CN107780309A CN201711168100.5A CN201711168100A CN107780309A CN 107780309 A CN107780309 A CN 107780309A CN 201711168100 A CN201711168100 A CN 201711168100A CN 107780309 A CN107780309 A CN 107780309A
Authority
CN
China
Prior art keywords
signal
infrared
track
sedimentation
lifting body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711168100.5A
Other languages
Chinese (zh)
Inventor
李又云
李松皓
李昊阳
杨立
鲁昆明
冯国春
谢柯
朱方宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201711168100.5A priority Critical patent/CN107780309A/en
Publication of CN107780309A publication Critical patent/CN107780309A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • E01B35/12Applications of measuring apparatus or devices for track-building purposes for measuring movement of the track or of the components thereof under rolling loads, e.g. depression of sleepers, increase of gauge
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/08Deep or vertical foundation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention discloses a kind of sedimentation applied to track and eliminates system and method in real time, the system passes through embedding hydraulic jack in online road and bridge, hydraulic jack connects rubber support, rubber support connects track plates, the controller connection lifting body and infrared remote receiver of circuit bridge side are placed in, the elongate rod connection infrared transmitter during insertion is native.After track plates settle, the different infrared induction line of infrared radiation makes infrared remote receiver send unlike signal, controller control hydraulic jack is risen or is stopped.Energy real-time monitored Track Settlement of the invention, and sedimentation can be eliminated in time.

Description

A kind of sedimentation applied to track eliminates system and method in real time
Technical field
The present invention relates to high-speed railway rail technical field of construction, and in particular to a kind of sedimentation applied to track eliminates in real time is System and method.
Background technology
Chinese high ferro passes through the construction and development of more than ten years, has been enter into maturing, has maximum-norm in the world and most The High-speed Railway Network of high overall trip speed, the development of domestic economy is largely pulled, it is even more important that it turns into one Individual beautiful business card, the emergence of China Railway High-speed is declared to the whole world.High-speed railway has not in country variant different times With regulation.Definition of the China national Railway Bureau to high-speed railway be:Newly-built design start 250 kilometers/hour (containing reserved) and with Upper motor train unit train, initial stage, overall trip speed was not less than 200 kilometers/hour of passenger dedicated railway line.China " recovery number " is dynamic at present Car group takes the lead in realizing 350 kilometers of speed per hour operations in Beijing-Shanghai express railway, turns into high ferro commercial operation speed highest country in the world.But It is people and the speed per hour for being unsatisfactory for hundreds of kilometer, it is proposed that the concept of " super high ferro ".The train of superelevation speed per hour sinks to track Drop standard proposes higher requirement, and amount of deflection minimum on the line may also injure the safe operation of train.Therefore, high ferro Basic relative settlement is to influence the key issue of train operation quality and safety in circuit.High ferro circuit is constructed as strip Thing, indulge across hundreds of kilometer, or even thousands of kilometers, geological condition is sufficiently complex along the line, is especially deposited on unfavorable geology section, basis In the risk of relative settlement.In addition, in the junction in bridge and tunnel, bridge and roadbed junction, can be special because of two parts stress Property difference, and there is different degrees of relative settlement, influence train driving safety.
According to《Railway bridges and culverts ground and foundation design code (TB10002.5-2005)》, for open bridge floors bridge:Stake top is equal Even settling amount is less than 40mm;The difference 20mm of adjacent studs uniform settlement amount.According to《High-speed railway subgrade design specification》, roadbed and bridge The relative settlement of beam, tunnel and transversary thing intersection not should be greater than 5mm, roadbed caused by changeover portion settles and bridge, tunnel The knuckle in road not should be greater than 1/1000.At present, the processing of settlement issues uses traditional means mostly, can only reduce sedimentation, it is impossible to Accomplish that sedimentation is completely eliminated, the sedimentation occurred suddenly by extraneous factor can not be eliminated in time.
The content of the invention
In order to solve the problems, such as the relative settlement of train line in the prior art, it is an object of the invention to provide one kind to apply System and method is eliminated in real time in the sedimentation of track, the system energy real-time monitored Track Settlement, and sedimentation can be eliminated in time.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of sedimentation applied to track eliminates system in real time, including support bar and the height for adjustable track height are adjusted Section system;
The pile foundation of railway is goed deep into soil layer, and the circuit bridge of the top connection railway of pile foundation, the track plates of railway are set The top of online road and bridge, is provided with the rubber support for supporting rail guidance tape, rubber branch between the top of circuit bridge and track plates The top of seat is connected with track plates;
The lower end of support bar is arranged in the ground of pile foundation side;
Height adjusting system includes lifting body, controller, signal projector and signal receiver, and lifting body is arranged on Between the top of circuit bridge floor and rubber support;Signal projector and signal receiver are separately positioned on track plates side and support The upper end of bar, or signal projector and signal receiver are separately positioned on the upper end and track plates side of support bar;
Signal projector:For sending signal;
Signal receiver:The signal sent for reception signal transmitter, and transmit the signal to controller;
Controller:For the signal of reception signal receiver transmission, lifting body is controlled to act according to the signal, to adjust The height of rubber support is saved, and further eliminates the sedimentation of track.
Lifting body is embedded in below circuit bridge top surface, and the top surface of lifting body is fixedly connected with rubber support bottom surface.
Support bar is elongate rod, and the level height of elongate rod lower end is less than the level height of pile foundation lower end.
The lifting body is hydraulic jack, and hydraulic jack is connected with oil pipe, and oil pipe is connected with hydraulic pump, hydraulic pump It is connected by oil pipe with fuel tank, in oil pipe embedment circuit bridge.Oil pipe junction between hydraulic jack and hydraulic pump is provided with valve Door, valve are used for the disengaging for controlling hydraulic oil in hydraulic jack.
The signal projector is Infrared Projector, and signal receiver is infrared signal receiver, infrared remote receiver One of infrared induction line is provided with spacing intervals along short transverse.
Infrared remote receiver sets one of infrared induction line along short transverse every 1~2mm, and infrared induction line sets twice.
Track plates are erected on track plates.
A kind of real-time removing method of sedimentation applied to track, signal projector is to signal receiver transmission signal, signal Receiver receives the signal and transmits the signal to controller;
When pile foundation settles, pile foundation, circuit bridge, track plates and lifting body bulk settling, support bar do not sink Drop, reception signal transmitter sends the position of signal and changed on signal receiver, and controller is according to the change in location information To control lifting body to jack up rubber support upwards, and then track is set to rise to predeterminated position.
Infrared Projector is arranged on support bar, infrared signal receiver is arranged on track plates side, adjustment Position of the infrared radiation that Infrared Projector is sent on one of infrared induction line is slightly biased;
When pile foundation settles, pile foundation, circuit bridge, track plates and lifting body bulk settling, support bar do not sink Drop, the infrared ray that now Infrared Projector is sent move up with respect to infrared signal receiver, when infrared ray is radiated at down together When on infrared induction line, controller control lifting body jacks up rubber support upwards, while infrared signal receiver is with track plates Move up together, after infrared ray is radiated on preceding one of infrared induction line again, controller receives infrared signal receiver transmission Signal and control lifting body stopping act.
Compared with prior art, beneficial outcomes of the invention are as follows:
The sedimentation for being applied to track of the present invention eliminates the pile foundation connecting line road and bridge of system, the jacking in circuit bridge in real time Mechanism connects rubber support, rubber support connection track plates, therefore the height by adjusting rubber support can be achieved with to track The regulation of plate height, and further realize the regulation of the orbit altitude to being set up on track plates;The lower end of support bar is arranged on In the ground of pile foundation side, support bar settles jointly with pile foundation during therefore, it is possible to prevent that pile foundation from settling;It is high Degree regulating system includes lifting body, controller, signal projector and signal receiver, lifting body be arranged on circuit bridge floor with Under, for adjusting the height of rubber support, signal projector and signal receiver are separately positioned on track plates side and support bar Upper end, or signal projector and signal receiver be separately positioned on post upper and track plates;Therefore, when pile foundation is sent out During raw sedimentation, pile foundation, circuit bridge, track plates and lifting body bulk settling, support bar do not settle, and are received on signal receiver The position that signal projector sends signal changes, and controller controls lifting body to push up upwards according to the change in location information Rubber support is played, the height that lifting body jacks up rubber support upwards is identical with the settling height of pile foundation, and lifting body is upward After jacking up rubber support, you can track sedimentation eliminates caused by being settled to pile foundation;
To sum up, the present invention realizes real-time monitored Track Settlement, and can eliminate the sedimentation in time, so eliminate track by Occur to settle and caused amount of deflection in pile foundation, and then ensure the glacing flatness of train driving route.Carried out without substantial amounts of personnel The maintenance of engineering, Automated condtrol can be realized.
Brief description of the drawings
Fig. 1 is the real-time threedimensional model schematic diagram for eliminating system of sedimentation that the present invention is applied to track.
Fig. 2 is the real-time top schematic diagram for eliminating system of sedimentation that the present invention is applied to track.
Fig. 3 is the position detail drawing of the infrared remote receiver of present system, infrared transmitter and elongate rod.
Fig. 4 is the hydraulic jack detail drawing of present system.
In figure, 1- pile foundations, 2- circuit bridges, 3- hydraulic jacks, 4- rubber supports, 5- controllers, 6- fuel tanks, 7- oil Pipe, 8- track plates, 9- infrared remote receivers, 10- infrared transmitters, 11- elongate rods, 12- infrared induction lines, 13- valves.
Embodiment
It is next with reference to the accompanying drawings and examples that the present invention is further illustrated.
As depicted in figs. 1 and 2, the sedimentation applied to track of the invention eliminates system in real time, including support bar and is used for The height adjusting system of adjustable track height, the pile foundation 1 of railway are goed deep into soil layer, the line of the top connection railway of pile foundation 1 Road and bridge 2, the track plates 8 of railway are arranged on the top of circuit bridge 2, are provided between the top of circuit bridge 2 and track plates 8 for branch The rubber support 4 of track plates is supportted, the top of rubber support 4 is connected with track plates 8;
The top of pile foundation 1 is connected with circuit bridge 2, and hydraulic jack 3 is embedded to the top of circuit bridge 2, and rubber support 4 connects The top of hydraulic jack 3, track plates 8 connect the top of rubber support 4;
Support bar is elongate rod 11, and the lower end of elongate rod 11 is arranged in the ground of pile foundation side, the lower end of elongate rod 11 The level height of head is less than the level height of the lower end of pile foundation 1;
Height adjusting system includes lifting body, controller 5, signal projector and signal receiver, and lifting body is set Below the top surface of online road and bridge, for adjusting the height of rubber support 4;Signal projector and signal receiver are separately positioned on rail The side of guidance tape 8 and the upper end of support bar, or signal projector and signal receiver are separately positioned on above support bar and rail The side of guidance tape 8;
Signal projector:For sending signal;
Signal receiver:The signal sent for reception signal transmitter, and transmit the signal to controller 5;
Controller 5:For the signal of reception signal receiver transmission, lifting body is controlled to act according to the signal, with The height of rubber support 4 is adjusted, and further eliminates the sedimentation of track.
The lifting body of the present invention uses hydraulic jack 3, and hydraulic jack 3 is connected with oil pipe 7, and oil pipe 7 is connected with liquid Press pump, hydraulic pump are connected by oil pipe with fuel tank 6, and oil pipe 7 is embedded in circuit bridge 2.Oil between hydraulic jack 3 and hydraulic pump Pipe junction is provided with valve, and valve is used for the disengaging for controlling hydraulic oil in hydraulic jack 3;
Signal projector uses Infrared Projector 10, and signal receiver uses infrared signal receiver 9, as Fig. 1~ Fig. 3, infrared remote receiver 9 are provided with one of infrared induction line 12 at spacing intervals along short transverse.
Preferably, as shown in figure 3, infrared remote receiver 9 sets one of infrared induction line 12 along short transverse every 1~2mm, Infrared induction line 12 sets twice.
The real-time removing method of the sedimentation applied to track of the present invention, detailed process are as follows:
To signal receiver transmission signal, signal receiver receives the signal and transmits the signal to control signal projector Device 5 processed;
When pile foundation 1 settles, pile foundation 1, circuit bridge 2, track plates 8 and lifting body bulk settling, support bar Do not settle, reception signal transmitter sends the position of signal and changed on signal receiver, and controller 5 is according to the change in location Information controls lifting body to jack up rubber support 4 upwards, and lifting body jacks up the certain altitude of rubber support 4, make track upwards Default or initial position is risen to, the amount of deflection of track is met the requirements.
As shown in FIG. 1 to 3, Infrared Projector 10 is arranged on support bar, infrared signal receiver 9 is arranged on On the side of track plates 8, the infrared radiation that adjustment Infrared Projector 10 is sent is on one of infrared induction line 12 is slightly biased Position;
When pile foundation 1 settles, pile foundation 1, circuit bridge 2, track plates 8 and lifting body bulk settling, support bar Do not settle, the infrared ray that now Infrared Projector 10 is sent moves up with respect to infrared signal receiver 9, when infrared ray is radiated at When on lower one of infrared induction line 12, controller 5 controls lifting body to jack up rubber support 4, while IR signal reception upwards Device 9 moves up with track plates 8, and after infrared ray is radiated on preceding one of infrared induction line 12 again, controller 5 receives infrared The signal of the transmission of signal receiver 9 simultaneously controls lifting body stopping to act.
Embodiment
In the present embodiment, track is erected on track plates, and track plates are erected on rubber support, and rubber support sets up online On road and bridge and lifting body is connected, the base form of circuit bridge selects pile foundation, and pile foundation 1 gos deep into soil layer, and the stake of pile foundation 1 is long Calculated with stake footpath according to design requirement, the connecting line road and bridge 2 of pile foundation 1, hydraulic jack 3 is placed on below the top surface of circuit bridge 2, collinear Road and bridge 2 pour together, and the top surface of hydraulic jack 3 flushes with the top surface of circuit bridge 2.The top surface of hydraulic jack 3 and rubber support 4 Bottom surface welding, hydraulic jack 3 is connected with fuel tank 6 by the oil pipe 7 being embedded in circuit bridge 2, and fuel tank 6 is placed on circuit bridge 2 Side.The top of rubber support 4 connection track plates 8.A root long degree, which is inserted, in the soil on the side of pile foundation 1 is longer than the elongated of pile foundation Bar 11, the lower end level height of elongate rod 11 are less than pile foundation 1, infrared transmitter 10 are connected in elongate rod 11, on track plates 8 An infrared remote receiver 9 is connected, infrared remote receiver 9 has one of infrared induction line 12 along short transverse every 1mm~2mm, sets altogether Twice infrared induction line 12, infrared remote receiver 9 connect control system 5.
With reference to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, when the present embodiment carries out track sedimentation elimination in real time, start elongate rod 11 The infrared transmitter 10 of upper connection, infrared transmitter 10 project infrared ray, and infrared ray impinges upon the bottom of infrared remote receiver 9 together The slightly biased upper place (such as Fig. 3) of infrared induction line 12.Start controller 5 and infrared remote receiver 9.The load action of track plates 8 is in rubber On bearing 4, load is reached hydraulic jack 3 by rubber support 4, and load is reached circuit bridge 2 by hydraulic jack 3, and circuit bridge 2 will Load reaches pile foundation 1, pile foundation 1, circuit bridge 2, hydraulic jack 3, rubber support 4 and track 8 it is overall in load action Lower gradually produce settles, meanwhile, the infrared remote receiver 9 connected on the side of track plates 8 also sinks.When deflection reaches 1mm, To on the infrared induction line 12 of one of the top of infrared remote receiver 9, infrared induction line 12 reaches signal infrared for infrared radiation Signal is reached controller 5 by receiver 9, infrared remote receiver 9 again, and controller 5 controls the oil transportation into hydraulic jack 3 of fuel tank 6, liquid Pressure jack 3 also rises the lifting of track plates 8, infrared remote receiver 9 lifting of rubber support 4, rubber support 4 with track plates 8, when When ascending amount reaches 1mm, in infrared radiation to 9 bottom of infrared remote receiver, one of infrared induction line 12, infrared induction line 12 Signal is reached into infrared remote receiver 9, signal is reached controller 5 by infrared remote receiver 9, and controller 5 controls fuel tank 6 to stop oil transportation, Hydraulic jack 3 is stopped, and controller 5 controls the valve 13 of hydraulic jack 3 to close, and prevents oil leak.
The system of the present invention can be used in the track of capsule train one kind ultrahigh speed transport facility, can eliminate track Because pile foundation occurs to settle and caused amount of deflection, and then ensure the glacing flatness of train driving route, enter without substantial amounts of personnel The maintenance of row engineering, Automated condtrol can be realized so that the operation of bullet train is safer.
The use step of present system is as follows:
1) circuit bridge 2 connects pile foundation 1, and the collinear road and bridge 2 of hydraulic jack 3 are together poured, and ensures hydraulic jack Push up 3 top surfaces to flush with the top surface of circuit bridge 2, the one end of 3 connected pipes of hydraulic jack 7, oil pipe 7 is also cast in circuit bridge 2, oil pipe The connection of 7 other ends is placed on the fuel tank 6 on circuit bridge 2, and fuel tank 6 connects controller 5;
2) bottom surface of rubber support 4 and the top surface of hydraulic jack 3 are welded, track plates 8 is erected on rubber support 4;
3) infrared remote receiver 9 and controller 5 are installed, by infrared remote receiver 9 and hydraulic jack 3, the connection of fuel tank 6 Controller 5;
4) elongate rod 11 is inserted in soil and connects infrared transmitter 10;
5) infrared transmitter 10 is started, so far the system installs, into use state;
After pile foundation 1 settles, the different infrared induction line 12 of infrared radiation makes infrared remote receiver 9 send difference Signal, controller 5 is set to control hydraulic jack 3 to rise or stop, to reach the purpose for eliminating sedimentation.

