CN107741080A - Central air-conditioning starting-up method, device and central air-conditioning - Google Patents

Central air-conditioning starting-up method, device and central air-conditioning Download PDF

Info

Publication number
CN107741080A
CN107741080A CN201710946234.9A CN201710946234A CN107741080A CN 107741080 A CN107741080 A CN 107741080A CN 201710946234 A CN201710946234 A CN 201710946234A CN 107741080 A CN107741080 A CN 107741080A
Authority
CN
China
Prior art keywords
conditioning
central air
water
air
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710946234.9A
Other languages
Chinese (zh)
Inventor
李元阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Group Co Ltd
Original Assignee
Midea Group Co Ltd
Guangdong Midea HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Midea Group Co Ltd, Guangdong Midea HVAC Equipment Co Ltd filed Critical Midea Group Co Ltd
Priority to CN201710946234.9A priority Critical patent/CN107741080A/en
Publication of CN107741080A publication Critical patent/CN107741080A/en
Pending legal-status Critical Current

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The embodiment of the present invention provides a kind of starting-up method of central air-conditioning, device and central air-conditioning, belongs to air-conditioning technical field.A kind of starting-up method of central air-conditioning, this method include:When receiving start-up command, it is determined that the performance parameter on the central air-conditioning;According to the aggregate demand ability Q in the performance parameter with the central air-conditioningeRelevant performance parameter determines the aggregate demand ability Qe;According to the aggregate demand ability QeDetermine to influence the factor of central air-conditioning start with the performance parameter on the central air-conditioning to control at least one cooling tower, at least one cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units to open.The present invention can make central air-conditioning start shooting at steady state, smoothly enter steady operational status from open state, reduce energy resource consumption.

Description

Central air-conditioning starting-up method, device and central air-conditioning
Technical field
The present invention relates to air-conditioning technical field, more particularly to central air-conditioning starting-up method, device and central air-conditioning.
Background technology
Large-size water-cooling central air conditioner system is that an equipment is more, the system for controlling complexity.Its system energy efficiency is by system Equipment state, circuit design, outdoor climate and end load the factors such as change influence.Phase interaction between each factor With complicated mechanism, Optimized Operation is all the pith for realizing economical operation in whole start and running.
In the start-up course of large-size water-cooling central air-conditioning, because the length of whole waterway circulating is grown, water is gone out from cold More than 30min is usually required to cold is looped back.1h is even needed to complete once complete circulation for the cold station in center.Institute There is large dead time effect with central air-conditioning, when starting, also because refrigeration unit is more, refrigerating water pump, cooling pump and cooling The number of units of tower is more, and refrigeration unit is frequently necessary to be switched to more units from single unit, or even sometimes load judges inaccuracy Could also stablize subtracting machine from more units, for cooling pump and refrigerating water pump also because flow it is initial indefinite, it is necessary to according to System the temperature difference Real-time frequency conversion operation, can not fast and stable get off, it is possible to there is flow phenomenon bigger than normal, blower fan of cooling tower It is likely to occur the power consumption phenomenon of standard-sized sheet.
The content of the invention
The purpose of the embodiment of the present invention is to provide a kind of central air-conditioning starting-up method, device and central air-conditioning, the center Air-conditioning starting-up method, device and central air-conditioning can make central air-conditioning start shooting at steady state, smoothly from open state Into steady operational status, energy resource consumption is reduced.
To achieve these goals, the embodiment of the present invention provides a kind of starting-up method of central air-conditioning, and the central hollow is stealthily substituted Include at least one cooling tower, at least one cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units, this method Including:When receiving start-up command, it is determined that the performance parameter on the central air-conditioning;According in the performance parameter with it is described The aggregate demand ability Q of central air-conditioningeRelevant performance parameter determines the aggregate demand ability Qe;According to the aggregate demand ability Qe Determine that the factor for influenceing the central air-conditioning start is described at least one to control with the performance parameter on the central air-conditioning Cooling tower, at least one cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units are opened.
Preferably, the performance parameter on the central air-conditioning includes:The indoor wet-bulb temperatures T of every air-conditioningIt is interior, chilled water Supply water temperature T1, every air-conditioning standard wet-bulb temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning Standard capability QMark, chilled water return water temperature T2, chilled water inflow temperature T3, cooling water return water temperature T4, cooling water leaving water temperature T5, water specific heat capacity C and outdoor wet-bulb temperature TOutside
Preferably, it is described according in the performance parameter with the aggregate demand ability QeDescribed in relevant performance parameter determines Aggregate demand ability QeIncluding:According to the indoor wet-bulb temperatures T of every air-conditioningIt is interior, the chilled water supply water temperature T1, it is described every The standard wet-bulb temperature T of platform air-conditioningIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning mark Quasi- ability QMarkDetermine the requirement capability Q of every air-conditioningn;Add the requirement capability Q with every air-conditioningnIt is described total to obtain Requirement capability Qe
Preferably, it is described according to the aggregate demand ability QeDetermine to influence institute with the performance parameter on the central air-conditioning State the factor of central air-conditioning start is included with controlling at least one chilled water pump to open:According to the aggregate demand ability Qe、 The chilled water return water temperature T2, the chilled water inflow temperature T3And the specific heat capacity C of water determines at least one chilled water pump Initial flow MFreeze;According to the initial flow M of at least one chilled water pumpFreezeAt least one chilled water pump is controlled to open.
Preferably, according to the aggregate demand ability QeIn determining that influence is described with the performance parameter on the central air-conditioning The factor of centre air-conditioning start is included with controlling at least one handpiece Water Chilling Units to open:By by the aggregate demand ability QeWith not The same method of salary distribution is distributed at least one handpiece Water Chilling Units corresponding with each method of salary distribution at least one to be calculated The efficiency of handpiece Water Chilling Units;With efficiency COP maximum in the efficiencymaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe; The requirement capability control at least one handpiece Water Chilling Units being allocated according at least one handpiece Water Chilling Units are opened.
Preferably, it is described according to the aggregate demand ability QeDetermine to influence institute with the performance parameter on the central air-conditioning State the factor of central air-conditioning start is included with controlling at least one cooling water pump to open:According to the aggregate demand ability Qe、 The cooling water return water temperature T4, the cooling water leaving water temperature T5, the maximum efficiency COPmaxAnd the specific heat capacity C of water is true The initial flow M of fixed at least one cooling water pumpBut;According to the initial flow M of at least one cooling water pumpButControl institute At least one cooling water pump is stated to open.
Preferably, it is determined that influenceing the initial flow M at least one cooling water pump that at least one cooling water pump is openedBut Including:According to the aggregate demand ability QeWith the maximum efficiency COPmaxIt is determined that condensation thermal discharge Qc;According to condensation thermal discharge Qc, the cooling water return water temperature T4, the cooling water leaving water temperature T5And the specific heat capacity C of water determine it is described at least one cold But the initial flow M of water pumpBut
Preferably, it is described according to the aggregate demand ability QeDetermine to influence institute with the performance parameter on the central air-conditioning State the factor of central air-conditioning start is included with controlling the blower fan of at least one cooling tower to open:Determine the cooling water water outlet Temperature T5With the outdoor wet-bulb temperature TOutsideDifference;According to the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutside's Difference controls the blower fan of at least one cooling tower to open.
Preferably, the opening sequence for the equipment that the central air-conditioning includes is:Open the wind of at least one cooling tower Machine;Open at least one cooling water pump;Open at least one chilled water pump;And open at least one cold water Unit.
Preferably, the requirement capability Q of every air-conditioningnCalculated by below equation:Wherein, TIt is interiorFor indoor wet-bulb temperatures, the T of every air-conditioning1For the chilled water supply water temperature, TIn markFor the standard wet bulb of every air-conditioning Temperature, TMark 1For standard chilled water supply water temperature, the Q of every air-conditioningMarkFor the standard capability of every air-conditioning.
Preferably, the initial flow M of at least one chilled water pumpFreezeCalculated by below equation:Wherein, QeFor the aggregate demand ability, T2For the chilled water return water temperature, T3Enter for the chilled water Coolant-temperature gage, the specific heat capacity that C is water.
Preferably, the condensation thermal discharge QcCalculated by below equation:Wherein, QeFor institute State aggregate demand ability, COPmaxFor the maximum efficiency.
Preferably, the initial flow M of at least one cooling water pumpButCalculated by below equation:Wherein, QcFor condensation thermal discharge, T4For the cooling water return water temperature, T5Go out water temperature for the cooling water Degree, the specific heat capacity that C is water.
The embodiment of the present invention also provides a kind of opening device of central air-conditioning, and the central air-conditioning includes at least one cooling Tower, at least one cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units, the device include:Detection unit And control unit, wherein, the detection unit is used for when receiving start-up command, it is determined that the performance on the central air-conditioning is joined Number;Described control unit is used for according to the aggregate demand ability Q in the performance parameter with the central air-conditioningeRelevant performance ginseng Number determines the aggregate demand ability Qe;According to the aggregate demand ability QeShadow is determined with the performance parameter on the central air-conditioning Ring the factor of central air-conditioning start with control at least one cooling tower, at least one cooling water pump, it is described extremely A few chilled water pump and at least one handpiece Water Chilling Units are opened.
Preferably, the performance parameter on the central air-conditioning includes:The indoor wet-bulb temperatures T of every air-conditioningIt is interior, chilled water Supply water temperature T1, every air-conditioning standard wet-bulb temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning Standard capability QMark, chilled water return water temperature T2, chilled water inflow temperature T3, cooling water return water temperature T4, cooling water leaving water temperature T5, water specific heat capacity C and outdoor wet-bulb temperature TOutside
Preferably, described control unit is additionally operable to:According to the indoor wet-bulb temperatures T of every air-conditioningIt is interior, the chilled water Supply water temperature T1, every air-conditioning standard wet-bulb temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1、 The standard capability Q of every air-conditioningMarkDetermine the requirement capability Q of every air-conditioningn;Add the demand energy with every air-conditioning Power QnTo obtain the aggregate demand ability Qe
Preferably, described control unit is additionally operable to:According to the aggregate demand ability Qe, the chilled water return water temperature T2, institute State chilled water inflow temperature T3And the specific heat capacity C of water determines the initial flow M of at least one chilled water pumpFreeze;According to it is described extremely The initial flow M of a few chilled water pumpFreezeAt least one chilled water pump is controlled to open.
Preferably, described control unit is additionally operable to include:By by the aggregate demand ability QeWith the different methods of salary distribution Distribute at least one handpiece Water Chilling Units so that the energy of at least one handpiece Water Chilling Units corresponding with each method of salary distribution is calculated Effect;With efficiency COP maximum in the efficiencymaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe;According to it is described at least The allocated requirement capability control at least one handpiece Water Chilling Units of one handpiece Water Chilling Units are opened.
Preferably, described control unit is additionally operable to:According to the aggregate demand ability Qe, the cooling water return water temperature T4, institute State cooling water leaving water temperature T5, the maximum efficiency COPmaxAnd the specific heat capacity C of water determines at least one cooling water pump Initial flow MBut;According to the initial flow M of at least one cooling water pumpButAt least one cooling water pump is controlled to open Open.
Preferably, described control unit is additionally operable to:According to the aggregate demand ability QeWith the maximum efficiency COPmaxReally Surely thermal discharge Q is condensedc;According to condensation thermal discharge Qc, the cooling water return water temperature T4, the cooling water leaving water temperature T5And The specific heat capacity C of water determines the initial flow M of at least one cooling water pumpBut
Preferably, described control unit is additionally operable to:Determine the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference;According to the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference control at least one cooling tower Blower fan open.
Preferably, the opening sequence for the equipment that the central air-conditioning includes is:Open the wind of at least one cooling tower Machine;Open at least one cooling water pump;Open at least one chilled water pump;And open at least one cold water Unit.
The present invention also provides a kind of central air-conditioning, and the central air-conditioning includes the opening device of central air-conditioning described above.
Pass through above-mentioned technical proposal, should using central air-conditioning starting-up method, device and central air-conditioning provided by the invention Method includes:When receiving start-up command, it is determined that the performance parameter on the central air-conditioning;According in the performance parameter with The aggregate demand ability Q of the central air-conditioningeRelevant performance parameter determines the aggregate demand ability Qe;According to the aggregate demand energy Power QeDetermine to influence the factor of central air-conditioning start with the performance parameter on the central air-conditioning with control it is described at least One cooling tower, at least one cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units Open.Indoor load before being started shooting by Accurate Prediction central air-conditioning, by refrigerating water pump, cooling pump, cooling tower and handpiece Water Chilling Units Accurately open under stable state corresponding to the load, smoothly can enter steady operational status from open state, reduce energy Source consumes.
The further feature and advantage of the embodiment of the present invention will be described in detail in subsequent specific embodiment part.
Brief description of the drawings
Accompanying drawing is that the embodiment of the present invention is further understood for providing, and a part for constitution instruction, with The embodiment in face is used to explain the embodiment of the present invention together, but does not form the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is the flow chart of the starting-up method for the central air-conditioning that one embodiment of the invention provides;
Fig. 2 is the flow chart of the determination method of the aggregate demand ability for the central air-conditioning that one embodiment of the invention provides;
Fig. 3 is the flow chart of the open method of the chilled water pump for the central air-conditioning that one embodiment of the invention provides;
Fig. 4 is the flow chart of the open method of the handpiece Water Chilling Units for the central air-conditioning that one embodiment of the invention provides;
Fig. 5 is the flow chart of the open method of the cooling water pump for the central air-conditioning that one embodiment of the invention provides;
Fig. 6 is the stream of the initial flow method for determination of amount of the cooling water pump for the central air-conditioning that another embodiment of the present invention provides Cheng Tu;
Fig. 7 is the flow chart of the open method of the blower fan of the cooling tower for the central air-conditioning that one embodiment of the invention provides;
Fig. 8 is the structural representation of the opening device for the central air-conditioning that one embodiment of the invention provides.
Description of reference numerals
The control unit of 1 detection unit 2.
Embodiment
The embodiment of the embodiment of the present invention is described in detail below in conjunction with accompanying drawing.It should be appreciated that this The embodiment of place description is merely to illustrate and explain the present invention embodiment, is not intended to limit the invention embodiment.
Fig. 1 is the flow chart of the starting-up method for the central air-conditioning that one embodiment of the invention provides.It is as shown in figure 1, of the invention Embodiment provides a kind of starting-up method of central air-conditioning, and the central air-conditioning includes at least one cooling tower, at least one cooling water Pump, at least one chilled water pump and at least one handpiece Water Chilling Units, this method include:When receiving start-up command, it is determined that on The performance parameter (step S11) of the central air-conditioning;According to the aggregate demand ability in the performance parameter with the central air-conditioning QeRelevant performance parameter determines the aggregate demand ability Qe(step S12);According to the aggregate demand ability QeWith in described The performance parameter of centre air-conditioning determine to influence the factor of central air-conditioning start with control at least one cooling tower, it is described extremely A few cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units open (step S13).
In the present embodiment, performance parameter of the present invention preferably on the central air-conditioning includes:The interior of every air-conditioning Wet-bulb temperature TIt is interior, chilled water supply water temperature T1, every air-conditioning standard wet-bulb temperature TIn mark, every air-conditioning standard chilled water supply Coolant-temperature gage TMark 1, every air-conditioning standard capability QMark, chilled water return water temperature T2, chilled water inflow temperature T3, cooling water backwater temperature Spend T4, cooling water leaving water temperature T5, water specific heat capacity C and outdoor wet-bulb temperature TOutside
Above-mentioned performance parameter is obtained by the mode such as detecting and inquiring about, and passes through above-mentioned performance parameter and calculates central air-conditioning Aggregate demand ability Qe, aggregate demand ability QeIt can be understood as needing whole central air-conditioning under conditions present within the time per second Refrigerating capacity.According to aggregate demand ability QeIt can determine to influence the factor of the central air-conditioning start with above-mentioned performance parameter, point The factor of at least one cooling tower, the factor of at least one cooling water pump of influence, at least one chilled water pump of influence Wei not influenceed Factor and influence the factors of at least one handpiece Water Chilling Units.And at least one cooling tower, at least one are controlled by above-mentioned factor Individual cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units are opened.
Fig. 2 is the flow chart of the determination method of the aggregate demand ability for the central air-conditioning that one embodiment of the invention provides.Such as Fig. 2 Shown, this method includes:According to the indoor wet-bulb temperatures T of every air-conditioningIt is interior, the chilled water supply water temperature T1, it is described every The standard wet-bulb temperature T of platform air-conditioningIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning mark Quasi- ability QMarkDetermine the requirement capability Q of every air-conditioningn(step S21);Add the requirement capability Q with every air-conditioningnWith To the aggregate demand ability Qe(step S22).
Using part and aggregate demand ability Q in the present embodimenteRelevant performance parameter, the demand of every air-conditioning is calculated first Ability Qn, can specifically be realized by below equation:
Wherein, TIt is interiorFor indoor wet-bulb temperatures, the T of every air-conditioning1Supplied for the chilled water Coolant-temperature gage, TIn markFor standard wet-bulb temperature, the T of every air-conditioningMark 1For standard chilled water supply water temperature, the Q of every air-conditioningMarkFor every The standard capability of air-conditioning.
Then by the air-conditioned requirement capability Q of institutenSum up, obtain the aggregate demand ability Q of whole central air-conditioninge
Fig. 3 is the flow chart of the open method of the chilled water pump for the central air-conditioning that one embodiment of the invention provides.Such as Fig. 3 institutes Show, this method includes:According to the aggregate demand ability Qe, the chilled water return water temperature T2, the chilled water inflow temperature T3With And the specific heat capacity C of water determines the initial flow M of at least one chilled water pumpFreeze(step S31);According at least one chilled water The initial flow M of pumpFreezeAt least one chilled water pump is controlled to open (step S32).
The present embodiment provides the method for controlling at least one chilled water pump to open, wherein according to aggregate demand ability QeIt can obtain To the factor for influenceing at least one chilled water pump:Initial flow MFreeze, can be realized by below equation:
Wherein, QeFor the aggregate demand ability, T2For the chilled water return water temperature, T3To be described Chilled water inflow temperature, the specific heat capacity that C is water.
At least one chilled water pump is controlled according to initial flow MFreezeOpen, at least one chilled water pump is reached the initial flow Measure MFreeze
Fig. 4 is the flow chart of the open method of the handpiece Water Chilling Units for the central air-conditioning that one embodiment of the invention provides.Such as Fig. 4 institutes Show, this method includes:By by the aggregate demand ability QeDistributed with the different methods of salary distribution at least one cooling-water machine Group is to be calculated the efficiency (step S41) of at least one handpiece Water Chilling Units corresponding with each method of salary distribution;With in the efficiency Maximum efficiency COPmaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe(step S42);According to described at least one cold The allocated requirement capability control at least one handpiece Water Chilling Units of water dispenser group open (step S43).
The present embodiment provides the method for controlling at least one handpiece Water Chilling Units to open, wherein according to aggregate demand ability QeIt can obtain To the factor for influenceing at least one handpiece Water Chilling Units:The allocated requirement capability of each handpiece Water Chilling Units.Wherein, first by will always need Seek ability QeDistributed with the different methods of salary distribution at least one handpiece Water Chilling Units, such as by aggregate demand ability QeIt is divided into n parts, N handpiece Water Chilling Units are given in a manner of decile or not decile according to the performance of each handpiece Water Chilling Units, so as to obtain each cooling-water machine Power of the group for allocated requirement capability.Then aggregate demand ability Q is usedeDivided by the cold water of all allocated requirement capabilities The sum of the power of unit, so as to obtain efficiency COP.Finally, the multiple efficiency COP obtained with the different methods of salary distribution are carried out pair Than finding maximum efficiency COPmax, use the efficiency COP of maximummaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe。 Handpiece Water Chilling Units can be opened according to allocated requirement capability, handpiece Water Chilling Units is reached allocated requirement capability.
Fig. 5 is the flow chart of the open method of the cooling water pump for the central air-conditioning that one embodiment of the invention provides.Such as Fig. 5 institutes Show, this method includes:According to the aggregate demand ability Qe, the cooling water return water temperature T4, the cooling water leaving water temperature T5、 The maximum efficiency COPmaxAnd the specific heat capacity C of water determines the initial flow M of at least one cooling water pumpBut(step S51);According to the initial flow M of at least one cooling water pumpButAt least one cooling water pump is controlled to open (step S52)。
The present embodiment provides the method for controlling at least one cooling water pump to open, wherein according to aggregate demand ability QeIt can obtain To the factor for influenceing at least one cooling water pump:Initial flow MBut, and at least one cooling water pump is controlled according to initial flow MBut Open, at least one cooling water pump is reached initial flow MBut
Fig. 6 is the stream of the initial flow method for determination of amount of the cooling water pump for the central air-conditioning that another embodiment of the present invention provides Cheng Tu.As shown in fig. 6, this method includes:According to the aggregate demand ability QeWith the maximum efficiency COPmaxIt is determined that condensation is put Heat Qc(step S61);According to condensation thermal discharge Qc, the cooling water return water temperature T4, the cooling water leaving water temperature T5And The specific heat capacity C of water determines the initial flow M of at least one cooling water pumpBut(step S62).
Initial flow M is provided in the present embodimentButComputational methods, specially first calculate condensation thermal discharge Qc, can be with Realized using below equation:
Wherein, QeFor the aggregate demand ability, COPmaxFor the maximum efficiency.
Then in condensation thermal discharge QcOn the basis of, calculate initial flow M using below equationBut
Wherein, QcFor condensation thermal discharge, T4For the cooling water return water temperature, T5For the cooling Water leaving water temperature, the specific heat capacity that C is water.
Fig. 7 is the flow chart of the open method of the blower fan of the cooling tower for the central air-conditioning that one embodiment of the invention provides.Such as Shown in Fig. 7, this method includes:Determine the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference (step S71); According to the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference control the blower fan of at least one cooling tower Open (step S72).
The present embodiment provides the method for controlling the blower fan of at least one cooling tower to open, wherein according to cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideThe difference of the two can be obtained, in cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutside When identical, the blower fan of at least one cooling tower is not turned on;In cooling water leaving water temperature T5More than the outdoor wet-bulb temperature TOutsideWhen, The blower fan of at least one cooling tower is opened, with cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference it is bigger, extremely The quantity that the blower fan of a few cooling tower is opened is more and frequency is bigger.
In addition, the present invention controlled according to above example the blower fan of at least one cooling tower, at least one cooling water pump, While at least one chilled water pump and at least one handpiece Water Chilling Units are opened, while it may be referred to following order and open above-mentioned set It is standby:The blower fan of at least one cooling tower is first turned on, then opens at least one cooling water pump, followed by unlatching institute At least one chilled water pump is stated, finally opens at least one handpiece Water Chilling Units.
Fig. 8 is the structural representation of the opening device for the central air-conditioning that one embodiment of the invention provides.As shown in figure 8, this Inventive embodiments also provide a kind of opening device of central air-conditioning, and the central air-conditioning includes at least one cooling tower, at least one Cooling water pump, at least one chilled water pump and at least one handpiece Water Chilling Units, the device include:Detection unit 1 and control unit 2, wherein, the detection unit 1 is used for when receiving start-up command, it is determined that the performance parameter on the central air-conditioning;It is described Control unit 2 is used for according to the aggregate demand ability Q in the performance parameter with the central air-conditioningeRelevant performance parameter determines The aggregate demand ability Qe;According to the aggregate demand ability QeDetermined with the performance parameter on the central air-conditioning described in influence The factor of central air-conditioning start is to control at least one cooling tower, at least one cooling water pump, described at least one Chilled water pump and at least one handpiece Water Chilling Units are opened.
Performance parameter on the central air-conditioning includes:The indoor wet-bulb temperatures T of every air-conditioningIt is interior, chilled water supply water temperature Spend T1, every air-conditioning standard wet-bulb temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning standard Ability QMark, chilled water return water temperature T2, chilled water inflow temperature T3, cooling water return water temperature T4, cooling water leaving water temperature T5, water Specific heat capacity C and outdoor wet-bulb temperature TOutside
Described control unit 2 is additionally operable to:According to the indoor wet-bulb temperatures T of every air-conditioningIt is interior, the chilled water supplies water temperature Spend T1, every air-conditioning standard wet-bulb temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, it is described every The standard capability Q of platform air-conditioningMarkDetermine the requirement capability Q of every air-conditioningn;Add the requirement capability Q with every air-conditioningnWith Obtain the aggregate demand ability Qe
Described control unit 2 is additionally operable to:According to the aggregate demand ability Qe, the chilled water return water temperature T2, the freezing Water inflow temperature T3And the specific heat capacity C of water determines the initial flow M of at least one chilled water pumpFreeze;According to described at least one The initial flow M of chilled water pumpFreezeAt least one chilled water pump is controlled to open.
Described control unit 2 is additionally operable to include:By by the aggregate demand ability QeWith the different methods of salary distribution distribute to At least one handpiece Water Chilling Units are to be calculated the efficiency of at least one handpiece Water Chilling Units corresponding with each method of salary distribution;With institute State efficiency COP maximum in efficiencymaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe;According to described at least one cold The allocated requirement capability control at least one handpiece Water Chilling Units of water dispenser group are opened.
Described control unit 2 is additionally operable to:According to the aggregate demand ability Qe, the cooling water return water temperature T4, the cooling Water leaving water temperature T5, the maximum efficiency COPmaxAnd the specific heat capacity C of water determines the initial of at least one cooling water pump Flow MBut;According to the initial flow M of at least one cooling water pumpButAt least one cooling water pump is controlled to open.
Described control unit 2 is additionally operable to:According to the aggregate demand ability QeWith the maximum efficiency COPmaxIt is determined that condensation Thermal discharge Qc;According to condensation thermal discharge Qc, the cooling water return water temperature T4, the cooling water leaving water temperature T5And the ratio of water Thermal capacitance C determines the initial flow M of at least one cooling water pumpBut
Described control unit 2 is additionally operable to:Determine the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference; According to the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference control the blower fan of at least one cooling tower Open.
The opening sequence for the equipment that the central air-conditioning includes is:Open the blower fan of at least one cooling tower;Open At least one cooling water pump;Open at least one chilled water pump;And open at least one handpiece Water Chilling Units.
The present invention also provides a kind of central air-conditioning, and the central air-conditioning includes the opening device of central air-conditioning described above.
Pass through above-mentioned technical proposal, using central air-conditioning starting-up method, device and central air-conditioning provided by the invention, lead to The indoor load crossed before the start of Accurate Prediction central air-conditioning, refrigerating water pump, cooling pump, cooling tower and handpiece Water Chilling Units are accurately opened Under stable state corresponding to the load, it smoothly can enter steady operational status from open state, reduce energy resource consumption.
The optional embodiment of the embodiment of the present invention is described in detail above in association with accompanying drawing, still, the embodiment of the present invention is simultaneously The detail being not limited in above-mentioned embodiment, can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical scheme for applying example carries out a variety of simple variants, and these simple variants belong to the protection domain of the embodiment of the present invention.
It is further to note that each particular technique feature described in above-mentioned embodiment, in not lance In the case of shield, it can be combined by any suitable means.In order to avoid unnecessary repetition, the embodiment of the present invention pair Various combinations of possible ways no longer separately illustrate.
It will be appreciated by those skilled in the art that realize that all or part of step in above-described embodiment method is to pass through Program instructs the hardware of correlation to complete, and the program storage is in the storage medium, including some instructions are causing list Piece machine, chip or processor (processor) perform all or part of step of each embodiment methods described of the application.It is and preceding The storage medium stated includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
In addition, it can also be combined between a variety of embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is run counter to, it should equally be considered as disclosure of that of the embodiment of the present invention.

Claims (23)

1. a kind of starting-up method of central air-conditioning, the central air-conditioning includes at least one cooling tower, at least one cooling water pump, extremely A few chilled water pump and at least one handpiece Water Chilling Units, it is characterised in that this method includes:
When receiving start-up command, it is determined that the performance parameter on the central air-conditioning;
According to the aggregate demand ability Q in the performance parameter with the central air-conditioningeRelevant performance parameter determines the aggregate demand Ability Qe
According to the aggregate demand ability QeDetermine to influence the central air-conditioning start with the performance parameter on the central air-conditioning Factor is to control at least one cooling tower, at least one cooling water pump, at least one chilled water pump and institute At least one handpiece Water Chilling Units are stated to open.
2. the starting-up method of central air-conditioning according to claim 1, it is characterised in that the performance on the central air-conditioning Parameter includes:
The indoor wet-bulb temperatures T of every air-conditioningIt is interior, chilled water supply water temperature T1, every air-conditioning standard wet-bulb temperature TIn mark, every sky The standard chilled water supply water temperature T of tuneMark 1, every air-conditioning standard capability QMark, chilled water return water temperature T2, chilled water inflow temperature T3, cooling water return water temperature T4, cooling water leaving water temperature T5, water specific heat capacity C and outdoor wet-bulb temperature TOutside
3. the starting-up method of central air-conditioning according to claim 2, it is characterised in that described according in the performance parameter With the aggregate demand ability QeRelevant performance parameter determines the aggregate demand ability QeIncluding:
According to the indoor wet-bulb temperatures T of every air-conditioningIt is interior, the chilled water supply water temperature T1, every air-conditioning standard it is wet Ball temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning standard capability QMarkDetermine institute State the requirement capability Q of every air-conditioningn
Add the requirement capability Q with every air-conditioningnTo obtain the aggregate demand ability Qe
4. the starting-up method of central air-conditioning according to claim 3, it is characterised in that described according to the aggregate demand ability QeDetermine to influence the factor of central air-conditioning start with the performance parameter on the central air-conditioning to control described at least one Individual chilled water pump, which is opened, to be included:
According to the aggregate demand ability Qe, the chilled water return water temperature T2, the chilled water inflow temperature T3And the specific heat of water Hold the initial flow M that C determines at least one chilled water pumpFreeze
According to the initial flow M of at least one chilled water pumpFreezeAt least one chilled water pump is controlled to open.
5. the starting-up method of central air-conditioning according to claim 3, it is characterised in that according to the aggregate demand ability QeWith Performance parameter on the central air-conditioning determines that the factor for influenceing the central air-conditioning start is described at least one cold to control Water dispenser group, which is opened, to be included:
By by the aggregate demand ability QeDistributed with the different methods of salary distribution at least one handpiece Water Chilling Units to be calculated The efficiency of at least one handpiece Water Chilling Units corresponding with each method of salary distribution;
With efficiency COP maximum in the efficiencymaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe
The requirement capability control at least one handpiece Water Chilling Units being allocated according at least one handpiece Water Chilling Units are opened.
6. the starting-up method of central air-conditioning according to claim 5, it is characterised in that described according to the aggregate demand ability QeDetermine to influence the factor of central air-conditioning start with the performance parameter on the central air-conditioning to control described at least one Individual cooling water pump, which is opened, to be included:
According to the aggregate demand ability Qe, the cooling water return water temperature T4, the cooling water leaving water temperature T5, it is described maximum Efficiency COPmaxAnd the specific heat capacity C of water determines the initial flow M of at least one cooling water pumpBut
According to the initial flow M of at least one cooling water pumpButAt least one cooling water pump is controlled to open.
7. the starting-up method of central air-conditioning according to claim 6, it is characterised in that it is determined that influenceing described at least one cold But the initial flow M at least one cooling water pump that water pump is openedButIncluding:
According to the aggregate demand ability QeWith the maximum efficiency COPmaxIt is determined that condensation thermal discharge Qc
According to condensation thermal discharge Qc, the cooling water return water temperature T4, the cooling water leaving water temperature T5And the specific heat capacity C of water Determine the initial flow M of at least one cooling water pumpBut
8. the starting-up method of central air-conditioning according to claim 2, it is characterised in that described according to the aggregate demand ability QeDetermine to influence the factor of central air-conditioning start with the performance parameter on the central air-conditioning to control described at least one The blower fan of individual cooling tower, which is opened, to be included:
Determine the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference;
According to the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference control the wind of at least one cooling tower Machine is opened.
9. the starting-up method of central air-conditioning according to claim 1, it is characterised in that the equipment that the central air-conditioning includes Opening sequence be:
Open the blower fan of at least one cooling tower;
Open at least one cooling water pump;
Open at least one chilled water pump;And
Open at least one handpiece Water Chilling Units.
10. the starting-up method of central air-conditioning according to claim 3, it is characterised in that the demand energy of every air-conditioning Power QnCalculated by below equation:
Wherein, TIt is interiorFor indoor wet-bulb temperatures, the T of every air-conditioning1Supplied water for the chilled water warm Degree, TIn markFor standard wet-bulb temperature, the T of every air-conditioningMark 1For standard chilled water supply water temperature, the Q of every air-conditioningMarkFor every air-conditioning Standard capability.
11. the starting-up method of central air-conditioning according to claim 4, it is characterised in that at least one chilled water pump Initial flow MFreezeCalculated by below equation:
Wherein, QeFor the aggregate demand ability, T2For the chilled water return water temperature, T3For the freezing Water inflow temperature, the specific heat capacity that C is water.
12. the starting-up method of central air-conditioning according to claim 7, it is characterised in that the condensation thermal discharge QcBy with Lower formula calculates:
Wherein, QeFor the aggregate demand ability, COPmaxFor the maximum efficiency.
13. the starting-up method of central air-conditioning according to claim 7, it is characterised in that at least one cooling water pump Initial flow MButCalculated by below equation:
Wherein, QcFor condensation thermal discharge, T4For the cooling water return water temperature, T5Go out for the cooling water Coolant-temperature gage, the specific heat capacity that C is water.
14. a kind of opening device of central air-conditioning, the central air-conditioning include at least one cooling tower, at least one cooling water pump, At least one chilled water pump and at least one handpiece Water Chilling Units, it is characterised in that the device includes:
Detection unit and control unit, wherein,
The detection unit is used for when receiving start-up command, it is determined that the performance parameter on the central air-conditioning;
Described control unit is used for according to the aggregate demand ability Q in the performance parameter with the central air-conditioningeRelevant performance ginseng Number determines the aggregate demand ability Qe;According to the aggregate demand ability QeShadow is determined with the performance parameter on the central air-conditioning Ring the factor of central air-conditioning start with control at least one cooling tower, at least one cooling water pump, it is described extremely A few chilled water pump and at least one handpiece Water Chilling Units are opened.
15. the opening device of central air-conditioning according to claim 14, it is characterised in that the property on the central air-conditioning Energy parameter includes:
The indoor wet-bulb temperatures T of every air-conditioningIt is interior, chilled water supply water temperature T1, every air-conditioning standard wet-bulb temperature TIn mark, every sky The standard chilled water supply water temperature T of tuneMark 1, every air-conditioning standard capability QMark, chilled water return water temperature T2, chilled water inflow temperature T3, cooling water return water temperature T4, cooling water leaving water temperature T5, water specific heat capacity C and outdoor wet-bulb temperature TOutside
16. the opening device of central air-conditioning according to claim 15, it is characterised in that described control unit is additionally operable to:
According to the indoor wet-bulb temperatures T of every air-conditioningIt is interior, the chilled water supply water temperature T1, every air-conditioning standard it is wet Ball temperature TIn mark, every air-conditioning standard chilled water supply water temperature TMark 1, every air-conditioning standard capability QMarkDetermine institute State the requirement capability Q of every air-conditioningn
Add the requirement capability Q with every air-conditioningnTo obtain the aggregate demand ability Qe
17. the opening device of central air-conditioning according to claim 16, it is characterised in that described control unit is additionally operable to:
According to the aggregate demand ability Qe, the chilled water return water temperature T2, the chilled water inflow temperature T3And the specific heat of water Hold the initial flow M that C determines at least one chilled water pumpFreeze
According to the initial flow M of at least one chilled water pumpFreezeAt least one chilled water pump is controlled to open.
18. the opening device of central air-conditioning according to claim 16, it is characterised in that described control unit is additionally operable to wrap Include:
By by the aggregate demand ability QeDistributed with the different methods of salary distribution at least one handpiece Water Chilling Units to be calculated The efficiency of at least one handpiece Water Chilling Units corresponding with each method of salary distribution;
With efficiency COP maximum in the efficiencymaxThe corresponding method of salary distribution distributes the aggregate demand ability Qe
The requirement capability control at least one handpiece Water Chilling Units being allocated according at least one handpiece Water Chilling Units are opened.
19. the opening device of central air-conditioning according to claim 18, it is characterised in that described control unit is additionally operable to:
According to the aggregate demand ability Qe, the cooling water return water temperature T4, the cooling water leaving water temperature T5, it is described maximum Efficiency COPmaxAnd the specific heat capacity C of water determines the initial flow M of at least one cooling water pumpBut
According to the initial flow M of at least one cooling water pumpButAt least one cooling water pump is controlled to open.
20. the opening device of central air-conditioning according to claim 19, it is characterised in that described control unit is additionally operable to:
According to the aggregate demand ability QeWith the maximum efficiency COPmaxIt is determined that condensation thermal discharge Qc
According to condensation thermal discharge Qc, the cooling water return water temperature T4, the cooling water leaving water temperature T5And the specific heat capacity C of water Determine the initial flow M of at least one cooling water pumpBut
21. the opening device of central air-conditioning according to claim 15, it is characterised in that described control unit is additionally operable to:
Determine the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference;
According to the cooling water leaving water temperature T5With the outdoor wet-bulb temperature TOutsideDifference control the wind of at least one cooling tower Machine is opened.
22. the opening device of central air-conditioning according to claim 14, it is characterised in that what the central air-conditioning included sets Standby opening sequence is:
Open the blower fan of at least one cooling tower;
Open at least one cooling water pump;
Open at least one chilled water pump;And
Open at least one handpiece Water Chilling Units.
23. a kind of central air-conditioning, it is characterised in that the central air-conditioning includes any one claim in claim 14-22 The opening device of described central air-conditioning.
CN201710946234.9A 2017-10-12 2017-10-12 Central air-conditioning starting-up method, device and central air-conditioning Pending CN107741080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710946234.9A CN107741080A (en) 2017-10-12 2017-10-12 Central air-conditioning starting-up method, device and central air-conditioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710946234.9A CN107741080A (en) 2017-10-12 2017-10-12 Central air-conditioning starting-up method, device and central air-conditioning

Publications (1)

Publication Number Publication Date
CN107741080A true CN107741080A (en) 2018-02-27

Family

ID=61237309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710946234.9A Pending CN107741080A (en) 2017-10-12 2017-10-12 Central air-conditioning starting-up method, device and central air-conditioning

Country Status (1)

Country Link
CN (1) CN107741080A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108592291A (en) * 2018-05-09 2018-09-28 深圳达实智能股份有限公司 A kind of method and system judging water pump of air conditioner efficiency by flow and pressure difference
CN109654707A (en) * 2019-02-21 2019-04-19 陈碧贤 Energy-saving control method for central air conditioner based on edge effect
CN110332848A (en) * 2019-08-08 2019-10-15 长江慧控科技(武汉)有限公司 A kind of cooling tower energy conservation increasing longevity control method, device and equipment based on BA
CN110686381A (en) * 2019-10-15 2020-01-14 广东美的暖通设备有限公司 Air conditioner control method and device and computer readable storage medium
CN114576797A (en) * 2022-03-28 2022-06-03 珠海格力电器股份有限公司 Control method of air conditioner and air conditioner

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1375665A (en) * 2001-03-20 2002-10-23 广东省科学院自动化工程研制中心 Intelligent power saving system for central air conditioner
JP2004309032A (en) * 2003-04-08 2004-11-04 Hiroshi Ogawa Central air conditioning and heating equipment and its operation control method
CN102080863A (en) * 2010-12-08 2011-06-01 海尔集团公司 Control method and device of central air conditioner
CN102645006A (en) * 2012-05-07 2012-08-22 深圳市捷华深环保节能科技有限公司 Energy-saving remote control system for central air conditioner and use method thereof
CN105546759A (en) * 2016-01-12 2016-05-04 重庆大学 Central air-conditioning energy-saving control system and control strategy thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1375665A (en) * 2001-03-20 2002-10-23 广东省科学院自动化工程研制中心 Intelligent power saving system for central air conditioner
JP2004309032A (en) * 2003-04-08 2004-11-04 Hiroshi Ogawa Central air conditioning and heating equipment and its operation control method
CN102080863A (en) * 2010-12-08 2011-06-01 海尔集团公司 Control method and device of central air conditioner
CN102645006A (en) * 2012-05-07 2012-08-22 深圳市捷华深环保节能科技有限公司 Energy-saving remote control system for central air conditioner and use method thereof
CN105546759A (en) * 2016-01-12 2016-05-04 重庆大学 Central air-conditioning energy-saving control system and control strategy thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108592291A (en) * 2018-05-09 2018-09-28 深圳达实智能股份有限公司 A kind of method and system judging water pump of air conditioner efficiency by flow and pressure difference
CN109654707A (en) * 2019-02-21 2019-04-19 陈碧贤 Energy-saving control method for central air conditioner based on edge effect
CN110332848A (en) * 2019-08-08 2019-10-15 长江慧控科技(武汉)有限公司 A kind of cooling tower energy conservation increasing longevity control method, device and equipment based on BA
CN110686381A (en) * 2019-10-15 2020-01-14 广东美的暖通设备有限公司 Air conditioner control method and device and computer readable storage medium
CN110686381B (en) * 2019-10-15 2021-09-14 广东美的暖通设备有限公司 Air conditioner control method and device and computer readable storage medium
CN114576797A (en) * 2022-03-28 2022-06-03 珠海格力电器股份有限公司 Control method of air conditioner and air conditioner

Similar Documents

Publication Publication Date Title
CN107741080A (en) Central air-conditioning starting-up method, device and central air-conditioning
JP4829147B2 (en) Air conditioning equipment
JP5890697B2 (en) Cooling tower fan control apparatus and method
CN105757912B (en) A kind of quick accuracy controlling system of museum's showcase microenvironment temperature and humidity
US20130098084A1 (en) Chiller control apparatus
US9175889B2 (en) Heat source system and control method thereof
US10181725B2 (en) Method for operating at least one distributed energy resource comprising a refrigeration system
US20110197601A1 (en) Chiller with setpoint adjustment
JP6001375B2 (en) Air conditioning system
CN107883519A (en) Central air-conditioning, the control method of its cooling tower, device and readable storage medium storing program for executing
US20160178262A1 (en) Method and system for pre-cooling
US11808483B2 (en) Systems and methods for controlling free cooling and integrated free cooling
CN107664339A (en) Control method, device and the central air-conditioning of the cooling water pump of central air-conditioning
CN109237844A (en) The refrigeration control method and device of air-conditioning system, air-conditioning system
CA2962291C (en) Micro environmental control system
JP2006284063A (en) Thermo-hygrostat
KR100789436B1 (en) Complex heating and cooling system
JP6017374B2 (en) Heat source system
KR102507362B1 (en) Data center local cooling system with pre-cooling chiller
JP5098046B2 (en) Temperature control system
WO2020151112A1 (en) Spray control method and device for indirect evaporative cold-source cold pump
JP5336268B2 (en) Cooling system and cooling method
CN206514574U (en) A kind of data center's refrigeration system
CN107560086A (en) Control method, device and the central air-conditioning of central air conditioning cooling water system
US20160109196A1 (en) Method and system for multi-purpose cooling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Yuanyang

Inventor after: Liang Rui

Inventor after: Wang Ying

Inventor after: Zhang Rui

Inventor after: Wu Jiang

Inventor after: Luo Dingxin

Inventor before: Li Yuanyang

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20190429

Address after: 528311 Six Global Innovation Centers in Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Midea HVAC Equipment Co., Ltd.

Applicant after: GUANGZHOU METRO GROUP CO., LTD.

Address before: 528311 Penglai Road Industrial Avenue, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant before: Guangdong Midea HVAC Equipment Co., Ltd.

Applicant before: Midea Group Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227

RJ01 Rejection of invention patent application after publication