CN107740595A - A kind of processing method of metope cracking - Google Patents

A kind of processing method of metope cracking Download PDF

Info

Publication number
CN107740595A
CN107740595A CN201711000684.5A CN201711000684A CN107740595A CN 107740595 A CN107740595 A CN 107740595A CN 201711000684 A CN201711000684 A CN 201711000684A CN 107740595 A CN107740595 A CN 107740595A
Authority
CN
China
Prior art keywords
cracking
wall surface
glue
wall
processing method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711000684.5A
Other languages
Chinese (zh)
Inventor
何同继
王鹏
张怀鹏
王建亮
章晓铭
仓少杰
曾波
李锡波
施有贤
黄小春
闫心灵
田文成
程现伟
王巍
司威振
王冠川
张磊
杨正彪
孟飞
曹晓真
刘宏伟
徐棚
李伟晗
周宾
刘雷
姚善福
房国权
郑栋帅
韩马超
满彦汝
王华甫
朱强
王超
傅永阁
王联庚
郭辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201711000684.5A priority Critical patent/CN107740595A/en
Publication of CN107740595A publication Critical patent/CN107740595A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0296Repairing or restoring facades

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Ceramic Engineering (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Materials Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Organic Chemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of cracking of wall surface processing method, belong to architecture structural crack technical field of construction.Cracking of wall surface processing method disclosed by the invention comprises the following steps:A, moved towards according to cracking of wall surface, pending cracking of wall surface is slotted, dug depth and fill brick face to dig to wall, cut width and respectively stretch out not less than crack both sides the width after 10cm, dig length not less than the distance between wall body slit slitted distal end;B, brushing glue at cracking of wall surface fluting;C, grid cloth is first laid at cracking of wall surface fluting, then the brushing glue on grid cloth again;D, fill and lead up cracking of wall surface with motar closing to slot, the motar, which is participated in, glue;Above-mentioned steps a, b, c, d are carried out successively.Cracking of wall surface processing method disclosed by the invention is simple, convenient, and efficiency of construction is high, low engineering cost, and the secondary cracking risk of cracking of wall surface is small.

Description

A kind of processing method of metope cracking
Technical field
The invention belongs to architecture structural crack technical field of construction, and in particular to a kind of processing method of metope cracking.
Background technology
In building structure field, new roof/wall surface crack is relatively conventional common fault.The reason for possible, has a lot, such as:Wall The non-plucking in body surface face or plucking are of poor quality, build wall on disconnected brick by laying bricks or stones, and masonry seam is uneven, masonry hole defect, and concrete joins with masonry Linked network processing in face is poor, and pipeline, which is slotted, fixed difference or does not block direct rendering, and individual layer of plastering is blocked up etc..Cracking of wall surface both influences U.S. See, potential safety hazard again be present, it is therefore desirable to timely processing.
Traditional wall crazing repairing method has:1st, wall body structure ftractures.This common decoration method of cracking can not be repaired, must Professional building structure personnel must be looked for take corresponding measure according to actual conditions.2nd, seam crossing ftractures.Typically etc. whole building body deformation Repaired after tending towards stability, the reparation within the short time easily deforms again.3rd, putty layer ftractures.If crack is deep Enter putty layer, can insert filleting gypsum first with sharp instruments by crack growth to a screwdriver size and carry out levelling, patch of polishing Carried out after upper grid cloth with putty it is levelling, finally according to normal process mopping or wallpaper.4th, coat of plaster ftractures.Knock out original There is coat of plaster, do the coat of plaster of a cement mortar again, normal procedure mopping is pressed again after levelling, cost can phase after so handling To improving.The 5th, if simply surface film is cracked enamelled coating cracking.Crackle is polished off with fine sandpaper, selects respective color identical Wall finiss, brush again.
But at Specific construction scene, the reason for causing cracking of wall surface, is complicated and changeable, and above-mentioned conventional repair method can not solve All cracking of wall surface problems certainly actually occurred, and process is lengthy and jumbled, long in time limit, construction costs is high.
Therefore, it is necessary to develop new cracking of wall surface processing method.
The content of the invention
In order to solve the above technical problems, the present invention provides a kind of processing method of metope cracking.Metope of the present invention The processing method of cracking improves operating efficiency, saves financial cost.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of cracking of wall surface processing method, comprises the following steps:
A, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Width is cut not less than crack both sides respectively to stretch out the width after 10cm, dig length not less than wall body slit slitted distal end it Between distance;
B, after the completion of step a, brushing glue at cracking of wall surface fluting;
C, after the completion of step b, grid cloth is first laid at cracking of wall surface fluting, then the brushing glue on grid cloth again;
D, after the completion of step c, filled and led up with motar closing at cracking of wall surface fluting;The motar, which is participated in, glue;
Above-mentioned steps a, b, c, d are carried out successively.
Further, the sand-lime match ratio of motar described in step d, it is 1 by weight:3~1:2.5;By weight Percentages, the percentage by weight that glue accounts for cement are 1%~2%.
Preferably, by weight percentage, the percentage by weight that the glue accounts for cement is 1%~1.5%.
Preferably, it is that slitted distal end cuts 20cm more that length is dug described in step a.
Preferably, step a also includes operation:Dabbing processing is carried out to the substrate dug.
In specifically embodiment, the glue is 108 glue and/or 801 glue and/or 901 glue.
Optionally, the present invention has advantages below compared with prior art:
(1)Cracking of wall surface processing method disclosed by the invention is simple, convenient, and efficiency of construction is high.
(2)Cracking of wall surface processing method low engineering cost disclosed by the invention, save financial cost.
(3)The secondary cracking risk of cracking of wall surface treated through method disclosed by the invention is small.
Brief description of the drawings
Fig. 1 is the construction process figure of the present invention.
Embodiment
108 glue
" 108 glue " is a kind of novel high polymer synthesis architecture adhesion agent, and outward appearance is micro white transparent colloid, incorporation degree of constructing Well, adhesion strength is high, economical and practical, the stickup of wall, floor tile suitable for normal temperature laboratory environment." 108 glue " is also known as " polyethylene Alcohol formal glue ", it is that a kind of macromolecule bonds prepared by condensation reaction is carried out in acid medium with polyvinyl alcohol and formaldehyde Solution, belong to the translucent or transparent aqueous solution.It is odorless, tasteless, nontoxic, there is good adhesive property, adhesion strength is up to 0.9MPa.
108 glue are routine building raw material, can be by commercially available.
801 glue
801 glue are the improved products of 107 glue(801 and 107 be to claim in generations of the specifications and models of glue), it is to produce 107 glue A set of production process is added during water, i.e., with urea condensation free formaldehyde into urine aldehyde, it is therefore an objective to reduce free formaldehyde content, Show as penetrating odor reduction.
801 glue production raw materials are:Polyvinyl alcohol, water, formaldehyde, urea, hydrochloric acid and sodium hydroxide.
801 glue are routine building raw material, can be by commercially available.
901 glue
901 glue by a variety of high molecular polymers, be aided with function additive science and be formulated, be the glue made of 901 glue powders Water is nontoxic, pollution-free, odorlessness, it is "dead", without alkalescence, cold water can be instantly dissolved in, determine powder, caustic soda without grain corn.Have Film forming is fast, and viscosity height, suspension moisturizing, antienzyme is ageing-resistant, dosage is small, holding time length, stable performance.With its preparation coating, It is easy for construction, line, good leveling property are not urinated, does not roll up skin, are polyvinyl alcohol, the preferable product substituted of acrylamide glue.
901 glue are routine building raw material, can be by commercially available.
Wall body slit
" wall body slit " of the present invention refers specifically to the inside and outside wall body slit of new room.
Motar
" motar " of the present invention, which refers to, to be mainly used in the decoration of building facade and wipes one's face use, or brushes on building basal plane Play this kind of mortar levelling or that protection is provided.
" dig depth and fill brick face to dig to wall " described in cracking of wall surface process method step a disclosed by the invention Meaning be to smear 108 and/or 801 glue and/or 901 glue improve stiction force to be follow-up.
" cut width not less than crack to stretch out described in cracking of wall surface process method step a disclosed by the invention 10cm ", which refers to, to be cut width and respectively stretches out not less than crack both sides the width after 10cm.
The concrete operations of brushing glue are at cracking of wall surface process method step b cracking of wall surface flutings disclosed by the invention: One layer of 108 glue and/or 801 glue and/or 901 glue are equably brushed at fluting so that glue can form one with wall Individual complete uniform plane.The meaning of step operation is to facilitate subsequent construction more preferably to carry out, while plays the solid effect of wall.Such as Fruit at fluting glue smear it is uneven, easily cause plane irregularity, the grid cloth described in step c can not with it is more preferable at fluting Ground adhesion, easily cause the hidden danger that wall ftractures again.
In cracking of wall surface process method step c disclosed by the invention, the more wide pavings of grid cloth laying scope preferably fluting are more Width, seldom spread quite a few paving.More pavings are easily caused grid cloth leakage, and subsequent treatment trouble, few paving is easily caused wall can not be more preferable Adhesion is so as to there is the risk to ftracture again.
Generally, calculate by weight, inner-outer wall sand-lime match ratio uses 1:3~1:2.5 weight are plastered than configuration Mortar;Motar, which is participated in, glue.Count by weight percentage, the percentage that the content of glue accounts for cement weight is 1%~ 2%。
Motar participates in glue, such as 108 glue and/or 801 glue and/or 901 glue so that sand-lime and wall are more Connect well, can effectively prevent wall crazing.
With reference to specific embodiment, the present invention will be further described.It should be understood that within the scope of the present invention, it is of the invention Above-mentioned each technical characteristic and below(Such as embodiment)It can be mutually combined between each technical characteristic of middle specific descriptions, so as to Form new or preferable technical scheme.As space is limited, no longer tire out one by one herein and state.It is all to be realized based on the above of the present invention Technical scheme belong to the scope of the present invention.
Embodiment 1
Job site situation:Certain cell house outdoor wall surface cracking, the long 2m in crack, wide 1cm, fracture shape rule, and wall be present Face is flaked phenomenon.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s);
Motar:Sand-lime match ratio is 1:2.5(Calculate by weight), the weight ratio that 108 glue account for cement is 1%(By weight Percentage calculates).
Cracking of wall surface processing technological flow:
1st, metope ghost is knocked out, is moved towards according to wall body slit, pending cracking of wall surface is slotted, digs to wall and fills brick Face, cut width and respectively stretch out 10cm for crack both sides, it is the distance between wall body slit slitted distal end 2m to dig length;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 108 glue with participating in is filled and led up at cracking of wall surface fluting.
Embodiment 2
Job site situation:Certain cell house wall ftractures, and the long 3m in crack, wide 0.2cm, fracture shape is irregular, and exists Putty layer cracking phenomena.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s);
Motar:Sand-lime match ratio is 1:3(Calculate by weight), the weight ratio that 108 glue account for cement is 2%(By weight hundred Divide than calculating).
Cracking of wall surface processing technological flow:
1st, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Cut width for crack both sides respectively to stretch out 15cm, digging length, to be that respectively end for wall body slit end cuts 20cm;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 108 glue with participating in is filled and led up at cracking of wall surface fluting.
Embodiment 3
Job site situation:Certain cell house wall seam crossing is ftractureed, and the long 1.7m in crack, wide 0.2cm, fracture shape are not advised Then, and putty layer cracking phenomena be present.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s);901 glue(Sichuan Bai Cheng Hong Yuan);
Motar:Sand-lime match ratio is 1:2.8(Calculate by weight), the weight ratio that 901 glue account for cement is 1.5%(By weight Percentage is measured to calculate).
Cracking of wall surface processing technological flow:
1st, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Cut width for crack both sides respectively to stretch out 10cm, it is the distance between wall body slit slitted distal end to dig length;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 901 glue with participating in is filled and led up at cracking of wall surface fluting.
Embodiment 4
Job site situation:Certain cell house wall surface putty layer ftractures, the long 1m in crack, wide 0.3cm, and fracture shape is irregular.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s), 901 glue(Sichuan Bai Cheng Hong Yuan);
Motar:Sand-lime match ratio is 1:2.5(Calculate by weight), the weight ratio that 901 glue account for cement is 1%(By weight Percentage calculates).
Cracking of wall surface processing technological flow:
1st, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Cut width for crack both sides respectively to stretch out 10cm, it is the distance between wall body slit slitted distal end to dig length, to digging Substrate carry out dabbing processing;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 901 glue with participating in is filled and led up at cracking of wall surface fluting.
Embodiment 5
Job site situation:Certain cell house wall surface putty layer ftractures, the long 2m in crack, wide 0.4cm, and fracture shape is irregular.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s), 801 glue(Sichuan Bai Cheng Hong Yuan).
Motar:Sand-lime match ratio is 1:3(Calculate by weight), the weight ratio that 801 glue account for cement is 2%(By weight Percentage is measured to calculate).
Cracking of wall surface processing technological flow:
1st, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Cut width for crack both sides respectively to stretch out 10cm, digging length, to be that respectively end respectively more for wall body slit end cuts 20cm, right The substrate dug carries out dabbing processing;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, after the completion of step b, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 801 glue with participating in is filled and led up at cracking of wall surface fluting.
Embodiment 6
Job site situation:Wall crazing outside certain cell house room, the long 3m in crack, wide 1cm, fracture shape is irregular, and deposits In putty layer cracking phenomena.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s), 801 glue(Sichuan Bai Cheng Hong Yuan).
Motar:Sand-lime match ratio is 1:3(Calculate by weight), the weight ratio that 108 glue account for cement is 1.5%(Press Percentage calculates), the weight ratio that 801 glue account for cement is 0.5%(Count by weight percentage).
Cracking of wall surface processing technological flow
1st, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Cut width for crack both sides respectively to stretch out 20cm, it is that respectively end respectively more cuts for wall body slit slitted distal end to dig length 30cm, dabbing processing is carried out to the substrate dug;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 108 glue, 801 glue with participating in is filled and led up at cracking of wall surface fluting.
Embodiment 7
Job site situation:Certain cell house wall seam crossing is ftractureed, and the long 1.7m in crack, wide 0.2cm, fracture shape are not advised Then, and putty layer cracking phenomena be present.
Main construction material:
108 glue(Xi'an Han Gang Chemical Co., Ltd.s), 901 glue(Sichuan Bai Cheng Hong Yuan).
Motar:Sand-lime match ratio is 1:2.5(Calculate by weight), the weight ratio that 901 glue account for cement is 1.5% (Percentagewise).
Cracking of wall surface processing technological flow
1st, moved towards according to wall body slit, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Cut width for crack both sides respectively to stretch out 15cm, it is that respectively end respectively more cuts 25cm for slitted distal end to dig length, has been dug Substrate carries out dabbing processing;
2nd, 108 glue are brushed at cracking of wall surface fluting;
3rd, grid cloth is first laid at cracking of wall surface fluting, then brushes 108 glue on grid cloth again;
4th, the motar closing for having 901 glue with ginseng is filled and led up at cracking of wall surface fluting.
The construction effect of 1~embodiment of embodiment 7:
New room external and internal wall crack after method disclosed in 1~embodiment of embodiment 7 is treated, maintenance is firm, metope without Microgroove, in 5 years, maintenance back wall does not occur secondary cracking.
Above content is only presently preferred embodiments of the present invention, for one of ordinary skill in the art, according to the present invention Thinking, part can be changed in specific embodiment mode and its application, this specification content should not be construed as Limitation of the present invention.

Claims (6)

1. a kind of cracking of wall surface processing method, it is characterised in that comprise the following steps:
A, moved towards according to cracking of wall surface, pending cracking of wall surface slotted, dug depth and fill brick face to dig to wall, Width is cut not less than crack both sides respectively to stretch out the width after 10cm, dig length not less than wall body slit slitted distal end it Between distance;
B, after the completion of step a, brushing glue at cracking of wall surface fluting;
C, after the completion of step b, grid cloth is first laid at cracking of wall surface fluting, then the brushing glue on grid cloth again;
D, after the completion of step c, filled and led up with motar closing at cracking of wall surface fluting, the motar, which is participated in, glue;
Above-mentioned steps a, b, c, d are carried out successively.
2. cracking of wall surface processing method according to claim 1, it is characterised in that the sand-lime of motar described in step d Match ratio, it is 1 by weight:3~1:2.5;By weight percentage, the percentage by weight that glue accounts for cement is 1%~2%.
3. cracking of wall surface processing method according to claim 2, it is characterised in that by weight percentage, the glue The percentage by weight for accounting for cement is 1%~1.5%.
4. cracking of wall surface processing method according to claim 1, it is characterised in that length is dug described in step a as cracking End cuts 20cm more.
5. cracking of wall surface processing method according to claim 1, it is characterised in that step a also includes operation:To what is dug Substrate carries out dabbing processing.
6. the cracking of wall surface processing method according to Claims 1 to 5 any one, it is characterised in that the glue is 108 Glue and/or 801 glue and/or 901 glue.
CN201711000684.5A 2017-10-24 2017-10-24 A kind of processing method of metope cracking Pending CN107740595A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711000684.5A CN107740595A (en) 2017-10-24 2017-10-24 A kind of processing method of metope cracking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711000684.5A CN107740595A (en) 2017-10-24 2017-10-24 A kind of processing method of metope cracking

Publications (1)

Publication Number Publication Date
CN107740595A true CN107740595A (en) 2018-02-27

Family

ID=61237991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711000684.5A Pending CN107740595A (en) 2017-10-24 2017-10-24 A kind of processing method of metope cracking

Country Status (1)

Country Link
CN (1) CN107740595A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043008A (en) * 2019-04-29 2019-07-23 盘锦同济世家装饰工程有限公司 Method for smoothing wall surface and preventing cracking
CN110080550A (en) * 2019-04-03 2019-08-02 由中国 A kind of metope structure
CN111456479A (en) * 2020-04-09 2020-07-28 深圳市维业装饰集团股份有限公司 Ceiling leakage treatment method
CN111733989A (en) * 2020-07-08 2020-10-02 海南红杉科创实业有限公司 Anti-cracking method for splicing seams of assembled wallboard
CN112282415A (en) * 2020-10-20 2021-01-29 天津市建筑材料科学研究院有限公司 Repairing method for crack of thin-plastered external thermal insulation system
CN113431360A (en) * 2021-05-28 2021-09-24 北京市第三建筑工程有限公司 Construction method for repairing cracks of bare concrete wall
CN114150888A (en) * 2021-11-25 2022-03-08 金川集团股份有限公司 Wall plastering layer crack treatment method
CN114538858A (en) * 2022-03-21 2022-05-27 中国十七冶集团有限公司 Concrete floor surface cracking rapid repairing material and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6291368B1 (en) * 1999-10-28 2001-09-18 Wen-Wang Lee Elastic crack tape
JP2009097251A (en) * 2007-10-17 2009-05-07 Sanzeon:Kk Wall surface repair structure
CN204609344U (en) * 2015-05-14 2015-09-02 江苏筑森建筑设计有限公司 A kind of easy construction crack repairing structure fast
CN106285033A (en) * 2016-08-12 2017-01-04 马鞍山十七冶工程科技有限责任公司 A kind of Light trabs crack repairing method
CN106677550A (en) * 2016-12-14 2017-05-17 四川省爱馨佳建筑装饰工程有限公司 Maintenance method for outer-wall crevices
CN106760598A (en) * 2016-12-14 2017-05-31 四川省爱馨佳建筑装饰工程有限公司 Out-wall crack repairs structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6291368B1 (en) * 1999-10-28 2001-09-18 Wen-Wang Lee Elastic crack tape
JP2009097251A (en) * 2007-10-17 2009-05-07 Sanzeon:Kk Wall surface repair structure
CN204609344U (en) * 2015-05-14 2015-09-02 江苏筑森建筑设计有限公司 A kind of easy construction crack repairing structure fast
CN106285033A (en) * 2016-08-12 2017-01-04 马鞍山十七冶工程科技有限责任公司 A kind of Light trabs crack repairing method
CN106677550A (en) * 2016-12-14 2017-05-17 四川省爱馨佳建筑装饰工程有限公司 Maintenance method for outer-wall crevices
CN106760598A (en) * 2016-12-14 2017-05-31 四川省爱馨佳建筑装饰工程有限公司 Out-wall crack repairs structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080550A (en) * 2019-04-03 2019-08-02 由中国 A kind of metope structure
CN110043008A (en) * 2019-04-29 2019-07-23 盘锦同济世家装饰工程有限公司 Method for smoothing wall surface and preventing cracking
CN111456479A (en) * 2020-04-09 2020-07-28 深圳市维业装饰集团股份有限公司 Ceiling leakage treatment method
CN111733989A (en) * 2020-07-08 2020-10-02 海南红杉科创实业有限公司 Anti-cracking method for splicing seams of assembled wallboard
CN112282415A (en) * 2020-10-20 2021-01-29 天津市建筑材料科学研究院有限公司 Repairing method for crack of thin-plastered external thermal insulation system
CN113431360A (en) * 2021-05-28 2021-09-24 北京市第三建筑工程有限公司 Construction method for repairing cracks of bare concrete wall
CN114150888A (en) * 2021-11-25 2022-03-08 金川集团股份有限公司 Wall plastering layer crack treatment method
CN114538858A (en) * 2022-03-21 2022-05-27 中国十七冶集团有限公司 Concrete floor surface cracking rapid repairing material and method

Similar Documents

Publication Publication Date Title
CN107740595A (en) A kind of processing method of metope cracking
CN109838065B (en) Floor tile ground paving construction method
CN104211357B (en) A kind of low alkalinity tile adhesives of improvement
CN105541230B (en) Imitative stone material dry powder paint and its construction method
CN107176814A (en) A kind of method that brushing gypsum or putty are made of building waste
CN106893532A (en) A kind of liquid glue for tile and preparation method thereof
CN105198311A (en) Tile adhesive
CN102531489B (en) Middle elastic relief rough coating
CN103291024B (en) A kind of construction method of novel cement-based motar
CN110306819A (en) A kind of ancient building common brick exterior wall method for repairing and mending
CN107601985A (en) A kind of ceramic tile interface agent
CN111411733B (en) Stone reverse-hitting process additionally provided with heat insulation board
CN107987599A (en) A kind of exterior wall smooth surface powder of lacquer putty for use on formula
CN104193268A (en) Water-retention and anti-cracking concrete for flower stand
CN110028269A (en) A kind of strength glue for tile essence
CN112010597A (en) Multifunctional single-component leveling material for renovating old wall surfaces and old ceramic tiles and construction method thereof
CN105462335A (en) Modified powder capable of raising stability of polymer-cement waterproof coating
CN104860610A (en) High viscosity building wall repair material
CN103274644A (en) Leveling putty specially used for ceiling as well as preparation method and construction method thereof
CN107188507A (en) A kind of levelling patch block mortar material of indoor and outdoor
CN103469978B (en) A kind of wall surface construction technology
CN110157228A (en) A kind of powdery textured coating and its construction method
CN109516740A (en) The dedicated clay of the levelling integrated construction of floor tile paving and its construction method
CN204662834U (en) A kind of thin-coat plaster heat insulation decoration integrated plate and production system
CN215802402U (en) New and old wall surface prevents ftractureing and levels structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 101100 Tongzhou District, Beijing, Jufuyuan Ethnic Industry Development Base, Juhe Sixth Street, Hui Township

Applicant after: China Railway 16 Bureau Group Beijing Metro Engineering Construction Co., Ltd.

Applicant after: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Address before: 100020 Beili 2, Korean Pine Garden, Chaoyang District, Beijing

Applicant before: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Applicant before: China Railway 16 Bureau Group Beijing Metro Engineering Construction Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227