CN107762163A - A kind of floor beam mount bracket and use construction method - Google Patents

A kind of floor beam mount bracket and use construction method Download PDF

Info

Publication number
CN107762163A
CN107762163A CN201711031710.0A CN201711031710A CN107762163A CN 107762163 A CN107762163 A CN 107762163A CN 201711031710 A CN201711031710 A CN 201711031710A CN 107762163 A CN107762163 A CN 107762163A
Authority
CN
China
Prior art keywords
floor beam
horizontal
crossbeam
tuned plate
mount bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711031710.0A
Other languages
Chinese (zh)
Other versions
CN107762163B (en
Inventor
吴寿星
林良华
陈孝东
王筑生
陈双敏
吴昌伦
董文武
陈冬伟
陈建兰
潘建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Weitai Construction Co Ltd
Original Assignee
Wenzhou Weitai Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Weitai Construction Co Ltd filed Critical Wenzhou Weitai Construction Co Ltd
Priority to CN201711031710.0A priority Critical patent/CN107762163B/en
Publication of CN107762163A publication Critical patent/CN107762163A/en
Application granted granted Critical
Publication of CN107762163B publication Critical patent/CN107762163B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of floor beam mount bracket and use construction method, a kind of floor beam mount bracket and use construction method include support body, the crossbeam that floor beam is held for holding in the palm and the height adjustment mechanism for adjusting beam height, the horizontal regulating mechanism for being provided with horizontal tuned plate on the crossbeam and driving horizontal tuned plate to be moved along crossbeam length direction are provided with the top of the support body;Horizontal tuned plate both ends in the longitudinal direction or position close to both ends are provided with the vertical regulating mechanism of position of the regulation floor beam on beam width direction;Mounting bracket can accurately be adjusted to the horizontal level of floor beam, angle and height, effectively reduce the position adjustment requirement of the holding time and tower crane of tower crane to floor beam, and substantially increase floor beam construction quality on this basis.

Description

A kind of floor beam mount bracket and use construction method
Technical field
The present invention relates to building field, more particularly to floor beam mount bracket and construction method is used.
Background technology
At present in high-rise building, many buildings are all using framed-tube structure carrying system, its Core Walls Structure and external surrounding frame Trestle uses steel reinforced concrete structure or ordinary reinforced concrete structure more, and its floor structure majority uses steel-coagulation Native combining structure.During construction, the connection of floor beam and Core Walls Structure is generally:One end is connected with the bracket on formed steel construction, another End is connected with the built-in fitting on Xtah Crude Clay structure(During ordinary reinforced concrete structure), connected mode is usually welding and bolt connection With reference to, or be used alone.
When floor beam is connected with the bracket on formed steel construction, connected mode is usually that bolt connection combines connection with welding. Process is that floor beam is hung in place and adjusted with bracket accurately to upper with tower crane, and web is connected with by connecting plate, Then upper and lower cover plates is connected with welding.Due to be adjusted to tower crane both sides screw be aligned, and at least tighten 8 bolts with Tower crane could unclamp afterwards, and adjustment is difficult, takes the time of tower crane length, influences efficiency of construction.
The content of the invention
The purpose of the present invention one is to provide floor beam mount bracket, which solve adjusted in floor beam installation process it is difficult, The problem of occupancy tower crane time is long.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of floor beam mount bracket, including support body, be provided with the top of the support body crossbeam that floor beam is held for holding in the palm and For adjusting the height adjustment mechanism of beam height, horizontal tuned plate is provided with the crossbeam and drives horizontal tuned plate along crossbeam length The horizontal regulating mechanism just moved up;Horizontal tuned plate both ends in the longitudinal direction are provided with regulation close to the position at both ends The vertical regulating mechanism of position of the floor beam on beam width direction.
Using such scheme, prefabricated floor beam can be lifted to the top of horizontal tuned plate by shape tower crane, and substantially do position On adjustment;Floor beam can then be placed to horizontal tuned plate, and liberate the occupancy to tower crane simultaneously, to cause tower crane can Process is moved down to enter;And the follow-up location adjustment of floor beam is then completed by mounting bracket;Vertical regulating mechanism, horizontal regulating mechanism are right respectively The vertical and horizontal position of floor beam is adjusted, that is, position in the horizontal plane can obtain more accurately adjusting; And height regulating mechanism is adjusted to the height and position of floor beam so that floor beam can be dropped to after the completion of adjustment or Correspondence position is risen to, or for the floor beam that some sides are fixed, it can be made corresponding with the mounting hole of side;It is comprehensive On, when the occupancy of this high capital equipment of tower crane can be greatly reduced by installing transfer using mounting bracket as floor beam on the one hand Between, overall efficiency of construction is improved, on the other hand, is also easier to, more accurately adjusts floor beam to being appointed as installation site, Improve construction quality.
More preferably:The horizontal tuned plate sliding is erected on crossbeam;Horizontal regulating mechanism includes the tooth being fixed on support body Take turns and be fixed on the bottom of horizontal tuned plate or the rack of side;The wheel and rack is engaged, and band moving gear is connected with gear The first handwheel rotated.
Using such scheme, being adjusted in a manner of rack-and-pinion can be easier to, also more accurately to the position of horizontal tuned plate It is controlled, so as to control the position of floor beam thereon.
More preferably:The height adjustment mechanism includes being fixed on the fine-tuning screw of crossbeam bottom, provides fine setting silk The column of bar grafting and the fine-tuning nut being threadedly connected to outside fine-tuning screw, wherein fine-tuning nut are socketed on the outer of column Portion simultaneously has the shoulder abutted with the top of column.
Using such scheme, fine-tuning nut is socketed on column and limited beyond being axially moveable and rotate of fine-tuning nut The free degree, shoulder provides support for fine-tuning nut, and fine-tuning screw is plugged in column and also prevents fine-tuning screw to deflect, so as to It ensure that the stability of the horizontal tuned plate of screw mandrel support;Horizontal tuned plate and floor beam thereon can be realized by rotating fine-tuning nut Move up and down, and in this process, the effect of the amplification of the actual power of also playing of screw rod transmission.
More preferably:The vertical regulating mechanism is worn including at least one the first riser, screw thread being fixed on horizontal tuned plate The push rod being arranged on the first riser and the second handwheel for driving push rod to rotate;The end set of the push rod has flip horizontal The push pedal being connected on push rod.
Using such scheme, push rod is equally that the mode of a screw rod transmission produces relative movement in the first riser, is pushed away successively Dynamic floor beam is longitudinally producing mobile or deflection, so as to be adjusted to its water level position;Push pedal is then to increase resistance surface Product, avoids causing to have an impact the structural strength of floor beam because of stress concentration.
More preferably:The both sides of width of the horizontal tuned plate in same extension position are provided with symmetrical vertical tune Mechanism.
Using such scheme, bidirectional modulation and the stable floor beam of conflict, the scope and amplitude of regulation can be bigger.
More preferably:The both sides of width of the horizontal tuned plate in same extension position are respectively arranged with horizontal tune machine Structure and resetting-mechanism;The second riser that resetting-mechanism includes being fixed on crossbeam or horizontal tuned plate, it is fixed on the second riser and court Spring to horizontal regulating mechanism and be fixed on spring end baffle plate, at least one sliding is wherein fixed with the inside of baffle plate and is worn Cross the release link of the second riser.
Using such scheme, when mounting bracket is built, horizontal tuned plate is arranged on support in width One side can reduce the material built, but now also imply that only unilateral vertical regulating mechanism is easy for operation;Using spring Resetting structure can push rod decontrol abut when reserve migration, so as to unilateral can dress to floor beam carry out larger amplitude The adjustment of degree, shortcoming are that the stress of push rod is larger.
More preferably:The support body includes mutually dismountable restocking and undercarriage, the bottom of wherein undercarriage are provided with Supporting part and the turnover wheel portion being arranged on supporting part;Supporting part and wheel portion can be as the portions directly contacted with ground Position.
Using such scheme, restocking and the separately formed modular assembling mode of undercarriage, the dismounting of mounting bracket can make it that It is all more convenient, and using wheel portion as when support, can be own as means of delivery or to be rapidly performed by down The position adjustment of frame.
More preferably:The wheel portion includes generally L-shaped web frame and is fixed on the runner of web frame bottom, The web frame includes bottom plate and two side plates, and its latus inframedium is rotatablely connected with supporting part, and bottom plate supports in wheel portion as bottom When abutted with the bottom of supporting part.
Using such scheme, when needing static, it will be turned in wheel portion, expose supporting part, and bottom is used as using supporting part Portion is supported, and when needing to move, wheel subordinate is turned over, and is abutted with bottom plate with supporting part, and its actual effect is equivalent to support Portion directly bears against runner;Lifting surface area is larger, and structural stability is preferable;The switching of two states is more convenient.
More preferably:Be provided with socket at the top of the undercarriage and restocking, the bottom of the restocking be provided with Socket coordinates inserted link;And affixed bolt is extended transversely through on both plug-in positions.
Using such scheme, combined with modular restocking and undercarriage, the mode of grafting can be carried out pair with fast and accurate Connect, and affixed bolt is then to be fixed enhancing stability herein on this basis.
The purpose of the present invention two is to provide the use construction method of floor beam mount bracket.
Comprise the following steps:
Undercarriage is moved to the position for needing to install floor beam by step S1, overturns wheel portion so that the supporting part of undercarriage is connected to ground Face;
One or more restockings are fixed and built to proper height by step S2, in its over-assemble crossbeam, wherein being equipped on crossbeam Horizontal tuned plate, each mechanism has formerly been assembled on crossbeam;
Step S3 tower cranes hang floor beam to be mounted in place, are placed on horizontal tuned plate;
Step S4 adjusts the angle of floor beam and the position on beam width direction using vertical regulating mechanism;
Step S5 adjusts the position of flooring two in the longitudinal direction using vertical regulating mechanism;
Step S6 is adjusted floor beam to setting height(from bottom) using height adjustment mechanism;
Step S7 is attached operation using bolt or welding by design requirement to the web and upper and lower cover plates of floor beam;
After mono- group of floor beam installation of step S8, restocking is removed, undercarriage is adjusted to runner mobile status;Mounting bracket is transported It is defeated to arrive at next use.
Using such scheme, because mounting bracket can be carried out accurately to the horizontal level of floor beam, angle and height Adjustment, effectively reduces the position adjustment requirement of the holding time and tower crane of tower crane to floor beam, and carry significantly on this basis High floor beam construction quality;And mounting bracket using modularization in itself due to being dismounted and possessing walking, the shape of inactive state State changes, and quickly can be shifted in different construction locations, and efficiency of construction is high.
In summary, the invention has the advantages that:
1st, mounting bracket can accurately be adjusted to the horizontal level of floor beam, angle and height, effectively reduce tower Position adjustment requirement of the holding time and tower crane hung to floor beam, and floor beam construction quality is substantially increased on this basis;
2nd, mounting bracket, can be quick in itself due to being dismounted using modularization and possessing walking, the state change of inactive state Shifted in different construction locations, efficiency of construction is high.
Brief description of the drawings
Fig. 1 is the overall structure figure of the mounting bracket of embodiment 1;
Fig. 2 is the explosive view of the mounting bracket of embodiment 1;
Fig. 3 is enlarged drawings of the Fig. 2 of embodiment 1 at B;
Fig. 4 is the cut-away view of the height adjustment mechanism of embodiment 1;
Fig. 5 is enlarged drawings of the Fig. 2 of embodiment 1 at A;
Fig. 6 is enlarged drawings of the Fig. 1 of embodiment 1 at C;
Fig. 7 is the structure chart of the resetting-mechanism of embodiment 2.
In figure, 1, support body;2nd, horizontal tuned plate;3rd, height adjustment mechanism;4th, horizontal regulating mechanism;5th, regulating mechanism is indulged;6th, crossbeam;7th, it is multiple Position mechanism;11st, restocking;12nd, undercarriage;13rd, wheel portion;131st, web frame;1311st, bottom plate;1312nd, side plate;132nd, runner;14th, prop up Support part;15th, socket;16th, inserted link;17th, affixed bolt;31st, fine-tuning screw;32nd, column;33rd, fine-tuning nut;331st, shoulder;41、 Gear;42nd, the first handwheel;51st, the first riser;52nd, push rod;53rd, the second handwheel;54th, push pedal;71st, the second riser;72nd, spring; 73rd, release link;74th, baffle plate.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the protection domain of invention by Patent Law.
Embodiment 1:A kind of floor beam mount bracket, as depicted in figs. 1 and 2, including support body 1, crossbeam 6, horizontal tuned plate 2, height Spend governor motion 3, horizontal regulating mechanism 4 and vertical regulating mechanism 5;Its middle cross beam 6 has two, the horizontal top for being set up in support body 1;It is high Degree governor motion 3 is supported between support body 1 and crossbeam 6.Horizontal tuned plate 2 is generally t-shaped, and protruding parts below are shorter, horizontal tune The slip of plate 2 is set up on two crossbeams 6, and the protruding parts of lower section play limitation between two crossbeams 6;Horizontal regulating mechanism 4 In the lower section of horizontal tuned plate 2, length direction of the horizontal tuned plate 2 along crossbeam 6 is driven to move, that is, transverse direction signified in this programme.It is vertical Regulating mechanism 5 is located at the position close to both ends on horizontal tuned plate 2 in the longitudinal direction, and the both ends of the width in same extension position There is symmetrical setting two, what it was adjusted is the lengthwise position and angle for the floor beam being loaded on horizontal tuned plate 2.
Reference picture 2 and Fig. 3, height adjustment mechanism 3 include being fixed on the fine-tuning screw 31 of the bottom of crossbeam 6, provide fine setting silk The socket of the column 32 of the grafting of bar 31 and the fine-tuning nut 33, wherein fine-tuning nut 33 that are threadedly connected to outside fine-tuning screw 31 In the outside of column 32 and with the shoulder 331 abutted with the top of column 32.
Reference picture 2, horizontal regulating mechanism 4 include the gear 41 being fixed on support body 1 and are fixed on the tooth of the bottom of horizontal tuned plate 2 Bar;Gear 41 is engaged with rack, and the first handwheel 42 rotated with moving gear 41 is connected with gear 41.
Reference picture 5, vertical regulating mechanism 5 include wearing that to be placed in first vertical to the first riser 51, the screw thread being fixed on horizontal tuned plate 2 The second handwheel 53 that push rod 52 and drive push rod 52 on plate 51 rotate;The end set of push rod 52 has the connection of flip horizontal In the push pedal 54 on push rod 52.
Reference picture 2 and Fig. 6, support body 1 include the top of mutually dismountable restocking 11 and undercarriage 12, undercarriage 12 and restocking 11 Socket 15 is provided with, the bottom of restocking 11 is provided with coordinates inserted link 16 with socket 15;And laterally passed through on both plug-in positions It is installed with affixed bolt 17.The bottom of wherein undercarriage 12 is provided with supporting part 14 and the turnover wheel being arranged on supporting part 14 Portion 13;Supporting part 14 and wheel portion 13 can be as the positions directly contacted with ground.
Wheel portion 13 includes generally L-shaped web frame 131 and is fixed on the runner 132 of the bottom of web frame 131, web frame 131 include bottom plate 1311 and two side plates 1312, and its latus inframedium 1312 is rotatablely connected with supporting part 14, and bottom plate 1311 is in wheel portion 13 Bottom when being supported as bottom with supporting part 14 abuts.
Embodiment 2:A kind of use construction method of floor beam mount bracket, comprises the following steps:
Undercarriage 12 is moved to the position for needing to install floor beam by step S1, overturns wheel portion 13 so that the supporting part 14 of undercarriage 12 It is connected to ground;
One or more restockings 11 are fixed and built to proper height by step S2, in its over-assemble crossbeam 6, wherein being equipped on horizontal stroke Horizontal tuned plate 2 on beam 6, each mechanism have formerly been assembled on crossbeam 6;
Step S3 tower cranes hang floor beam to be mounted in place, are placed on horizontal tuned plate 2;
Step S4 adjusts the angle of floor beam and the position on the width of crossbeam 6 using vertical regulating mechanism 5;
Step S5 adjusts the position of flooring two in the longitudinal direction using vertical regulating mechanism 5;
Step S6 is adjusted floor beam to setting height(from bottom) using height adjustment mechanism 3;
Step S7 is attached operation using bolt or welding by design requirement to the web and upper and lower cover plates of floor beam;
After mono- group of floor beam installation of step S8, restocking 11 is removed, undercarriage 12 is adjusted to the mobile status of runner 132;Will installation Transporting bracket is to next at.
Embodiment 3:As shown in fig. 7, it is with the difference of embodiment 1, width of the horizontal tuned plate 2 in same extension position The both sides in direction are respectively arranged with horizontal regulating mechanism 4 and resetting-mechanism 7;Resetting-mechanism 7 includes being fixed on crossbeam 6 or horizontal tuned plate 2 On the second riser 71, be fixed on the second riser 71 and towards horizontal regulating mechanism 4 spring 72 and be fixed on the end of spring 72 Baffle plate 74, the inner side of wherein baffle plate 74 is fixed with least one release link 73 for slipping through the second riser 71.
When mounting bracket is built, horizontal tuned plate 2 is arranged on into support can be reduced in the one side of width The material built, but now also imply that only unilateral vertical regulating mechanism 5 is easy for operation;Can using the resetting structure of spring 72 With reserve migration when push rod 52 is decontroled and abutted, so as to carry out tune by a relatively large margin to floor beam in unilateral can dress Whole, shortcoming is that the stress of push rod 52 is larger.

Claims (10)

1. a kind of floor beam mount bracket, it is characterized in that:Including support body (1), it is provided with the top of the support body (1) and is held for support The crossbeam (6) of floor beam and the height adjustment mechanism (3) for adjusting crossbeam (6) height, horizontal stroke is provided with the crossbeam (6) Tuned plate (2) and the horizontal regulating mechanism (4) for driving horizontal tuned plate (2) to be moved along crossbeam (6) length direction;The horizontal tuned plate (2) exists Both ends on length direction or the position close to both ends are provided with position of the regulation floor beam on crossbeam (6) width Vertical regulating mechanism (5).
2. a kind of floor beam mount bracket according to claim 1, it is characterized in that:Horizontal tuned plate (2) sliding is erected at On crossbeam (6);Horizontal regulating mechanism (4) include the gear (41) that is fixed on support body (1) and the bottom for being fixed on horizontal tuned plate (2) or The rack of side;The gear (41) is engaged with rack, and the first handwheel rotated with moving gear (41) is connected with gear (41) (42)。
3. a kind of floor beam mount bracket according to claim 1, it is characterized in that:The height adjustment mechanism (3) includes The fine-tuning screw (31) of crossbeam (6) bottom is fixed on, the column (32) of fine-tuning screw (31) grafting is provided and is threadedly connected to The outside fine-tuning nut (33) of fine-tuning screw (31), the wherein outside for being socketed on column (32) of fine-tuning nut (33) and with The shoulder (331) that the top of column (32) abuts.
4. a kind of floor beam mount bracket according to claim 1, it is characterized in that:The vertical regulating mechanism (5) is included at least One the first riser (51), the screw thread being fixed on horizontal tuned plate (2) wear the push rod (52) that is placed on the first riser (51) and The second handwheel (53) for driving push rod (52) to rotate;What the end set of the push rod (52) had a flip horizontal is connected to push rod (52) push pedal (54) on.
5. a kind of floor beam mount bracket according to claim 4, it is characterized in that:The horizontal tuned plate (2) is in same length The both sides of the width of position are provided with symmetrically vertical regulating mechanism(5).
6. a kind of floor beam mount bracket according to claim 5, it is characterized in that:The horizontal tuned plate (2) is in same length The both sides of the width of position are respectively arranged with horizontal regulating mechanism (4) and resetting-mechanism (7);Resetting-mechanism (7) includes fixing In the second riser (71) on crossbeam (6) or horizontal tuned plate (2), it is fixed on the second riser (71) and towards the bullet of horizontal regulating mechanism (4) Spring (72) and be fixed on spring (72) end baffle plate(74), wherein baffle plate(74)Inner side be fixed with least one sliding Through the release link (73) of the second riser (71).
7. a kind of floor beam mount bracket according to claim 1, it is characterized in that:The support body (1) includes mutually removable The restocking (11) unloaded and undercarriage (12), the bottom of wherein undercarriage (12) are provided with supporting part (14) and turnover are arranged at branch Wheel portion (13) on support part (14);Supporting part (14) and wheel portion (13) can be as the positions directly contacted with ground.
8. a kind of floor beam mount bracket according to claim 7, it is characterized in that:The wheel portion (13) includes substantially L The web frame (131) of shape and the runner (132) for being fixed on web frame (131) bottom, the web frame (131) include bottom plate (1311) it is rotatablely connected with two side plates (1312), its latus inframedium (1312) with supporting part (14), bottom plate (1311) is in wheel portion (13) bottom when being supported as bottom with supporting part (14) abuts.
9. a kind of floor beam mount bracket according to claim 7, it is characterized in that:The undercarriage (12) and restocking (11) Top be provided with socket (15), the bottom of the restocking (11) is provided with coordinates inserted link (16) with socket (15);And two Affixed bolt (17) has been extended transversely through on person's plug-in position.
10. a kind of use construction method of floor beam mount bracket, it is characterized in that:Comprise the following steps:
Undercarriage (12) is moved to the position for needing to install floor beam, upset wheel portion (13) so that the branch of undercarriage (12) by step S1 Support part (14) is connected to ground;
Step S2 builds one or more restockings (11) fixation to proper height, in its over-assemble crossbeam (6), wherein carrying In the horizontal tuned plate (2) on crossbeam (6), each mechanism has formerly been assembled on crossbeam (6);
Step S3 tower cranes hang floor beam to be mounted in place, are placed on horizontal tuned plate (2);
Step S4 adjusts the angle of floor beam and the position on crossbeam (6) width using vertical regulating mechanism (5);
Step S5 adjusts the position of flooring two in the longitudinal direction using vertical regulating mechanism (5);
Step S6 is adjusted floor beam to setting height(from bottom) using height adjustment mechanism (3);
Step S7 is attached operation using bolt or welding by design requirement to the web and upper and lower cover plates of floor beam;
After mono- group of floor beam installation of step S8, restocking (11) is removed, undercarriage (12) is adjusted to runner (132) mobile status; Mounting bracket is transported next at.
CN201711031710.0A 2017-10-28 2017-10-28 A kind of floor beam mount bracket and use construction method Active CN107762163B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711031710.0A CN107762163B (en) 2017-10-28 2017-10-28 A kind of floor beam mount bracket and use construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711031710.0A CN107762163B (en) 2017-10-28 2017-10-28 A kind of floor beam mount bracket and use construction method

Publications (2)

Publication Number Publication Date
CN107762163A true CN107762163A (en) 2018-03-06
CN107762163B CN107762163B (en) 2019-08-13

Family

ID=61270298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711031710.0A Active CN107762163B (en) 2017-10-28 2017-10-28 A kind of floor beam mount bracket and use construction method

Country Status (1)

Country Link
CN (1) CN107762163B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2361735Y (en) * 1998-10-07 2000-02-02 陈学平 Multi-purpose building support
JP2000034777A (en) * 1998-07-21 2000-02-02 Taisei Corp Method for constructing building
CN200955254Y (en) * 2006-09-30 2007-10-03 王雄文 Supporting device for building
CN202164808U (en) * 2011-07-19 2012-03-14 山东新巨龙能源有限责任公司 Adjustable pipe support type work platform
CN103628692A (en) * 2013-12-20 2014-03-12 宁波建工股份有限公司 Floor beam mounting bracket and use and construction method thereof
US20150033661A1 (en) * 2013-07-31 2015-02-05 Staging Concepts Acquisitions, Llc Staging system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000034777A (en) * 1998-07-21 2000-02-02 Taisei Corp Method for constructing building
CN2361735Y (en) * 1998-10-07 2000-02-02 陈学平 Multi-purpose building support
CN200955254Y (en) * 2006-09-30 2007-10-03 王雄文 Supporting device for building
CN202164808U (en) * 2011-07-19 2012-03-14 山东新巨龙能源有限责任公司 Adjustable pipe support type work platform
US20150033661A1 (en) * 2013-07-31 2015-02-05 Staging Concepts Acquisitions, Llc Staging system and method
CN103628692A (en) * 2013-12-20 2014-03-12 宁波建工股份有限公司 Floor beam mounting bracket and use and construction method thereof

Also Published As

Publication number Publication date
CN107762163B (en) 2019-08-13

Similar Documents

Publication Publication Date Title
KR101657994B1 (en) Form traveler, and bridge construction method for using the same
CN201074517Y (en) Broaden tunnel lining bogie
CN102146732A (en) Extra-large-area hyperboloid welding ball network frame sliding construction method
KR20150052207A (en) A panel support bracket
CN106320713B (en) 3D building printing operation platform
CN203007849U (en) Movable construction device for cast-in-place concrete crash barriers with hanging eaves
CN102943561B (en) Overhead working hanging basket anti-sway device
CN102409864A (en) Steel truss construction method and temporary reinforcing device used in hoisting process of same
CN103758471A (en) Portable well repair tubular column shifting and conveying device
JP6270692B2 (en) Lifting device and lifting method
CN108824199A (en) The Arch Bridge Construction method of underneath type Hanging Basket
CN103061313A (en) Channel slope concrete plastering troweling machine with vibration and rolling functions
CN107762163A (en) A kind of floor beam mount bracket and use construction method
CN107780653A (en) A kind of template supporting tool and construction method for steel structure floor system
CN102071641A (en) Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof
CN202380732U (en) Self-load bearing template support device utilizing steel reinforced concrete beam
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN106401606A (en) Framework trestle trolley
CN110282579A (en) The Lift-on/Lift-off System and hanging method of prefabricated pipe trench in height-limited small space
CN106351441A (en) Chimney creeping formwork construction device and construction method
CN207645573U (en) Piece-shape type aging blocks install elevator additional
CN203655186U (en) Portable well repair pipe column transportation device
JP4474445B2 (en) Delivery method
CN201873949U (en) Bride prestress stretch-draw trolley
CN206111212U (en) Rock -anchored beam construction trolley car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant