CN107770100A - One kind surveys hair control redundant network framework and redundancy approach - Google Patents

One kind surveys hair control redundant network framework and redundancy approach Download PDF

Info

Publication number
CN107770100A
CN107770100A CN201710959791.4A CN201710959791A CN107770100A CN 107770100 A CN107770100 A CN 107770100A CN 201710959791 A CN201710959791 A CN 201710959791A CN 107770100 A CN107770100 A CN 107770100A
Authority
CN
China
Prior art keywords
equipment
network
test
data processing
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710959791.4A
Other languages
Chinese (zh)
Other versions
CN107770100B (en
Inventor
金剑铮
陈玉坤
荣刚
冯忠伟
曾发
欧连军
张声艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Launch Vehicle Technology CALT
Original Assignee
China Academy of Launch Vehicle Technology CALT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Launch Vehicle Technology CALT filed Critical China Academy of Launch Vehicle Technology CALT
Priority to CN201710959791.4A priority Critical patent/CN107770100B/en
Publication of CN107770100A publication Critical patent/CN107770100A/en
Application granted granted Critical
Publication of CN107770100B publication Critical patent/CN107770100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L49/00Packet switching elements
    • H04L49/55Prevention, detection or correction of errors
    • H04L49/552Prevention, detection or correction of errors by ensuring the integrity of packets received through redundant connections
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/22Arrangements for detecting or preventing errors in the information received using redundant apparatus to increase reliability
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663Performing the actions predefined by failover planning, e.g. switching to standby network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L49/00Packet switching elements
    • H04L49/70Virtual switches

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

One kind, which surveys hair control redundant network framework and redundancy approach, framework, includes more redundant networks, network head end equipment and network backend equipment;More redundant networks provide the communication link of information exchange for network head end equipment and network backend equipment room;The network head end equipment is connected with aircraft and transmitting support system, is connected with network backend equipment by more redundant networks and is completed test and emission control before aircraft is penetrated;The network backend equipment includes being arranged in the equipment away from launch point, including performs the necessary network backend test equipment of test emission control task and network equipment monitoring and headend equipment administrative unit.The present invention uses real time fail switchover policy, realizes the fast quick-recovery of exchange fault, simplifies link configuration work, and provides recovery ways for headend equipment failure, to meet current quick test and launch mission requirement.

Description

One kind surveys hair control redundant network framework and redundancy approach
Technical field
The present invention relates to a kind of highly reliable fast recovery to survey hair control redundant network architecture design, belongs to Aerospace vehicle test with controlling Field.
Background technology
Launch vehicle measurement is aircraft development and the important leverage system taken a flight test, for completing the test in aircraft each stage And emission control task.Current increasingly intensive space launch mission proposes higher want to quick test lift-off technology Ask, the necessary bar that reliable, the fast quick-recovery of energy survey hair control network system is guarantee test and emission control task is satisfactorily completed Part, guarantee is provided for the quick test and transmitting of aircraft.
Existing hair control network system of surveying typically uses front and back end framework and automatic test mode, and wherein front end uses nothing more People's mode on duty.Realized for the existing kinds of schemes of survey hair control redundant network of front and back end framework, including main/slave link scheme, master Standby link uses the two-node cluster hot backup scheme of Hot Standy Router Protocol (HSRP), main/slave link using HSRP and quickly generates tree Agreement (RSTP) scheme etc..Above-mentioned redundant network scheme finds application in space mission, but finds exist in practice process Following deficiency:1) interchanger fault-finding and switch between master and slave machines time length on link, cause mass data to be lost;2) link configuration Process is complicated;3) recovery ways are lacked during the active and standby interchanger simultaneous faults in front end.
As it was previously stated, existing solution to be difficult to meet that quick test transmitting proposes to launch vehicle measurement highly reliable, Fast quick-recovery demand.
The content of the invention
The technology of the present invention solves problem:In place of overcome the deficiencies in the prior art, there is provided a kind of highly reliable fast recovery is surveyed Hair controls more redundant network architecture designs, using real time fail switchover policy, realizes that the fast quick-recovery of exchange fault, simplified link are matched somebody with somebody Work is put, and recovery ways are provided for headend equipment failure, to meet current quick test and launch mission requirement.
The technical scheme is that:A kind of highly reliable fast recovery, which is surveyed, sends out control redundant network framework, including more redundant networks, Network head end equipment and network backend equipment;More redundant networks provide information and handed over for network head end equipment and network backend equipment room Mutual communication link;The network head end equipment is connected with aircraft and transmitting support system, is passed through with network backend equipment more Test and emission control before aircraft is penetrated are completed in redundant network connection;The network backend equipment includes being arranged in away from launch point Equipment, including perform the necessary network backend test equipment of test emission control task and network equipment monitoring and headend equipment Administrative unit.
More redundant networks are made up of the dual redundant network channel based on virtual exchange system and emergency network passage, double Redundant network passage and the network channel that emergency network passage is independent parallel;Dual redundant network channel is used for network head end equipment The transmission of test data and control command information between rear end equipment;Emergency network passage is used for headend equipment, network equipment shape The monitoring of state information, rear end launch vehicle measurement device management unit is completed to headend equipment by escape truck under emergency rating Remote control.
The dual redundant network channel include a master one for end switch before two platforms, a master one for end switch after two platforms and The optical fiber of more connection front and back ends interchangers;The active and standby interchanger in front end is connected with headend equipment respectively, the active and standby interchanger in rear end It is connected respectively with rear end equipment.
The emergency network passage includes end switch after end switch, escape truck before escape truck and connection front and back end The optical fiber of interchanger;End switch connects headend equipment before escape truck;End switch connects rear end equipment before escape truck.
The headend equipment is unattended equipment, including front end test device, data processing server and front end add Electric control unit, front end test device, data processing server, front end add the front end net of electric control unit and more redundant networks Network interchanger connects;
Front end test device is connected with aircraft, transmitting support system by wired or wireless way, is exchanged by front end Machine is connected with data processing server, is completed Aerospace vehicle test data acquisition and is sent number to data processing server, reception comes from Emission control instruction is tested data processing server, handles backward aircraft, transmitting support system is sent;
Data processing server is connected by dual redundant network with front end test device, network backend test equipment, is received The test emission control instruction that front end test device data and back end test equipment are sent, completes data storage and in real time processing, End equipment sends test data processing result information, forward end test equipment transmitted test emission control instruction backward;
Front end adds electric control unit to go electric control for adding for network head end equipment, passes through emergency network passage and rear end The network equipment monitoring and headend equipment administrative unit connection, receive positioned at rear end the network equipment monitoring and headend equipment management The headend equipment that unit is sent adds electric control to instruct, and the break-make of headend equipment power supply is controlled according to command content, completes front end The power-up of equipment and remove electricity.
The front end test device, data processing server configure double netcard, and are bound using double netcard, double netcard point It is not connected, is completed between front end test device and data processing server with the front end host exchange of dual redundant network and standby interchanger Two-way communication.
The front end test device passes from the test data real time propelling movement that aircraft obtains to front end data processing server Defeated agreement uses the UDP packet protocols of predetermined format;Front end test device receives the test transmitting control from data processing server System instruction, host-host protocol use the TCP transmission agreement of predetermined format;The data processing server is by dual redundant network with after End test equipment realizes that data double-way communicates;Data processing server asks test to the back-end to set according to back end test device data Standby transmission result data, host-host protocol use the UDP packet protocols of predetermined format;Data processing server receives back end test The test emission control director data that equipment is initiated, control life is sent by handling, decomposing backward corresponding front end test device Order, data processing server use the TCP transmission agreement of predetermined format with back end test equipment room Data Transport Protocol;It is described pre- The formula that fixes udp protocol bag includes source address, stay of two nights address, information category, data field length, data field, the predetermined format TCP transmission protocol package containing frame head, source address, stay of two nights address, information category, data field length, data field, postamble.
The handling process of data processing server data processing is as follows:
Test data handling process:After test data of the data processing server reception from each front end test device in real time Store hard disk;Data processing server is handled test data in real time, and result of the generation with physical significance is simultaneously Cache in internal memory, after data processing server receives the request of data that back end test equipment is sent, taken out from internal memory Corresponding result, after being packaged into udp protocol bag according to predetermined format, issue corresponding back end test equipment;
Test emission control instruction processing pipeline:Data processing server receives the test transmitting from back end test equipment Real-time storage is to hard disk after control instruction;According to control instruction content, control instruction is handled, decomposed, corresponding to generation Front end test device control instruction sequence, corresponding control instruction is sent to corresponding front end test device according to intended flow;
The network backend equipment includes back end test equipment and network equipment monitoring and headend equipment administrative unit;Rear end Test equipment includes rear end display device and control computer;Rear end display device passes through at the data of dual redundant network and front end Server connection is managed, obtaining Aerospace vehicle test data from data processing server is used for operator monitor test mode;Control meter Calculation machine is connected by dual redundant network and the data processing server of front end, and operator needs to pass through control computer according to task Test emission control instruction is sent to data processing server, test emission control instruction is completed by data processing server Reason and distribution perform;The network equipment is monitored and headend equipment administrative unit is connected by network with more redundant networks, is received and is shown Show that the headend equipment work state information from front end, network switch work state information realize the reality of network and headend equipment When monitor, and can by operator control send headend equipment power up, go electric control to instruct, sent to via emergency network passage Front end adds electric control unit, realizes the powered up and down of headend equipment.
Hair control redundancy approach is surveyed in a kind of highly reliable fast recovery, and step is as follows:
1) Aerospace vehicle test data are gathered by front end test device and send front end data processing service in a predetermined format Device carries out data processing, Parameter analysis of electrochemical, passes to back end test equipment according to predetermined format by dual redundant network and is shown;
2) Aerospace vehicle test control instruction is sent in a predetermined format by back end test equipment, is given via dual redundant network delivery Front end data processing server is handled, parsed, and phase is distributed in a predetermined format after forming front end test device control instruction Front end test device is closed, is completed to Aerospace vehicle test, transmitting Row control;
3) all headend equipments, the work state information of the network equipment are produced by each equipment, are given through dual redundant network delivery The network equipment monitoring and headend equipment administrative unit for being placed in rear end are monitored;
4) headend equipment management instruction is produced by network equipment monitoring and headend equipment administrative unit, through emergency network passage Be delivered in a predetermined format front end plus electric control unit is removed, realize power-up, power-off control to headend equipment.
Compared with the prior art, the invention has the advantages that:
(1) the survey hair that the present invention is built controls more redundant network frameworks, there is provided front and back end test equipment information interaction Reliable link, by emergency network, front end test device is managed, meets the unattended use demand of headend equipment;
(2) the data transfer main channel in the more redundant networks of the present invention employs exchange piling technology and virtual switch system (VSS) technology of system, compared to the main/slave link network redundancy scheme using HSRP+RSTP technologies being applied at present, configuration letter Single, failover is quicker;
(3) the preposition scheme of data processing server that the present invention uses, the interaction letter of test equipment between front and back end is reduced Data volume is ceased, network switch load between front and back end is reduced, ensure that data transmission credibility;
(4) the headend equipment Managed Solution that uses of the present invention, under the conditions of headend equipment is unattended, effectively increases and be System reliability.
Brief description of the drawings
Fig. 1 controls redundant network framework to survey hair;
Fig. 2 is end equipment and network primary channel connection diagram before and after double netcard
Fig. 3 is escape truck network connection schematic diagram;
Fig. 4 is network monitoring data stream sketch;
Fig. 5 is headend equipment management process;
Fig. 6 is that working condition and chain supervise data packet format;
Fig. 7 is standby machine switching flow;
Fig. 8 flows to for data processing of information;
Fig. 9 is flow chart of data processing.
Figure 10 is experiment process management program flow graph.
Figure 11 is application layer message transmission protocol header schematic diagram when being transmitted using UDP.
Figure 12 is using application layer message transmission protocol header schematic diagram during TCP transmission.
Embodiment
Hair control redundant network framework of the present invention of surveying is set including more redundant networks, network head end equipment and network backend It is standby.After headend equipment adds electric control unit, rear end equipment to include including front end test device, data processing server, front end Test equipment, network equipment monitoring and headend equipment administrative unit are held, more redundant networks are by data transfer main channel and emergency network Network forms, as shown in Figure 1.
Data transfer main channel is based on virtual exchange system technology dual redundant activestandby hot backup network, each two of front and back end Interchanger and corresponding connecting cable composition, two activestandby hot backup interchangers of rear and front end are utilized respectively Stack Technology, lead to Two heap superimposing thread connections are crossed, form a virtual switch, there is provided high bandwidth, the dual redundant information of front and back end facility information exchange Exchange channels;Front and back end inter-exchange is connected by a plurality of optical fiber, using trunking technology, forms gigabit Ethernet passage (GEC) transmission bandwidth and link redundancy of transmission link between front and rear end equipment, are improved, improves reliability.Headend equipment and Rear end equipment be respectively adopted Teaming technologies realize double netcard binding after, exchanged respectively with the active and standby of front-end and back-end interchanger Machine connects, and forms dual redundant network, and schematic diagram is shown in Fig. 2.
Emergency network passage is independently of the separate network passage of data transfer main channel dual redundant network, is set for front end Standby monitoring and management, to meet the unattended requirement of headend equipment, as shown in Figure 3.Emergency network channel transfer headend equipment With the work state information of interchanger, headend equipment and interchanger generation status information, network is transferred to by escape truck and set Standby monitoring and headend equipment administrative unit.Network monitoring uses Simple Network Management Protocol (SNMP), the network switch, front end clothes The business equipment such as device configures snmp protocol, operational network monitoring and equipment pipe in headend equipment network monitoring and front end management equipment Software is managed, obtains, parse and show the running status of the network equipment and headend equipment, and equipment is controlled.Monitoring information Flow is as shown in Figure 4.
In front end during active and standby exchange fault by back-end network monitoring of tools and front end management equipment to unattended front end Each equipment is managed and controlled, and completes the recovery of headend equipment working condition, improves system reliability.Management strategy is as follows: When the equipment control equipment monitor of rear end is to headend equipment failure, reset is sent by escape truck forward end faulty equipment and referred to Order, it is returned to working condition, if reset is unsuccessful, forward end add electrical control equipment send failure machine power-off refer to Order, the power supply of failure machine is disconnected, end, which adds, further along goes electrical control equipment to send the power supply instruction of failure machine, recovers the power supply of failure machine, makes Working condition is returned to after failure machine cold start-up, control flow is as shown in Figure 5.
Each unit in front end uses activestandby hot backup working method, carries out active-standby switch during hostdown, switching flow is as follows: Standby machine sends running status by the timing of preceding end switch forward end server and chain supervises information (as shown in Figure 6), by front end Server is arbitrated and switches the active and standby configuration of unit, while each equipment running status, active and standby configuration status, alarm status etc. are sent out Give the monitoring of the network equipment in rear end and front end management equipment supplies back-end operations personnel's decision-making.When headend equipment n main frames go out Existing failure, front-end server receive equipment n hostdown information, or can not receive for a long time headend equipment n operational state of mainframe and When chain supervises information, then equipment n hostdowns being judged, starting switch between master and slave machines flow, original host is switched into standby host, standby host switching For main frame, complete failure machine-cut and change.Switch between master and slave machines flow is as shown in Figure 7.
Data processing server is placed in front end, service data processing and experiment process management program.Data processor is adopted Collect and store all data and state caused by each extension set in front end, and ask rear end display terminal to send customization letter according to rear end Breath, reduces front and back end network traffics, and so as to reduce network frame loss rate, data processor information flow direction is as shown in figure 8, processing Flow is as shown in Figure 9.Experiment process management program operates in server, and program reads after starting and is loaded into multiple predefined Business procedure configuration files, flow of task list is generated, and rear end control terminal is passed into the timing of list summary info and supplies preview.Appoint Server receives the task loading command sent from rear end control terminal, the task flow for selecting Loading Control terminal to specify before business Journey, and the control commands such as task start, task suspension, task termination are received, respectively set according to the automatic forward end of flow configuration information Preparation goes out control command, and receives each equipment feedback, realizes automatic dispatching.Experiment process management program flow graph such as Figure 10 institutes Show.As described above, experiment process management program transmission tasks flow summary info in rear end before test mission, during experiment Only simple command, the front end such as the task loading command of reception rear end control terminal, task start, task suspension, task termination is each The control command of equipment is directly sent by front-end server, reduces front and back end information exchange, when reducing the control in flow Prolong.
The difference that different types of data requires according to data integrity uses different host-host protocols, and rear end display information is adopted With UDP transmission means, rear end control information uses TCP transmission mode, and customizes host-host protocol, ensures the reliable of information transfer Property.Figure 11 and Figure 12 sets forth to be illustrated using application layer message transmission protocol header when UDP and TCP transmission.
The known technology for the content category professional and technical personnel in the field not being described in detail in description of the invention.

Claims (10)

1. hair control redundant network framework is surveyed in a kind of highly reliable fast recovery, it is characterised in that:Set including more redundant networks, network front end Standby and network backend equipment;More redundant networks provide the communication chain of information exchange for network head end equipment and network backend equipment room Road;The network head end equipment is connected with aircraft and transmitting support system, is connected with network backend equipment by more redundant networks Connect and complete test and emission control before aircraft is penetrated;The network backend equipment includes being arranged in the equipment away from launch point, bag Include the necessary network backend test equipment of execution test emission control task and network equipment monitoring and headend equipment administrative unit.
2. a kind of highly reliable fast survey hair that recovers controls redundant network framework according to claim 1, it is characterised in that:It is described how superfluous Co-net network is made up of the dual redundant network channel based on virtual exchange system and emergency network passage, dual redundant network channel and should Anxious network channel is the network channel of independent parallel;Dual redundant network channel is used to test between network head end equipment and rear end equipment The transmission of data and control command information;Emergency network passage is used for the monitoring of headend equipment, network equipment state information, meets an urgent need Launch vehicle measurement device management unit in rear end completes the remote control to headend equipment by escape truck under state.
3. a kind of highly reliable fast survey hair that recovers controls redundant network framework according to claim 2, it is characterised in that:It is described double superfluous Remaining network channel includes a master one and connects front and back ends with Duo Gen for end switch, a master one before two platforms for end switch after two platforms The optical fiber of interchanger;The active and standby interchanger in front end is connected with headend equipment respectively, and the active and standby interchanger in rear end connects with rear end equipment respectively Connect.
4. a kind of highly reliable fast survey hair that recovers controls redundant network framework according to claim 2, it is characterised in that:It is described emergent Network channel includes the optical fiber of end switch before and after end switch after end switch, escape truck before escape truck and connection;Should Anxious Channel front end interchanger connects headend equipment;End switch connects rear end equipment before escape truck.
5. a kind of highly reliable fast survey hair that recovers controls redundant network framework according to claim 1, it is characterised in that:The front end Equipment is unattended equipment, including front end test device, data processing server and front end add electric control unit, and front end is surveyed Examination equipment, data processing server, front end add electric control unit to be connected with the front network interchanger of more redundant networks;
Front end test device and aircraft, transmitting support system are connected by wired or wireless way, by preceding end switch with Data processing server connects, and completes Aerospace vehicle test data acquisition and send number to data processing server, reception comes from data Emission control instruction is tested processing server, handles backward aircraft, transmitting support system is sent;
Data processing server is connected by dual redundant network with front end test device, network backend test equipment, receiving front-end The test emission control instruction that test equipment data and back end test equipment are sent, completes data storage and in real time processing, backward End equipment sends test data processing result information, forward end test equipment transmitted test emission control instruction;
Front end adds electric control unit to go electric control for adding for network head end equipment, passes through emergency network passage and the net of rear end Network monitoring of tools and the connection of headend equipment administrative unit, receive the network equipment monitoring positioned at rear end and headend equipment administrative unit The headend equipment sent adds electric control to instruct, and the break-make of headend equipment power supply is controlled according to command content, completes headend equipment Power-up and remove electricity.
6. the highly reliable fast survey hair that recovers of one kind according to claim 5 controls redundant network framework, it is characterised in that:Before described End test equipment, data processing server configure double netcard, and are bound using double netcard, double netcard respectively with dual redundant network Front end host exchange connect with standby interchanger, the two-way communication between completion front end test device and data processing server.
7. a kind of highly reliable fast survey hair that recovers according to claim 5 or 6 controls redundant network framework, it is characterised in that:Institute Front end test device is stated from the test data real time propelling movement that aircraft obtains to front end data processing server, host-host protocol uses The UDP packet protocols of predetermined format;Front end test device receives the test emission control instruction from data processing server, transmission Agreement uses the TCP transmission agreement of predetermined format;The data processing server passes through dual redundant network and back end test equipment Realize that data double-way communicates;Data processing server asks rear end test equipment transmission processing according to back end test device data Result data, host-host protocol use the UDP packet protocols of predetermined format;Data processing server receives what back end test equipment was initiated Emission control director data is tested, control command, data processing are sent by handling, decomposing backward corresponding front end test device Server uses the TCP transmission agreement of predetermined format with back end test equipment room Data Transport Protocol;The predetermined format UDP associations View bag includes source address, stay of two nights address, information category, data field length, data field, the TCP transmission association of the predetermined format View includes frame head, source address, stay of two nights address, information category, data field length, data field, postamble.
8. the highly reliable fast survey hair that recovers of one kind according to claim 7 controls redundant network framework, it is characterised in that:At data The handling process for managing server data processing is as follows:
Test data handling process:Data processing server receives real-time storage after the test data from each front end test device To hard disk;Data processing server is handled test data in real time, including generating the result with physical significance simultaneously Middle caching is deposited, after data processing server receives the request of data that back end test equipment is sent, is taken out from internal memory corresponding Result, after being packaged into udp protocol bag according to predetermined format, issue corresponding to back end test equipment;
Test emission control instruction processing pipeline:Data processing server receives the test emission control from back end test equipment Real-time storage is to hard disk after instruction;According to control instruction content, control instruction is handled, decomposed, front end corresponding to generation Test equipment control instruction sequence, corresponding control instruction is sent to corresponding front end test device according to intended flow.
9. hair control redundant network framework is surveyed according to a kind of any described highly reliable fast recoveries of claim 5-8, it is characterised in that: The network backend equipment includes back end test equipment and network equipment monitoring and headend equipment administrative unit;Back end test equipment Including rear end display device and control computer;Rear end display device passes through dual redundant network and the data processing server of front end Connection, obtain Aerospace vehicle test data from data processing server and be used for operator monitor test mode;Control computer passes through Dual redundant network and the data processing server of front end are connected, and operator is needed by control computer at data according to task Reason server sends test emission control instruction, and the processing and distribution of test emission control instruction are completed by data processing server Perform;The network equipment is monitored and headend equipment administrative unit is connected by network with more redundant networks, before receiving and showing and come from Headend equipment work state information, the network switch work state information at end realize the real-time monitoring of network and headend equipment, And can be controlled by operator and send headend equipment power-up, go electric control to instruct, sending front end to via emergency network passage adds Electric control unit is removed, realizes the powered up and down of headend equipment.
10. hair control redundancy approach is surveyed in a kind of highly reliable fast recovery, it is characterised in that step is as follows:
1) Aerospace vehicle test data are gathered and send front end data processing server in a predetermined format by front end test device Row data processing, Parameter analysis of electrochemical, back end test equipment is passed to according to predetermined format by dual redundant network and shown;
2) Aerospace vehicle test control instruction is sent in a predetermined format by back end test equipment, via dual redundant network delivery to front end Data processing server is handled, parsed, before being distributed to correlation in a predetermined format after formation front end test device control instruction Test equipment is held, is completed to Aerospace vehicle test, transmitting Row control;
3) all headend equipments, the work state information of the network equipment are produced by each equipment, are placed in through dual redundant network delivery The network equipment monitoring of rear end and headend equipment administrative unit are monitored;
4) headend equipment management instruction is produced by network equipment monitoring and headend equipment administrative unit, through emergency network passage with pre- It is that the formula of fixing is delivered to front end plus remove electric control unit, realize power-up, power-off control to headend equipment.
CN201710959791.4A 2017-10-16 2017-10-16 Test, launch and control redundancy network architecture and redundancy method Active CN107770100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710959791.4A CN107770100B (en) 2017-10-16 2017-10-16 Test, launch and control redundancy network architecture and redundancy method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710959791.4A CN107770100B (en) 2017-10-16 2017-10-16 Test, launch and control redundancy network architecture and redundancy method

Publications (2)

Publication Number Publication Date
CN107770100A true CN107770100A (en) 2018-03-06
CN107770100B CN107770100B (en) 2019-12-20

Family

ID=61268426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710959791.4A Active CN107770100B (en) 2017-10-16 2017-10-16 Test, launch and control redundancy network architecture and redundancy method

Country Status (1)

Country Link
CN (1) CN107770100B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144794A (en) * 2018-08-14 2019-01-04 华东计算技术研究所(中国电子科技集团公司第三十二研究所) Redundant Ethernet card
CN112689333A (en) * 2020-12-29 2021-04-20 北京金迈捷科技有限公司 Wireless test and emission control information transmission system based on 5G

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060010352A1 (en) * 2004-07-06 2006-01-12 Intel Corporation System and method to detect errors and predict potential failures
CN201491022U (en) * 2009-09-01 2010-05-26 卡斯柯信号有限公司 System for hot-backup redundant computer to communicate with other devices via redundant network
CN202918339U (en) * 2012-06-18 2013-05-01 北京宇航***工程研究所 Ground test-launch-control system of carrier rocket based on cloud computing
US20140074347A1 (en) * 2012-09-12 2014-03-13 Honeywell International Inc. Launch vehicle testing system
CN103647781A (en) * 2013-12-13 2014-03-19 大连理工计算机控制工程有限公司 Mixed redundancy programmable control system based on equipment redundancy and network redundancy
CN104216363A (en) * 2014-08-18 2014-12-17 北京航天自动控制研究所 Test-launch-control remote data transmission system
CN104296596A (en) * 2014-08-29 2015-01-21 北京宇航***工程研究所 Carrier rocket testing and launch control procedure command system and method
CN105005283A (en) * 2015-03-31 2015-10-28 北京航天发射技术研究所 Master control unit dual-redundancy hot backup launching vehicle control method
CN105610555A (en) * 2016-02-19 2016-05-25 北京宇航***工程研究所 Practical system-level redundant communication network architecture
CN106406076A (en) * 2016-07-06 2017-02-15 上海宇航***工程研究所 Redundant time sequence control system for launcher

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060010352A1 (en) * 2004-07-06 2006-01-12 Intel Corporation System and method to detect errors and predict potential failures
CN201491022U (en) * 2009-09-01 2010-05-26 卡斯柯信号有限公司 System for hot-backup redundant computer to communicate with other devices via redundant network
CN202918339U (en) * 2012-06-18 2013-05-01 北京宇航***工程研究所 Ground test-launch-control system of carrier rocket based on cloud computing
US20140074347A1 (en) * 2012-09-12 2014-03-13 Honeywell International Inc. Launch vehicle testing system
CN103647781A (en) * 2013-12-13 2014-03-19 大连理工计算机控制工程有限公司 Mixed redundancy programmable control system based on equipment redundancy and network redundancy
CN104216363A (en) * 2014-08-18 2014-12-17 北京航天自动控制研究所 Test-launch-control remote data transmission system
CN104296596A (en) * 2014-08-29 2015-01-21 北京宇航***工程研究所 Carrier rocket testing and launch control procedure command system and method
CN105005283A (en) * 2015-03-31 2015-10-28 北京航天发射技术研究所 Master control unit dual-redundancy hot backup launching vehicle control method
CN105610555A (en) * 2016-02-19 2016-05-25 北京宇航***工程研究所 Practical system-level redundant communication network architecture
CN106406076A (en) * 2016-07-06 2017-02-15 上海宇航***工程研究所 Redundant time sequence control system for launcher

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余力凡: "运载火箭测发控网络设计", 《航天控制》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109144794A (en) * 2018-08-14 2019-01-04 华东计算技术研究所(中国电子科技集团公司第三十二研究所) Redundant Ethernet card
CN112689333A (en) * 2020-12-29 2021-04-20 北京金迈捷科技有限公司 Wireless test and emission control information transmission system based on 5G

Also Published As

Publication number Publication date
CN107770100B (en) 2019-12-20

Similar Documents

Publication Publication Date Title
CN101447892B (en) Distributed test method, system and test server
CN101150454B (en) Testing method for automatic switching optical network
CN106162219B (en) Video cloud storage method and system
CN103117876B (en) The synchronous method and device of user state information
CN101965691B (en) Cable redundancy and networked system
CN109408084B (en) Method and system for remotely upgrading energy storage BMS equipment through Internet
CN103262046A (en) Server management apparatus, server management method, and program
CN108183836A (en) A kind of distributed synchronization bus network test system and its test method
CN107770100A (en) One kind surveys hair control redundant network framework and redundancy approach
CN109038332A (en) A kind of Intelligent Mobile Robot and scheduling system business operations linkage system
Selga et al. Solutions to the computer networking challenges of the distribution smart grid
CN114500297A (en) Large-scale network testing system based on virtual-real fusion
Hu et al. FTLink: Efficient and flexible link fault tolerance scheme for data plane in Software-Defined Networking
CN114328115A (en) Cloud monitoring and edge operation and maintenance method and system
CN107094091A (en) A kind of intelligent substation station level network configuration method of calibration and system
CN100531144C (en) Router and routing transmission method
CN111741382B (en) Dynamic network topology management system and method
JP5480189B2 (en) Network monitoring apparatus, network test method, path information management method, and program
CN111092931B (en) Method and system for rapidly distributing streaming data of online super real-time simulation of power system
Vela et al. CASTOR: a monitoring and data analytics framework to help operators understand what is going on in their networks
CN104468211A (en) Nuclear power station numerical control system platform communication failure diagnostic system and method
JP2012114645A (en) Network fabric switch system and fault detection method for the network fabric switch system
CN101431435A (en) Connection-oriented service configuration and management method
WO2021093898A1 (en) Method and apparatus for upgrading network management system
CN109039681A (en) Method for optimizing route, storage device and the network equipment based on SDN

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant