CN107794844B - A kind of viaduct curve anti-collision wall is logical across precast construction method - Google Patents

A kind of viaduct curve anti-collision wall is logical across precast construction method Download PDF

Info

Publication number
CN107794844B
CN107794844B CN201711042326.0A CN201711042326A CN107794844B CN 107794844 B CN107794844 B CN 107794844B CN 201711042326 A CN201711042326 A CN 201711042326A CN 107794844 B CN107794844 B CN 107794844B
Authority
CN
China
Prior art keywords
collision wall
box beam
height
outer side
side form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711042326.0A
Other languages
Chinese (zh)
Other versions
CN107794844A (en
Inventor
陈兆荣
朱敏涛
吴杰
刘殿生
周建诚
蒋玉明
俞冬云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Building Materials Technology Group Co Ltd
Original Assignee
Shanghai Jiangong Construction Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangong Construction Material Co Ltd filed Critical Shanghai Jiangong Construction Material Co Ltd
Priority to CN201711042326.0A priority Critical patent/CN107794844B/en
Publication of CN107794844A publication Critical patent/CN107794844A/en
Application granted granted Critical
Publication of CN107794844B publication Critical patent/CN107794844B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

It is logical across precast construction method that the invention discloses a kind of viaduct curve anti-collision walls, it is characterized in that, this method includes following construction process: box girder tensioning mud jacking is completed → installs correction → interior side form installation correction → outer side mold in box beam upper bracket construction → reinforcing bar binding → pipeline and install correction → casting concrete spring quantum and overall dimensions → according to actual condition setting control line after box beam erection → that box beam moves under the prefabricated place of anti-collision wall → measurement box girder tensioning.Technical solution of the present invention is to improving efficiency, reduce loss, avoid having remarkable result to the interference of environment, the present invention not only simplifies working procedure, improve construction efficiency, the globality that can also preferably guarantee anti-collision wall Yu main body box-beam structure also ensures that the whole line style of anti-collision wall is smooth and presentation quality.

Description

A kind of viaduct curve anti-collision wall is logical across precast construction method
Technical field
The invention belongs to field of bridge construction, and in particular to a kind of viaduct curve anti-collision wall is logical across precast construction method.
Background technique
With the fast development of overhead road of city highway, the landscape of modern city is higher to the appearance requirement of bridge, anti-collision wall As the safety prevention measure of sky way bridge, peculiar direction of traffic structure curve, the quality buffer vehicle of armored concrete Impact force improves safety coefficient, protects people's lives and properties.Currently, anti-collision wall main construction techniques are still traditional entirety Cast-in-place, site operation, which is poured, causes many influences to ambient enviroment and road traffic, and construction efficiency is low, and loss is high, and It is traditional pour mode often and will cause the color of whole anti-collision wall, the problems such as quality is uneven.
Summary of the invention
Aiming at the problems existing in the prior art, the present invention provides a kind of logical across prefabricated construction side of viaduct curve anti-collision wall Method can preferably guarantee the globality of anti-collision wall Yu main body box-beam structure, while also ensure that anti-collision wall streamline is smooth and beautiful.
To achieve the above object, the invention adopts the following technical scheme:
A kind of viaduct curve anti-collision wall is logical across precast construction method, and this method includes following construction process: box girder tensioning Mud jacking completes → box beam is moved into spring quantum under the prefabricated place of anti-collision wall → measurement box girder tensioning and overall dimensions → according to case Actual condition setting control line after erection → in box beam upper bracket construction → reinforcing bar binding → pipeline installs correction → inside Mould installs correction → outer side mold and installs correction → casting concrete.
The setting control line includes surveying setting-out and vertical control survey,
Surveying setting-out is the control line by drawing measuring anti-collision wall, and absolute altitude control line is arranged on anti-collision wall reserved steel bar, The linear and absolute altitude of strict control anti-collision wall, use the structure centre line of total station measuring box beam as control internal model reference line, Actual measurement actual quantities is carried out to the spring quantum of box beam simultaneously, convenient for being adjusted in installation template, specifically includes the following steps:
Step 1, cloth observing and controlling net selects spacious place placement control point, observes horizontal angle using survey time method, use whole station The three-dimensional coordinate of the horizontal distance and two control point A, B between adjacent two control points A, B is observed and recorded to instrument,
Step 2, the inside and outside boundary line of anti-collision wall is scheduled case by the design position of anti-collision wall by the control of box beam levelness On the top surface of beam, and marking, every side anti-collision wall releases inside and outside two boundary lines,
According to design requirement, the live anti-collision wall gradient is simulated, according to the working principle of horizontal line of sight in level, according to The measured value of levelling rod reads height value a, b of control point A, B point-to-point transmission, calculates the difference in height h between control point A, BAB, It determines the need for measuring and goes out the corresponding gradient, according to the height difference h measuredABThe height of regulating box beam bottom portion adjustable backing plate until Control point levels box beam bottom on the same water surface, if necessary to the side gradient, according to design requirement, using can The steel plate of adjusting is corrected the gradient in measurement, until there is the correspondence gradient of corresponding box beam,
Step 3, total station is placed on survey station control point by the control of box beam absolute altitude, is had after centering, leveling to every Pin The box beam of anti-collision wall carries out the level measurement of beam face, measures the height of A, B two o'clock respectively, and the height for measuring prism is h0, obtains every The actual height of every Pin box beam is obtained difference by the actual height h1 of Pin box beam compared with design height, which is then adjustable The height that section backing plate needs to adjust, the box beam to every Pin with anti-collision wall carry out the level measurement of beam face, facilitate anticollision wall form tune Section meets design specification to corresponding height with the whole height for ensuring box beam and anti-collision wall,
It surveys site information setting: entering survey station point information input screen, input the details of the survey station point: point number, instrument Device is high, point number encodes and confirms,
The setting of backsight point information: entering backsight point information input screen, inputs backsight point number, calibrates when completing backsight point Afterwards, start detail point measurement.In order to guarantee to pour the presentation quality of rear anti-crash wall, when measurement, encrypts detail point, every Pin box beam It is measured by mono- point of 2m,
Step 4, anti-collision wall level measurement carries out level measurement to every Pin anti-collision wall using total station 10 according to step 3, point The height for not measuring A, B two o'clock, the height for measuring prism is h0, the actual height h2 of every Pin anti-collision wall is obtained, by every Pin anticollision The actual height of wall obtains difference compared with design height, which is then the height that adjustable backing plate needs to adjust, in anticollision After the completion of the equal formwork of internal model and external mold of wall, anti-collision wall absolute altitude repetition measurement is carried out, if after repetition measurement, the actual height and design of anti-collision wall The error of height is more than 2mm, then needs to readjust adjustable backing plate height, until error is within the scope of 2mm.
Box beam upper bracket construction specifically includes the following steps:
Step 1, template construct, anti-collision wall are made of outer side mold and interior side form, and the outer side mold and interior side form are punching block, The lower part of outer side mold, which is equipped with, adjusts screw rod, is equipped between outer side mold and box girder web and adjusts tensioning screw rod, in the interior side form It is equipped with internal model adjusting screw rod between bottom and box beam, pull rod is equipped between interior side form and box beam upper surface, is set below box beam There is upright bar, the outer side mold is fixedly connected with the top of interior side form by Screw arbor with nut at both-ends, according to actual design drawing in outer side form Upper setting protrusion or recess portion, the positions such as lamppost, marker post, outer steel formwork make corresponding structure i.e. protrusion, the dress such as electronic box It sets and considers on the punching block of inside, the single-unit length of curve anti-collision wall medial and lateral punching block is by 1 meter of design, convenient for control anti-collision wall Whole line style.
Step 2, template is installed, firstly, carrying out the installation of interior side form, according to anti-collision wall top surface absolute altitude and puts the internal model set Reference line, with pull rod respectively with interior side form is suitable for reading and box beam top surface in built-in fitting consolidate, while reinforcing internal side form verticality Correction;Then, the installation for carrying out outer side mold, by the steel bracket platform of setting type, while installation and adjustment screw rod, it will with lifting appliance Outer side mold is hung to steel bracket platform, and lower mouth is withstood with adjusting screw rod, and the locating slot suitable for reading with interior side form with Screw arbor with nut at both-ends suitable for reading is tight Gu the absolute altitude of outer side mold adjusts screw rod by lower mouth and is adjusted, while utilizing the connector and outside reserved at box girder web It is fastened between mouth location hole with adjusting tensioning screw rod under mould, it is ensured that the verticality and installation dimension of external mold.
The inside Mould Breadth degree for including protrusion and/or recess portion is 1 meter, install in side form when to box beam spring quantum by using in The internal model adjusting screw rod of mouth is adjusted under side form.According to directly for Qu Yuanli, curve anti-collision wall mold is different from 2 meters long common Straight line anti-collision wall wall mold, curve anti-collision wall are intended with short straight line close to curve assembly according to directly averagely 1 meter long for Qu Yuanli.
The distance between adjacent adjusting tensioning screw rod is 1 meter on the outer side mold.
Horizontal slice is poured when the casting concrete, and every thickness degree is not more than 30cm, when pouring between upper layer and lower layer Between shorten when should use up, the vibrating head of immersion vibrator is extend at lower-layer concrete 5cm, casting concrete uses plug-in type Vibrator is consolidated, and concrete is inserted into after entering mould immediately following vibrator, and vibrator operating radius is not to be exceeded in ranks spacing of vibrating 1.5 times, concrete mixing time is no less than 90 seconds, the slump stablize, when pouring entire plane section range level be layered into Row pours, and every thickness degree is not more than 30cm, after concreting to top surface, extra laitance is removed, is first compacted, is closed flat, to It smoothed out before concrete initial set, receive light, and no less than twice, then, concrete geotextiles are covered water seasoning one week, Remain moisture state.
Compared with prior art, the invention has the benefit that
Technical solution of the present invention is to improving efficiency, reduce loss, avoid having remarkable result to the interference of environment, the present invention Not only simplify working procedure, improves construction efficiency, can also preferably guarantee the globality of anti-collision wall Yu main body box-beam structure, also guarantee The whole line style of anti-collision wall is smooth and presentation quality.
Detailed description of the invention
Fig. 1 is the schematic diagram of elevation observing and controlling in cloth observing and controlling net in the present invention.
Fig. 2 is the measurement structural representation of box beam absolute altitude in the present invention.
Fig. 3 is the measurement structural representation of anti-collision wall absolute altitude in the present invention.
Fig. 4 is the mounting structure schematic diagram of interior side form and outer side mold in the present invention.
Specific embodiment
As Figure 1-Figure 4, curve anti-collision wall in the present embodiment viaduct is logical across precast construction method, and this method includes following Construction process: box girder tensioning mud jacking completes → by box beam move to spring quantum under the prefabricated place of anti-collision wall → measurement box girder tensioning and Overall dimensions → according to the actual condition setting control line → in box beam upper bracket construction → reinforcing bar binding → pipe after box beam erection Line installation correction → interior side form installation correction → outer side mold installs correction → casting concrete.
Setting control line includes surveying setting-out and vertical control survey described in the present embodiment,
Surveying setting-out is the control line by drawing measuring anti-collision wall, and absolute altitude control line is arranged on anti-collision wall reserved steel bar, The linear and absolute altitude of strict control anti-collision wall, use the structure centre line of total station measuring box beam as control internal model reference line, Actual measurement actual quantities is carried out to the spring quantum of box beam simultaneously, convenient for being adjusted in installation template, specifically includes the following steps:
Step 1, cloth observing and controlling net selects spacious place placement control point, observes horizontal angle using survey time method, use whole station The three-dimensional coordinate of the horizontal distance and two control point A, B between adjacent two control points A, B is observed and recorded to instrument 10,
Step 2, the inside and outside boundary line of anti-collision wall is scheduled case by the design position of anti-collision wall by the control of box beam levelness On the top surface of beam, and marking, every side anti-collision wall releases inside and outside two boundary lines,
According to design requirement, the live anti-collision wall gradient is simulated, according to the working principle of horizontal line of sight 12 in level, root According to the measured value of levelling rod 11, height value a, b of control point A, B point-to-point transmission are read, the difference in height between control point A, B is calculated hAB, it is determined whether need measuring to go out the corresponding gradient, according to the height difference h measuredABThe height of regulating box beam bottom portion adjustable backing plate Until on the same water surface, box beam bottom is leveled for control point, if necessary to the side gradient, according to design requirement, benefit With adjustable steel plate, the gradient is corrected in measurement, until there is the correspondence gradient of corresponding box beam,
Step 3, total station is placed on survey station control point by the control of box beam absolute altitude, is had after centering, leveling to every Pin The box beam of anti-collision wall carries out the level measurement of beam face, measures the height of A, B two o'clock respectively, and the height for measuring prism 13 is h0, obtains The actual height of every Pin box beam is obtained difference by the actual height h1 of every Pin box beam compared with design height, which is then can The height that backing plate needs to adjust is adjusted,
Step 4, anti-collision wall level measurement carries out level measurement to every Pin anti-collision wall using total station 10 according to step 3, point The height for not measuring A, B two o'clock, the height for measuring prism 13 is h0, obtains the actual height h2 of every Pin anti-collision wall, every Pin is prevented The actual height for hitting wall obtains difference compared with design height, which is then the height that adjustable backing plate needs to adjust, anti- After the completion of hitting internal model and the equal formwork of external mold of wall, carry out anti-collision wall absolute altitude repetition measurement, if after repetition measurement, the actual height of anti-collision wall with set The error for counting height is more than 2mm, then needs to readjust adjustable backing plate height, until error is within the scope of 2mm.
The present embodiment box beam upper bracket construct specifically includes the following steps:
Step 1, template construct, anti-collision wall are made of outer side mold 1 and interior side form 2, and the outer side mold 1 and interior side form 2 are Punching block, the lower part of outer side mold 1, which is equipped with, adjusts screw rod 9, is equipped between 3 web of outer side mold 1 and box beam and adjusts tensioning screw rod 4, in institute It states and is equipped with internal model adjusting screw rod 5 between the bottom of interior side form and box beam 3, pull rod is equipped between 3 upper surface of interior side form 2 and box beam 6, upright bar 7, the outer side mold 1 and the top of interior side form 2 are equipped with below box beam 3 and is fixedly connected by Screw arbor with nut at both-ends 8, according to reality Protrusion or recess portion is arranged in border design drawing on outer side form 1,
Step 2, template is installed, firstly, in carrying out side form 2 installation, set according to anti-collision wall top surface absolute altitude and putting in Mould reference line, with pull rod 6 respectively with interior side form 2 is suitable for reading and box beam top surface in built-in fitting consolidate, while it is vertical to reinforce internal side form 2 The correction of degree;Then, the installation for carrying out outer side mold 1, by the steel bracket platform of setting type, while installation and adjustment screw rod 9, with lifting Outer side mold 1 is hung to steel bracket platform by equipment, and lower mouth adjusts screw rod 9 and withstands, suitable for reading suitable for reading with Screw arbor with nut at both-ends 8 and interior side form 2 Locating slot fastening, the absolute altitude of outer side mold 1 adjusts screw rod 9 by lower mouth and is adjusted, while using reserving at box girder web It is fastened between 1 lower mouthful of location hole of connector and outer side mold with adjusting tensioning screw rod, it is ensured that the verticality and installation of outer side mold Size.
Preferably, the inside Mould Breadth degree that the present embodiment includes protrusion and/or recess portion is 1 meter, install in side form when pair Box beam spring quantum with the internal model adjusting screw rod 5 of mouth under interior side form by being adjusted;On outer side mold adjacent adjusting tensioning screw rod it Between distance be 1 meter.According to directly for Qu Yuanli, curve anti-collision wall mold is different from 2 meters long generic linear anti-collision wall mold, bent Line anti-collision wall is intended with short straight line close to curve assembly according to directly averagely 1 meter long for Qu Yuanli.
Horizontal slice is poured when casting concrete described in the present embodiment, and every thickness degree is not more than 30cm, upper layer and lower layer Between pour time shortening when should use up, the vibrating head of immersion vibrator is extend at lower-layer concrete 5cm, casting concrete is adopted It is consolidated with poker vibrator, concrete is inserted into after entering mould immediately following vibrator, and vibrator is not to be exceeded in ranks spacing of vibrating 1.5 times of operating radius, concrete mixing time are no less than 90 seconds, and the slump is stablized, in entire plane section range water when pouring To divide layer equally to be poured, every thickness degree is not more than 30cm, after concreting to top surface, extra laitance removed, first compacting, It is closed flat, to which light is smoothed out, received before concrete initial set, and no less than twice, then, concrete geotextiles is covered into watering and are supported Shield one week, remains moisture state.
Although above-described embodiment makes specific descriptions to the present invention, come for those of ordinary skill in the art It says, it is understood that can be modified within spirit and scope of the invention based on present disclosure not departing from Or improve, these modification and improvement are all within spirit and scope of the invention.

Claims (5)

1. a kind of viaduct curve anti-collision wall is logical across precast construction method, which is characterized in that this method includes following construction process: Box beam complete → is moved to spring quantum and overall dimensions under the prefabricated place of anti-collision wall → measurement box girder tensioning by box girder tensioning mud jacking → the actual condition setting control line after being set according to box beam → is corrected in box beam upper bracket construction → reinforcing bar binding → pipeline installation → interior side form installation correction → outer side mold installs correction → casting concrete;
The setting control line includes surveying setting-out and vertical control survey,
Surveying setting-out is the control line by drawing measuring anti-collision wall, absolute altitude control line is arranged on anti-collision wall reserved steel bar, strictly The linear and absolute altitude for controlling anti-collision wall uses the structure centre line of total station measuring box beam as the reference line of control internal model, simultaneously Actual measurement actual quantities is carried out to the spring quantum of box beam, convenient for being adjusted in installation template, specifically includes the following steps:
Step 1, cloth observing and controlling net selects spacious place placement control point, observes horizontal angle using survey time method, use total station (10) three-dimensional coordinate of the horizontal distance and two control point A, B between adjacent two control points A, B is observed and records,
Step 2, the inside and outside boundary line of anti-collision wall is scheduled box beam by the design position of anti-collision wall by the control of box beam levelness On top surface, and marking, every side anti-collision wall releases inside and outside two boundary lines,
According to design requirement, the live anti-collision wall gradient is simulated, according to the working principle of horizontal line of sight in level (12), according to The measured value of levelling rod (11) reads height value a, b of control point A, B point-to-point transmission, calculates the difference in height between control point A, B hAB, it is determined whether need measuring to go out the corresponding gradient, according to the difference in height h measuredABThe height of regulating box beam bottom portion adjustable backing plate It is low to level box beam bottom until control point is on the same water surface, if necessary to the side gradient, according to design requirement, Using adjustable steel plate, the gradient is corrected in measurement, until there is the correspondence gradient of corresponding box beam,
Step 3, total station is placed on survey station control point by the control of box beam absolute altitude, has anticollision to every Pin after centering, leveling The box beam of wall carries out the level measurement of beam face, measures the height of A, B two o'clock respectively, and the height for measuring prism (13) is h0, obtains every The actual height of every Pin box beam is obtained difference by the actual height h1 of Pin box beam compared with design height, which is then adjustable The height that section backing plate needs to adjust,
Step 4, anti-collision wall level measurement carries out level measurement to every Pin anti-collision wall using total station (10) according to step 3, respectively The height for measuring A, B two o'clock, the height for measuring prism (13) is h0, obtains the actual height h2 of every Pin anti-collision wall, every Pin is prevented The actual height for hitting wall obtains difference compared with design height, which is then the height that adjustable backing plate needs to adjust, anti- After the completion of hitting internal model and the equal formwork of external mold of wall, carry out anti-collision wall absolute altitude repetition measurement, if after repetition measurement, the actual height of anti-collision wall with set The error for counting height is more than 2mm, then needs to readjust adjustable backing plate height, until error is within the scope of 2mm.
2. curve anti-collision wall in viaduct according to claim 1 is logical across precast construction method, which is characterized in that in box beam Rack construction specifically includes the following steps:
Step 1, template construct, anti-collision wall are made of outer side mold (1) and interior side form (2), the outer side mold (1) and interior side form (2) It is punching block, the lower part of outer side mold (1), which is equipped with, adjusts screw rod (9), is equipped with to adjust between outer side mold (1) and box beam (3) web and open It draws screw rod (4), internal model adjusting screw rod (5) is equipped between the bottom and box beam (3) of the interior side form, in interior side form (2) and case Pull rod (6) are equipped between beam (3) upper surface, upright bar (7), the outer side mold (1) and interior side form (2) are equipped with below box beam (3) Top be fixedly connected by Screw arbor with nut at both-ends (8), protrusion or recess portion are arranged on outer side form (1) according to actual design drawing,
Step 2, template is installed, firstly, carrying out the installation of interior side form (2), according to anti-collision wall top surface absolute altitude and puts the internal model set Reference line, with pull rod (6) respectively with interior side form (2) is suitable for reading and box beam top surface in built-in fitting consolidate, while reinforcing internal side form (2) The correction of verticality;Then, the installation for carrying out outer side mold (1), by the steel bracket platform of setting type, while installation and adjustment screw rod (9), outer side mold (1) is hung to steel bracket platform with lifting appliance, lower mouth is withstood with screw rod (9) are adjusted, suitable for reading to use Screw arbor with nut at both-ends (8) it is fastened with interior side form (2) locating slot suitable for reading, the absolute altitude of outer side mold (1) adjusts screw rod (9) by lower mouth and is adjusted, together It is fastened between mouth location hole with adjusting tensioning screw rod under the connector and outer side mold (1) reserved at Shi Liyong box girder web, Ensure the verticality and installation dimension of outer side mold.
3. curve anti-collision wall in viaduct according to claim 2 is logical across precast construction method, which is characterized in that include convex The inside Mould Breadth degree of portion and/or recess portion is 1 meter, passes through the internal model tune with mouth under interior side form when installing interior side form to box beam spring quantum Section screw rod (5) is adjusted.
4. curve anti-collision wall in viaduct according to claim 2 is logical across precast construction method, which is characterized in that the outside The distance between adjacent adjusting tensioning screw rod is 1 meter on mould.
5. curve anti-collision wall in viaduct according to claim 1 is logical across precast construction method, which is characterized in that described to pour The vibrating head of immersion vibrator is extend at lower-layer concrete 5cm when concrete, casting concrete uses internal vibration Device is consolidated, and concrete is inserted into after entering mould immediately following vibrator, and ranks spacing of vibrating is not to be exceeded the 1.5 of vibrator operating radius Times, concrete mixing time is no less than 90 seconds, and the slump is stablized, and is poured when pouring in the layering of entire plane section range level It builds, every thickness degree is not more than 30cm, after concreting to top surface, extra laitance is removed, is first compacted, is closed flat, to coagulation It smoothed out before native initial set, receive light, and no less than twice, then, by concrete geotextiles covering water seasoning one week, always Keep moisture state.
CN201711042326.0A 2017-10-31 2017-10-31 A kind of viaduct curve anti-collision wall is logical across precast construction method Active CN107794844B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711042326.0A CN107794844B (en) 2017-10-31 2017-10-31 A kind of viaduct curve anti-collision wall is logical across precast construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711042326.0A CN107794844B (en) 2017-10-31 2017-10-31 A kind of viaduct curve anti-collision wall is logical across precast construction method

Publications (2)

Publication Number Publication Date
CN107794844A CN107794844A (en) 2018-03-13
CN107794844B true CN107794844B (en) 2019-06-07

Family

ID=61548295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711042326.0A Active CN107794844B (en) 2017-10-31 2017-10-31 A kind of viaduct curve anti-collision wall is logical across precast construction method

Country Status (1)

Country Link
CN (1) CN107794844B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267567B (en) * 2020-09-02 2022-06-14 中建三局集团有限公司 Synchronous construction method for SRC column and outer frame structure of super high-rise building
CN112917669A (en) * 2021-02-09 2021-06-08 浙江交工集团股份有限公司 Synchronous prefabrication integral construction process for precast beam top anti-collision wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201065644Y (en) * 2007-07-10 2008-05-28 宏润建设集团股份有限公司 Anti-collision wall formwork without supporting bracket
CN201722613U (en) * 2010-03-29 2011-01-26 杭州市市政工程集团有限公司 Outer steel formwork suspension device using bump wall inner steel formwork
CN201962608U (en) * 2011-03-09 2011-09-07 天津第四市政建筑工程有限公司 Adjustable viaduct concrete anti-collision guardrail template supporting device
CN103061267A (en) * 2013-01-15 2013-04-24 广州市市政工程设计研究院 Construction method of combined prefabricated bridge anti-collision wall
CN103255717A (en) * 2013-04-28 2013-08-21 中国五冶集团有限公司 Method for constructing hit-preventing wall
CN103334379A (en) * 2013-06-27 2013-10-02 中铁四局集团第三建设有限公司 Construction method for hanging part of anti-collision guardrail on expressway
CN105525571A (en) * 2014-10-27 2016-04-27 牟绍林 Construction method of anti-collision wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201065644Y (en) * 2007-07-10 2008-05-28 宏润建设集团股份有限公司 Anti-collision wall formwork without supporting bracket
CN201722613U (en) * 2010-03-29 2011-01-26 杭州市市政工程集团有限公司 Outer steel formwork suspension device using bump wall inner steel formwork
CN201962608U (en) * 2011-03-09 2011-09-07 天津第四市政建筑工程有限公司 Adjustable viaduct concrete anti-collision guardrail template supporting device
CN103061267A (en) * 2013-01-15 2013-04-24 广州市市政工程设计研究院 Construction method of combined prefabricated bridge anti-collision wall
CN103255717A (en) * 2013-04-28 2013-08-21 中国五冶集团有限公司 Method for constructing hit-preventing wall
CN103334379A (en) * 2013-06-27 2013-10-02 中铁四局集团第三建设有限公司 Construction method for hanging part of anti-collision guardrail on expressway
CN105525571A (en) * 2014-10-27 2016-04-27 牟绍林 Construction method of anti-collision wall

Also Published As

Publication number Publication date
CN107794844A (en) 2018-03-13

Similar Documents

Publication Publication Date Title
CN102174792B (en) Intelligent GPS (global positioning system) elevation and average thickness control system of floated screed plate paver
CN106192682B (en) Railway roadbed substrate 3D concrete paver and 3D pave method
CN107794844B (en) A kind of viaduct curve anti-collision wall is logical across precast construction method
CN109515252A (en) A kind of subway contact net trackless measurement construction method
CN109443327A (en) A kind of distribution method of SURVEYING CONTROL NETWORK
CN111155383B (en) Large-span self-anchored steel box girder suspension bridge track lofting and measuring method
CN107310025A (en) The fabricated device and method for prefabricating of a kind of Prefabricated bar boots
CN107988852B (en) The III new structural construction method of plate-type non-fragment orbit of tunnel location CRTS
CN209585094U (en) A kind of bracket basis installation of embedded parts auxiliary mould
CN109024463B (en) River model making method
CN207280467U (en) It is a kind of position, the cross horizon rule of leveling
CN106638183A (en) Urban rail transit assembly board type high precision rail base cast-in-place construction method
CN106988339B (en) Sandy gravel stratum piping lane construction technology
CN101469526B (en) Slab unballasted railroad switch construction method
CN108487016A (en) The irregular accurate elevation concrete pavement construction method in test site
CN110186424A (en) A kind of round-the-clock measurement of higher degree device and method of subgrade and pavement
CN208328621U (en) Steady layer of water numerically controlled intelligent paver
CN106351077A (en) Subway track plate base construction device
CN109778704A (en) A kind of curved variable cross-section fish-bellied type steel box-girder production positioning measurement constructing device and method
CN103344214A (en) 1.6-degree parabolic extralarge pier measuring and pier body linear control method
CN105350409A (en) Construction method for urban rail transit long sleeper type steel spring floating slab track bed turnout
KR101550398B1 (en) the improved construction method of road boundary stone based on rain drainage
CN209703579U (en) Multifunctional novel laser slope repairing instrument
CN109056475A (en) The construction method of kerbstone mounting structure
CN104006798B (en) Pier stud verticality measuring instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200120 Southwest District, 2123 Pudong Road, Pudong New Area, Shanghai.

Patentee after: Shanghai Construction Engineering Building Materials Technology Group Co., Ltd

Address before: 200135 3E-1178 room, No. 2123 Pudong Road, Shanghai, Pudong New Area

Patentee before: SHANGHAI JIANGONG CONSTRUCTION MATERIAL Co.,Ltd.

CP03 Change of name, title or address