CN107730212A - A kind of project under construction personnel long-distance real-time management system - Google Patents

A kind of project under construction personnel long-distance real-time management system Download PDF

Info

Publication number
CN107730212A
CN107730212A CN201711046684.9A CN201711046684A CN107730212A CN 107730212 A CN107730212 A CN 107730212A CN 201711046684 A CN201711046684 A CN 201711046684A CN 107730212 A CN107730212 A CN 107730212A
Authority
CN
China
Prior art keywords
project
personnel
information
mobile phone
microcomputer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711046684.9A
Other languages
Chinese (zh)
Inventor
谢立
金志荣
孙志刚
蔡陈
李进华
黄燕斌
戴洪
朱奉武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Nantong Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711046684.9A priority Critical patent/CN107730212A/en
Publication of CN107730212A publication Critical patent/CN107730212A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K17/00Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
    • G06K17/0022Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0853Network architectures or network communication protocols for network security for authentication of entities using an additional device, e.g. smartcard, SIM or a different communication terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W12/00Security arrangements; Authentication; Protecting privacy or anonymity
    • H04W12/06Authentication

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computer Security & Cryptography (AREA)
  • General Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Computing Systems (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses a kind of project under construction personnel long-distance real-time management system, including field apparatus, communication network and remote monitoring equipment.The present invention changes traditional personnel on site's inspection method, can be in the personal management at long-range scenes more in real time, and method is simple, effective and reliable, improves the efficiency of management of personnel, reduces the construction cost of personal management, has good promotion prospect.

Description

A kind of project under construction personnel long-distance real-time management system
Technical field
The present invention relates to a kind of long-range, real-time and entry personnel management system.
Background technology
Construction project is disposable, therefore job location also changes with project place.The each side of construction is as built Unit, supervisor and the project of the location of unit in charge of construction and construction are general not in same place, and constructing needs to control peace Entirely, the target such as quality and progress, these targets can be analyzed to control the factors such as people, machine, material, method and ring.And people is to need to manage Most important factor.Traditional personnel management methods are checked to job site, but so inspection personnel must take from a distant place The vehicles will necessarily bring time and the cost increase of traffic and inspection personnel to job site.If it can be supervised from a distant place The people of project site operation is controlled, such cost reduces and the raising of the efficiency of management.
The content of the invention:
It is an object of the invention to provide it is a kind of can multiple projects under construction of real-time management in the distance live project under construction people Member's long-distance real-time management system.
The present invention technical solution be:
A kind of project under construction personnel long-distance real-time management system, it is characterized in that:Including field apparatus, communication network and remote monitoring Equipment;
Field apparatus using the mobile phone, read-write equipment and microcomputer of RFID-SIM cards by being formed;Field apparatus it is individual several Determined according to the job site quantity for needing to control;Mobile phone quantity needs controllers quantity to determine by each;RFID in mobile phone, Three kinds of information of project under construction personnel are record, when project under construction unit information, second, my identity of mobile phone holder is believed Breath, third, the information that mobile phone holder is relevant with project under construction;Construction project management needs the personal information checked, and is placed on RFID In, the function of site inspection project personnel can be thus realized, inspection method is to utilize cell phone application, shows the people of RFID card The information of member, compared with field check personnel holds actual person by the RFID card photo and identity card of reading with mobile phone, It is identical, it was demonstrated that holder's management information is correct, is otherwise mistake;When the mobile phone holder with management information is close to read-write equipment During sphere of action, read-write equipment reads the information of the RFID card in mobile phone, and microcomputer is transferred information to by WIFI;
Microcomputer is mainly provided with wireless WIFI module and 3G module, memory module, database module, judge module, data Processing module, phone number read through model and output module;Wireless WIFI module receives the RFID card in read-write equipment reading mobile phone Information is simultaneously stored information by memory module, and microcomputer has the related data that project manager needs to check; Microcomputer is collected into real-time RFID information and judged compared with the information that microcomputer is deposited, and judges whether it is scene Project personnel, personnel belong to that job site, belong to that unit in charge of construction, are the units of total bag or subpackage, are custodians Member or construction team personnel, are each grades of what work post;Project personnel judge implementation method, are that microcomputer is collected into live hand Machine SIM card compared with being stored in microcomputer database storing item workmen mobile phone SIM number card, sentence by such as identical can Be set to project personnel, into project scene judgement, if compare be without SIM card number, mobile phone hold artificially non-project people Member, alarm signal is distally sent out in locality warning or 4G by processing module and speaker module;By that analogy, administrative staff's list is entered Position, total subpackage, personnel's property, work post judge that the personnel that upper level judges to be are transferred to next stage and judge input, with microcomputer The demographic data of memory storage compares, and no personnel enter processing module, and processing module is counted all kinds of personnel and position And temporally store, to inquire about in the future, and distinguished with different mark, shown in the total of output or divide on plane map, with Just all levels of management personnel intuitively understands Field Force's situation;Processing module is transmitted remote in addition to exporting at the scene by sending module 4G Square supervising device;
Remote monitoring device is subjected to the field apparatus transmission of the 4G wireless networks transmission of the field apparatus of the multiple projects in a distant place Field data, recorded, stored and counted, and the data related to each live microcomputer project database progress is comprehensive Analysis is closed, compares and arranges, and each Project Management Information can be shown in output display device;
When project under construction has personnel to increase or decrease, or persons eligible and management identity change, remote monitoring people can Control information is sent to live microcomputer by 4G, changes the comparison information in microcomputer storehouse, and by wireless The read-write equipment of WIFI controls, when mobile phone holder is close to read-write equipment, microcomputer sends instructions to read-write equipment, rewrites The RFID information of live mobile phone holder, it is achieved in that long-range renewal control mobile phone holder information;
In the distance, the real-time inspection of Field Force can be achieved, it is long-range that its method is that remote monitoring personnel pass through in remote monitoring device Supervising device sends out control command, is sent to live microcomputer by wireless 4G networks, live microcomputer passes through WIFI Verbal announcement mobile phone holder, mobile phone holder is by APP real-time image transmissions or shoots my photo on request and is sent to far Square supervising device, remote monitoring people can determine whether that job site mobile phone is held according to database and transmission image or the picture at scene People to mistake, realize long-range real-time core pair, long-distance monitorng device is needed to set multiple monitoring clients by management.
The project under construction unit information includes civil engineering, electrical construction, total bag or subpackage unit, contracted in the project Scope and intend operating time information in the project.
My identity information includes identification card number and my recent photo.
The mobile phone holder information relevant with project under construction, including my academic title, occupational qualification, special expertise and this The mankind are like work experience information.
The microcomputer has the related data that project manager needs to check, including described project under construction Three kinds of information of personnel and project management by job scheduling renewal real time personnel control information and project general layout and Associated construction place plan.
The microcomputer has the related data that project manager needs to check, including described construction The real time personnel control information and project general layout that three kinds of information of project personnel and project management are updated by job scheduling And associated construction place plan.
The present invention changes traditional personnel on site's inspection method, can in the personal managements at long-range scenes more in real time, method is simple, It is effectively and reliable, the efficiency of management of personnel is improved, the construction cost of personal management is reduced, there is good promotion prospect.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is project personnel's long-distance real-time management system structural representation.
Fig. 2 is personnel's long-distance real-time management system principle schematic.
Embodiment
A kind of project under construction personnel long-distance real-time management system, including field apparatus, communication network and remote monitoring equipment;
Field apparatus using the mobile phone, read-write equipment and microcomputer of RFID-SIM cards by being formed;Field apparatus it is individual several Determined according to the job site quantity for needing to control;Mobile phone quantity needs controllers quantity to determine by each;RFID in mobile phone, Three kinds of information of project under construction personnel are record, when project under construction unit information, second, my identity of mobile phone holder is believed Breath, third, the information that mobile phone holder is relevant with project under construction;Construction project management needs the personal information checked, and is placed on RFID In, the function of site inspection project personnel can be thus realized, inspection method is to utilize cell phone application, shows the people of RFID card The information of member, compared with field check personnel holds actual person by the RFID card photo and identity card of reading with mobile phone, It is identical, it was demonstrated that holder's management information is correct, is otherwise mistake;When the mobile phone holder with management information is close to read-write equipment During sphere of action, read-write equipment reads the information of the RFID card in mobile phone, and microcomputer is transferred information to by WIFI;
Microcomputer is mainly provided with wireless WIFI module and 3G module, memory module, database module, judge module, data Processing module, phone number read through model and output module;Wireless WIFI module receives the RFID card in read-write equipment reading mobile phone Information is simultaneously stored information by memory module, and microcomputer has the related data that project manager needs to check; Microcomputer is collected into real-time RFID information and judged compared with the information that microcomputer is deposited, and judges whether it is scene Project personnel, personnel belong to that job site, belong to that unit in charge of construction, are the units of total bag or subpackage, are custodians Member or construction team personnel, are each grades of what work post;Project personnel judge implementation method, are that microcomputer is collected into live hand Machine SIM card compared with being stored in microcomputer database storing item workmen mobile phone SIM number card, sentence by such as identical can Be set to project personnel, into project scene judgement, if compare be without SIM card number, mobile phone hold artificially non-project people Member, alarm signal is distally sent out in locality warning or 4G by processing module and speaker module;By that analogy, administrative staff's list is entered Position, total subpackage, personnel's property, work post judge that the personnel that upper level judges to be are transferred to next stage and judge input, with microcomputer The demographic data of memory storage compares, and no personnel enter processing module, and processing module is counted all kinds of personnel and position And temporally store, to inquire about in the future, and distinguished with different mark, shown in the total of output or divide on plane map, with Just all levels of management personnel intuitively understands Field Force's situation;Processing module is transmitted remote in addition to exporting at the scene by sending module 4G Square supervising device;
Remote monitoring device is subjected to the field apparatus transmission of the 4G wireless networks transmission of the field apparatus of the multiple projects in a distant place Field data, recorded, stored and counted, and the data related to each live microcomputer project database progress is comprehensive Analysis is closed, compares and arranges, and each Project Management Information can be shown in output display device;
When project under construction has personnel to increase or decrease, or persons eligible and management identity change, remote monitoring people can Control information is sent to live microcomputer by 4G, changes the comparison information in microcomputer storehouse, and by wireless The read-write equipment of WIFI controls, when mobile phone holder is close to read-write equipment, microcomputer sends instructions to read-write equipment, rewrites The RFID information of live mobile phone holder, it is achieved in that long-range renewal control mobile phone holder information;
In the distance, the real-time inspection of Field Force can be achieved, it is long-range that its method is that remote monitoring personnel pass through in remote monitoring device Supervising device sends out control command, is sent to live microcomputer by wireless 4G networks, live microcomputer passes through WIFI Verbal announcement mobile phone holder, mobile phone holder is by APP real-time image transmissions or shoots my photo on request and is sent to far Square supervising device, remote monitoring people can determine whether that job site mobile phone is held according to database and transmission image or the picture at scene People to mistake, realize long-range real-time core pair, long-distance monitorng device is needed to set multiple monitoring clients by management.
The project under construction unit information includes civil engineering, electrical construction, total bag or subpackage unit, contracted in the project Scope and intend operating time information in the project.
My identity information includes identification card number and my recent photo.
The mobile phone holder information relevant with project under construction, including my academic title, occupational qualification, special expertise and this The mankind are like work experience information.
The microcomputer has the related data that project manager needs to check, including described project under construction Three kinds of information of personnel and project management by job scheduling renewal real time personnel control information and project general layout and Associated construction place plan.
The microcomputer has the related data that project manager needs to check, including described construction The real time personnel control information and project general layout that three kinds of information of project personnel and project management are updated by job scheduling And associated construction place plan.

Claims (6)

1. a kind of project under construction personnel long-distance real-time management system, it is characterized in that:Supervised including field apparatus, communication network and a distant place Control equipment;
Field apparatus using the mobile phone, read-write equipment and microcomputer of RFID-SIM cards by being formed;Field apparatus it is individual several Determined according to the job site quantity for needing to control;Mobile phone quantity needs controllers quantity to determine by each;RFID in mobile phone, Three kinds of information of project under construction personnel are record, when project under construction unit information, second, my identity of mobile phone holder is believed Breath, third, the information that mobile phone holder is relevant with project under construction;Construction project management needs the personal information checked, and is placed on RFID In, the function of site inspection project personnel can be thus realized, inspection method is to utilize cell phone application, shows the people of RFID card The information of member, compared with field check personnel holds actual person by the RFID card photo and identity card of reading with mobile phone, It is identical, it was demonstrated that holder's management information is correct, is otherwise mistake;When the mobile phone holder with management information is close to read-write equipment During sphere of action, read-write equipment reads the information of the RFID card in mobile phone, and microcomputer is transferred information to by WIFI;
Microcomputer is mainly provided with wireless WIFI module and 3G module, memory module, database module, judge module, data Processing module, phone number read through model and output module;Wireless WIFI module receives the RFID card in read-write equipment reading mobile phone Information is simultaneously stored information by memory module, and microcomputer has the related data that project manager needs to check; Microcomputer is collected into real-time RFID information and judged compared with the information that microcomputer is deposited, and judges whether it is scene Project personnel, personnel belong to that job site, belong to that unit in charge of construction, are the units of total bag or subpackage, are custodians Member or construction team personnel, are each grades of what work post;Project personnel judge implementation method, are that microcomputer is collected into live hand Machine SIM card compared with being stored in microcomputer database storing item workmen mobile phone SIM number card, sentence by such as identical can Be set to project personnel, into project scene judgement, if compare be without SIM card number, mobile phone hold artificially non-project people Member, alarm signal is distally sent out in locality warning or 4G by processing module and speaker module;By that analogy, administrative staff's list is entered Position, total subpackage, personnel's property, work post judge that the personnel that upper level judges to be are transferred to next stage and judge input, with microcomputer The demographic data of memory storage compares, and no personnel enter processing module, and processing module is counted all kinds of personnel and position And temporally store, to inquire about in the future, and distinguished with different mark, shown in the total of output or divide on plane map, with Just all levels of management personnel intuitively understands Field Force's situation;Processing module is transmitted remote in addition to exporting at the scene by sending module 4G Square supervising device;
Remote monitoring device is subjected to the field apparatus transmission of the 4G wireless networks transmission of the field apparatus of the multiple projects in a distant place Field data, recorded, stored and counted, and the data related to each live microcomputer project database progress is comprehensive Analysis is closed, compares and arranges, and each Project Management Information can be shown in output display device;
When project under construction has personnel to increase or decrease, or persons eligible and management identity change, remote monitoring people can Control information is sent to live microcomputer by 4G, changes the comparison information in microcomputer storehouse, and by wireless The read-write equipment of WIFI controls, when mobile phone holder is close to read-write equipment, microcomputer sends instructions to read-write equipment, rewrites The RFID information of live mobile phone holder, it is achieved in that long-range renewal control mobile phone holder information;
In the distance, the real-time inspection of Field Force can be achieved, it is long-range that its method is that remote monitoring personnel pass through in remote monitoring device Supervising device sends out control command, is sent to live microcomputer by wireless 4G networks, live microcomputer passes through WIFI Verbal announcement mobile phone holder, mobile phone holder is by APP real-time image transmissions or shoots my photo on request and is sent to far Square supervising device, remote monitoring people can determine whether that job site mobile phone is held according to database and transmission image or the picture at scene People to mistake, realize long-range real-time core pair, long-distance monitorng device is needed to set multiple monitoring clients by management.
2. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:The project under construction list Position information includes civil engineering, electrical construction, total bag or subpackage unit, the scope contracted in the project and intends working in the project Temporal information.
3. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:My identity is believed Breath includes identification card number and my recent photo.
4. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:The mobile phone holder The information relevant with project under construction, including my academic title, occupational qualification, special expertise and my similar work experience information.
5. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:The microcomputer There is the related data that project manager needs to check, includes the three kinds of information and project of described project under construction personnel The real time personnel control information and project general layout and associated construction place plan that management is updated by job scheduling.
6. project under construction personnel long-distance real-time management system according to claim 2, it is characterized in that:The microcomputer Calculation machine, which has project manager, needs the related data checked, including three kinds of information of described project under construction personnel and The real time personnel control information and project general layout and associated construction place plan that project management is updated by job scheduling.
CN201711046684.9A 2017-10-31 2017-10-31 A kind of project under construction personnel long-distance real-time management system Pending CN107730212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711046684.9A CN107730212A (en) 2017-10-31 2017-10-31 A kind of project under construction personnel long-distance real-time management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711046684.9A CN107730212A (en) 2017-10-31 2017-10-31 A kind of project under construction personnel long-distance real-time management system

Publications (1)

Publication Number Publication Date
CN107730212A true CN107730212A (en) 2018-02-23

Family

ID=61203532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711046684.9A Pending CN107730212A (en) 2017-10-31 2017-10-31 A kind of project under construction personnel long-distance real-time management system

Country Status (1)

Country Link
CN (1) CN107730212A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109389360A (en) * 2018-08-28 2019-02-26 安徽继远软件有限公司 A kind of personnel safety management-control method based on multiple authentication manipulation permission
CN110210793A (en) * 2019-06-25 2019-09-06 广州银禾网络通信有限公司 A kind of project sites construction remote monitoring platform, system and method
CN110334928A (en) * 2019-06-24 2019-10-15 国网江苏省电力有限公司南通供电分公司 Construction operation ticket personnel management system
CN113609132A (en) * 2021-08-12 2021-11-05 国网江苏省电力有限公司南通供电分公司 Test data monitoring system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204270381U (en) * 2014-11-25 2015-04-15 北京爱必优得科技发展有限公司 The working-yard personnel of taking part in building are carried out to the system of system of real name management and control
CN105184434A (en) * 2015-07-14 2015-12-23 国家电网公司 Construction project real-time management system
CN105809362A (en) * 2016-03-16 2016-07-27 江苏省电力公司常州供电公司 Operating method of outsourcing team management and control system
CN107180312A (en) * 2017-06-02 2017-09-19 国网浙江省电力公司嘉兴供电公司 A kind of capital construction operation intelligent safety monitoring method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204270381U (en) * 2014-11-25 2015-04-15 北京爱必优得科技发展有限公司 The working-yard personnel of taking part in building are carried out to the system of system of real name management and control
CN105184434A (en) * 2015-07-14 2015-12-23 国家电网公司 Construction project real-time management system
CN105809362A (en) * 2016-03-16 2016-07-27 江苏省电力公司常州供电公司 Operating method of outsourcing team management and control system
CN107180312A (en) * 2017-06-02 2017-09-19 国网浙江省电力公司嘉兴供电公司 A kind of capital construction operation intelligent safety monitoring method and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109389360A (en) * 2018-08-28 2019-02-26 安徽继远软件有限公司 A kind of personnel safety management-control method based on multiple authentication manipulation permission
CN110334928A (en) * 2019-06-24 2019-10-15 国网江苏省电力有限公司南通供电分公司 Construction operation ticket personnel management system
CN110210793A (en) * 2019-06-25 2019-09-06 广州银禾网络通信有限公司 A kind of project sites construction remote monitoring platform, system and method
CN113609132A (en) * 2021-08-12 2021-11-05 国网江苏省电力有限公司南通供电分公司 Test data monitoring system

Similar Documents

Publication Publication Date Title
CN107370983B (en) method and device for acquiring track of video monitoring system
CN107730212A (en) A kind of project under construction personnel long-distance real-time management system
CN203720890U (en) Wearable polling terminal
CN107944838A (en) A kind of intelligent barrier gate Field Monitoring System and method
CN104700211A (en) RFID management system for site construction worker safety
CN108197801A (en) Site staff's management method and system and method based on visualized presence monitoring system
CN111768123A (en) Visual management system for power distribution network construction site
CN108038674A (en) A kind of visualized presence monitoring system and method for possessing construction dynamic monitoring function
CN107239868A (en) End message processing method and processing device for security cruising inspection system
CN112101495A (en) Risk monitoring method, system and related equipment
CN203054575U (en) Pollution source on-line monitoring system
CN105844846B (en) A kind of method for safety monitoring based on Ibeacon technologies, apparatus and system
CN107578160A (en) Construction personnel's real-name management method
CN113408683A (en) Construction site safety supervision method and system
TW201123038A (en) A personnel location tracking and management system and the method thereof
CN111882288A (en) Intelligent office system
CN108615286B (en) Intelligent management method and system for cell
CN106303420A (en) A kind of monitoring method being applied to moving target and monitoring system
CN107767497A (en) Construction personnel's Non-contact attendance method
CN109598645A (en) Scenic spot tourist's real-time distribution analysis method and device based on GIS and RFID
CN107301516A (en) A kind of method and system of work about electric power site safety management
CN109857829A (en) A kind of geographic information data fusion system
CN104269061B (en) Yellow label car detection and management system and detection and management method based on network
CN110148229A (en) It is a kind of to monitor, go on patrol integrated management system and method
CN107680665A (en) A kind of medical management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223

RJ01 Rejection of invention patent application after publication