Claims (10)

1. a kind of sedimentation applied to track eliminates system in real time, it is characterised in that including support bar and for adjustable track height The height adjusting system of degree;
The lower end of support bar is arranged in the ground of pile foundation (1) side of railway;
Height adjusting system includes lifting body, controller (5), signal projector and signal receiver, lifting body and is arranged on The top of the circuit bridge (2) of railway and for supporting between the rubber support (4) of track plates (8) of railway;Signal projector and Signal receiver is separately positioned on track plates (8) side and the upper end of support bar, or signal projector and signal receiver point The side of post upper and track plates (8) is not arranged on;
Signal projector:For sending signal;
Signal receiver:The signal sent for reception signal transmitter, and transmit the signal to controller (5);
Controller (5):For the signal of reception signal receiver transmission, lifting body is controlled to act according to the signal, to adjust The height of rubber support (4) is saved, and further eliminates the sedimentation of track.
2. a kind of sedimentation applied to track according to claim 1 eliminates system in real time, it is characterised in that the pile foundation The upper end of plinth (1) is connected with circuit bridge (2), and lifting body is embedded in below circuit bridge (2) top surface, the top surface of lifting body and rubber Glue bearing (4) bottom surface is fixedly connected, and track plates (8) are erected on rubber support (4).
3. a kind of sedimentation applied to track according to claim 1 eliminates system in real time, it is characterised in that support bar is Elongate rod (11), the level height of elongate rod (11) lower end are less than the level height of pile foundation (1) lower end.
4. a kind of sedimentation applied to track according to claim 1 eliminates system in real time, it is characterised in that the jacking Mechanism is hydraulic jack (3).
5. a kind of sedimentation applied to track according to claim 1 eliminates system in real time, it is characterised in that the signal Transmitter is Infrared Projector (10), and signal receiver is infrared signal receiver (9), and infrared remote receiver (9) is along highly Direction is provided with one of infrared induction line (12) at spacing intervals.
6. a kind of sedimentation applied to track according to claim 5 eliminates system in real time, it is characterised in that infrared receiver Device (9) sets one of infrared induction line (12) along short transverse every 1~2mm.
7. a kind of sedimentation applied to track according to claim 6 eliminates system in real time, it is characterised in that infrared induction Line (12) sets twice.
8. a kind of sedimentation applied to track according to claim 1-7 any one eliminates system in real time, its feature exists In track is erected on track plates.
9. a kind of real-time removing method of sedimentation applied to track, based on being applied to rail shown in claim 1-8 any one The sedimentation in road eliminates system in real time, it is characterised in that signal projector receives to signal receiver transmission signal, signal receiver The signal simultaneously transmits the signal to controller (5);
When pile foundation (1) settles, pile foundation (1), circuit bridge (2), rubber support (4), track plates (8) and lifting body Bulk settling, support bar do not settle, and reception signal transmitter sends the position of signal and changed on signal receiver, controller (5) control lifting body to jack up rubber support (4) upwards according to the change in location information, and then track is risen to default position Put.
10. the real-time removing method of a kind of sedimentation applied to track according to claim 9, it is characterised in that will be infrared Signal projector (10) is arranged on support bar, and infrared signal receiver (9) is arranged on track plates (8), adjusts infrared signal Position of the infrared radiation that transmitter (10) is sent on one of infrared induction line (12) is slightly biased;
When pile foundation (1) settles, pile foundation (1), circuit bridge (2), rubber support (4), track plates (8) and lifting body Bulk settling, support bar do not settle, and the infrared ray that now Infrared Projector (10) is sent is with respect to infrared signal receiver (9) Move up, when infrared ray is radiated at down on one of infrared induction line (12), controller (5) control lifting body jacks up rubber upwards Bearing (4), while infrared signal receiver (9) moves up with rubber support (4), it is infrared together before infrared ray is radiated at again After on the line of induction (12), controller (5) receives the signal of infrared signal receiver (9) transmission and controls lifting body to stop moving Make.
CN201711168100.5A 2017-11-21 2017-11-21 A kind of sedimentation applied to track eliminates system and method in real time Pending CN107780309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711168100.5A CN107780309A (en) 2017-11-21 2017-11-21 A kind of sedimentation applied to track eliminates system and method in real time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711168100.5A CN107780309A (en) 2017-11-21 2017-11-21 A kind of sedimentation applied to track eliminates system and method in real time

