CN107733089A - 一种基于svm的变电站刀闸二次回路故障预测方法 - Google Patents

一种基于svm的变电站刀闸二次回路故障预测方法 Download PDF

Info

Publication number
CN107733089A
CN107733089A CN201711103650.9A CN201711103650A CN107733089A CN 107733089 A CN107733089 A CN 107733089A CN 201711103650 A CN201711103650 A CN 201711103650A CN 107733089 A CN107733089 A CN 107733089A
Authority
CN
China
Prior art keywords
mrow
msub
data
svm
disconnecting link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711103650.9A
Other languages
English (en)
Inventor
陈晶腾
陈帅
卓文兴
蒋雷震
刘烁洁
肖颂勇
林啸
蔡方伟
陈敏
陈芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711103650.9A priority Critical patent/CN107733089A/zh
Publication of CN107733089A publication Critical patent/CN107733089A/zh
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0003
    • H02J13/0006
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提供了一种基于SVM的变电站刀闸二次回路故障预测方法,包括如下步骤:步骤一:整理数据源;步骤二:对上述数据源进行预处理获得一致的单调性,并归一化使数值范围处在[0,1];步骤三:通过步骤二得到归一化的数值后,结合历史数据构成的训练样本(xi,yi),训练样本(xi,yi)通过SVM工具箱中函数train‑svm的计算,即可得到偏差b和拉格朗日系数α,得出预测模型:步骤五:用历史数据训练好的预测模型进行刀闸二次回路故障预测,输出为‑1认为正常运行,若输出为+1认为存在故障,即可结合停电计划提前进行故障排查。

Description

一种基于SVM的变电站刀闸二次回路故障预测方法
技术领域
本发明涉及自动化操作领域,尤其涉及平压机自动化送纸。
背景技术
电力***中的隔离开关即刀闸,是电力***重要的电气设备。一旦发生变 电站刀闸二次回路故障,将会出现刀闸拒合、拒分等现象,产生危急缺陷,不 仅影响停送电效率,还增加了工作的安全风险,更甚者可能引起瓷瓶产生裂缝, 甚至断裂,导致设备故障跳闸的严重后果,影响电网正常运行。
然而,由于不同刀闸的各部件损耗进程不同,定期检修、定期维护除增加 维护成本、维护工作量外并不能从根本上解决并预测出刀闸二次回路是否故 障。目前,对于在变电站被广泛使用的刀闸二次回路故障缺乏一种有效的预测 方法。
发明内容
本发明的主要目的在于克服现有技术中的上述缺陷,提出一种基于SVM的 变电站刀闸二次回路故障预测方法,其方法简单清晰,便于计算,易于实现。
为了解决上述的技术问题,本发明提供了一种基于SVM的变电站刀闸二次 回路故障预测方法,包括如下步骤:
步骤一:整理导出PMS台账***中刀闸台账的①安装厂家、②运行年限、 ③检修次数、④运行环境、⑤配电装置型式、⑥承担负荷情况六大主要影响因 素作为数据源;
步骤二:对上述数据源中①安装厂家、④运行环境、⑤配电装置型式进行 预处理获得一致的单调性,并归一化使数值范围处在[0,1];
对安装厂家进行预处理和归一化是指:依据该安装厂家在本辖区电网中实 际故障数量gi,结合PMS台账***中相关安装厂家设备总数Ci,定义该厂家健 康度ηi
式中i=1,2,...,m,m为设备出现过故障的安装厂家数量,并规定暂未出现过 故障的安装厂家健康度为0;
对运行环境进行预处理是指:设备运行在户外环境的情况为1,运行在户 内环境的情况为0;
对配电装置型式进行预处理是指:规定AIS设备为1,GIS设备为0;
①安装厂家、④运行环境、⑤配电装置型式经过上述预处理后获得了一致 的单调性,数值越大,故障率越高,再根据公式(2)将各数据进行归一化使 数值范围处在[0,1];
式中i=1,2,...,n,表示第i组数据,j=1,2,...,6,表示第j维数据,Iij、Ii'j分别表示经预处理后各影响因素数值及经归一化后数值;
步骤三:选择采用径向基RBF函数作为核函数;
步骤四:通过步骤二得到归一化的数值后,结合历史数据构成的训练样本 (xi,yi),i=1,2,...,n,表示第i组数据,其中yi∈{+1,-1};训练样本(xi,yi)通过SVM 工具箱中函数train-svm的计算,即可得到偏差b和拉格朗日系数α,从而得 出如下式的预测模型:
式中xi为训练数据,i=1,2,...,n,n为训练数据组数,x为待预测数据,K为 核函数,且训练数据与预测数据均为6维数据类型; 式中调整参数σ设为64.290;
步骤五:用历史数据训练好的预测模型进行刀闸二次回路故障预测,输出 为-1认为正常运行,若输出为+1认为存在故障,即可结合停电计划提前进行 故障排查。
在一较佳实施例中:在步骤四中,
通过超平面方程w·x+b=0,将:训练样本(xi,yi)分为两类:
上式中,w是向量,支持向量机的最优超平面是一个使得分类边缘最大的 超平面,即使得最大,所以求解最优超平面,即目标函数为
上式应满足约束条件:yi(w·xi+b)-1≥0,i=1,2,...,n。
根据拉格朗日对偶性原理,上述目标函数等效转换为
式中α为拉格朗日乘子,T是矩阵转子,其与w存在如下关系:
采用上述训练样本数据进行训练。
相较于现有技术,本发明的技术方案具备以下有益效果
本发明提出的一种基于SVM的变电站刀闸二次回路故障预测方法,可提前 预知刀闸二次回路健康与否,结合停电计划提前进行故障排查,减少刀闸突发 性故障对倒闸操作的影响和对人身、电网、设备带来的安全隐患,大大提高供 电企业的安全运行水平,提高供电可靠率,具有巨大的社会效益和经济效益。
具体实施方式
以下通过具体实施方式对本发明作进一步的描述。具体包括如下步骤:
1)首先,从PMS台账***中整理导出刀闸台账的①安装厂家、②运行年 限、③检修次数、④运行环境、⑤配电装置型式、⑥承担负荷情况六大主要影 响因素作为训练及测试数据;
2)由于①安装厂家、④运行环境、⑤配电装置型式的数据存在特殊性, 需进行如下预处理:
(1)安装厂家:依据该安装厂家在本辖区电网中实际故障数量gi,结合 PMS台账***中相关安装厂家设备总数Ci,定义该厂家健康度ηi
式中i=1,2,...,m,m为设备出现过故障的安装厂家数量,并规定暂未出现过 故障的安装厂家健康度为0。显然地,健康度越趋近于1,说明故障率越高。
(2)运行环境:本发明规定设备运行在户外的情况为1,在户内的情况为 0,经不完全统计,运行在户外的设备故障率相对高;
(3)配电装置型式:本发明规定AIS设备为1,GIS设备为0,经不完全 统计,AIS设备故障率相对高;
经过上述预处理后获得了一致的单调性,数值越大,故障率越高,再根据 公式(2)将各数据进行归一化使数值范围处在[0,1];
式中i=1,2,...,n,表示第i组数据,j=1,2,...,6,表示第j维数据,Iij、Ii'j分别表示经预处理后各影响因素数值及经归一化后数值。
3)对于模型参数的选定,本发明通过经验及多次测试,选择采用径向基 RBF函数作为核函数,
式中调整参数σ设为64.290;
4)我们知道的,支持向量机是基于统计学***面,使得该平面两侧的两类样本之间的距离最大 化,从而对分类问题提供很好的泛化能力。通过步骤2)得到归一化的数值后, 结合历史数据构成的训练样本(xi,yi),i=1,2,...,n,表示第i组数据,其中 yi∈{+1,-1}。接着,通过超平面方程w·x+b=0,将样本分为两类:
w为向量,支持向量机的最优超平面是一个使得分类边缘最大的超平面, 即使得最大,所以求解最优超平面,即目标函数为
上式应满足约束条件:yi(w·xi+b)-1≥0,i=1,2,...,n。
根据拉格朗日对偶性原理,上述目标函数等效转换为
式中T为矩阵转子,α为拉格朗日乘子,其与w存在如下关系:
采用上述训练样本数据进行训练,通过SVM工具箱中函数train-svm的计 算,即可得到偏差b和拉格朗日系数α,并根据式(7),求出w,从而得出如 下式的预测模型:
式中xi为训练数据,i=1,2,...,n,x为待预测数据,K为核函数,本发明且训练数据与预测数据均为6维数据类型。
5)根据历史数据训练好的预测模型式(8),将预测样本数据输入SVM工 具箱中函数predict-svm进行计算,完成对刀闸二次回路的故障预测,输出为 -1认为正常运行,若输出为+1认为存在故障,即可结合停电计划提前进行故 障排查。
应用举例
根据某地市公司历史运行情况,整理导出300组训练样本,30组测试样本。 训练样本中正常状态260组,故障状态40组;测试样本中正常状态25组,故 障状态5组。
本发明首先根据步骤1)-4)将上述训练样本构成训练集为 {(x1,y1),(x2,y2),...,(x300,y300)},其中,xi∈R6,yi={1,-1},当yi=1时,表示第i个样本 存在刀闸二次回路故障,当yi=-1时,表示第i个样本刀闸二次回路正常。接着, 通过SVM工具箱中函数train-svm计算得到预测模型traindata.model,最后, 根据步骤5)结合预测模型,将预测样本数据输入SVM工具箱中函数 predict-svm计算出预测结果,如下表1所示。
表1刀闸二次回路故障预测结果
上表中整体正确率为预测正确样本数与总预测样本数的比值。且由表1可 知,该发明对刀闸二次回路故障预测的正确率可达90%以上,因此对刀闸二次 回路故障预测是可行、高效的。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局 限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易 想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护 范围应该以权利要求的保护范围为准。

Claims (2)

1.一种基于SVM的变电站刀闸二次回路故障预测方法,其特征在于包括如下步骤:
步骤一:整理导出PMS台账***中刀闸台账的①安装厂家、②运行年限、③检修次数、④运行环境、⑤配电装置型式、⑥承担负荷情况六大主要影响因素作为数据源;
步骤二:对上述数据源中①安装厂家、④运行环境、⑤配电装置型式进行预处理获得一致的单调性,并归一化使数值范围处在[0,1];
对安装厂家进行预处理和归一化是指:依据该安装厂家在本辖区电网中实际故障数量gi,结合PMS台账***中相关安装厂家设备总数Ci,定义该厂家健康度ηi
<mrow> <msub> <mi>&amp;eta;</mi> <mi>i</mi> </msub> <mo>=</mo> <mfrac> <msub> <mi>g</mi> <mi>i</mi> </msub> <msub> <mi>C</mi> <mi>i</mi> </msub> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
式中i=1,2,...,m,m为设备出现过故障的安装厂家数量,并规定暂未出现过故障的安装厂家健康度为0;
对运行环境进行预处理是指:设备运行在户外环境的情况为1,运行在户内环境的情况为0;
对配电装置型式进行预处理是指:规定AIS设备为1,GIS设备为0;
①安装厂家、④运行环境、⑤配电装置型式经过上述预处理后获得了一致的单调性,数值越大,故障率越高,再根据公式(2)将各数据进行归一化使数值范围处在[0,1];
<mrow> <msubsup> <mi>I</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> <mo>&amp;prime;</mo> </msubsup> <mo>=</mo> <mfrac> <mrow> <msub> <mi>I</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mo>-</mo> <mi>min</mi> <mi> </mi> <msub> <mi>I</mi> <mi>j</mi> </msub> </mrow> <mrow> <mi>max</mi> <mi> </mi> <msub> <mi>I</mi> <mi>j</mi> </msub> <mo>-</mo> <mi>min</mi> <mi> </mi> <msub> <mi>I</mi> <mi>j</mi> </msub> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
式中i=1,2,...,n,表示第i组数据,j=1,2,...,6,表示第j维数据,Iij、I′ij分别表示经预处理后各影响因素数值及经归一化后数值;
步骤三:选择采用径向基RBF函数作为核函数,其中调整参数σ设为64.290;
步骤四:通过步骤二得到归一化的数值后,结合历史数据构成的训练样本(xi,yi),i=1,2,...,n,表示第i组数据,其中yi∈{+1,-1};训练样本(xi,yi)通过SVM工具箱中函数train-svm的计算,即可得到偏差b和拉格朗日系数α,从而得出如下式的预测模型:
<mrow> <mi>y</mi> <mrow> <mo>(</mo> <mi>x</mi> <mo>)</mo> </mrow> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;alpha;</mi> <mi>i</mi> </msub> <mi>K</mi> <mrow> <mo>(</mo> <mi>x</mi> <mo>,</mo> <msub> <mi>x</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mi>b</mi> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
式中xi为训练数据,i=1,2,...,n,n为训练数据组数,x为待预测数据,K为核函数,且训练数据与预测数据均为6维数据类型;
步骤五:用历史数据训练好的预测模型进行刀闸二次回路故障预测,输出为-1认为正常运行,若输出为+1认为存在故障,即可结合停电计划提前进行故障排查。
2.根据权利要求1所述的一种基于SVM的变电站刀闸二次回路故障预测方法,其特征在于:在步骤四中,
通过超平面方程w·x+b=0,将:训练样本(xi,yi)分为两类:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>w</mi> <mo>&amp;CenterDot;</mo> <mi>x</mi> <mo>+</mo> <mi>b</mi> <mo>&amp;GreaterEqual;</mo> <mn>0</mn> <mo>,</mo> <mrow> <mo>(</mo> <mi>y</mi> <mo>=</mo> <mo>+</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>w</mi> <mo>&amp;CenterDot;</mo> <mi>x</mi> <mo>+</mo> <mi>b</mi> <mo>&amp;le;</mo> <mn>0</mn> <mo>,</mo> <mrow> <mo>(</mo> <mi>y</mi> <mo>=</mo> <mo>-</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>4</mn> <mo>)</mo> </mrow> </mrow>
上式中,w是向量;支持向量机的最优超平面是一个使得分类边缘最大的超平面,即使得最大,所以求解最优超平面,即目标函数为
<mrow> <mi>m</mi> <mi>i</mi> <mi>n</mi> <mi>&amp;phi;</mi> <mrow> <mo>(</mo> <mi>w</mi> <mo>)</mo> </mrow> <mo>=</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <mo>|</mo> <mo>|</mo> <mi>w</mi> <mo>|</mo> <msup> <mo>|</mo> <mn>2</mn> </msup> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> </mrow>
上式应满足约束条件:yi(w·xi+b)-1≥0,i=1,2,...,n。
根据拉格朗日对偶性原理,上述目标函数等效转换为
<mrow> <mi>m</mi> <mi>a</mi> <mi>x</mi> <mi>&amp;Gamma;</mi> <mrow> <mo>(</mo> <mi>w</mi> <mo>,</mo> <mi>b</mi> <mo>,</mo> <mi>&amp;alpha;</mi> <mo>)</mo> </mrow> <mo>=</mo> <mfrac> <mn>1</mn> <mn>2</mn> </mfrac> <mo>|</mo> <mo>|</mo> <mi>w</mi> <mo>|</mo> <msup> <mo>|</mo> <mn>2</mn> </msup> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <msub> <mi>&amp;alpha;</mi> <mi>i</mi> </msub> <mrow> <mo>(</mo> <msub> <mi>y</mi> <mi>i</mi> </msub> <mo>(</mo> <mrow> <msup> <mi>w</mi> <mi>T</mi> </msup> <msub> <mi>x</mi> <mi>i</mi> </msub> <mo>+</mo> <mi>b</mi> </mrow> <mo>)</mo> <mo>-</mo> <mn>1</mn> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
式中α为拉格朗日乘子,T是指矩阵转子,其与w存在如下关系:
<mrow> <mi>w</mi> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <mi>y</mi> <mrow> <mo>(</mo> <msub> <mi>x</mi> <mi>i</mi> </msub> <mo>)</mo> </mrow> <msub> <mi>x</mi> <mi>i</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>7</mn> <mo>)</mo> </mrow> </mrow>
采用上述训练样本数据进行训练。
CN201711103650.9A 2017-11-10 2017-11-10 一种基于svm的变电站刀闸二次回路故障预测方法 Pending CN107733089A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711103650.9A CN107733089A (zh) 2017-11-10 2017-11-10 一种基于svm的变电站刀闸二次回路故障预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711103650.9A CN107733089A (zh) 2017-11-10 2017-11-10 一种基于svm的变电站刀闸二次回路故障预测方法

Publications (1)

Publication Number Publication Date
CN107733089A true CN107733089A (zh) 2018-02-23

Family

ID=61214326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711103650.9A Pending CN107733089A (zh) 2017-11-10 2017-11-10 一种基于svm的变电站刀闸二次回路故障预测方法

Country Status (1)

Country Link
CN (1) CN107733089A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108923413A (zh) * 2018-05-23 2018-11-30 国网福建省电力有限公司莆田供电公司 基于支持向量机的电压质量预测方法
CN109035066A (zh) * 2018-09-30 2018-12-18 国网山西省电力公司阳泉供电公司 基于svm的10千伏配网高掉闸线路成因分析及治理方法
CN109061453A (zh) * 2018-08-02 2018-12-21 国网福建省电力有限公司 计及相关系数的变电站刀闸二次回路故障预测方法
CN110649597A (zh) * 2019-09-06 2020-01-03 国网山东省电力公司寿光市供电公司 一种基于rbf神经网络的配电网馈线自动化控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105160444A (zh) * 2015-10-22 2015-12-16 广东电网有限责任公司电力调度控制中心 电力设备故障率确定方法及***
CN105932774A (zh) * 2016-05-11 2016-09-07 国网冀北电力有限公司张家口供电公司 基于ica算法的智能变电站设备状态预警方法
US20170015339A1 (en) * 2014-12-12 2017-01-19 Beijing Jiaotong University Complex network-based high speed train system safety evaluation method
CN106844826A (zh) * 2016-12-02 2017-06-13 上海电机学院 一种用于风电机组齿轮箱故障预测诊断的方法
CN107257161A (zh) * 2017-06-20 2017-10-17 安徽南瑞继远电网技术有限公司 一种基于状态识别算法的变电站刀闸遥控辅助校核方法及***

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170015339A1 (en) * 2014-12-12 2017-01-19 Beijing Jiaotong University Complex network-based high speed train system safety evaluation method
CN105160444A (zh) * 2015-10-22 2015-12-16 广东电网有限责任公司电力调度控制中心 电力设备故障率确定方法及***
CN105932774A (zh) * 2016-05-11 2016-09-07 国网冀北电力有限公司张家口供电公司 基于ica算法的智能变电站设备状态预警方法
CN106844826A (zh) * 2016-12-02 2017-06-13 上海电机学院 一种用于风电机组齿轮箱故障预测诊断的方法
CN107257161A (zh) * 2017-06-20 2017-10-17 安徽南瑞继远电网技术有限公司 一种基于状态识别算法的变电站刀闸遥控辅助校核方法及***

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
余彬 等: "基于支持向量机的变电站过热故障的在线监测", 《浙江电力》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108923413A (zh) * 2018-05-23 2018-11-30 国网福建省电力有限公司莆田供电公司 基于支持向量机的电压质量预测方法
CN109061453A (zh) * 2018-08-02 2018-12-21 国网福建省电力有限公司 计及相关系数的变电站刀闸二次回路故障预测方法
CN109035066A (zh) * 2018-09-30 2018-12-18 国网山西省电力公司阳泉供电公司 基于svm的10千伏配网高掉闸线路成因分析及治理方法
CN110649597A (zh) * 2019-09-06 2020-01-03 国网山东省电力公司寿光市供电公司 一种基于rbf神经网络的配电网馈线自动化控制方法

Similar Documents

Publication Publication Date Title
CN107733089A (zh) 一种基于svm的变电站刀闸二次回路故障预测方法
Liu et al. A systematic approach for dynamic security assessment and the corresponding preventive control scheme based on decision trees
US9239816B2 (en) Method of power system preventive control candidate measures identification self-adaptive to external environment
CN104616090B (zh) 基于风险评估的电缆检修策略方法
CN103700025B (zh) 一种基于风险分析的电力***设备重要度的评估排序方法
CN103545832B (zh) 一种基于发电预测误差的光伏***储能容量配置方法
CN107194574B (zh) 一种基于负荷损失的电网安全风险评估方法
CN104392391A (zh) 一种电网运行安全风险量化方法
CN102934312B (zh) 能量产生***及其控制
CN103337043B (zh) 电力通信设备运行状态的预警方法和***
CN104299116A (zh) 一种电网运行安全风险定量评估方法
CN103279900B (zh) 一种针对区域输电网脆弱域的评估方法
CN106447227A (zh) 城市电网异常状态分析方法及***
CN109359896B (zh) 一种基于svm的电网线路故障风险预警方法
CN109061453A (zh) 计及相关系数的变电站刀闸二次回路故障预测方法
CN103150635B (zh) 电力设备运维方法
CN106058865A (zh) 一种电网节点电压暂降的风险评估方法
CN104021304A (zh) 一种变压器在线监测装置安装优先级评估方法
CN107239652A (zh) 一种充电站运行状态风险评估方法
CN103500283A (zh) 基于故障树的电力变压器风险评估方法
CN105184490B (zh) 电网调度操作过程风险辅助预控***
CN109214717A (zh) 配电网电源并网评价方法及其评价***
CN106600458A (zh) 基于改进功率介数的电网风险综合评估方法
CN107069705A (zh) 一种电网元件连锁故障模拟方法
CN106571627A (zh) 一种基于在线监测信息的二次设备健康状态评价方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180705

Address after: 351100 No. 999, South Garden Road, Xia Lin Street, Chengxiang District, Putian, Fujian

Applicant after: PUTIAN POWER SUPPLY COMPANY, STATE GRID FUJIAN ELECTRIC POWER CO., LTD.

Applicant after: State Grid Fujian Electric Power Co., Ltd.

Address before: No. 54, No. 257, Drum Tower District, Fuzhou, Fujian

Applicant before: State Grid Fujian Electric Power Co., Ltd.

Applicant before: State Grid Corporation of China

Applicant before: PUTIAN POWER SUPPLY COMPANY, STATE GRID FUJIAN ELECTRIC POWER CO., LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223