CN107762536A - Novel tunnel lining trolley step type plug and reinforcing method of plug - Google Patents

Novel tunnel lining trolley step type plug and reinforcing method of plug Download PDF

Info

Publication number
CN107762536A
CN107762536A CN201711060448.2A CN201711060448A CN107762536A CN 107762536 A CN107762536 A CN 107762536A CN 201711060448 A CN201711060448 A CN 201711060448A CN 107762536 A CN107762536 A CN 107762536A
Authority
CN
China
Prior art keywords
plank
steel pipe
ring
plug
closure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711060448.2A
Other languages
Chinese (zh)
Other versions
CN107762536B (en
Inventor
高飞
胥克明
李井国
孙小猛
郑永胜
胡晓东
顾智刚
宋瑞杰
梅可
刘明建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Second Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201711060448.2A priority Critical patent/CN107762536B/en
Publication of CN107762536A publication Critical patent/CN107762536A/en
Application granted granted Critical
Publication of CN107762536B publication Critical patent/CN107762536B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a novel tunnel lining trolley step type plug and a method for reinforcing the plug. The step type plug has a plurality of right-angle surfaces on the concrete surface of the construction joint of the lining end, so that the flowing water path is prolonged, and the waterproof effect is obviously improved; in addition, the plugging wood board does not need to be cut repeatedly, so that the waste of materials can be effectively avoided, and the application prospect is good.

Description

A kind of reinforcement means of new tunnel lining trolley step plug and the plug
Technical field
The application is more particularly to a kind of new tunnel lining trolley step plug and the reinforcement means of the plug.
Background technology
The reinforcing mode of step plug is divided into two kinds in the prior art:Reinforced on the outside of plank and plank is embedded and reinforced, its It is poor that waterstop rebar clip fixed effect is buried in middle first method, fixture set-up time length, and waterstop bending is buried in easily causing, In bury the waterproof effect of waterstop and have a greatly reduced quality;Second method is influenceed by first branch section out break or lining thickness change, envelope Stifled plank needs frequently to be cut, and the waste to plank is larger, and economic and environment-friendly aspect is poor.
The content of the invention
The present invention eliminates the defects of respective, devised a kind of easy for construction, economical to integrate the advantage of above two method The step plug of the practical belt of liner containing polyurethane, effectively improves lining construction technique.
The technical scheme is that:A kind of new tunnel lining trolley step plug, including supporting plate, stopper Plate, closure plank, vertically polyurethane liner belt, reinforcing plank, steel pipe back rib, ring fixation steel pipe, reinforcing bar retainer ring, its In, the blocking plate according to thickness of tunnel linings and in bury waterstop installation requirement, ring is installed on chassis panel termination in advance, And be connected with chassis panel termination using adjustable bolt, the closure plank is fixed between steel pipe and blocking plate along section from ring It is inserted radially into and withstands back-adhering waterstop, closure plank splices closely knit, the vertical reinforcing wood along lining cutting termination ring one by one Plate is stupefied for being reinforced to closure plank as erecting, and the steel pipe back rib is stupefied to vertically reinforcing as horizontal stroke through reinforcing bar retainer ring Plank is fixed, and the ring fixes steel pipe and is used for fixed closure plank, and the reinforcing bar retainer ring is welded in blocking plate in advance, For steel pipe back rib is fixed.
Further, the blocking plate and supporting plate are fixed together by welding, or by blocking plate and supporting plate It is set to integrative-structure.
Present invention also offers a kind of reinforcement means of above-mentioned step plug, specifically comprise the following steps:Buried in laying Waterstop and outer patch waterstop → installation polyurethane liner belt → installation closure plank, and simultaneously with the polyurethane liner skin Band vertically reinforces plank → installation steel pipe back rib with iron wire colligation → installation.
Compared with the prior art, beneficial effects of the present invention are as follows:
There are multiple right-angle surfaces in the step plug, extend flowing water path, waterproof in lining cutting termination construction joint concrete surface Positive effect is lifted;It need not repeatedly be cut additionally, due to closure plank, can effectively avoid the waste of material, therefore application prospect is good It is good.
Brief description of the drawings
Below in conjunction with the accompanying drawings and embodiment the invention will be further described:
Fig. 1 is the structural representation of the present invention;
Wherein:1st, supporting plate, 2, back-adhering waterstop, 3, closure plank, 4, polyurethane liner belt, 5, middle buried water stop, 6th, blocking plate, 7, chassis panel, 8, adjustable bolt, 9, vertically reinforce plank, 10, ring fix steel pipe, 11, reinforcing bar fixes Ring, 12, steel pipe back rib.
Embodiment
Embodiment:It is lining trolley step plug provided by the invention with reference to shown in Fig. 1, the plug includes support Plate 1, blocking plate 6, closure plank 3, polyurethane liner belt 4, vertical plank 9, steel pipe back rib 12, the ring reinforced fix steel pipe 10th, reinforcing bar retainer ring 11.
In the present embodiment, the blocking plate according to thickness of tunnel linings and in bury waterstop installation requirement, blocking plate carries Front ring is connected with chassis panel termination using adjustable bolt to being installed on chassis panel termination, in bury waterstop laying position Put away from chassis panel 15cm, the radially adjustable 5cm of regulating bolt;The closure plank size is 50cm(It is long)×20cm(It is wide)* 5cm(It is thick), fixed from ring between steel pipe and blocking plate and be inserted radially into along section and withstand splash guard, block plank along lining cutting termination Ring splices closely knit one by one.Plank can be repeated several times use, and the polyurethane liner belt section is right-angled trapezium, sectional dimension (Upper bottom 6cm+ bottoms 10cm)× high 8cm, per root long 280cm, weight 22kg/ roots, customized using polyurethane material, hardness 75 can Bending radius is not more than 200cm.It is closely connected with blocking plate that waterstop is first buried by during installation, then polyurethane liner belt loopful is pasted Waterstop and firm with iron wire colligation is buried in tight.The advantages of being made using polyurethane material:When it is wear-resisting, durable, it can make for a long time With and belt damages will not be caused, it is also indeformable by concrete extrusion, can arbitrarily be bent according to section radian;It is second, easily de- Mould and non-sticky mortar, concrete surface is smooth after the demoulding;Third, it is easy to install, and waterstop can be controlled to be in new and old two lining coagulations Position and length in soil, waterstop waterproof effect is can effectively ensure that, the vertical plank size of reinforcing is 200cm(It is long)× 20cm(It is wide)*5cm(It is thick)Plank, as it is perpendicular it is stupefied closure plank is reinforced, the steel pipe back rib uses diameter 42mm, wall thickness 3.5mm seamless steel pipe processing and fabricating, it is used as horizontal stroke stupefied through reinforcing bar retainer ring and vertical plank of reinforcing is fixed, steel pipe back rib Ring spacing 1m arranges that the ring fixes steel pipe and uses diameter 42mm, wall thickness 3.5mm seamless steel pipe processing and fabricating, shifts to an earlier date Cyclization to be welded along blocking plate termination, plank is blocked for fixed, the reinforcing bar retainer ring uses diameter 22mm round steel welding cyclization, And blocking plate is welded in advance, for steel pipe back rib is fixed, arranged according to ring spacing 1m.
In the present embodiment, step is reinforced in the installation for additionally providing the chassis step plug, specifically includes following step Suddenly:Buried in laying and outer patch waterstop → installation polyurethane liner belt → installation blocks plank, and used simultaneously with liner belt Plank → installation steel pipe back rib is vertically reinforced in iron wire colligation → installation.
Certainly the above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with technique People can understand present disclosure and implement according to this, it is not intended to limit the scope of the present invention.It is all according to this hair The modification that the Spirit Essence of bright main technical schemes is done, it should all be included within the scope of the present invention.

Claims (3)

  1. A kind of 1. new tunnel lining trolley step plug, it is characterised in that:Including supporting plate, blocking plate, closure plank, Polyurethane liner belt, plank, steel pipe back rib, ring fixation steel pipe, reinforcing bar retainer ring are vertically reinforced, wherein, the blocking plate According to thickness of tunnel linings and in bury waterstop installation requirement, ring is installed on chassis panel termination in advance, and with chassis panel Termination is connected using adjustable bolt, and the closure plank is fixed between steel pipe and blocking plate from ring and is inserted radially into and pushes up along section Firmly back-adhering waterstop, closure plank splice closely knit one by one along lining cutting termination ring, and the vertical plank of reinforcing is as erecting stupefied use Reinforced in closure plank, the steel pipe back rib stupefied is consolidated through reinforcing bar retainer ring as horizontal to vertical plank of reinforcing Fixed, the ring fixes steel pipe and is used for fixed closure plank, and the reinforcing bar retainer ring is welded in blocking plate in advance, for steel pipe Back rib is fixed.
  2. A kind of 2. new tunnel lining trolley step plug according to claim 1, it is characterised in that:The stopper Plate and supporting plate are fixed together by welding, or blocking plate and supporting plate are set into integrative-structure.
  3. 3. the reinforcement means of a kind of step plug as described in claim 1-2, it is characterised in that comprise the following steps:
    (1)Polyurethane liner belt is installed;
    (2)Installation closure plank, and simultaneously with the polyurethane liner belt iron wire colligation;
    (3)Installation is vertical to reinforce plank;
    (4)Steel pipe back rib is installed.
CN201711060448.2A 2017-11-02 2017-11-02 Novel stepped plug of tunnel lining trolley and reinforcing method of plug Active CN107762536B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711060448.2A CN107762536B (en) 2017-11-02 2017-11-02 Novel stepped plug of tunnel lining trolley and reinforcing method of plug

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711060448.2A CN107762536B (en) 2017-11-02 2017-11-02 Novel stepped plug of tunnel lining trolley and reinforcing method of plug

Publications (2)

Publication Number Publication Date
CN107762536A true CN107762536A (en) 2018-03-06
CN107762536B CN107762536B (en) 2024-03-19

Family

ID=61272085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711060448.2A Active CN107762536B (en) 2017-11-02 2017-11-02 Novel stepped plug of tunnel lining trolley and reinforcing method of plug

Country Status (1)

Country Link
CN (1) CN107762536B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386210A (en) * 2018-04-26 2018-08-10 中国水利水电第四工程局有限公司 Length pipe plug template blocks ruggedized construction
CN111502692A (en) * 2020-04-10 2020-08-07 中铁隧道集团二处有限公司 TBM (tunnel boring machine) first-ring segment lining split mounting type box locking device and application method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929344A (en) * 2010-07-14 2010-12-29 中铁隧道集团二处有限公司 Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint
CN202882947U (en) * 2012-10-25 2013-04-17 中铁十二局集团第二工程有限公司 Tunnel double-lining concrete trolley blocking head formwork reinforcing structure
CN204899938U (en) * 2015-06-30 2015-12-23 中铁隧道股份有限公司 Tunnel secondary lining formworking jumbo bulkhead
CN205189894U (en) * 2015-11-26 2016-04-27 中交隧道工程局有限公司 A lining cutting end mould for having bury formula waterstop in
CN205936641U (en) * 2016-05-18 2017-02-08 中铁二十五局集团第一工程有限公司 A hinge shi kamo for construction of tunnel secondary lining
CN206111205U (en) * 2016-10-10 2017-04-19 中铁七局集团路桥工程有限公司 Two lining mold in tunnel build platform truck and bury waterstop installation fastening head template in with
CN206205900U (en) * 2016-09-22 2017-05-31 中铁十四局集团有限公司 Lining construction has the end-blocking simplicity fixing device of bar connecting
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN206360709U (en) * 2016-12-29 2017-07-28 中铁十八局集团第五工程有限公司 For end head formwork installation auxiliary device in Tunnel Second Lining Construction
CN107060828A (en) * 2017-05-19 2017-08-18 四川皓德斯新材料科技有限公司 A kind of flexible bulkhead of compounded rubber vertical rod and its application method
CN207332901U (en) * 2017-11-02 2018-05-08 中铁四局集团第二工程有限公司 Novel tunnel lining platform truck step end cap

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929344A (en) * 2010-07-14 2010-12-29 中铁隧道集团二处有限公司 Method for mounting medium-deep buried water stop of tunnel archwall lining concrete toroidal construction joint
CN202882947U (en) * 2012-10-25 2013-04-17 中铁十二局集团第二工程有限公司 Tunnel double-lining concrete trolley blocking head formwork reinforcing structure
CN204899938U (en) * 2015-06-30 2015-12-23 中铁隧道股份有限公司 Tunnel secondary lining formworking jumbo bulkhead
CN205189894U (en) * 2015-11-26 2016-04-27 中交隧道工程局有限公司 A lining cutting end mould for having bury formula waterstop in
CN205936641U (en) * 2016-05-18 2017-02-08 中铁二十五局集团第一工程有限公司 A hinge shi kamo for construction of tunnel secondary lining
CN206205900U (en) * 2016-09-22 2017-05-31 中铁十四局集团有限公司 Lining construction has the end-blocking simplicity fixing device of bar connecting
CN206111205U (en) * 2016-10-10 2017-04-19 中铁七局集团路桥工程有限公司 Two lining mold in tunnel build platform truck and bury waterstop installation fastening head template in with
CN206360709U (en) * 2016-12-29 2017-07-28 中铁十八局集团第五工程有限公司 For end head formwork installation auxiliary device in Tunnel Second Lining Construction
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN107060828A (en) * 2017-05-19 2017-08-18 四川皓德斯新材料科技有限公司 A kind of flexible bulkhead of compounded rubber vertical rod and its application method
CN207332901U (en) * 2017-11-02 2018-05-08 中铁四局集团第二工程有限公司 Novel tunnel lining platform truck step end cap

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386210A (en) * 2018-04-26 2018-08-10 中国水利水电第四工程局有限公司 Length pipe plug template blocks ruggedized construction
CN111502692A (en) * 2020-04-10 2020-08-07 中铁隧道集团二处有限公司 TBM (tunnel boring machine) first-ring segment lining split mounting type box locking device and application method
CN111502692B (en) * 2020-04-10 2024-05-17 中铁隧道集团二处有限公司 TBM head ring pipe sheet lining assembled box type locking device and application method

Also Published As

Publication number Publication date
CN107762536B (en) 2024-03-19

Similar Documents

Publication Publication Date Title
CN107387119A (en) Prefabricated assembled tunnel inverted arch, tunnel structure and its construction method
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN103184747B (en) Method and structure for leakage seepage prevention construction for two-walls-in-one structure of deep-underground engineering
CN106988343A (en) A kind of town road pipeline protection structure and its construction method
CN107762536A (en) Novel tunnel lining trolley step type plug and reinforcing method of plug
CN108867690B (en) Reverse construction method for pile plate retaining wall of large foundation pit
CN106939791A (en) One kind can prestress steel structure concrete pipe sheet and its construction method
CN207619807U (en) Cast-in-situ concrete hollow slab beam and its core model supporting construction
CN204940505U (en) A kind of finished product gutter being provided with seamless cover plate
CN201261950Y (en) Open pore structure on steel reinforced concrete pond wall
CN102691301A (en) Synchronous construction method for envelope enclosure supporting breast beam and main structure wall
CN104358936A (en) Seepage prevention structure and method for periphery of floor-passing-through pipeline
CN203891015U (en) Oblique anchor simple hole-sealing grouting bag device
CN204187141U (en) A kind of through-flooring tube circumference leakage preventing structure
CN207332901U (en) Novel tunnel lining platform truck step end cap
CN110552371A (en) Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method
CN107542086B (en) Anchor cable construction method for filling slope
CN109629664A (en) Basement construction method based on assembled resin concrete drainage ditch
JP2008088715A (en) Concrete structure reconstructing method, concrete structure producing method, and corrosion resistant member for use in the methods
CN107299835A (en) Tunnel double-lining chassis section plug Construction Technology Design
CN204174496U (en) A kind of novel town road structure
CN103267181A (en) Plain end concrete pipe connecting method
CN207727733U (en) The spliced gutter that can be had enough to meet the need
CN106320585A (en) Novel fully-fabricated floor slab
CN108086542A (en) A kind of concrete structure pipe construction through walls reserves structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.96, Wangjiang East Road, Baohe District, Hefei City, Anhui Province, 230041

Applicant after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Applicant after: THE SECOND CONSTRUCTION CO., LTD. OF CTCE Group

Address before: No.9, litanghe Road, Xiangcheng District, Suzhou City, Jiangsu Province

Applicant before: THE SECOND CONSTRUCTION CO., LTD. OF CTCE Group

Applicant before: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant