CN107780640A - Movable Scaffold and its application method for exterior wall - Google Patents
Movable Scaffold and its application method for exterior wall Download PDFInfo
- Publication number
- CN107780640A CN107780640A CN201710908562.XA CN201710908562A CN107780640A CN 107780640 A CN107780640 A CN 107780640A CN 201710908562 A CN201710908562 A CN 201710908562A CN 107780640 A CN107780640 A CN 107780640A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- sliding chassis
- sliding
- chassis
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention is a kind of movable Scaffold for exterior wall;It is characterized in that:Including sliding rail, sliding chassis and scaffold;Sliding rail is set by laying sleeper;Sliding chassis are placed in orbit;Set up steel pipe scaffold and form operating platform suspension scaffold in sliding chassis top;Sliding chassis are combined by base main framing, base skeleton binding beam and are formed skeleton;Four counterweight water tanks are placed on sliding chassis, each cylinder lower side is provided with water discharging valve, and top blind flange is provided with inlet valve, and top cover is provided with exhaust intake valve and is used for cooperation plus water and draining;Sliding chassis are provided with six base support positioning pipes, and the top of scaffold is provided with operating platform railing.This scaffold can move in construction, so as to solve the problem that building side high-altitude constructing operation working face builds complexity.
Description
Technical field
The present invention relates to the realm of building construction, specifically a kind of movable Scaffold and its application method for exterior wall.
Background technology
Existing scaffold is applied when on external wall, it is necessary to build repeatedly temporarily and in scaffold external sheath safety
Net, especially on the outside of building during the constructing operation of high-altitude, building for traditional scaffold even more needs to set the devices such as safety anchor,
In turn result in skin scaffold and build the problem of cost is high, efficiency is low.
The content of the invention
It is an object of the invention to overcome drawbacks described above, there is provided and the exterior wall movement pin hand that can be moved in a kind of construction adds,
So as to solve the problem of building side high-altitude constructing operation working face.
In order to achieve the above object, the present invention is realized in:
A kind of movable Scaffold for exterior wall, including sliding rail, sliding chassis and scaffold;Sliding rail passes through laid rail
Pillow sets two parallel tracks, and sliding chassis are placed in orbit by rail wheel;Set up steel pipe feet hand in sliding chassis top
Frame simultaneously forms operating platform suspension scaffold;Sliding chassis are combined by base main framing, base skeleton binding beam and are formed skeleton;The main bone of base
The construction of frame is " mesh " font, forms three connected rectangle frames;Some binding beams, binding beam and main bone are provided with each rectangle frame
Frame welds;Four counterweight water tanks are placed on sliding chassis, each cylinder lower side is provided with water discharging valve, and top blind flange is provided with
Inlet valve, water is filled after installation first and has the function that chassis counterweight, arranged after Practical Completion removes scaffold using bottom
Penstock draining, reach the purpose of unloading, while top cover is provided with exhaust intake valve and is used for cooperation plus water and draining;On sliding chassis
Provided with six base support positioning pipes, when setting up scaffold, will in the standpipe insertion support positioning pipe of scaffold, ensure support body and
The globality of sliding chassis can simultaneously move with it, and be arranged on according to demand beside building body, meet the need of constructing operation
Ask;The top of scaffold is provided with operating platform railing;Have the function that security protection.
The application method of the movable Scaffold for exterior wall, including
Step 1, building side set sleeper;
Step 2, laying and trapped orbit;
Step 3, place sliding chassis;
Step 4, place counterweight water tank;
Step 5, water tank with water;
Step 6, set up scaffold;
Step 7, set up suspension scaffold;
Step 8, guardrail is set;
Bamboo fragrant plant is laid in step 9, operating platform;
Step 10, movable support body to purpose region;
Step 11, scaffold set wall-connecting piece to ensure stability;
Step 12, constructing operation;
Step 13, repetition movement meet construction requirement;
Scaffold, counterweight water tank, sliding chassis, track are removed after step 14, construction.
This scaffold can be moved in construction, and complexity is built so as to solve building side high-altitude constructing operation working face
Problem.The making of this scaffold is easily simple to operate, is advantageous to improve efficiency of construction, is advantageous to substitute the totally-enclosed scaffold of exterior wall
Reduce construction cost.
Brief description of the drawings
Fig. 1 sliding chassis schematic diagrames.
Fig. 2 sliding chassis rail wheel schematic diagrames.
Fig. 3 scaffold building schematic diagrames.
Fig. 4 scaffold profiles.
Fig. 5 exterior wall movable Scaffold operation charts.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Fig. 1 ~ Fig. 5, a kind of movable Scaffold for exterior wall, including sliding rail 6, sliding chassis and pin hand
Frame;Sliding rail 6 is to set two parallel tracks by laying sleeper, and sliding chassis are placed on slip rail by rail wheel 3
On road 6;Set up steel pipe scaffold 8 and form operating platform suspension scaffold 7 in sliding chassis top;Sliding chassis by base main framing 1,
The combination of base skeleton binding beam 2 forms skeleton;The construction of base main framing 1 is " mesh " font, forms three connected rectangle frames;Often
Some binding beams 2 are provided with individual rectangle frame, binding beam 2 welds with main framing 1;Four counterweight water tanks 4 are placed on sliding chassis, each
Cylinder lower side is provided with water discharging valve, and top blind flange is provided with inlet valve, fills water after installation first and reaches chassis counterweight
Effect, after Practical Completion remove scaffold after utilize bottom water discharging valve draining, reach the purpose of unloading, while top cover is provided with
It is vented intake valve and is used for cooperation plus water and draining;Sliding chassis are provided with six base support positioning pipes 5, when setting up scaffold,
By in the standpipe insertion support positioning pipe 5 of scaffold, ensure the globality of support body and sliding chassis and can move with it,
The side of building body 9 is arranged on according to demand, meets the needs of constructing operation;The top of scaffold is provided with operating platform railing;Reach
To the effect of security protection.
The application method of the movable Scaffold for exterior wall, including
Step 1, building side set sleeper;
Step 2, laying and trapped orbit;
Step 3, place sliding chassis;
Step 4, place counterweight water tank;
Step 5, water tank with water;
Step 6, set up scaffold;
Step 7, set up suspension scaffold;
Step 8, guardrail is set;
Bamboo fragrant plant is laid in step 9, operating platform;
Step 10, movable support body to purpose region;
Step 11, scaffold set wall-connecting piece to ensure stability;
Step 12, constructing operation;
Step 13, repetition movement meet construction requirement;
Scaffold, counterweight water tank, sliding chassis, track are removed after step 14, construction.
This scaffold can be moved in construction, and complexity is built so as to solve building side high-altitude constructing operation working face
Problem.The making of this scaffold is easily simple to operate, is advantageous to improve efficiency of construction, is advantageous to substitute the totally-enclosed scaffold of exterior wall
Reduce construction cost.
Claims (2)
1. a kind of movable Scaffold for exterior wall, it is characterized in that:Including sliding rail, sliding chassis and scaffold;Slide rail
Road sets two parallel tracks by laying sleeper, and sliding chassis are placed in orbit by rail wheel;Sliding chassis top
Set up steel pipe scaffold and form operating platform suspension scaffold;Sliding chassis are combined and formed by base main framing, base skeleton binding beam
Skeleton;The construction of base main framing is " mesh " font, forms three connected rectangle frames;Some connection are provided with each rectangle frame
Beam, binding beam weld with main framing;Four counterweight water tanks are placed on sliding chassis, each cylinder lower side is provided with water discharging valve,
Top blind flange is provided with inlet valve, fills water after installation first and has the function that chassis counterweight, treats that Practical Completion removes pin hand
Bottom water discharging valve draining is utilized after frame, reaches the purpose of unloading, at the same top cover be provided with exhaust intake valve be used to coordinate plus water and
Draining;Sliding chassis are provided with six base support positioning pipes, when setting up scaffold, by the standpipe insertion support positioning of scaffold
Guan Zhong, ensure the globality of support body and sliding chassis and can move with it, be arranged on according to demand beside building body, it is full
The demand of sufficient constructing operation;The top of scaffold is provided with operating platform railing;Have the function that security protection.
2. it is used for the application method of the movable Scaffold of exterior wall described in claim 1, it is characterized in that:Including
Step 1, building side set sleeper;
Step 2, laying and trapped orbit;
Step 3, place sliding chassis;
Step 4, place counterweight water tank;
Step 5, water tank with water;
Step 6, set up scaffold;
Step 7, set up suspension scaffold;
Step 8, guardrail is set;
Bamboo fragrant plant is laid in step 9, operating platform;
Step 10, movable support body to purpose region;
Step 11, scaffold set wall-connecting piece to ensure stability;
Step 12, constructing operation;
Step 13, repetition movement meet construction requirement;
Scaffold, counterweight water tank, sliding chassis, track are removed after step 14, construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710908562.XA CN107780640A (en) | 2017-09-29 | 2017-09-29 | Movable Scaffold and its application method for exterior wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710908562.XA CN107780640A (en) | 2017-09-29 | 2017-09-29 | Movable Scaffold and its application method for exterior wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107780640A true CN107780640A (en) | 2018-03-09 |
Family
ID=61433612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710908562.XA Pending CN107780640A (en) | 2017-09-29 | 2017-09-29 | Movable Scaffold and its application method for exterior wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107780640A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843007A (en) * | 2018-06-15 | 2018-11-20 | 永嘉县中飞建设有限公司 | A kind of carrying frame built for municipal works and room |
CN109488006A (en) * | 2018-12-13 | 2019-03-19 | 中国建筑第八工程局有限公司 | Scaffold is anti-to topple over bracket |
CN110749368A (en) * | 2019-10-14 | 2020-02-04 | 深圳市维业装饰集团股份有限公司 | Intelligent working platform |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4235690B2 (en) * | 2003-09-02 | 2009-03-11 | サコス株式会社 | Scaffolding equipment |
CA2629578C (en) * | 2008-04-22 | 2010-06-01 | Paul Richard Smith | Movable wellhead platform |
CN204040431U (en) * | 2014-08-12 | 2014-12-24 | 中国建筑第七工程局有限公司 | Movable triangular frame |
CN205224561U (en) * | 2015-12-02 | 2016-05-11 | 江苏绿能环保集成木屋有限公司 | Rail mounted removes scaffold |
CN105672638A (en) * | 2016-02-17 | 2016-06-15 | 浙江精工钢结构集团有限公司 | Scaffold with supporting and sliding functions and net rack mounting method |
CN105696782A (en) * | 2016-04-06 | 2016-06-22 | 中国建筑局(集团)有限公司 | Novel mobile operation platform |
-
2017
- 2017-09-29 CN CN201710908562.XA patent/CN107780640A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4235690B2 (en) * | 2003-09-02 | 2009-03-11 | サコス株式会社 | Scaffolding equipment |
CA2629578C (en) * | 2008-04-22 | 2010-06-01 | Paul Richard Smith | Movable wellhead platform |
CN204040431U (en) * | 2014-08-12 | 2014-12-24 | 中国建筑第七工程局有限公司 | Movable triangular frame |
CN205224561U (en) * | 2015-12-02 | 2016-05-11 | 江苏绿能环保集成木屋有限公司 | Rail mounted removes scaffold |
CN105672638A (en) * | 2016-02-17 | 2016-06-15 | 浙江精工钢结构集团有限公司 | Scaffold with supporting and sliding functions and net rack mounting method |
CN105696782A (en) * | 2016-04-06 | 2016-06-22 | 中国建筑局(集团)有限公司 | Novel mobile operation platform |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843007A (en) * | 2018-06-15 | 2018-11-20 | 永嘉县中飞建设有限公司 | A kind of carrying frame built for municipal works and room |
CN108843007B (en) * | 2018-06-15 | 2020-05-08 | 永嘉县中飞建设有限公司 | A carrier frame for municipal works and room are built |
CN109488006A (en) * | 2018-12-13 | 2019-03-19 | 中国建筑第八工程局有限公司 | Scaffold is anti-to topple over bracket |
CN110749368A (en) * | 2019-10-14 | 2020-02-04 | 深圳市维业装饰集团股份有限公司 | Intelligent working platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107780640A (en) | Movable Scaffold and its application method for exterior wall | |
CN103758341B (en) | Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method | |
CN104097253B (en) | Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system | |
CN207144449U (en) | A kind of hoistway operation platform | |
CN106400951B (en) | A kind of level and vertical structure method for synchronously constructing of super high-rise building | |
CN106760529A (en) | Roof system steel truss slipping and assembling operation platform and installation method | |
CN204385634U (en) | Railway is not stopped transport the overall jacking mechanism of cross-line box culvert | |
CN106088660B (en) | A kind of building up station platform widens the construction method of reconstruction structure system | |
CN107905114A (en) | A kind of construction method of large span Successive interference cancellation | |
CN207700068U (en) | A kind of modularization Bridge Pier Construction job platform | |
CN204212450U (en) | A kind of tool-type safe and convenient passage | |
CN206034876U (en) | From hard protective platform of formula level that climbs in construction | |
CN206319610U (en) | Roof system steel truss slipping and assembling construction platform structure | |
CN103452328B (en) | Post brutal bracing means and method is subtracted for reinforced concrete member | |
CN106320183A (en) | Assembly type bent cap formwork system | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN203321529U (en) | Train type rapid lifting and folding work platform for tunnel engineering | |
CN202882377U (en) | Hanging scaffold for integral hanging construction of truss | |
CN110905204B (en) | Method for transferring formwork supporting materials of wood formwork of building outer frame column | |
CN205954482U (en) | Construction structures of " people " style of calligraphy cable tower entablature support | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
CN204112721U (en) | The huge post climbing apparatus of a kind of track attaching superelevation support body steel reinforced concrete | |
CN201169750Y (en) | Moving platform for bridging | |
CN103510718A (en) | Automatic lifting escape ladder for super high-rise structure construction | |
CN206267519U (en) | A kind of light engine position hydraulic climbing die block system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180309 |