CN107733993A - Electricity charge collection methods and Internet of things system based on compound Internet of Things - Google Patents

Electricity charge collection methods and Internet of things system based on compound Internet of Things Download PDF

Info

Publication number
CN107733993A
CN107733993A CN201710856661.8A CN201710856661A CN107733993A CN 107733993 A CN107733993 A CN 107733993A CN 201710856661 A CN201710856661 A CN 201710856661A CN 107733993 A CN107733993 A CN 107733993A
Authority
CN
China
Prior art keywords
platform
electricity
management
ammeters
internet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710856661.8A
Other languages
Chinese (zh)
Inventor
邵泽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Qinchuan IoT Technology Co Ltd
Original Assignee
Chengdu Qinchuan IoT Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Qinchuan IoT Technology Co Ltd filed Critical Chengdu Qinchuan IoT Technology Co Ltd
Priority to CN201710856661.8A priority Critical patent/CN107733993A/en
Publication of CN107733993A publication Critical patent/CN107733993A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/60Arrangements in telecontrol or telemetry systems for transmitting utility meters data, i.e. transmission of data from the reader of the utility meter

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Physics & Mathematics (AREA)
  • Finance (AREA)
  • Marketing (AREA)
  • Accounting & Taxation (AREA)
  • General Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Game Theory and Decision Science (AREA)
  • Computing Systems (AREA)
  • Medical Informatics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to Internet of Things field, there is provided a kind of electricity charge collection methods and Internet of things system based on compound Internet of Things.Internet of things system includes user platform, multiple services divide platform, multiple management divide platform, sensing network platform and multiple objects to divide platform.Electricity consumption data is sent to management in predetermined time certainly by ammeter and divides platform, after management divides the electricity consumption data of multiple ammeters of platform one cell of statistics or section, the electricity consumption data total amount of the section and the power consumption index that government services platform divides platform to provide to management are compared, and formulate toll project, the total electricity bill of the section is generated, user platform can complete payment by supplementing platform with money.Pass through one cell of programming count or the total amount of the electricity consumption data of section, and charged according to quantity based on power consumption index, a cell or section using electricity wisely can be preferably supervised, by being managed to the user platform of a cell or section, can preferably carry out the policies such as using electricity wisely.

Description

Electricity charge collection methods and Internet of things system based on compound Internet of Things
Technical field
The present invention relates to Internet of Things field, in particular to a kind of electricity charge collection methods based on compound Internet of Things and Internet of things system.
Background technology
With making rapid progress for technology of Internet of things, various instrument and meters also begin to the ranks into Internet of Things, such as ammeter. With the generation of Internet of Things intelligent electric meter, it gradually substitutes traditional ammeter.In order to advocate using electricity wisely, it is necessary to which government passes through confession Electric company is managed to the ammeter and electricity consumption situation of every household, but because number of users is numerous, it is difficult to management and implementation.
The content of the invention
In view of this, it is an object of the invention to provide a kind of electricity charge collection methods and Internet of Things based on compound Internet of Things System, to improve above mentioned problem.
In order to achieve the above object, the technical solution adopted by the present invention is as described below:
In a first aspect, the invention provides a kind of electricity charge collection methods based on compound Internet of Things, methods described is applied to Internet of things system, the Internet of things system includes user platform, multiple services divide platform, multiple management divide platform, sensing network Platform and multiple objects divide platform, and multiple services divide platform to include government services platform and supplement platform, multiple pipes with money Reason divides multiple management servers that platform includes electric company, and multiple objects divide platform to include ammeter, methods described bag Include:Any one transmission electricity consumption that multiple ammeters are divided in platform in predetermined time by sensing network platform to multiple management Data;The management divides the total amount of the electricity consumption data of the multiple ammeters of platform statistics;The management divides platform will be multiple described The power consumption index that the total amount of the electricity consumption data of ammeter is sent with the government services platform compares;The management divides platform foundation Comparing result formulates toll project, and obtains the total electricity bill of multiple ammeters according to toll project;When the user platform leads to Cross when supplementing platform payment with money, the management divides platform to send the total electricity bill to described to supplement platform with money, it is described supplement with money platform by According to the total electricity bill the corresponding amount of money is collected from the user platform.
Further, multiple services divide platform also to include carrier service platform, and it is more that the management divides platform to obtain Also include after the total electricity bill of the individual ammeter:The management divides platform to take the total electricity bill of multiple ammeters by operator Business platform is sent to the user platform.
Further, the management divides platform to formulate toll project according to comparing result, and obtains according to toll project more The step of total electricity bill of the individual ammeter, specifically includes:If the total amount of the electricity consumption data of multiple ammeters is less than or equal to described Power consumption index, then the unit price of total electricity bill is according to benchmark fee;If the total amount of the electricity consumption data of multiple ammeters is more than institute Power consumption index is stated, then calculates the total amount and the difference of the power consumption index of the electricity consumption data of multiple ammeters;If the difference Less than first gradient value, then the unit price of total electricity bill floats according to benchmark expense and 10 collected;If the difference is in the first ladder Between angle value and the second Grad, then the unit price of total electricity bill is collected according to benchmark expense floating 20 percent;If the difference More than the second Grad, then the unit price of total electricity bill floats according to benchmark expense and 30 percent collected;Wherein, the first gradient Value, second Grad and the benchmark expense preset value are put down in the government services platform, and by the government services Platform, which is sent to the management, divides platform.
Further, a user platform corresponds to multiple ammeters, and between the user platform and multiple ammeters It is interrelated.
Further, methods described also includes:The government services platform divides platform acquisition multiple described from the management The total electricity bill of ammeter, according to the relation that is mutually related between user platform and multiple ammeters, obtain the user platform Electricity consumption situation, the electricity consumption situation of the user platform is being shown corresponding to the government services platform on website.
Further, the predetermined time is any one day of every month, and methods described also includes:The management divides platform The total amount of the monthly electricity consumption data of multiple ammeters is counted, the total amount for calculating the electricity consumption data of annual multiple ammeters exceeds The month number of power consumption index;If the total amount of the electricity consumption data of annual multiple ammeters is big beyond the month number of power consumption index In preset times, then electricity Unit Price increase of the user platform corresponding to multiple ammeters in next year.
Second aspect, the present invention also provide a kind of Internet of things system, including user platform, multiple services divide platform, multiple Management divides platform, sensing network platform and multiple objects to divide platform, multiple services divide platform include government services platform with Supplement platform with money, multiple management divide multiple management servers that platform includes electric company, and multiple objects divide platform equal Including ammeter;The ammeter is used for any one hair divided in predetermined time by sensing network platform to multiple management in platform Send electricity consumption data;The management divides platform to be used to count the total amount of the electricity consumption data of multiple ammeters and by multiple ammeters The power consumption index that is sent with the government services platform of total amount of electricity consumption data compare;And formulate and charge according to comparing result Scheme, the total electricity bill of multiple ammeters is obtained according to toll project;The management divides platform to be used for when the user platform leads to Cross supplement with money platform payment when, the total electricity bill is sent to described and supplements platform with money;The platform of supplementing with money is used for according to total electricity Expense collects the corresponding amount of money from the user platform.
Further, multiple services divide platform also to include carrier service platform, and the management divides platform to be additionally operable to The total electricity bill of multiple ammeters is sent to the user platform by carrier service platform.
Further, the management divides platform to be specifically used for:If the total amount of the electricity consumption data of multiple ammeters be less than or Equal to the power consumption index, then the unit price of total electricity bill is according to benchmark fee;If the electricity consumption data of multiple ammeters is total Amount is more than the power consumption index, then calculates the total amount and the difference of the power consumption index of the electricity consumption data of multiple ammeters;Institute State difference and be less than first gradient value, then the unit price of total electricity bill is collected according to benchmark expense floating 10;If the difference exists Between first gradient value and the second Grad, then the unit price of total electricity bill is collected according to benchmark expense floating 20 percent;If institute State difference and be more than the second Grad, then the unit price of total electricity bill is collected according to benchmark expense floating 30 percent;Wherein, described One Grad, second Grad and the benchmark expense preset value are in the government services platform, and by the government Service platform, which is sent to the management, divides platform.
Further, a user platform corresponds to multiple ammeters, and between the user platform and multiple ammeters It is interrelated.
Further, the government services platform is additionally operable to the total electricity for dividing platform to obtain multiple ammeters from the management Take, according to the relation that is mutually related between user platform and multiple ammeters, obtain the electricity consumption situation of the user platform, will The electricity consumption situation of the user platform is being shown corresponding to the government services platform on website.
Further, the predetermined time is any one day of every month, and the management divides platform to be additionally operable to statistics monthly The total amount of the electricity consumption data of multiple ammeters, the total amount for calculating the electricity consumption data of annual multiple ammeters exceed power consumption index Month number;If the total amount of the electricity consumption data of annual multiple ammeters is more than default time beyond the month number of power consumption index Number, then electricity Unit Price increase of the user platform corresponding to multiple ammeters in next year.
The invention provides a kind of electricity charge collection methods and Internet of things system based on compound Internet of Things.This method is applied to Internet of things system, the Internet of things system includes user platform, multiple services divide platform, multiple management divide platform, sensing network Platform and multiple objects divide platform, and multiple services divide platform to include government services platform and supplement platform, multiple pipes with money Reason divides multiple management servers that platform includes electric company, and multiple objects divide platform to include ammeter.Methods described bag Include:Any one transmission electricity consumption that multiple ammeters are divided in platform in predetermined time by sensing network platform to multiple management Data;The management divides the total amount of the electricity consumption data of the multiple ammeters of platform statistics;The management divides platform will be multiple described The power consumption index that the total amount of the electricity consumption data of ammeter is sent with the government services platform compares;The management divides platform foundation Comparing result formulates toll project, and obtains the total electricity bill of multiple ammeters according to toll project;When the user platform leads to Cross when supplementing platform payment with money, the management divides platform to send the total electricity bill to described to supplement platform with money, it is described supplement with money platform by According to the total electricity bill the corresponding amount of money is collected from the user platform.
The present invention, which is certainly sent electricity consumption data to management in predetermined time by ammeter, divides platform, and management divides platform to count It is after the electricity consumption data of multiple ammeters of one section, the electricity consumption data total amount of the section and government services platform is flat to management point The power consumption index that platform provides compares, and formulates toll project, generates the total electricity bill of the section, user platform can be by supplementing with money Platform completes payment.By one cell of programming count or the total amount of the electricity consumption data of section, and based on power consumption index according to quantity To charge, a cell or section using electricity wisely can be preferably supervised, by entering to the user platform of a cell or section Row management, can preferably carry out the policies such as using electricity wisely.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the composition schematic diagram of Internet of things system provided in an embodiment of the present invention.
Fig. 2 is the flow chart of the electricity charge collection methods provided in an embodiment of the present invention based on compound Internet of Things.
Fig. 3 is the total amount and charge feelings of tetra- sections of A, B, C, D provided in an embodiment of the present invention electricity consumption data of one month Condition schematic diagram.
Fig. 4 is the exceeded number schematic diagram of tetra- sections of A, B, C, D provided in an embodiment of the present invention.
Icon:100- Internet of things system;10- user platforms;20- services divide platform;30- management divides platform;40- Sensor Networks Network platform;50- objects divide platform.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be configured to arrange and design with a variety of.
Therefore, below the detailed description of the embodiments of the invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.It is common based on the embodiment in the present invention, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, belong to the model that the present invention protects Enclose.
Fig. 1 is refer to, is the composition schematic diagram of Internet of things system provided in an embodiment of the present invention.The embodiment of the present invention provides The electricity charge collection methods based on compound Internet of Things be applied to Internet of things system 100, the Internet of things system 100 includes user platform 10th, multiple services divide platform 20, multiple management to divide platform 30, sensing network platform 40 and multiple objects to divide platform 50.Wherein, Multiple objects divide in platform 50 any one can by sensing network platform 40 with it is multiple management divide it is any in platform 30 One communication connection, to manage the electricity consumption data for dividing the sending object of platform 30 to divide platform 50 to multiple.
Multiple management divide in platform 30 any one divide platform 20 to communicate to connect with multiple services, in the present embodiment In, service divides platform 20 to include government services platform, supplement with money in platform and social carrier service platform, multiple services point Platform 20 communicates to connect with user platform 10, for receiving the charging information of the transmission of user platform 10, and to user platform 10 Send total electricity bill to be paid.User platform 10 can be general electronic equipment, as PC (personal computer, PC), smart mobile phone, tablet personal computer, personal digital assistant (personal digital assistant, PDA), mobile Internet access are set Standby (mobile Internet device, MID) etc..In the present embodiment, an office building or the infrastructure management company of cell or section A user platform 10 is operated, to manage multiple ammeters of whole cell or section or whole office building.Multiple management divide platform 30 can be multiple management servers of an electric company.Each object divides platform 50 to include ammeter, and the embodiment of the present invention carries The electricity charge collection methods based on compound Internet of Things supplied are applied to reasonably collect multiple ammeters for a user platform 10 The electricity charge, using electricity wisely can be effectively advocated, also allow for managing.
Fig. 2 is refer to, is the flow chart of the electricity charge collection methods provided in an embodiment of the present invention based on compound Internet of Things.Need It is noted that the electricity charge collection methods of the present invention based on compound Internet of Things are not with Fig. 2 and tool as described below Body order is limitation.It should be appreciated that in other embodiments, the electricity charge collection methods of the present invention based on compound Internet of Things The order of which part step can be exchanged with each other according to being actually needed, or part steps therein can also be omitted or deleted Remove, the electricity charge collection methods based on compound Internet of Things are applied to Internet of things system 100, the described method comprises the following steps:
Step S1, multiple ammeters predetermined time by sensing network platform 40 to it is multiple management divide it is any one in platform Individual transmission electricity consumption data.
In the present embodiment, multiple ammeters can be ammeter corresponding to each resident family in a cell or section.Sensor Network Network platform 40 can be intelligent networking gateway, and all ammeters of a cell or section can correspond to an Internet of Things intelligent network Close.In the present embodiment by taking section as an example, the electricity consumption data of itself is passed through the piece by all ammeters of a section in predetermined time Intelligent networking gateway corresponding to area is sent to a management server in multiple management servers of electric company.
Multiple each management servers for dividing in platform 30 of managing can correspond to one or more sections, i.e. section All ammeters, which every time all send the electricity consumption data of itself to multiple management in predetermined time, divides a corresponding pipe in platform 30 Manage in server.Preferably, the predetermined time can be the zero point on every month 1, certainly in other embodiments, The predetermined time can also be 12 points of monthly 8 points, monthly No. 10 of No. 2, per week one zero point etc..
Step S2, management divide the total amount of the electricity consumption data of the multiple ammeters of platform statistics.
The multiple electricity for thering is a management to divide platform 30 to have received that corresponding section divided due to multiple management in platform 30 The electricity consumption data of table, receive the electricity consumption number that the management of the electricity consumption data of multiple ammeters divides platform 30 to count multiple ammeters According to total amount.
Step S3, management divide platform 30 to send out the total amount of the electricity consumption data of multiple ammeters and the government services platform The power consumption index sent compares.
Because government services platform and management divide the intercommunication of platform 30, government services platform can be by power consumption index Each management is sent in advance and divides platform 30, and management divides platform 30 to be stored power consumption index.Wherein, the power consumption index is The Standard clectrical quantity used of the section that government's platform provides in every month, power consumption index can be directed to different sections and make Fixed, situation similar in the ammeter number in section, power consumption index can be with identical.
Refer to Fig. 3, be tetra- sections of A, B, C, D provided in an embodiment of the present invention electricity consumption data of one month total amount and Charge situation schematic diagram.Wherein, the total amount difference for the electricity consumption data that all ammeters of tetra- sections of A, B, C, D used at one month For 400kwh, 550kwh, 640kwh, 710kwh, the ammeter sum of tetra- sections of A, B, C, D is close, four sections Power consumption index be 500kwh.A, the total amount of electricity consumption data of tetra- sections of B, C, D and the comparing result of power consumption index are: The total amount of the electricity consumption data of A sections is without departing from power consumption index;The total amount of the electricity consumption data of B sections exceeds power consumption index 50kw h;The total amount of the electricity consumption data of C sections exceeds power consumption index 140kwh;The total amount of the electricity consumption data of D sections exceeds power consumption index 210kw·h。
Step S4, the management divide platform to formulate toll project according to comparing result, and obtain according to toll project multiple The total electricity bill of the ammeter.
In step s3, the total amount of the electricity consumption data of multiple ammeters corresponding to a section and power consumption index are done Contrast, referring again to Fig. 3, the toll project that the present embodiment is formulated is:If the total amount of the electricity consumption data of multiple ammeters is small In or equal to the power consumption index, then the unit price of total electricity bill is according to benchmark fee.Benchmark expense in the present embodiment is α, Then the total electricity bill of A sections is 400 × α.
If the total amount of the electricity consumption data of multiple ammeters is more than the power consumption index, the use of multiple ammeters is calculated The total amount of electric data and the difference of the power consumption index.Such as the electricity consumption data of multiple ammeters of tri- sections of B, C, D Total amount exceeds the power consumption index, and exceeds 50kwh, 140kwh, 210kwh respectively.
If the difference is less than first gradient value, the unit price of total electricity bill is collected according to benchmark expense floating 10; If the difference, between first gradient value and the second Grad, the unit price of total electricity bill is according to benchmark expense floating 2 percent Ten collect;If the difference is more than the second Grad, the unit price of total electricity bill is collected according to benchmark expense floating 30 percent. Wherein, the first gradient value, second Grad and the benchmark expense preset value be in the government services platform, and Sent by the government services platform to the management and divide platform 30.
In the present embodiment, first gradient value and the second Grad are respectively 100kwh and 200kwh, therefore, B sections Total electricity bill for 550 × α × (1+10%) member, the total electricity bill of C sections is 640 × α × (1+20%), and the total electricity bill of D sections is 710 × α × (1+30%).Certainly, in other embodiments, the first gradient value and the second Grad can also be Other, such as 50kwh and 100kwh, 80kwh and 150kwh etc., government services platform is specifically needed according to actual feelings Condition is formulated.
Step S5, when the user platform by supplement with money platform pay the fees when, management divide platform by the total electricity bill send to Described to supplement platform with money, the platform of supplementing with money collects the corresponding amount of money according to the total electricity bill from the user platform.
It is described management divide the total electricity bill that platform 30 calculates a section after, can be sent by carrier service platform to The user platform 10, after user platform 10 collects the payment information of carrier service platform, it may be selected within certain time limit Payment is completed, in 7 days.When property management personnel operate user platform 10 by supplement with money platform turn over it is time-consuming, management divide platform 30 meetings, which send the total electricity bill of section corresponding to the user platform 10 to described, supplements platform with money, and the platform of supplementing with money is from the user Account corresponding to platform 10 takes off the amount of money corresponding to total electricity bill.The platform of supplementing with money can be the chain server, micro- of supplementing with money of red flag Letter, Alipay etc. can be used for the server supplemented with money.Need it is to be noted that multiple ammeters of a cell or section and the cell Or the user platform 10 of section is interrelated.
In the embodiment of the present invention, the electricity charge collection methods based on compound Internet of Things also include:The management divides platform 30 count the total amount of the monthly electricity consumption data of multiple ammeters, and the total amount for calculating the electricity consumption data of annual multiple ammeters surpasses Go out the month number of power consumption index;
If the total amount of the electricity consumption data of annual multiple ammeters is more than preset times beyond the month number of power consumption index, Then electricity Unit Price increase of the user platform 10 corresponding to multiple ammeters in next year.Described, preset times can be that government takes The index that business platform is formulated.
Fig. 4 is refer to, is the exceeded number schematic diagram of tetra- sections of A, B, C, D provided in an embodiment of the present invention.Wherein, A, B, tetra- sections of C, D are respectively 4 times, 2 times, 3 times, 8 times beyond the month number of power consumption index in annual 12 middle of the month, A, B, C, The preset times of tetra- sections of D are 6 times, thus tri- section whole years of A, B, C monthly beyond power consumption index number be satisfied by it is pre- If number, the electricity Unit Price of next year does not adjust, and is performed according to market price.D sections are more than preset times, and have had more 2 times, this reality The expenses standard of next year can be specified according to the number having more by applying in example, i.e., D sections are α × (1+ in the unit price of the next year electricity charge 20%).
Methods described also includes:The government services platform divides platform 30 to obtain the total of multiple ammeters from the management The electricity charge, according to the relation that is mutually related between user platform 10 and multiple ammeters, obtain user corresponding to various zones and put down The electricity consumption situation of platform 10, by the electricity consumption situation of user platform corresponding to various zones 10 in net corresponding to the government services platform Shown on standing, to advocate each cell, section using electricity wisely.
In summary, the invention provides a kind of electricity charge collection methods and Internet of things system based on compound Internet of Things.Should Method is applied to Internet of things system, and the Internet of things system includes user platform, multiple services divide platform, multiple management point are flat Platform, sensing network platform and multiple objects divide platform, and multiple services divide platform to include government services platform and supplement platform with money, Multiple management divide multiple management servers that platform includes electric company, and multiple objects divide platform to include ammeter. The present invention, which is certainly sent electricity consumption data to management in predetermined time by ammeter, divides platform, and management divides platform to count a section Multiple ammeters electricity consumption data after, divide what platform provided to management by the electricity consumption data total amount of the section and government services platform Power consumption index compares, and formulates toll project, generates the total electricity bill of the section, and management divides platform that total electricity bill can be passed through to fortune Battalion's business's service platform informs user platform in the form of short message, and user platform can complete payment by supplementing platform with money.The present invention The electricity charge collection methods based on compound Internet of Things can with one cell of programming count or the total amount of the electricity consumption data of section, and Charged according to quantity based on power consumption index, can preferably supervise a cell or section using electricity wisely, by cell or The user platform of section is managed, and can preferably carry out the policies such as using electricity wisely.Also, the electricity consumption data total amount mistake of cell Gao Shi, charge it is also higher, beyond the moon number of power consumption index it is higher when, the charge of next year also can be higher, passes through this mode energy It is enough effectively to supervise user's using electricity wisely.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.It should be noted that:Similar label and letter exists Similar terms is represented in following accompanying drawing, therefore, once being defined in a certain Xiang Yi accompanying drawing, is then not required in subsequent accompanying drawing It is further defined and explained.

Claims (12)

1. a kind of electricity charge collection methods based on compound Internet of Things, it is characterised in that methods described is applied to Internet of things system, institute State Internet of things system divides platform, multiple management to divide platform, sensing network platform and multiple objects including user platform, multiple services Divide platform, multiple services divide platform to include government services platform and supplement platform with money, and multiple management divide platform to include confession Multiple management servers of electric company, multiple objects divide platform to include ammeter, and methods described includes:
Multiple ammeters are used in any one transmission that predetermined time is divided in platform by sensing network platform to multiple management Electric data;
The management divides the total amount of the electricity consumption data of the multiple ammeters of platform statistics;
The management divides the electricity consumption that platform sends the total amount of the electricity consumption data of multiple ammeters and the government services platform Index compares;
The management divides platform to formulate toll project according to comparing result, and obtains the total of multiple ammeters according to toll project The electricity charge;
When the user platform is paid the fees by supplementing platform with money, the management divides platform to send the total electricity bill to described to supplement with money Platform, the platform of supplementing with money collect the corresponding amount of money according to the total electricity bill from the user platform.
2. the electricity charge collection methods according to claim 1 based on compound Internet of Things, it is characterised in that multiple services Platform is divided also to include carrier service platform, the total electricity bill for dividing platform to obtain multiple ammeters that manages also includes afterwards: The management divides platform to send the total electricity bill of multiple ammeters to the user platform by carrier service platform.
3. the electricity charge collection methods according to claim 1 based on compound Internet of Things, it is characterised in that the management point is flat Platform formulates toll project according to comparing result, and specifically wraps the step of obtain the total electricity bill of multiple ammeters according to toll project Include:
If the total amount of the electricity consumption data of multiple ammeters is less than or equal to the power consumption index, the unit price of total electricity bill is according to base Quasi- fee;
If the total amount of the electricity consumption data of multiple ammeters is more than the power consumption index, the electricity consumption number of multiple ammeters is calculated According to total amount and the power consumption index difference;
If the difference is less than first gradient value, the unit price of total electricity bill is collected according to benchmark expense floating 10;If institute Difference is stated between first gradient value and the second Grad, then the unit price of total electricity bill is received according to benchmark expense floating 20 percent Take;If the difference is more than the second Grad, the unit price of total electricity bill is collected according to benchmark expense floating 30 percent;
Wherein, the first gradient value, second Grad and the benchmark expense preset value are put down in the government services Platform, and sent by the government services platform to the management and divide platform.
4. the electricity charge collection methods according to claim 1 based on compound Internet of Things a, it is characterised in that user platform Corresponding multiple ammeters, and it is interrelated between the user platform and multiple ammeters.
5. the electricity charge collection methods according to claim 4 based on compound Internet of Things, it is characterised in that methods described is also wrapped Include:The government services platform divides the total electricity bill that platform obtains multiple ammeters from the management, according to user platform with it is more Be mutually related relation between the individual ammeter, obtains the electricity consumption situation of the user platform, by the electricity consumption of the user platform Situation is being shown corresponding to the government services platform on website.
6. the electricity charge collection methods according to claim 5 based on compound Internet of Things, it is characterised in that the predetermined time For any one day of every month, methods described also includes:The management divides the electricity consumption number that platform counts monthly multiple ammeters According to total amount, the total amount for calculating the electricity consumption data of annual multiple ammeters exceeds the month number of power consumption index;
If the total amount of the electricity consumption data of annual multiple ammeters is more than preset times beyond the month number of power consumption index, more Electricity Unit Price increase of the user platform corresponding to the individual ammeter in next year.
7. a kind of Internet of things system, it is characterised in that divide platform, multiple management to divide platform including user platform, multiple services, pass The sense network platform and multiple objects divide platform, and multiple services divide platform to include government services platform and supplement platform with money, multiple The management divides multiple management servers that platform includes electric company, and multiple objects divide platform to include ammeter;
The ammeter is used to use in any one transmission that predetermined time is divided in platform by sensing network platform to multiple management Electric data;
The management divides platform to be used to count the total amount of the electricity consumption data of multiple ammeters and by the electricity consumption of multiple ammeters The power consumption index that the total amount of data is sent with the government services platform compares;And toll project is formulated according to comparing result, The total electricity bill of multiple ammeters is obtained according to toll project;
The management divides platform to be used to, when the user platform is paid the fees by supplementing platform with money, the total electricity bill is sent to described Supplement platform with money;
The platform of supplementing with money is used to collect the corresponding amount of money from the user platform according to the total electricity bill.
8. Internet of things system according to claim 7, it is characterised in that the service divides platform also to include carrier service Platform, the management divide platform to be additionally operable to by carrier service platform send the total electricity bill of multiple ammeters to the use Family platform.
9. Internet of things system according to claim 7, it is characterised in that the management divides platform to be specifically used for:It is if multiple The total amount of the electricity consumption data of the ammeter is less than or equal to the power consumption index, then the unit price of total electricity bill is received according to benchmark expense Take;
If the total amount of the electricity consumption data of multiple ammeters is more than the power consumption index, the electricity consumption number of multiple ammeters is calculated According to total amount and the power consumption index difference;
If the difference is less than first gradient value, the unit price of total electricity bill is collected according to benchmark expense floating 10;If institute Difference is stated between first gradient value and the second Grad, then the unit price of total electricity bill is received according to benchmark expense floating 20 percent Take;If the difference is more than the second Grad, the unit price of total electricity bill is collected according to benchmark expense floating 30 percent;
Wherein, the first gradient value, second Grad and the benchmark expense preset value are put down in the government services Platform, and sent by the government services platform to the management and divide platform.
10. Internet of things system according to claim 7, it is characterised in that a user platform corresponds to multiple ammeters, and It is interrelated between the user platform and multiple ammeters.
11. Internet of things system according to claim 10, it is characterised in that the government services platform is additionally operable to from described Management divides the total electricity bill that platform obtains multiple ammeters, according to the pass that is mutually related between user platform and multiple ammeters System, obtains the electricity consumption situation of the user platform, and the electricity consumption situation of the user platform is corresponding in the government services platform Website on show.
12. Internet of things system according to claim 11, it is characterised in that the predetermined time is any one for every month My god, the management divides the total amount that platform is additionally operable to count the monthly electricity consumption data of multiple ammeters, calculates annual multiple described The total amount of the electricity consumption data of ammeter exceeds the month number of power consumption index;
If the total amount of the electricity consumption data of annual multiple ammeters is more than preset times beyond the month number of power consumption index, more Electricity Unit Price increase of the user platform corresponding to the individual ammeter in next year.
CN201710856661.8A 2017-09-20 2017-09-20 Electricity charge collection methods and Internet of things system based on compound Internet of Things Withdrawn CN107733993A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710856661.8A CN107733993A (en) 2017-09-20 2017-09-20 Electricity charge collection methods and Internet of things system based on compound Internet of Things

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710856661.8A CN107733993A (en) 2017-09-20 2017-09-20 Electricity charge collection methods and Internet of things system based on compound Internet of Things

Publications (1)

Publication Number Publication Date
CN107733993A true CN107733993A (en) 2018-02-23

Family

ID=61206360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710856661.8A Withdrawn CN107733993A (en) 2017-09-20 2017-09-20 Electricity charge collection methods and Internet of things system based on compound Internet of Things

Country Status (1)

Country Link
CN (1) CN107733993A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109190818A (en) * 2018-08-28 2019-01-11 清华大学 Electric power resource management method and system, server-side, computer readable storage medium
CN113411361A (en) * 2020-03-16 2021-09-17 成都秦川物联网科技股份有限公司 Partition cloud platform off-network operation method and system based on intelligent gas meter

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109190818A (en) * 2018-08-28 2019-01-11 清华大学 Electric power resource management method and system, server-side, computer readable storage medium
CN109190818B (en) * 2018-08-28 2021-02-09 交叉信息核心技术研究院(西安)有限公司 Power resource management method and system, server and computer readable storage medium
CN113411361A (en) * 2020-03-16 2021-09-17 成都秦川物联网科技股份有限公司 Partition cloud platform off-network operation method and system based on intelligent gas meter
CN113411361B (en) * 2020-03-16 2022-07-08 成都秦川物联网科技股份有限公司 Partition cloud platform off-network operation method and system based on intelligent gas meter

Similar Documents

Publication Publication Date Title
CN107240002B (en) Electric power transaction method and device and micro-grid system
CN110503569A (en) A kind of new energy settlement system based on block chain
Abdelkader et al. Network usage determination using a transformer analogy
CN112001576A (en) Accounting method for electric power consumption of renewable energy source
CN107967759A (en) Mobile power leasing method, device, terminal and computer-readable recording medium
Tao et al. A congestion-management allocation mechanism for multiple transaction networks
CN108023735A (en) A kind of charging method based on dynamic resource
CN107733993A (en) Electricity charge collection methods and Internet of things system based on compound Internet of Things
CN107508687A (en) A kind of method, apparatus of charging, Internet of Things application platform and accounting server
CN107886252A (en) Electricity electricity charge review method, system and terminal device
CN108053342A (en) A kind of intelligent estate management method, apparatus and system
CN107592363A (en) Water rate collection methods and Internet of things system based on compound Internet of Things
CN107730239A (en) Combustion gas expense collection methods and Internet of things system based on compound Internet of Things
CN106982126A (en) A kind of resource-sharing charging method and message accounting, memory bank
CN105301421A (en) Parallel period line loss measurement platform and method
CN102693463A (en) Pre-purchase power management system and information prompting method thereof
Ali et al. Integrating forecasting service and Gen2 blockchain into a local energy trading platform to promote sustainability goals
CN107786635A (en) Intelligent meter fee method and Internet of things system based on compound Internet of Things
CN104137581B (en) A kind of determination methods and device of repeatedly networking user
CN109523246A (en) Subscriber payment channel method and device for planning
CN104459253A (en) Intelligent electric meter based on network
CN107798555A (en) Heat energy based on compound Internet of Things takes collection methods and Internet of things system
CN110602665B (en) Method for determining sharing service index based on communication certificate sharing service
US9911106B2 (en) System and method for charging services using effective quanta units
CN107222350A (en) Matching method and device of power distribution and utilization business and communication mode

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180223

WW01 Invention patent application withdrawn after publication