CN107747281A - The construction hanging basket built for municipal works and room - Google Patents

The construction hanging basket built for municipal works and room Download PDF

Info

Publication number
CN107747281A
CN107747281A CN201711264236.6A CN201711264236A CN107747281A CN 107747281 A CN107747281 A CN 107747281A CN 201711264236 A CN201711264236 A CN 201711264236A CN 107747281 A CN107747281 A CN 107747281A
Authority
CN
China
Prior art keywords
main couple
moving track
roller
hanging basket
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711264236.6A
Other languages
Chinese (zh)
Other versions
CN107747281B (en
Inventor
阮存生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Wulian Construction Co Ltd
Original Assignee
Zhejiang Wulian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Wulian Construction Co Ltd filed Critical Zhejiang Wulian Construction Co Ltd
Priority to CN201711264236.6A priority Critical patent/CN107747281B/en
Publication of CN107747281A publication Critical patent/CN107747281A/en
Application granted granted Critical
Publication of CN107747281B publication Critical patent/CN107747281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Transmission Devices (AREA)

Abstract

The invention discloses a kind of construction hanging basket built for municipal works and room, its drip irrigation device is:Including main couple, the crossbeam being arranged on main couple, the moving track being arranged on mounting surface, main couple is provided with standing groove on bottom surface, some accommodating grooves are evenly distributed with standing groove internal groove side wall, some oil cylinders are provided with main truss top of support, rotation seat is fixedly connected with the end of cylinder piston rod, the first roller is rotatably connected on rotation seat, motor is provided with rotation seat, when needing to move main couple, control cylinder piston rod extends so that the first roller moves towards moving track side.When the first roller and moving track offset, oil cylinder pushing main couple moves up.Controlled motor is opened and drives the first roller to be rotated afterwards.At the same time, the first roller drives main couple to move.The construction hanging basket moving process so set is more convenient, quick, and improves the service efficiency of the construction hanging basket to a certain extent.

Description

The construction hanging basket built for municipal works and room
Technical field
The present invention relates to technical field of construction equipment, more particularly to a kind of construction hanging basket built for municipal works and room.
Background technology
Hanging Basket, is the construction platform of work high above the ground when bridge upper cantilever arm beam is cast-in-place, including is arranged on the bridge for having poured and being poured in Suspension purlin on the upside of girder cantilever box beam section termination and being arranged on the bed die branch on the downside of the bridge cantilever beam section termination being poured in is poured Support frame frame, is connected by suspension rod between the two.Suspension type Hanging Basket can substitute the steel pipe support set up upwardly from ground and big Type is vertical and horizontal transport equipment, influenceed in construction by adverse circumstances such as current, Gao Dun, valleys it is smaller, particularly across During line bridge construction, it is not necessary to set up the steel pipe support for disconnecting traffic under bridge, limited space, hanging type hanging can also be made full use of Basket assembly and disassembly are all more convenient, can repeatedly use, greatly reduce construction cost.
At present, notification number is that CN102345273B Chinese patent discloses a kind of synchronization of continuous rigid frame bridge construction Hanging Basket Basket device is moved, it includes main couple, the crossbeam of main couple front end, the vertical shift track that is arranged on bridge floor, the main couple bottom It is provided with the hydraulic jack for promoting main couple to vertically move.When being built using the Hanging Basket to bridge, typically need Main couple is connected on bridge using crab-bolt.When one section of box beam concrete casting complete, it is necessary to control crab-bolt and box beam Separation, the output elongate axis of hydraulic jack is controlled afterwards and promotes main couple to move.But promoted in hydraulic jack During main couple moves, due to the consistent length of hydraulic jack output shaft, so moving one end apart from it in main couple Afterwards, it is necessary to which hydraulic jack is removed from main couple and its position is adjusted.That is built to bridge During, it is necessary to constantly dismount jack so that the moving process of the Hanging Basket becomes relatively complicated, and drops to a certain extent The low service efficiency of the construction hanging basket.
The content of the invention
In view of the deficienciess of the prior art, applied it is an object of the invention to provide a kind of for what municipal works and room were built Work Hanging Basket, it has, and moving process is more convenient, the higher advantage of service efficiency.
The present invention above-mentioned technical purpose technical scheme is that:One kind is used for municipal works and room The construction hanging basket built, including main couple, the crossbeam being arranged on main couple, the moving track that is arranged on mounting surface, the master The standing groove passed through for moving track is provided with truss bottom surface, and when moving track is located inside standing groove, moving track Lateral wall offseted with standing groove internal groove side wall, the standing groove is towards being evenly distributed with some storages on the internal groove side wall of mounting surface Groove, is provided with the main truss top of support some with the one-to-one oil cylinder of accommodating groove, and the cylinder piston rod is through main truss Frame simultaneously protrudes from accommodating groove internal groove side wall, and rotation seat is fixedly connected with the end of the cylinder piston rod, is turned on the rotation seat The first roller being connected with for being offseted with moving track top surface is moved, motor, the motor output are provided with the rotation seat Axle is connected through rotation seat and with the first roller.
Pass through above-mentioned technical proposal, when needing to move main couple, control cylinder piston rod elongation so that be connected to oil cylinder The first roller on piston rod end moves towards moving track side.When the first roller and moving track top surface offset When, oil cylinder pushing main couple moves up so that main couple separates with mounting surface.Controlled motor is opened afterwards so that motor is defeated Shaft rotates and drives the first roller to be rotated.During the first roller rotates, the first roller drives main couple to carry out It is mobile.And the displacement of main couple can be controlled by the duration of the unlatching of motor.The construction hanging basket so set Moving process is more convenient, quick, improves the service efficiency of the construction hanging basket to a certain extent.When main couple will be moved to During relevant position, controlled motor is closed, and now main couple continues a certain distance that moves forward under effect of inertia.When the shifting of main couple During dynamic stopping completely, control cylinder piston rod is shunk, and now the spacing between main couple and mounting surface is gradually reduced.Work as main couple When being offseted with mounting surface, cylinder piston rod drives the first roller towards moving inside accommodating groove so that the first roller is with moving Dynamic rail road separates.Control cylinder is closed afterwards, can now be continuing with the construction hanging basket and bridge is built.And make During with the construction hanging basket, main couple offsets with mounting surface, be so less prone to moving track because be under pressure it is excessive and There is the bending even situation of damage, ensure that the service life of the construction hanging basket to a certain extent.
Preferably, moving track top surface place relative with the first roller is provided with the first slippage slot, when the first roller position When inside the first slippage slot, the lateral wall of the first roller offsets with the first slippage slot internal groove side wall.
Pass through above-mentioned technical proposal, during the first roller rotates and then drives main couple to move, first slides The internal groove side wall for moving groove offsets with the first roller side wall so that rotation seat is not easy to rotate around cylinder piston rod axle center county, and main truss The moving process of frame becomes more smooth, quick.
Preferably, sliding is connected with sliding rack on the moving track, is provided with and is used for and main couple in the sliding rack The abutting block to offset, the screw for being threadedly coupled with moving track is additionally provided with the sliding rack.
Pass through above-mentioned technical proposal, when needing to control main couple to move, the screw in sliding rack is screwed off first, Control sliding rack moves on moving track afterwards.When sliding rack is moved to specified location, tightening screw so that screw It is threadedly coupled with moving track and compresses sliding rack and is connected on moving track.The process so moved in main couple In, the abutting block in sliding rack can offset with the end of main couple and then the displacement of main couple is limited so that The displacement of main couple becomes more accurate.
Preferably, the second slippage slot is provided with the moving track side wall, second slippage slot is grown along moving track Spend direction to set, stop block is fixedly connected with the standing groove internal groove side wall, the stop block is used to deviate from the second slippage slot The internal groove side wall of mounting surface offsets and then prevents main couple to be kept completely separate with moving track.
Pass through above-mentioned technical proposal, during controlling main couple to move upwards by oil cylinder, standing groove inside groove Stop block on wall moves inside the second slippage slot.Internal groove side wall phase when stop block with the second slippage slot away from mounting surface To when, upward motion of the stop block to main couple limits, to ensure that main couple is not easy to be kept completely separate with moving track so that The use process of the construction hanging basket becomes more smooth, quick.
Preferably, the 3rd slippage slot is provided with the standing groove internal groove side wall, the stop block sliding is connected to the 3rd cunning Move inside groove, the 3rd slippage slot is internally provided with cylinder, and the cylinder is connected with stop block and for driving stop block to lean on Near or remote moving track.
Pass through above-mentioned technical proposal, when being assembled to the construction hanging basket, stop block is controlled towards the 3rd by cylinder Moved inside slippage slot so that stop block is accommodated in inside the 3rd slippage slot completely.Now control the placement on main couple Groove is located at the surface of moving track, main couple can be installed to main couple decentralization on moving track to afterwards so that this is applied The assembling process of work Hanging Basket becomes more convenient, fast.
Preferably, the stop block is rotatably connected to the second roller, second roller on the lateral wall of mounting surface For being offseted with internal groove side wall of second slippage slot away from mounting surface.
Pass through above-mentioned technical proposal, when main couple is moving on moving track, the second roller hair in stop block It is raw to rotate, the sliding friction between stop block and moving track is changed into rolling friction so that stop block and moving track are not Easily there is situation about wearing, improve the service life of construction hanging basket to a certain extent.
Preferably, it is fixedly connected with extension block in the main couple side wall, the extension block is towards on the end face of mounting surface Some springs for being offseted with mounting surface are provided with, the spring is provided with the end of extension block and offseted with mounting surface Slipping block.
Pass through above-mentioned technical proposal, during main couple moves towards mounting surface side, slipping block and mounting surface phase Support, spring applies upward elastic force between extension block and slipping block and to extension block so that main couple be not easy because with installation Face is touched and the situation of deformation or even damage occurs.
In summary, having the beneficial effect that in contrast to prior art of the invention:
1st, when needing to move main couple, the first roller is controlled to be offseted with moving track by oil cylinder first, and main couple is upward Move and separated with mounting surface, rotated afterwards by the roller of motor driven first and drive main couple to be slided on moving track Move, this process is more convenient, quick, improves the service efficiency of the construction hanging basket to a certain extent;
2nd, in the first roller rotation process, the internal groove side wall of the first slippage slot offsets with the first roller lateral wall, such rotation seat It is not easy to be rotated around cylinder piston rod axial line so that the moving process of the main couple becomes more smooth, quick.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment, is mainly used for showing the contour structures of embodiment;
Fig. 2 is Fig. 1 A portions enlarged drawing;
Fig. 3 is the schematic cross-sectional view of embodiment, is mainly used for showing the connection of each several part in embodiment;
Fig. 4 is Fig. 3 B portions enlarged drawing.
Reference:1st, main couple;2nd, crossbeam;3rd, moving track;4th, standing groove;5th, accommodating groove;6th, oil cylinder;7th, rotate Seat;8th, the first roller;9th, motor;10th, the first slippage slot;11st, sliding rack;12nd, block is abutted;13rd, screw;14th, the second slippage slot; 15th, stop block;16th, the 3rd slippage slot;17th, cylinder;18th, the second roller;19th, extension block;20th, spring;21st, slipping block;22nd, pacify Dress face.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
A kind of construction hanging basket built for municipal works and room, as shown in figure 1, including the movement being arranged on mounting surface 22 Track 3, the main couple 1 being arranged on moving track 3, the crossbeam 2 on main couple 1.
As shown in Figure 1 and Figure 2, the number of moving track 3 is two and is disposed side by side on mounting surface 22.Every moving rail The first slippage slot 10, and the length direction phase of the length direction of the first slippage slot 10 and moving track 3 are provided with the top surface of road 3 Together.Sliding is connected with sliding rack 11 on moving track 3, and the glide direction of sliding rack 11 is the length direction of moving track 3.It is sliding Move in the side wall of frame 11 to be fixedly connected with and abut block 12, abut block 12 and be used to offset with the end of main couple 1.On the top surface of sliding rack 11 also Some screws 13 are provided with, screw 13, which is used to be threadedly coupled with moving track 3 and then compresses sliding rack 11, is connected to moving rail On road 3.
As shown in Figure 3, Figure 4, the number of main couple 1 is two and corresponded with two moving tracks 3.The bottom of main couple 1 It is provided with face and extends for standing groove 4, standing groove 4 towards away from the side of mounting surface 22.Standing groove 4 is used for holding movable track 3, And when moving track 3 is located at 4 inside of standing groove, the internal groove side wall of the lateral wall and standing groove 4 of moving track 3 offsets.Standing groove 4 Some accommodating grooves 5 are provided with towards the internal groove side wall of mounting surface 22, and some accommodating grooves 5 uniformly divide along the length direction of standing groove 4 Cloth.
Some oil cylinders 6 are fixedly connected with the top surface of main couple 1, and some oil cylinders 6 correspond with some accommodating grooves 5.Oil The piston rod of cylinder 6 is towards the side of main couple 1, and the end of the piston rod of oil cylinder 6 through accommodating groove 5 and protrudes from the direction of accommodating groove 5 The internal groove side wall of the side of mounting surface 22.Facility has rotation seat 7 on the end of the piston rod of oil cylinder 6, and first is rotatably connected on rotation seat 7 Roller 8, the first roller 8 are located at directly over the first slippage slot 10, and the pivot center direction of the first roller 8 and the first slippage slot 10 Length direction it is perpendicular.Be fixedly connected with motor 9 in the side wall of rotation seat 7, the output shaft of motor 9 towards the side of the first roller 8, and The end of the output shaft of motor 9 is connected through rotation seat 7 and with the first roller 8.
As shown in Figure 2, Figure 4 shows, when needing to move main couple 1, the screw 13 in sliding rack 11 is unscrewed first, So that screw 13 separates with moving track 3, sliding rack 11 is controlled to be moved away from the side of main couple 1 afterwards, when sliding rack 11 When being moved to specified location, tightening screw 13 so that screw 13 is threadedly coupled with moving track 3 and compresses sliding rack 11 and is connected On moving track 3.The piston rod of control cylinder 6 extends afterwards so that rotation seat 7 and rotation on the piston rod end of oil cylinder 6 The first roller 8 being connected on rotation seat 7 moves towards the side of the first slippage slot 10.When the first roller 8 extend into the first sliding Inside groove 10, and when the first roller 8 and the bottom land of the first slippage slot 10 offset, oil cylinder 6 starts to drive main couple 1 to be moved upwards It is dynamic.When main couple 1 separates with mounting surface 22, control cylinder 6 is closed.
Motor 9 is opened afterwards so that the output shaft rotation of motor 9.At the same time, it is coaxially disposed with the output shaft of motor 9 First roller 8 starts to rotate and drives main couple 1 to be moved on moving track 3.When main couple 1 will be with abutting the phase of block 12 To when, controlled motor 9 is closed, and now main couple 1 continues to move under effect of inertia.Offset with abutting block 12 when main couple 1 and When the movement of main couple 1 stops completely, the piston rod of control cylinder 6 shrinks so that spacing between main couple 1 and mounting surface 22 by It is decrescence small.When main couple 1 and mounting surface 22 offset, the piston rod of oil cylinder 6 drives the roller 8 of rotation seat 7 and first to move up, When the first roller 8 separates with moving track 3, oil cylinder 6 is closed.
As shown in Figure 3, Figure 4, the both sides of moving track 3 are provided with the second slippage slot 14, and the length of the second slippage slot 14 Direction is identical with the length direction of moving track 3.If it is evenly distributed with the internal groove side wall relative with the second slippage slot 14 of standing groove 4 Dry 3rd slippage slot 16, and the length direction of the length direction and standing groove 4 of the 3rd slippage slot 16 is perpendicular.3rd slippage slot 16 Cylinder 17 is internally provided with, the length direction of the piston rod of cylinder 17 is identical with the length direction of the 3rd slippage slot 16 and cylinder 17 is lived Stopper rod direction the second slippage slot 14 side.Stop block 15 is provided with the end of the piston rod of cylinder 17, is turned on the top surface of stop block 15 Dynamic to be connected with some second rollers 18, the second roller 18 is used to offset with the second internal groove side wall of the slippage slot 14 away from mounting surface 22.
When needing to control main couple 1 to move, stop block 15 is controlled towards the second slippage slot 14 1 by cylinder 17 Side is moved, until stop block 15 is extend into inside the second slippage slot 14.During oil cylinder 6 drives main couple 1 to move upwards, The second roller 18 in stop block 15 can offset with the second internal groove side wall of the slippage slot 14 away from mounting surface 22 so that main couple 1 It is not easy to separate with moving track 3.
As shown in Figure 1 and Figure 2, it is fixedly connected with the extension block 19 of strip on the two side of main couple 1, and extension block 19 Length direction is identical with the length direction of moving track 3.Extension block 19 is towards being provided with spring 20, bullet on the end face of mounting surface 22 Spring 20 is provided with the slipping block 21 to be offseted with mounting surface 22 on the end of extension block 19.When the piston rod of oil cylinder 6 shrink and then Drive main couple 1 towards the side of mounting surface 22 move during, slipping block 21 towards the side of mounting surface 22 move and finally with Mounting surface 22 offsets, and the spring 20 between extension block 19 and slipping block 21 applies elastic force to extension block 19 and played slow afterwards The effect of punching.
Described above is only the exemplary embodiment of the present invention, not for limiting the scope of the invention, this hair Bright protection domain is determined by appended claim.

Claims (7)

1. a kind of construction hanging basket built for municipal works and room, including main couple (1), the crossbeam that is arranged on main couple (1) (2) moving track (3), being arranged on mounting surface (22), it is characterized in that:It is provided with main couple (1) bottom surface for movement The standing groove (4) that track (3) passes through, and when moving track (3) be located at standing groove (4) it is internal when, the lateral wall of moving track (3) Offseted with standing groove (4) internal groove side wall, the standing groove (4) is towards being evenly distributed with some storages on the internal groove side wall of mounting surface (22) Groove (5), it is provided with main couple (1) top surface some living with the one-to-one oil cylinder (6) of accommodating groove (5), the oil cylinder (6) Stopper rod is through main couple (1) and protrudes from accommodating groove (5) internal groove side wall, is fixedly connected on the end of oil cylinder (6) piston rod There is rotation seat (7), the first roller (8) for being offseted with moving track (3) top surface be rotatably connected on the rotation seat (7), Be provided with motor (9) on the rotation seat (7), motor (9) output shaft through rotation seat (7) and with the first roller (8) It is connected.
2. the construction hanging basket according to claim 1 built for municipal works and room, it is characterized in that:The moving track (3) top surface and the first roller (8) are provided with the first slippage slot (10) with respect to place, when the first roller (8) is located at the first slippage slot (10) when internal, lateral wall and the first slippage slot (10) internal groove side wall of the first roller (8) offset.
3. the construction hanging basket according to claim 1 built for municipal works and room, it is characterized in that:The moving track (3) sliding is connected with sliding rack (11) on, and the abutting block for being offseted with main couple (1) is provided with the sliding rack (11) (12) screw (13) for being threadedly coupled with moving track (3), is additionally provided with the sliding rack (11).
4. the construction hanging basket according to claim 1 built for municipal works and room, it is characterized in that:The moving track (3) the second slippage slot (14) is provided with side wall, second slippage slot (14) is set along moving track (3) length direction, institute State and stop block (15) is fixedly connected with standing groove (4) internal groove side wall, the stop block (15) is used to carry on the back with the second slippage slot (14) Internal groove side wall from mounting surface (22) offsets and then prevents main couple (1) to be kept completely separate with moving track (3).
5. the construction hanging basket according to claim 4 built for municipal works and room, it is characterized in that:The standing groove (4) The 3rd slippage slot (16) is provided with internal groove side wall, stop block (15) sliding is connected to the 3rd slippage slot (16) inside, described 3rd slippage slot (16) is internally provided with cylinder (17), and the cylinder (17) is connected with stop block (15) and for driving stop block (15) close to or away from moving track (3).
6. the construction hanging basket according to claim 4 built for municipal works and room, it is characterized in that:The stop block (15) The second roller (18) is rotatably connected on the lateral wall of mounting surface (22), second roller (18) is used for and the second sliding Groove (14) offsets away from the internal groove side wall of mounting surface (22).
7. the construction hanging basket according to claim 1 built for municipal works and room, it is characterized in that:The main couple (1) It is fixedly connected with extension block (19) in side wall, the extension block (19) is towards being provided with some be used on the end face of mounting surface (22) The spring (20) to be offseted with mounting surface (22), the spring (20) is provided with the end of extension block (19) and mounting surface (22) slipping block (21) to offset.
CN201711264236.6A 2017-12-05 2017-12-05 The construction hanging basket built for municipal works and room Active CN107747281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711264236.6A CN107747281B (en) 2017-12-05 2017-12-05 The construction hanging basket built for municipal works and room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711264236.6A CN107747281B (en) 2017-12-05 2017-12-05 The construction hanging basket built for municipal works and room

Publications (2)

Publication Number Publication Date
CN107747281A true CN107747281A (en) 2018-03-02
CN107747281B CN107747281B (en) 2019-06-18

Family

ID=61250150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711264236.6A Active CN107747281B (en) 2017-12-05 2017-12-05 The construction hanging basket built for municipal works and room

Country Status (1)

Country Link
CN (1) CN107747281B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643059A (en) * 2018-05-17 2018-10-12 庄跃东 A kind of Hanging Basket of wider type bridge construction
CN112482740A (en) * 2020-10-27 2021-03-12 中国一冶集团有限公司 Large concave curved working face construction operation device and construction operation method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408021A (en) * 2008-11-18 2009-04-15 中铁大桥局集团第二工程有限公司 Mobile bracket, formwork integral system and method for constructing continuous beam
KR20100106659A (en) * 2009-03-24 2010-10-04 황원기 Appartus for the maintain a level of concrete working
CN201871574U (en) * 2010-12-02 2011-06-22 威海华东重工有限公司 large-tonnage cross beam moving type hydraulic machine
CN202031032U (en) * 2011-03-28 2011-11-09 中铁一局集团有限公司 Direction-changeable wheeled running system for cradle
CN205474848U (en) * 2016-01-26 2016-08-17 刘铁柱 Hanging basket for bridge building
KR20160113430A (en) * 2015-03-20 2016-09-29 현대로템 주식회사 a Installation beam stiffness testing apparatus for Removable tactical long span bridge
CN106541607A (en) * 2016-10-25 2017-03-29 扬力集团股份有限公司 A kind of forcing press mold-change trolley and die exchange
CN206625136U (en) * 2017-04-13 2017-11-10 北京城建华晟交通建设有限公司 A kind of bridge construction Mobile operating platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408021A (en) * 2008-11-18 2009-04-15 中铁大桥局集团第二工程有限公司 Mobile bracket, formwork integral system and method for constructing continuous beam
KR20100106659A (en) * 2009-03-24 2010-10-04 황원기 Appartus for the maintain a level of concrete working
CN201871574U (en) * 2010-12-02 2011-06-22 威海华东重工有限公司 large-tonnage cross beam moving type hydraulic machine
CN202031032U (en) * 2011-03-28 2011-11-09 中铁一局集团有限公司 Direction-changeable wheeled running system for cradle
KR20160113430A (en) * 2015-03-20 2016-09-29 현대로템 주식회사 a Installation beam stiffness testing apparatus for Removable tactical long span bridge
CN205474848U (en) * 2016-01-26 2016-08-17 刘铁柱 Hanging basket for bridge building
CN106541607A (en) * 2016-10-25 2017-03-29 扬力集团股份有限公司 A kind of forcing press mold-change trolley and die exchange
CN206625136U (en) * 2017-04-13 2017-11-10 北京城建华晟交通建设有限公司 A kind of bridge construction Mobile operating platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643059A (en) * 2018-05-17 2018-10-12 庄跃东 A kind of Hanging Basket of wider type bridge construction
CN112482740A (en) * 2020-10-27 2021-03-12 中国一冶集团有限公司 Large concave curved working face construction operation device and construction operation method thereof
CN112482740B (en) * 2020-10-27 2022-05-10 中国一冶集团有限公司 Large concave curved working face construction operation device and construction operation method thereof

Also Published As

Publication number Publication date
CN107747281B (en) 2019-06-18

Similar Documents

Publication Publication Date Title
CN104894977B (en) A kind of method utilizing three-dimensional adjustable jack device to set up magnetic levitation track girder
CN206784198U (en) A kind of bridge high altitude operation stage apparatus
CN107747281A (en) The construction hanging basket built for municipal works and room
CN208183485U (en) It is a kind of can stable regulation roll the rolling device for building of dynamics
CN2861264Y (en) Expansion apparatus for bridge detecting vehicle
CN105201249A (en) Side movement type parking system
CN204570499U (en) A kind of large span vertical curve steel box-girder walking type pushing device
CN106368129A (en) Pushing construction method of single-line railway steel truss bridge utilizing guide beam
CN106740971A (en) The hand relieving device of rail vehicle Parking Brake Cylinders
CN203333261U (en) Automatic sleeper overturn gantry for track panel assembly production
CN105926459A (en) Bridge building steel frame equipment
CN205771390U (en) Copper pipe traction frame
CN204321520U (en) For the quick-replaceable bracing or strutting arrangement of large_sized hydraulic cylinder
CN107892238A (en) A kind of lowering equipment and method for Bailey beam
CN105350793A (en) Building monolithic movement device with self-walking function
CN203583372U (en) Piston shoe for pushing cantilever bridge box girder
CN207998772U (en) A kind of road embossing machine with hydraulicefficiency elevation structure
CN104355203B (en) Octahedral is oriented to elevator
CN107988980A (en) A kind of municipal administration bituminous concrete hollow pavement of road ponding processing equipment
CN206625845U (en) A kind of inverted arch trestle
CN102926327A (en) Rubber-tyred guide beam bridge girder erection machine and installation technology for discrete spanning assembly and integral spanning longitudinal shift of segmental beam
CN201121294Y (en) Hydraulic sliding device
CN1472392A (en) Vibrating vehicle
CN204960365U (en) Building has integral translation device of power
CN203960754U (en) Bridge vertical shift hydraulic means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction hanging basket for municipal engineering and housing construction

Effective date of registration: 20210616

Granted publication date: 20190618

Pledgee: Zhejiang Tailong commercial bank Taizhou branch of Limited by Share Ltd.

Pledgor: ZHEJIANG WULIAN CONSTRUCTION Co.,Ltd.

Registration number: Y2021330000557

PE01 Entry into force of the registration of the contract for pledge of patent right