Publications (1)

Publication Number Publication Date
CN107780309A true CN107780309A (en) 2018-03-09

Family

ID=61430522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711168100.5A Pending CN107780309A (en) 2017-11-21 2017-11-21 A kind of sedimentation applied to track eliminates system and method in real time

Country Status (1)

Country Link
CN (1) CN107780309A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616602A (en) * 2019-09-17 2019-12-27 西安建筑科技大学 Sedimentation control device and method for construction of pipe jacking and downward passing existing operation railway
CN112049433A (en) * 2020-08-11 2020-12-08 上海隧道工程有限公司 Steel truss pushing attitude control equipment and attitude control method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1328671A (en) * 1969-10-02 1973-08-30 Matisa Materiel Ind Sa Levelling of railway tracks
CN103233400A (en) * 2013-05-22 2013-08-07 中铁二院工程集团有限责任公司 Ballastless track railway bridge joint differential settlement adjusting device
CN204301728U (en) * 2015-01-02 2015-04-29 张澎 A kind of monitoring device of subgrade settlement
CN105674947A (en) * 2016-03-31 2016-06-15 西南石油大学 Large-sized oil storage tank deformation monitoring and deviation correcting device and method
CN106592563A (en) * 2017-01-09 2017-04-26 河海大学 Device for monitoring foundation settlement and measuring method thereof
CN207582194U (en) * 2017-11-21 2018-07-06 长安大学 System is eliminated in a kind of sedimentation applied to track in real time

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1328671A (en) * 1969-10-02 1973-08-30 Matisa Materiel Ind Sa Levelling of railway tracks
CN103233400A (en) * 2013-05-22 2013-08-07 中铁二院工程集团有限责任公司 Ballastless track railway bridge joint differential settlement adjusting device
CN204301728U (en) * 2015-01-02 2015-04-29 张澎 A kind of monitoring device of subgrade settlement
CN105674947A (en) * 2016-03-31 2016-06-15 西南石油大学 Large-sized oil storage tank deformation monitoring and deviation correcting device and method
CN106592563A (en) * 2017-01-09 2017-04-26 河海大学 Device for monitoring foundation settlement and measuring method thereof
CN207582194U (en) * 2017-11-21 2018-07-06 长安大学 System is eliminated in a kind of sedimentation applied to track in real time

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616602A (en) * 2019-09-17 2019-12-27 西安建筑科技大学 Sedimentation control device and method for construction of pipe jacking and downward passing existing operation railway
CN112049433A (en) * 2020-08-11 2020-12-08 上海隧道工程有限公司 Steel truss pushing attitude control equipment and attitude control method thereof

Similar Documents

Publication Publication Date Title
CN103757993B (en) High-speed railway subgrade sedimentation repair system and method
CN103334381B (en) Full-bracket track-bogie bearing and moving device and construction method for installing steel box girders
CN104695289B (en) A kind of put line construction for middle the low of low speed magnetic suspension traffic engineering embankment location
CN207582194U (en) System is eliminated in a kind of sedimentation applied to track in real time
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN106284079A (en) A kind of bridge break post replace classification synchronize integral jacking construction method
CN106702834A (en) Midline deviation rectifying method for sedimentary offset ballastless track
CN107780309A (en) A kind of sedimentation applied to track eliminates system and method in real time
CN103410062B (en) The method of single-track railway tunnel bracket type rail method construction solid concrete roabed
CN204825533U (en) Adopt existing circuit reinforcerment system of D type roof beam
CN205591131U (en) Whole superelevation of multispan case roof beam is jacking construction system in turn
CN102733307B (en) Method for constructing cast-in-place beam falsework
CN109610308A (en) The device and method of bridge settlement is avoided suitable for tunnel underbridge beam work progress
CN102797223B (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN105603838B (en) Method for lifting railway track board by using track board lifting trolley
CN107905046A (en) The magnetic railway track of track deformation adjusting apparatus and application described device
CN205576749U (en) Pontic roof beam structure promotes and rackwork
CN208777094U (en) A kind of floating raft type road structure
CN104141264B (en) Plate-type slag-free orbit lays precision keeping method
CN106498976A (en) A kind of inter-city passenger rail underpass of freeways open-cut group pushes up support and change method
CN101838967B (en) Construction technology of ballast bed of bridge double-block ballastless track
CN203475472U (en) Power cable trough hand hole well
CN105350409A (en) Construction method of urban railway traffic bolster type steel spring floating slab ballast bed turnout junction
CN207959020U (en) It is a kind of based on ballast balance pushing tow frame structure method road under wear high ferro device
CN209066200U (en) A kind of automatic filling and drainage system in floating raft type road structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination