CN107762146A - The adjustable formwork application process of building structure center sill structure - Google Patents

The adjustable formwork application process of building structure center sill structure Download PDF

Info

Publication number
CN107762146A
CN107762146A CN201710907303.5A CN201710907303A CN107762146A CN 107762146 A CN107762146 A CN 107762146A CN 201710907303 A CN201710907303 A CN 201710907303A CN 107762146 A CN107762146 A CN 107762146A
Authority
CN
China
Prior art keywords
adjustable formwork
adjustable
reinforced
formwork
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710907303.5A
Other languages
Chinese (zh)
Inventor
易万君
何莉
廖菊蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710907303.5A priority Critical patent/CN107762146A/en
Publication of CN107762146A publication Critical patent/CN107762146A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to the adjustable formwork application process of the realm of building construction, specifically building structure center sill structure;It is characterized in that it is included in assembled beam bottom board and bottom wood stupefied on beam form board mount;In beam form board mount both sides assembly adjustable formwork and sidepiece wood stupefied;The suitable for reading of adjustable formwork is connected with slab form with iron nail, is formed overall;Adjustable formwork is positioned and reinforced with steel pipe locking bar, and locking bar is connected with beam forms by pipe clamp;Adjustable formwork is finally reinforced with split bolt, and the row that split bolt is reinforced along deck-molding is directly proportional to deck-molding;Beam bottom board, adjustable formwork and slab form are installed and reinforced and finish, after inspecting for acceptance, casting beams board concrete.The present invention replaces conventional stent plate using adjustable formwork, not only reduces plank sheathing processing capacity, also can obviously reduce the template proportion of goods damageds, has the characteristics of economic, efficient, environmentally friendly.

Description

The adjustable formwork application process of building structure center sill structure
Technical field
The present invention relates to the adjustable formwork application process of the realm of building construction, specifically building structure center sill structure.
Background technology
The template applied in civil structural engineering is mainly plank sheathing, and plank sheathing usage amount in architectural engineering is big, turnover Master Cost input is big.At present, fixed dimension form is taken in plank sheathing installation, i.e., according to physical dimension, with whole plate amount body scale Cutting stock, the general most multipotency of clout after cutting carries out a secondary cut blanking, therefore the spillage of material of plank sheathing is generally very Greatly, in a construction project, plank sheathing is because the proportion of goods damageds of cutting loss are generally just more than 10%.
The content of the invention
It is an object of the invention to overcome drawbacks described above, there is provided a kind of template building method that can reduce template loss.
In order to achieve the above object, the present invention is realized in:
A kind of adjustable formwork application process of building structure center sill structure, including
Step 1, assembled beam bottom board and bottom wood stupefied on beam form board mount;
Step 2, in beam form board mount both sides assembly adjustable formwork and sidepiece wood stupefied;Wherein, when adjustable formwork is highly most girder During side form height, adjustable formwork is seated in the wood stupefied of bottom;When adjustable formwork is highly more than minimum beam side height, adjustable die Plate is seated on beam form board mount;
Step 3, the suitable for reading of adjustable formwork are connected with slab form with iron nail, are formed overall;
Step 4, adjustable formwork are positioned and reinforced with steel pipe locking bar, and locking bar is connected with beam forms by pipe clamp;
Step 5, adjustable formwork are finally reinforced with split bolt, and the row that split bolt is reinforced along deck-molding is with deck-molding into just Than;
Step 6, beam bottom board, adjustable formwork and slab form are installed and reinforced and finish, after inspecting for acceptance, casting beams board concrete.
The adjustable formwork application process of described building structure center sill structure, adjustable formwork have 100mm adjustable height.
The present invention replaces conventional stent plate using adjustable formwork, not only reduces plank sheathing processing capacity, also can obviously reduce The template proportion of goods damageds, there is the characteristics of economic, efficient, environmentally friendly.
Brief description of the drawings
Fig. 1 is adjustable formwork scheme of installation one of the present invention.
Fig. 2 is adjustable formwork scheme of installation two of the present invention.
Embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of adjustable formwork application process of building structure center sill structure, including
Step 1, assembled beam bottom board and bottom wood stupefied on beam form board mount 4;
Step 2, in beam form board mount both sides assembly adjustable formwork and sidepiece wood stupefied;Wherein, as shown in Figure 1 and Figure 2, adjustable die is worked as When plate is highly minimum beam side height, adjustable formwork is seated in the wood stupefied of bottom;When adjustable formwork is highly more than most girder side During mould height, adjustable formwork is seated on beam form board mount;
Step 3, the suitable for reading of adjustable formwork are connected with slab form with iron nail, are formed overall;
Step 4, adjustable formwork are positioned and reinforced with steel pipe locking bar, and locking bar is connected with beam forms by pipe clamp;
Step 5, adjustable formwork are finally reinforced with split bolt, and the row that split bolt is reinforced along deck-molding is with deck-molding into just Than;
Step 6, beam bottom board, adjustable formwork and slab form are installed and reinforced and finish, after inspecting for acceptance, casting beams board concrete.
As shown in Figure 1 and Figure 2, above-mentioned application process, following manner can be used to carry out during practice of construction:
1)The assembly of beam bottom board 2 and 100*50 wood stupefieds 3 finishes, on beam form board mount 4;
2)After adjustable formwork 1 and the assembly of 80*50 wood stupefieds 5, the assembled adjustable formwork 1 finished of installation;
3)When adjustable formwork is highly minimum beam side height, adjustable formwork 1 is seated on beam sill stupefied 3;Adjustable formwork height During more than minimum beam side height, adjustable formwork 1 is seated on the steel pipe crossbeam 4 of support bed die;
4)Adjustable formwork 1 is suitable for reading to be connected with floor template die plate 8 with iron nail, is formed overall;
5)Adjustable formwork 1 is positioned with steel pipe locking bar 6 and reinforcing, locking bar 6 are connected with the pipe clamp of cross bar 4;
6)Adjustable formwork 1 is finally reinforced with split bolt 7, and the row that split bolt 7 is reinforced along deck-molding is relevant with deck-molding;
7)Beam bottom board 2, adjustable formwork 1 and template die plate 8, which are installed and reinforced, to be finished, and after inspecting for acceptance, pours beam slab concrete 9.
The adjustable formwork application process of described building structure center sill structure, adjustable formwork have 100mm adjustable height (The design of structural beams height change is usually 50mm integral multiple, and a adjustable formwork can adjust 2 mark structure deck-moldings, flexibly use The problem of plank sheathing loss is big can greatly be improved).
The present invention replaces conventional stent plate using adjustable formwork, not only reduces plank sheathing processing capacity, also can obviously reduce The template proportion of goods damageds, there is the characteristics of economic, efficient, environmentally friendly.

Claims (2)

1. a kind of adjustable formwork application process of building structure center sill structure, it is characterized in that, including
Step 1, assembled beam bottom board and bottom wood stupefied on beam form board mount;
Step 2, in beam form board mount both sides assembly adjustable formwork and sidepiece wood stupefied;Wherein, when adjustable formwork is highly most girder During side form height, adjustable formwork is seated in the wood stupefied of bottom;When adjustable formwork is highly more than minimum beam side height, adjustable die Plate is seated on beam form board mount;
Step 3, the suitable for reading of adjustable formwork are connected with slab form with iron nail, are formed overall;
Step 4, adjustable formwork are positioned and reinforced with steel pipe locking bar, and locking bar is connected with beam forms by pipe clamp;
Step 5, adjustable formwork are finally reinforced with split bolt, and the row that split bolt is reinforced along deck-molding is with deck-molding into just Than;
Step 6, beam bottom board, adjustable formwork and slab form are installed and reinforced and finish, after inspecting for acceptance, casting beams board concrete.
2. the adjustable formwork application process of building structure center sill structure according to claim 1, it is characterized in that, adjustable formwork There is 100mm adjustable height.
CN201710907303.5A 2017-09-29 2017-09-29 The adjustable formwork application process of building structure center sill structure Pending CN107762146A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710907303.5A CN107762146A (en) 2017-09-29 2017-09-29 The adjustable formwork application process of building structure center sill structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710907303.5A CN107762146A (en) 2017-09-29 2017-09-29 The adjustable formwork application process of building structure center sill structure

Publications (1)

Publication Number Publication Date
CN107762146A true CN107762146A (en) 2018-03-06

Family

ID=61266885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710907303.5A Pending CN107762146A (en) 2017-09-29 2017-09-29 The adjustable formwork application process of building structure center sill structure

Country Status (1)

Country Link
CN (1) CN107762146A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881793A (en) * 2019-03-19 2019-06-14 中国十七冶集团有限公司 A kind of production and construction method of sealing reversed beam and main structure one-time-concreting
CN110029814A (en) * 2019-05-21 2019-07-19 广州交投城市道路建设有限公司 A kind of combined steel mould bases for beams of concrete enlarging section

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196236A (en) * 2014-09-10 2014-12-10 中建四局第六建筑工程有限公司 Rigid and recyclable beam lateral formwork clamp
CN106013787A (en) * 2016-07-11 2016-10-12 中国建筑第八工程局有限公司 Cast-in-place concrete beam formwork tool type reinforcing system and construction technology thereof
CN205840323U (en) * 2016-07-11 2016-12-28 中国建筑一局(集团)有限公司 Assembled adjustable beam formwork
CN106368431A (en) * 2016-11-04 2017-02-01 成都森钰泓绿化工程有限公司 Formwork adjustable in simply supported beam cross section height

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196236A (en) * 2014-09-10 2014-12-10 中建四局第六建筑工程有限公司 Rigid and recyclable beam lateral formwork clamp
CN106013787A (en) * 2016-07-11 2016-10-12 中国建筑第八工程局有限公司 Cast-in-place concrete beam formwork tool type reinforcing system and construction technology thereof
CN205840323U (en) * 2016-07-11 2016-12-28 中国建筑一局(集团)有限公司 Assembled adjustable beam formwork
CN106368431A (en) * 2016-11-04 2017-02-01 成都森钰泓绿化工程有限公司 Formwork adjustable in simply supported beam cross section height

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881793A (en) * 2019-03-19 2019-06-14 中国十七冶集团有限公司 A kind of production and construction method of sealing reversed beam and main structure one-time-concreting
CN110029814A (en) * 2019-05-21 2019-07-19 广州交投城市道路建设有限公司 A kind of combined steel mould bases for beams of concrete enlarging section

Similar Documents

Publication Publication Date Title
CN203440831U (en) Novel basement concrete shear force wall leads wall structure
CN207063523U (en) A kind of bracing means of steel reinforced concrete structure side template
CN107762146A (en) The adjustable formwork application process of building structure center sill structure
CN201202272Y (en) Rapid replacement formwork for tall building construction
CN101769072B (en) Method for making composite beam with composite beam die
CN210622302U (en) Pouring template for building construction
CN106337561A (en) Shear wall template reinforcing structure and reinforcing construction method thereof
CN206233579U (en) Shear wall template is to drawing connecting piece and template reinforced structure thereof
CN101839063B (en) Movable steel base for constructing prefabricated beam and standard joint thereof
CN111648411B (en) Down-turned post-pouring belt support changing structure, construction method and post-pouring belt construction method
CN206667023U (en) UHPC combined box beams
CN201620598U (en) Combined beam mould
CN108035544A (en) Expansion joint position shear wall side formwork reinforcing device and construction method
CN201011127Y (en) Suspended steel wood combined template
CN210797296U (en) Steel-concrete combination beam bridge floor flange plate bracket mounting structure
CN205574622U (en) Support is stacked to alley formula reinforcing bar
CN201671063U (en) Movable steel base for construction precast beams and standard knot thereof
CN110499857A (en) A kind of precast concrete superimposed sheet vertically goes out the installation method of muscle and readjustment
CN108222326B (en) Foam concrete light steel keel composite ultrahigh wall and construction method thereof
CN105317146A (en) Steel structure earthquake-resistant floor for construction and manufacturing method
CN105350718A (en) Reinforcement permanency beam formwork and manufacturing method for concrete structural member with shearing resistance
CN112482637B (en) GRC dismantling-free template for pouring concrete beam slab
CN112784333B (en) Design method of cast-in-place concrete box girder cross beam
CN109235235A (en) A kind of steel reinforced concrete combined bridge bridge floor continuously locates the longitudinally connected method of girder
CN104563354B (en) Combined long-span ribbed slab structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180306