CN107779531B - A kind of blast oven method - Google Patents
A kind of blast oven method Download PDFInfo
- Publication number
- CN107779531B CN107779531B CN201711050886.0A CN201711050886A CN107779531B CN 107779531 B CN107779531 B CN 107779531B CN 201711050886 A CN201711050886 A CN 201711050886A CN 107779531 B CN107779531 B CN 107779531B
- Authority
- CN
- China
- Prior art keywords
- cooling
- water
- blast
- flowing amount
- furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B5/00—Making pig-iron in the blast furnace
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
The invention discloses a kind of blast oven methods, belong to blast furnace field of metallurgy.The present invention the following steps are included: one, above Blast Furnace Bottom center, air port, inlet front end two sides install thermocouple;Two, it is filled the water in the cooling water channel of furnace bottom cooling pipe and cooling wall, uniform intervals close a plurality of cooling water channel in cooling wall, and reserve part is separately opened;Three, starting hot blast stove system leads to hot wind progress baker into blast furnace, and circulating water supply in the cooling water channel of unlatching is retained into furnace bottom cooling pipe and cooling wall;Four, when thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more, whole cooling water channels is opened and participate in circulating water supply, until baker terminates.The present invention overcomes the shortcomings of that blast oven is ineffective in the prior art, influences the life of the blast furnace, and the practical baking temperature of filler can be improved, improve the intensity of unsetting resistance to material and the Baker effect of blast furnace entirety, promote prolonging campaign.
Description
Technical field
The present invention relates to technical field of blast furnace metallurgy, more specifically to a kind of blast oven method.
Background technique
Blast furnace or some other Thermal Equipment of metallurgy industry after the completion of newly-built or overhaul construction, needed before operation into
Row baker operation makes moisture or resin in the furnace body masonry of resistance to material be evaporated, and refractory material consolidation strength is improved, to prevent
The rapid heat cycle phenomenon being likely to occur after operation, big destruction is caused to masonry.
Currently, generally carrying out baker using hot blast stove system hot wind, while setting to cooling for newly-built or overhaul blast furnace
Standby to carry out water flowing circulating cooling, water speed generally all at 600 DEG C, generallys use at present in 0.5m/s or so, highest oven drying temperature
This soft water airtight circulating cooling system intensity of cooling is high, since the thickness of barrel section brick fuel itself is larger, will ultimately result in
Filler temperature between brick fuel and cooling wall is general < 50 DEG C (44 DEG C or so), much smaller than the temperature of cupola well furnace bottom carbon packing consolidation
It spends (> 80 DEG C), is extremely difficult to the effect of baker, is unfavorable for prolonging campaign, and be easy to have the following problems: (1), contained by filler
Moisture fail fully effective from interior discharge, Baker effect is not achieved;(2), since oven drying temperature is to the intensity effect of filler
It is very big, the relatively low of actual temperature is toasted, fails that filler is made to reach due intensity, especially furnace bottom cupola well carbon packing cannot consolidate
Change, crackle or powder phenomenon-tion occur easily in subsequent normal productive process, once the packing layer of Wall of Blast Furnace it is cracked or
Person's dusting causes certain air gap to exist, and can substantially increase the heat transfer resistance of Wall of Blast Furnace, in turn result in the raising of brick fuel temperature, this is right
In the longevity of blast furnace be extremely disadvantageous;(3), water inlet is all closed in water furnace drying method requirement of closing commonly used at present, but is practiced
Middle workshop condition often has blast-furnace soft water system while supplying the use of hot-blast stove cooling water, therefore can not wholly off all pumps
Group.It can be seen that current industry, which is had to go to the toilet, needs a kind of blast oven mode of more effective more practical raising Baker effect.
Through retrieving, the improvement about blast oven mode has a large amount of patent disclosures, such as Chinese Patent Application No.:
2014106869913, the applying date: on November 24th, 2014, invention and created name are as follows: a kind of blast oven method, this application
A kind of blast oven method is disclosed, mainly during baker, closes cooling circulating water or the cooling water in cooling wall
High-temperature steam is passed through in channel, hot wind or hot water carry out baker, it is therefore an objective to by improving the hot-face temperature of cooling wall, improve with
The baking temperature of the carbon ramming mass of cooling wall contact is suitable for 80-90 DEG C or so of baking temperature.This application can be mentioned further
The baking temperature of blast furnace carbon ramming mass improves the compression strength of unsetting resistance to material, for improving blast oven quality, extends
Blast furnace service life plays an important role.
For another example Chinese Patent Application No.: 2014104097434, the applying date: on August 19th, 2014, invention and created name are as follows:
The following steps carried out including sequence: blast oven method is led to this application discloses a kind of blast oven method in blast furnace
Enter cold wind;Wind-warm syndrome is warming up to 300 DEG C since 150 DEG C with 6~20 DEG C/h, and heat preservation is carried out at 300 DEG C and continues 30~80h;With 8
The speed of~16 DEG C/h is warming up to 500 DEG C, and at 500 DEG C, heat preservation continues 20~40h;600 are warming up to the speed of 8~16 DEG C/h
DEG C, it is kept the temperature at 600 DEG C, when blast furnace waste gas humidity is equal to atmospheric humidity, and in first and second layer of blast furnace super leck brick
When heart temperature >=90 DEG C, stops third time and keep the temperature;With the speed of 10~20 DEG C/h, cools to subsequent handling and prepare temperature.The Shen
Please case can uniformly and stably improve resistance to material temperature in furnace, evaporate its moisture slowly, improve masonry integral strength, slow down cupola well
It corrodes, can effectively extend blast furnace crucibe service life.
The above application be can yet be regarded as a kind of good blast oven mode, help to improve the life of the blast furnace, but its still have into
The space of one-step optimization, also with greater need for the richer live furnace drying method for adapting to complicated site environment in industry.
Summary of the invention
1. technical problems to be solved by the inivention
It is an object of the invention to overcome the shortcomings of that blast oven is ineffective in the prior art, influences the life of the blast furnace, mention
A kind of blast oven method has been supplied, can effectively improve the practical baking temperature of filler, and then improve the intensity of unsetting resistance to material
And the Baker effect of blast furnace entirety, finally promote prolonging campaign.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of blast oven method of the invention, comprising the following steps:
Step 1: above Blast Furnace Bottom center, blast-furnace tuyere, blast-furnace tuyere front end two sides thermocouple is installed respectively;
Step 2: filling cooling water respectively in the cooling water channel of blast furnace bottom cooling pipe road and blast furnace cooling stave, then
Uniform intervals close a plurality of cooling water channel in cooling wall, retain and open part cooling water channel;
Step 3: starting hot blast stove system, which leads to hot wind into blast furnace, carries out baker, while it is cooling to furnace bottom to start kinetic pump
Retain circulating water supply in the cooling water channel opened in pipeline and cooling wall;
Step 4: when thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more, it will be in blast furnace cooling stave
Whole cooling water channels, which are opened, participates in circulating water supply, until baker terminates.
Further, uniform intervals close a plurality of cooling water channel in cooling wall in step 2, per adjacent two pieces of coolings
Only retain between wall and opens a cooling water channel.
Further, retaining water-flowing amount in the cooling water channel opened in step 3 in cooling wall is normal circulation water-flowing amount
30~35%.
Further, water-flowing amount is the 30~35% of normal circulation water-flowing amount in furnace bottom cooling pipe in step 3.
Further, water-flowing amount is the 15~20% of normal circulation water-flowing amount in blast furnace tuyere small sleeve in step 3.
It further, will in step 4 when thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more
Whole cooling water channels, which are opened, in blast furnace cooling stave participates in circulation, and the water-flowing amount of every cooling water channel is the 30 of normal circulation water-flowing amount
~35%;By 20~for 24 hours after, the water-flowing amount of every cooling water channel of control is the 40~45% of normal circulation water-flowing amount, until
Baker terminates.
Further, retaining water-flowing amount in the cooling water channel opened in step 3 in cooling wall is normal circulation water-flowing amount
30%.
Further, water-flowing amount is the 30% of normal circulation water-flowing amount in furnace bottom cooling pipe in step 3.
Further, water-flowing amount is the 15% of normal circulation water-flowing amount in blast furnace tuyere small sleeve in step 3.
It further, will in step 4 when thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more
Whole cooling water channels, which are opened, in blast furnace cooling stave participates in circulation, and the water-flowing amount of every cooling water channel is normal circulation water-flowing amount
30%;After 20h, the water-flowing amount of every cooling water channel of control is the 40% of normal circulation water-flowing amount, until baker terminates.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, there is following remarkable result:
(1) a kind of blast oven method of the invention, by cooling wall cooling water channel preliminary infusion, part circulation, by
The modes such as step control loop water carry out baker, can effectively improve the practical baking temperature of filler, and then improve unsetting resistance to
The Baker effect of intensity and the blast furnace entirety of material, finally promotes prolonging campaign.
(2) a kind of blast oven method of the invention closes most of recirculated cooling water after being previously implanted cooling water
Valve is passed in and out, recycles cooling water not, has preferable protective effect to cooling wall, while ensureing that at least a power pump group pump is just
Often work keeps the water in most of cooling water channel not flow, and helps to improve the hot face of cooling wall, unsetting resistance at baker initial stage
Material baking temperature ensures Baker effect, while also meeting equipment requirement.
(3) a kind of blast oven method of the invention, without carrying out complicated structure to existing blast furnace and cooling system etc.
Change, without other media are additionally passed through in cooling-water duct, can be realized by existing working condition, is suitable for promoting
Using.
(4) a kind of blast oven method of the invention, does monitor closely to the loine pressure not recycled in blast furnace cooling stave,
By to this not circulating cooling water channel pipeline Inlet and outlet water valve carry out by a small margin, the unlatching of short time carry out row pressure, make in it
Portion forms of short duration microcirculation, and removes the gas in water into the degassing tank before pump house eventually by exhaust main road, can be effective
Cooling water channel loine pressure is safely reduced, ensures safe baker.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of blast oven method of the invention.
Specific embodiment
To further appreciate that the contents of the present invention, in conjunction with attached drawing, the present invention is described in detail.
The present invention will be further described with reference to the examples below.
Embodiment 1
As shown in Figure 1, a kind of blast oven method of the present embodiment, follows the steps below:
Step 1: above Blast Furnace Bottom center, blast-furnace tuyere, blast-furnace tuyere front end two sides baker thermoelectricity is installed respectively
It is even, for monitoring the temperature of blast oven in time, and subsequent roast technic can be adjusted according to real time temperature;Basis in production practices
Detection demand can be corresponded in the multiple and different position installation thermocouple detections of blast furnace, be not described in detail one by one herein;
Step 2: cooling water is filled in advance respectively in the cooling water channel of blast furnace bottom cooling pipe road and blast furnace cooling stave,
Then uniform intervals close a plurality of cooling water channel in cooling wall, retain and open part cooling water channel;The present embodiment is per adjacent two
Only retain between block cooling wall and open a cooling water channel, specifically, in the present embodiment workshop condition totally 192 in blast furnace cooling stave
Cooling water channel closes 168, and uniform intervals retain 24 cooling water channels, and it is 600t that the present embodiment, which possesses water,;This implementation
Example closes the disengaging valve of most of recirculated cooling water, recycles cooling water not, have to cooling wall after being previously implanted cooling water
Preferable protective effect, while ensureing that at least a power pump group pump works normally, the water in the most of cooling water channel of holding is not
Flowing reduces intensity of cooling, helps to improve the hot face of cooling wall at baker initial stage, the unsetting baking temperature of resistance to material, ensures baker
Effect, while also meeting equipment requirement.
Step 3: starting hot blast stove system, which leads to hot wind into blast furnace, carries out baker, while it is cooling to furnace bottom to start kinetic pump
Retain circulating water supply in the cooling water channel opened in pipeline and cooling wall;Specifically, the present embodiment starts a medium lift pump and supplies water,
Quantity of circulating water is 3000m3/ h, the interior water-flowing amount for retaining every participation circulation in 24 cooling water channels opened of cooling wall is normal
(normal water is 23m to the 30% of circulation water-flowing amount3/ h), water-flowing amount is normal circulation water flowing in every cooling pipe of Blast Furnace Bottom
(normal water is 36m to the 30% of amount3/ h), tuyere medium jacket of blast furnace, belly pipe and hot blast stove system still use normal water flowing at this time
Circulation, in each tuyere small sleeve of blast furnace water-flowing amount be then normal circulation water-flowing amount 15% (normal water is 25m3/ h), it needs
Illustrate, normal circulation water-flowing amount etc. described in the present embodiment can operate for row those skilled in the art in practice
Know in environment, the possible real data situation of different steel mill's systems is different, and details are not described herein.Tuyere medium jacket of blast furnace, air port are small
The structures such as set, belly pipe are also existing well-known technique, are also no longer described in detail herein.
Step 4: when thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more, it will be in blast furnace cooling stave
Whole cooling water channels, which are opened, participates in circulating water supply, until baker terminates, specifically, participates in following after being first turned on whole cooling water channels
Ring supplies water, and it is the 30% of normal circulation water-flowing amount that the water-flowing amount of every cooling water channel, which still controls,;After entering baker after 20h
Phase, the water-flowing amount of every cooling water channel of control is the 40% of normal circulation water-flowing amount, until baker terminates, eventually by judging
There are humidity, the stabilization of atmospheric humidity of gas vent, especially tuyere zone gas vent steam discharge situation below and baker exhaust gas
Degree and degree of closeness etc. finally determine that blast oven terminal, baker terminate.
The furnace drying method of the present embodiment is not necessarily to carry out existing blast furnace and cooling system etc. complicated structure change, without
It is additionally passed through other media in cooling-water duct, can be realized by existing working condition, by cooling wall cooling water
Road preliminary infusion, part circulation, gradually the modes such as control loop water carry out baker, can effectively improve the practical baking of filler
Temperature, and then the intensity of unsetting resistance to material and the Baker effect of blast furnace entirety are improved, finally promote prolonging campaign.
It should also be noted that, production practices are found, in the blast-furnace cooled water circulating cooling stage in the present embodiment, due to water
The raising of temperature, water oxygen are overflowed from water because solubility is reduced, will cause soft water not current intelligence sewer pipes because
Gas largely overflows and is ramping up the pressure of entire pipeline, or even exceeds pipeline allowable stress, therefore in cooling wall
The cooling water channel progress row pressure processing of closing is particularly necessary, and the present embodiment, which is removed, carries out normal pipeline exhaust to normal circulation pipeline
Threshold switch more to set pressure gauge outside row pressure to 168 loine pressures not recycled early period in blast furnace cooling stave and do tight prison
Control, once pressure beyond standard limit, then by this not circulating cooling water channel pipeline Inlet and outlet water valve progress by a small margin, it is short
The unlatching of time carries out row pressure, and avoids by the way of routinely opening exhaust valve, sprays situation of hurting sb.'s feelings to prevent steam,
It specially first opens flowing water Valve, be then turned on inlet valve, valve opening amplitude size is 10~20% (specific the present embodiment
Middle unlatching amplitude is that 10%), each opening time control is 45~90s (opening time is 45s in specific the present embodiment), makes it
Inside forms of short duration microcirculation, and removes the gas in water into the degassing tank before pump house eventually by exhaust main road, can have
Effect safely reduces cooling water channel loine pressure, ensures safe baker.
Embodiment 2
A kind of blast oven method of the present embodiment, substantially with embodiment 1, the difference is that step 3 in the present embodiment
Retaining water-flowing amount in the cooling water channel opened in middle cooling wall is the 35% of normal circulation water-flowing amount, water flowing in furnace bottom cooling pipe
Amount is the 35% of normal circulation water-flowing amount, and water-flowing amount is the 20% of normal circulation water-flowing amount in blast furnace tuyere small sleeve;In step 4
When thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more, cooling water channels whole in blast furnace cooling stave are opened
Circulation is participated in, the water-flowing amount of every cooling water channel is the 35% of normal circulation water-flowing amount;After for 24 hours, every cooling water is controlled
The water-flowing amount in road is the 45% of normal circulation water-flowing amount, until baker terminates;
In the present embodiment to early period not circulating cooling water channel still using Inlet and outlet water valve by a small margin, the short time open by the way of
Row pressure is carried out, flowing water Valve is first opened, is then turned on inlet valve, valve opening amplitude size is 20%, each opening time control
It is made as 90s.
Embodiment 3
A kind of blast oven method of the present embodiment, substantially with embodiment 1, the difference is that step 3 in the present embodiment
Retaining water-flowing amount in the cooling water channel opened in middle cooling wall is the 32% of normal circulation water-flowing amount, water flowing in furnace bottom cooling pipe
Amount is the 32% of normal circulation water-flowing amount, and water-flowing amount is the 16% of normal circulation water-flowing amount in blast furnace tuyere small sleeve;In step 4
When thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more, cooling water channels whole in blast furnace cooling stave are opened
Circulation is participated in, the water-flowing amount of every cooling water channel is the 32% of normal circulation water-flowing amount;After 22h, every cooling water is controlled
The water-flowing amount in road is the 42% of normal circulation water-flowing amount, until baker terminates;
In the present embodiment to early period not circulating cooling water channel still using Inlet and outlet water valve by a small margin, the short time open by the way of
Row pressure is carried out, flowing water Valve is first opened, is then turned on inlet valve, valve opening amplitude size is 15%, each opening time control
It is made as 60s.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field
Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution
Similar frame mode and embodiment, are within the scope of protection of the invention.
Claims (5)
1. a kind of blast oven method, which comprises the following steps:
Step 1: above Blast Furnace Bottom center, blast-furnace tuyere, blast-furnace tuyere front end two sides thermocouple is installed respectively;
Step 2: filling cooling water respectively in the cooling water channel of blast furnace bottom cooling pipe road and blast furnace cooling stave, then uniformly
The a plurality of cooling water channel in cooling wall is closed at interval, is retained and is opened part cooling water channel;Uniform intervals close cooling in step 2
A plurality of cooling water channel in wall often only retains between adjacent two pieces of cooling walls and opens a cooling water channel;
Step 3: starting hot blast stove system, which leads to hot wind into blast furnace, carries out baker, while starting kinetic pump to furnace bottom cooling pipe
And retain circulating water supply in the cooling water channel opened in cooling wall;Retain water-flowing amount in the cooling water channel opened in cooling wall to be positive
Often the 30~35% of circulation water-flowing amount;Water-flowing amount is the 30~35% of normal circulation water-flowing amount in furnace bottom cooling pipe;Blast furnace wind
Water-flowing amount is the 15~20% of normal circulation water-flowing amount in the small set of mouth;
Step 4: when thermocouple detects that the cooling wall temperature of blast-furnace bosh reaches 90 DEG C or more, it will be whole in blast furnace cooling stave
Cooling water channel, which is opened, participates in circulation, and the water-flowing amount of every cooling water channel is the 30~35% of normal circulation water-flowing amount;By 20~
After for 24 hours, the water-flowing amount of every cooling water channel of control is the 40~45% of normal circulation water-flowing amount, until baker terminates.
2. a kind of blast oven method according to claim 1, it is characterised in that: retain in cooling wall in step 3 and open
Cooling water channel in water-flowing amount be normal circulation water-flowing amount 30%.
3. a kind of blast oven method according to claim 1, it is characterised in that: lead in furnace bottom cooling pipe in step 3
Water is the 30% of normal circulation water-flowing amount.
4. a kind of blast oven method according to claim 1, it is characterised in that: lead in blast furnace tuyere small sleeve in step 3
Water is the 15% of normal circulation water-flowing amount.
5. a kind of blast oven method according to claim 1, it is characterised in that: when thermocouple detects height in step 4
When the cooling wall temperature of furnace bosh reaches 90 DEG C or more, cooling water channels whole in blast furnace cooling stave are opened and participate in circulation, every cold
But the water-flowing amount of water channel is the 30% of normal circulation water-flowing amount;After 20h, the water-flowing amount of every cooling water channel of control is normal
The 40% of water-flowing amount is recycled, until baker terminates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711050886.0A CN107779531B (en) | 2017-10-31 | 2017-10-31 | A kind of blast oven method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711050886.0A CN107779531B (en) | 2017-10-31 | 2017-10-31 | A kind of blast oven method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107779531A CN107779531A (en) | 2018-03-09 |
CN107779531B true CN107779531B (en) | 2019-08-20 |
Family
ID=61432446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711050886.0A Active CN107779531B (en) | 2017-10-31 | 2017-10-31 | A kind of blast oven method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107779531B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110317909B (en) * | 2018-03-30 | 2020-12-08 | 上海梅山钢铁股份有限公司 | Blast furnace baking method |
CN112481434A (en) * | 2020-12-03 | 2021-03-12 | 山东钢铁股份有限公司 | Blast furnace baking method and blast furnace |
CN113106180B (en) * | 2021-04-09 | 2022-03-11 | 广东韶钢松山股份有限公司 | Blast furnace drying temperature detection couple mounting method, blast furnace and furnace drying method |
CN115466809B (en) * | 2021-06-10 | 2023-10-17 | 宝山钢铁股份有限公司 | Control method for cooling system of blast furnace baking furnace |
CN114045372A (en) * | 2021-10-27 | 2022-02-15 | 无锡市辉丰机电设备有限公司 | Furnace bottom water cooling method |
CN115386665B (en) * | 2022-08-30 | 2023-07-28 | 马鞍山钢铁股份有限公司 | Method for accurately controlling and adjusting air temperature of 150-600 ℃ during blast furnace baking |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102899441A (en) * | 2012-10-26 | 2013-01-30 | 莱芜钢铁集团有限公司 | Installation method of gas leading-out pipe for blast furnace baking taphole |
CN104357607A (en) * | 2014-11-24 | 2015-02-18 | 中冶赛迪工程技术股份有限公司 | Blast furnace roasting method |
CN104611487A (en) * | 2015-02-01 | 2015-05-13 | 山西太钢不锈钢股份有限公司 | Furnace top temperature control method for heating-up of blast furnace |
-
2017
- 2017-10-31 CN CN201711050886.0A patent/CN107779531B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102899441A (en) * | 2012-10-26 | 2013-01-30 | 莱芜钢铁集团有限公司 | Installation method of gas leading-out pipe for blast furnace baking taphole |
CN104357607A (en) * | 2014-11-24 | 2015-02-18 | 中冶赛迪工程技术股份有限公司 | Blast furnace roasting method |
CN104611487A (en) * | 2015-02-01 | 2015-05-13 | 山西太钢不锈钢股份有限公司 | Furnace top temperature control method for heating-up of blast furnace |
Non-Patent Citations (1)
Title |
---|
刘学文.重钢1200米³高炉烘炉和开炉总结.《四川冶金》.1991,(第1期),第75-81页. |
Also Published As
Publication number | Publication date |
---|---|
CN107779531A (en) | 2018-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107779531B (en) | A kind of blast oven method | |
CN205368433U (en) | Mesh belt furnace | |
CN104152618B (en) | Blast-furnace soft water cooling line control method | |
CN104531974A (en) | Large forging quenching heat treatment process | |
CN204874630U (en) | Handle powder material's high temperature vacuum apparatus | |
CN108707713A (en) | A kind of hot-blast stove attemperator and method | |
CN111893231A (en) | Blast furnace hearth and casting long-life lifting method thereof | |
CN204474703U (en) | Blast furnace banking air port sealed structure | |
CN105349720A (en) | Method for online treatment of water leakage of cooling wall water supply branch pipe of blast furnace hearth | |
CN104907518B (en) | A kind of stainless steel slab slow cooling temperature control equipment and control method | |
CN104357607A (en) | Blast furnace roasting method | |
CN115466809B (en) | Control method for cooling system of blast furnace baking furnace | |
CN113832268A (en) | Method for quickly recovering furnace condition | |
CN213012932U (en) | Blast furnace for iron making with reduced heat energy loss | |
CN207276638U (en) | A kind of integral type pulverized coal injection in blast furnace preheater | |
CN108660276B (en) | Converter cooling and secondary blow-in method | |
CN111910035A (en) | Quick furnace cooling method of improved top combustion type hot blast furnace | |
CN202272890U (en) | Thrash cooling device for blast furnace | |
CN206247873U (en) | A kind of top-blown bath smelting furnace profit cools down gun system | |
CN104928422A (en) | Repair method of blast furnace cold wall | |
CN206362179U (en) | Roaster with insulation cooling device | |
CN203923233U (en) | A kind of blast-furnace tuyere | |
CN110184402A (en) | A method of it is online quickly to determine the specific leak source of blast furnace cooling stave | |
CN102329904A (en) | Blast furnace water pumping cooling method | |
CN102912050A (en) | Material-ramming, mud-pressing and anti-freezing method for cooling wall of blast furnace in winter overhaul |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |