vertically;The square scale plate upper end head erect is connected with fixed block and fixed block intermediate interdigitated is provided with X-shaped groove;Motor is connected with inside the square scale plate lower end;The secondary bar body of the present invention is easy to move up and down on main rod body surface and is easy to increase mobile jib body length;Active fastening block compression spring is contracted in main rod body;When secondary bar body upward sliding, spring is easy to stick into active fastening block ejection and active fastening block in opening, is easy to fix the position of main rod body and secondary bar body;When screw thread bull stick is easy to by being engaged screw thread rotation and screw thread bull stick moves up and down.
Description
Technical field
The present invention relates to a kind of construction equipment, specifically a kind of construction is implanted into point aid with tie wall bar.
Background technology
Construction industry is one of key pillars of the national economy industry at present, its development with whole national economy, people's people's livelihood
Improvement living has close relationship.China is in the transition stage developed from low income country to middle income country,
Under the promotion that infrastructure construction and Process of Urbanization Construction dynamics continue to increase, Building Trade in China maintains good growth,
Economic benefit is constantly improve, and the contribution to growth of the national economic is larger, in building trade as in this case, the missing of building implement
A kind of really big short slab of building trade, this phenomenon result in the most building of building trade and depend on substantial amounts of labour
To fill up the shortage on instrument, it is reported that lacking the special tool of accuracy and stability in cylinder tie wall bar implantation process
Tool, therefore the present invention is provided with and accurately can be implanted into the determination instrument put by stable tie wall bar.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problem to be solved in the present invention is to provide a kind of the realm of building construction
Construction is implanted into point aid with tie wall bar.
In order to solve the above technical problems, the invention provides following technical scheme:
A kind of construction is implanted into point aid, including main rod body with tie wall bar;The main rod body upper end is socketed with secondary bar body;
Level is connected with spring on the right side of the main rod body upper end;The main rod body by-level passes through screw thread bull stick;The screw thread turns
Circular switch block is socketed among bar;The circular switch block surface is socketed with square scale plate vertically;The square scale plate upper end
Head erect is connected with fixed block and fixed block intermediate interdigitated is provided with X-shaped groove;Electricity is connected with inside the square scale plate lower end
Motivation;The motor lower end is connected with rotating shaft vertically and rotating shaft lower end passes through square scale plate;Described main rod body lower end or so
Symmetry through two thread bush;By being engaged screw thread horizontal through rotating bar among described two thread bush;In the rotating bar
End is connected with spill spin block vertically;Described two thread bush both ends are connected with two ambulatory splints;Described main rod body lower end or so two
End is symmetrically connected with two fixed plates and fixed plate horizontal through ambulatory splint;The ambulatory splint upper and lower ends are symmetrically vertical
It is connected with two slide bars;Described two slide bar upper ends are connected with two movable blocks.
As the further improvement project of the present invention:The secondary bar body right side wall lower end is provided with opening.
As further improvement project of the invention:The spring right-hand member level is connected with active fastening block.
As further improvement project of the invention:Rotating shaft lower end level is connected with emery wheel.
As further improvement project of the invention:If uniformly it is connected with dry milling vertically between described two movable blocks
Wheel.
Compared with prior art, the beneficial effects of the invention are as follows:
The secondary bar body of the present invention is easy to move up and down on main rod body surface and is easy to increase mobile jib body length;Active fastening block compresses bullet
Spring is contracted in main rod body;When secondary bar body upward sliding, spring is easy to active fastening block ejection and active fastening block sticking into opening
In, it is easy to fix the position of main rod body and secondary bar body;When screw thread bull stick is easy to by being engaged above and below screw thread rotation and screw thread bull stick
It is mobile;Screw thread bull stick is easy to drive circular switch block rotation and screw thread bull stick drives circular switch block to move up and down;Circular switch block is easy to
Drive the position that square scale plate moves up and down in main rod body and square scale plate is easy to accurate control tie wall bar to be implanted into point;Side
Shape scale plate is easy to drive that fixed block moves up and down and fixed block is easy to mark to X-shaped is drawn on wall by X-shaped groove;Motor
It is easy to drive rotating shaft rotation;When rotating shaft drives emery wheel rotation, emery wheel is easy to polish the place of cast-in-place cylinder lower end out-of-flatness;Two
Individual thread bush is easy to move left and right in main rod body lower end;Rotating bar is easy to rotate in thread bush, when rotating bar rotates up,
Rotating bar is easy to drive two thread bush to centre to gather, and when rotating bar is rotated down, rotating bar is easy to drive two screw threads
Cover and separated to both sides;Spill spin block is easy to drive rotating bar rotation;Two thread bush are easy to drive two ambulatory splints to move left and right;
Two thread bush are easy to drive ambulatory splint to move left and right in fixed plate, when ambulatory splint is gathered to centre, ambulatory splint
It is easy to clamp cylinder;Ambulatory splint is easy to move left and right in fixed plate by slide bar;Slide bar is easy to drive movable block in fixation
Plate moves left and right;When slide bar drives movable block to gather to centre, it is easy to roller to be slided up and down on cylinder, is easy to whole device
Move up and down.
Brief description of the drawings
Fig. 1 is the structural representation of construction tie wall bar implantation point aid;
Fig. 2 is the structural representation of side view in construction tie wall bar implantation point aid;
Fig. 3 is that construction is implanted into the structural representation overlooked in point aid with tie wall bar;
In figure:1- main rod bodies, 2- fixed plates, 3- movable blocks, 4- rollers, 5- ambulatory splints, 6- slide bars, 7- rotating bars, 8- rotations
Block, 9- thread bush, 10- emery wheels, 11- rotating shafts, 12- motor, 13- screw threads bull stick, 14- circles switch block, the square scale plates of 15-,
16- fixed blocks, 17- secondary bars body, 18- openings, 19- active fastening blocks, 20- springs.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
The embodiment of this patent is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, is only used for explaining this patent, and it is not intended that limitation to this patent.
In the description of this patent, it is to be understood that term " " center ", " on ", " under ", "front", "rear", " left side ",
The orientation or position relationship of the instruction such as " right side ", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are based on shown in the drawings
Orientation or position relationship, are for only for ease of description this patent and simplify and describe, rather than instruction or imply signified device or
Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to this patent.
, it is necessary to illustrate in the description of this patent, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection ", " setting " should be interpreted broadly, for example, it may be being fixedly linked, setting or being detachably connected, set
Put, or be integrally connected, set.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition
Concrete meaning in this patent.
Fig. 1-3 are referred to, present embodiments provide a kind of construction tie wall bar implantation point aid, including mobile jib
Body 1;The upper end of main rod body 1 is socketed with secondary bar body 17, and secondary bar body 17 is easy to move up and down on the surface of main rod body 1 and is easy to increase
The length of main rod body 1;Level is connected with spring 20 on the right side of the upper end of main rod body 1;The right-hand member level of spring 20 is connected with work
Dynamic fixture block 19, the compression spring 20 of active fastening block 19 are contracted in main rod body 1;The right side wall lower end of secondary bar body 17 is provided with opening
18, when secondary bar 17 upward sliding of body, spring 20 is easy to eject active fastening block 19 and active fastening block 19 is sticked into opening 18, just
In fixed main rod body 1 and the position of secondary bar body 17;The by-level of main rod body 1 passes through screw thread bull stick 13, when screw thread bull stick 13
It is easy to by being engaged screw thread rotation and screw thread bull stick 13 moves up and down;Circular switch block 14 is socketed among the screw thread bull stick 13,
Screw thread bull stick 13 is easy to drive that circular switch block 14 rotates and screw thread bull stick 13 drives circular switch block 13 to move up and down;Described circular turn
The surface of block 14 is socketed with square scale plate 15 vertically, and circular switch block 14 is easy to drive square scale plate 15 upper and lower in main rod body 1
Mobile and square scale plate 15 is easy to the position of accurate control tie wall bar implantation point;The upper end head erect of square scale plate 15 is consolidated
It is connected to fixed block 16 and the intermediate interdigitated of fixed block 16 is provided with X-shaped groove, square scale plate 15, which is easy to drive on fixed block 16, is moved down
Dynamic and fixed block 16 is easy to mark to drawing X-shaped on wall by X-shaped groove;Electricity is connected with inside the lower end of square scale plate 15
Motivation 12;The lower end of motor 12 is connected with rotating shaft 11 vertically and the lower end of rotating shaft 11 passes through square scale plate 15, motor 12
It is easy to drive rotating shaft 11 to rotate;The lower end level of rotating shaft 11 is connected with emery wheel 10, when rotating shaft 11 drives emery wheel 10 to rotate, sand
Wheel 10 is easy to polish the place of cast-in-place cylinder lower end out-of-flatness;The lower end of main rod body 1 is symmetrical to pass through two thread bush 9,
Two thread bush 9 are easy to move left and right in the lower end of main rod body 1;Among described two thread bush 9 by be engaged screw thread horizontal through
Rotating bar 7, rotating bar 7 are easy to rotate in thread bush 9, and when rotating bar 7 rotates up, rotating bar 7 is easy to drive two spiral shells
Line set 9 is gathered to centre, and when rotating bar 7 is rotated down, rotating bar 7 is easy to drive two thread bush 9 to separate to both sides;It is described
The upper end of rotating bar 7 is connected with spill spin block 8 vertically, and spill spin block 8 is easy to drive rotating bar 7 to rotate;Described two both ends of thread bush 9 are consolidated
Two ambulatory splints 5 are connected to, two thread bush 9 are easy to drive two ambulatory splints 5 to move left and right;The lower end of main rod body 1 is left
Right both ends are symmetrically connected with two fixed plates 2 and fixed plate 2 horizontal through ambulatory splint 5, and two thread bush 9, which are easy to drive, lives
Dynamic clamping plate 5 moves left and right in fixed plate 2, and when ambulatory splint 5 is gathered to centre, ambulatory splint 5 is easy to clamp cylinder;It is described
The upper and lower ends of ambulatory splint 5 are symmetrically connected with two slide bars 6 vertically, ambulatory splint 5 be easy to by slide bar 6 in fixed plate 2 it is left
Move right;Described two upper ends of slide bar 6 are connected with two movable blocks 3, and slide bar 6 is easy to drive movable block 3 to move in fixed plate 2 or so
It is dynamic;Some rollers 4 are uniformly connected with vertically between described two movable blocks 3, when slide bar 6 drives movable block 3 to gather to centre,
It is easy to roller 4 to be slided up and down on cylinder, is easy to whole device to move up and down.
Specifically used mode:Whole device is moved to cylinder edge first by person, then user passes through spill spin block 8
Rotating bar 7 is driven to rotate up, rotating bar 7 drives two thread bush 9 mobile to centre, and then thread bush 9 drives two activities
Fixture block 5 is mobile to centre, and then movable clip block 5 drives two movable blocks 3 to gather to centre and contacts cylinder by slide bar 6, so
Moved up and down afterwards by roller 4 in damaged surface, be then rotated down screw thread bull stick 13 afterwards in place so that emery wheel 10
Cylinder lower end is contacted, opens motor 12, motor 12 is rotated by the drive emery wheel 10 of bearing 11 and emery wheel 10 is polished, and post bottom is protected
Water holding is put down, then up rotary motion bar 7, is rotated and is driven two ambulatory splints 5 to clamp cylinder, pulls secondary bar body then up
17, active fastening block 19 is sticked into opening 18, is easy to fix main rod body 1 and secondary bar body 17, is then rotated upwardly and downwardly screw thread bull stick 13 just
In driving square scale plate 15 to move up and down, then user is made marks by fixed block 16 in damaged surface.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge
Make a variety of changes.
Claims (5)
1. a kind of construction is implanted into point aid, including main rod body with tie wall bar(1);It is characterized in that the main rod body(1)
Upper end is socketed with secondary bar body(17);The main rod body(1)Level is connected with spring on the right side of upper end(20);The main rod body(1)
By-level passes through screw thread bull stick(13);The screw thread bull stick(13)Centre is socketed with circular switch block(14);The circular switch block
(14)Surface is socketed with square scale plate vertically(15);The square scale plate(15)Upper end head erect is connected with fixed block(16)
And fixed block(16)Intermediate interdigitated is provided with X-shaped groove;The square scale plate(15)Motor is connected with inside lower end(12);Institute
State motor(12)Lower end is connected with rotating shaft vertically(11)And rotating shaft(11)Lower end passes through square scale plate(15);The main rod body
(1)Lower end is symmetrical to pass through two thread bush(9);Described two thread bush(9)It is middle by being engaged screw thread horizontal through turning
Lever(7);The rotating bar(7)Upper end is connected with spill spin block vertically(8);Described two thread bush(9)Both ends are connected with two
Ambulatory splint(5);The main rod body(1)Lower end left and right ends are symmetrically connected with two fixed plates(2)And fixed plate(2)Middle level
Through ambulatory splint(5);The ambulatory splint(5)Upper and lower ends are symmetrically connected with two slide bars vertically(6);Described two slide bars
(6)Upper end is connected with two movable blocks(3).
2. construction according to claim 1 is implanted into point aid with tie wall bar, it is characterized in that, the secondary bar body
(17)Right side wall lower end is provided with opening(18).
3. construction according to claim 1 is implanted into point aid with tie wall bar, it is characterized in that, the spring(20)
Right-hand member level is connected with active fastening block(19).
4. construction according to claim 1 is implanted into point aid with tie wall bar, it is characterized in that, the rotating shaft(11)
Lower end level is connected with emery wheel(10).
5. construction according to claim 1 is implanted into point aid with tie wall bar, it is characterized in that, described two activities
Block(3)Between be uniformly connected with some rollers vertically(4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711011497.7A CN107795129A (en) | 2017-10-26 | 2017-10-26 | A kind of construction is implanted into point aid with tie wall bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711011497.7A CN107795129A (en) | 2017-10-26 | 2017-10-26 | A kind of construction is implanted into point aid with tie wall bar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107795129A true CN107795129A (en) | 2018-03-13 |
Family
ID=61547394
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711011497.7A Pending CN107795129A (en) | 2017-10-26 | 2017-10-26 | A kind of construction is implanted into point aid with tie wall bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107795129A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07260403A (en) * | 1994-03-24 | 1995-10-13 | Maeda Corp | Inspection instrument for pressure welded part of reinforcing rod |
CN201155970Y (en) * | 2007-12-14 | 2008-11-26 | 张士伟 | Pull type ground clearance measurement ruler |
CN204621882U (en) * | 2015-03-24 | 2015-09-09 | 嘉善睿逸电子科技有限公司 | A kind of adjustable fixture |
CN205088967U (en) * | 2015-11-07 | 2016-03-16 | 山西一建集团有限公司 | Back bar planting unwrapping wire mould |
CN205449082U (en) * | 2016-04-08 | 2016-08-10 | 河南省建筑科学研究院有限公司 | Assistant alignment device for construction setting -out |
CN106639359A (en) * | 2016-12-02 | 2017-05-10 | 国家电网公司 | Adjustable supporting rod |
CN206435781U (en) * | 2017-01-18 | 2017-08-25 | 中建七局第四建筑有限公司 | A kind of bar planting frame with positioning pointer |
-
2017
- 2017-10-26 CN CN201711011497.7A patent/CN107795129A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07260403A (en) * | 1994-03-24 | 1995-10-13 | Maeda Corp | Inspection instrument for pressure welded part of reinforcing rod |
CN201155970Y (en) * | 2007-12-14 | 2008-11-26 | 张士伟 | Pull type ground clearance measurement ruler |
CN204621882U (en) * | 2015-03-24 | 2015-09-09 | 嘉善睿逸电子科技有限公司 | A kind of adjustable fixture |
CN205088967U (en) * | 2015-11-07 | 2016-03-16 | 山西一建集团有限公司 | Back bar planting unwrapping wire mould |
CN205449082U (en) * | 2016-04-08 | 2016-08-10 | 河南省建筑科学研究院有限公司 | Assistant alignment device for construction setting -out |
CN106639359A (en) * | 2016-12-02 | 2017-05-10 | 国家电网公司 | Adjustable supporting rod |
CN206435781U (en) * | 2017-01-18 | 2017-08-25 | 中建七局第四建筑有限公司 | A kind of bar planting frame with positioning pointer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107604910A (en) | A kind of rotary adjustable building piling machine | |
CN205761707U (en) | A kind of construction site scrap iron nail segregation apparatus | |
CN205761708U (en) | A kind of construction site iron nail high efficiente callback device | |
CN107795129A (en) | A kind of construction is implanted into point aid with tie wall bar | |
CN209745600U (en) | Quick sampling device of gardens soil | |
CN207420049U (en) | A kind of construction is implanted into point auxiliary tool with tie wall bar | |
CN214695434U (en) | Temporary support device is built to ecological bank protection of water conservancy | |
CN206902706U (en) | A kind of building stake piling equipment based on solar energy | |
CN209704081U (en) | A kind of architectural engineering support device | |
CN206860095U (en) | A kind of convenient type Water Conservancy Survey rig | |
CN211285729U (en) | Detection apparatus for foundation pile bearing capacity | |
CN107740917A (en) | A kind of construction instrument of surveying and mapping protection device | |
CN212166468U (en) | Novel martial arts training stake with adjustable | |
CN209277004U (en) | The hyperbola abnormal shape pier steel form of speed of application can be improved | |
CN107794921A (en) | A kind of construction convenient quickly piling equipment | |
CN210975464U (en) | Concrete road foundation construction device | |
CN209296383U (en) | A kind of bituminous pavement detection sampler | |
CN209584838U (en) | A kind of simple bridge deck concrete evener | |
CN208380112U (en) | A kind of construction material lifting device | |
CN214724158U (en) | Building engineering cost analytical equipment | |
CN221052361U (en) | Urban bridge anti-overturning composite limiting device | |
CN216338893U (en) | Rectangular side ditch template is pour to limit apart from adjustable | |
CN212988338U (en) | Protective cover for earth surface settlement observation point | |
CN207211141U (en) | A kind of construction piling fixed dual-purpose device | |
CN211646361U (en) | Building pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180313 |
|
RJ01 | Rejection of invention patent application after publication |