CN107730212A - A kind of project under construction personnel long-distance real-time management system - Google Patents
A kind of project under construction personnel long-distance real-time management system Download PDFInfo
- Publication number
- CN107730212A CN107730212A CN201711046684.9A CN201711046684A CN107730212A CN 107730212 A CN107730212 A CN 107730212A CN 201711046684 A CN201711046684 A CN 201711046684A CN 107730212 A CN107730212 A CN 107730212A
- Authority
- CN
- China
- Prior art keywords
- project
- personnel
- information
- mobile phone
- microcomputer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 61
- 238000012544 monitoring process Methods 0.000 claims abstract description 15
- 238000000034 method Methods 0.000 claims abstract description 14
- 238000007689 inspection Methods 0.000 claims abstract description 13
- 238000004891 communication Methods 0.000 claims abstract description 4
- 238000007726 management method Methods 0.000 claims description 46
- 238000012545 processing Methods 0.000 claims description 15
- 230000005540 biological transmission Effects 0.000 claims description 12
- 238000012806 monitoring device Methods 0.000 claims description 6
- 238000004458 analytical method Methods 0.000 claims description 3
- 230000006870 function Effects 0.000 claims description 3
- 230000005055 memory storage Effects 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims description 3
- 230000001755 vocal effect Effects 0.000 claims description 3
- 230000002123 temporal effect Effects 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06K—GRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
- G06K17/00—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations
- G06K17/0022—Methods or arrangements for effecting co-operative working between equipments covered by two or more of main groups G06K1/00 - G06K15/00, e.g. automatic card files incorporating conveying and reading operations arrangements or provisious for transferring data to distant stations, e.g. from a sensing device
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/08—Network architectures or network communication protocols for network security for authentication of entities
- H04L63/0853—Network architectures or network communication protocols for network security for authentication of entities using an additional device, e.g. smartcard, SIM or a different communication terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W12/00—Security arrangements; Authentication; Protecting privacy or anonymity
- H04W12/06—Authentication
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Computer Security & Cryptography (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Computer Hardware Design (AREA)
- Computing Systems (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Telephonic Communication Services (AREA)
Abstract
The invention discloses a kind of project under construction personnel long-distance real-time management system, including field apparatus, communication network and remote monitoring equipment.The present invention changes traditional personnel on site's inspection method, can be in the personal management at long-range scenes more in real time, and method is simple, effective and reliable, improves the efficiency of management of personnel, reduces the construction cost of personal management, has good promotion prospect.
Description
Technical field
The present invention relates to a kind of long-range, real-time and entry personnel management system.
Background technology
Construction project is disposable, therefore job location also changes with project place.The each side of construction is as built
Unit, supervisor and the project of the location of unit in charge of construction and construction are general not in same place, and constructing needs to control peace
Entirely, the target such as quality and progress, these targets can be analyzed to control the factors such as people, machine, material, method and ring.And people is to need to manage
Most important factor.Traditional personnel management methods are checked to job site, but so inspection personnel must take from a distant place
The vehicles will necessarily bring time and the cost increase of traffic and inspection personnel to job site.If it can be supervised from a distant place
The people of project site operation is controlled, such cost reduces and the raising of the efficiency of management.
The content of the invention:
It is an object of the invention to provide it is a kind of can multiple projects under construction of real-time management in the distance live project under construction people
Member's long-distance real-time management system.
The present invention technical solution be:
A kind of project under construction personnel long-distance real-time management system, it is characterized in that:Including field apparatus, communication network and remote monitoring
Equipment;
Field apparatus using the mobile phone, read-write equipment and microcomputer of RFID-SIM cards by being formed;Field apparatus it is individual several
Determined according to the job site quantity for needing to control;Mobile phone quantity needs controllers quantity to determine by each;RFID in mobile phone,
Three kinds of information of project under construction personnel are record, when project under construction unit information, second, my identity of mobile phone holder is believed
Breath, third, the information that mobile phone holder is relevant with project under construction;Construction project management needs the personal information checked, and is placed on RFID
In, the function of site inspection project personnel can be thus realized, inspection method is to utilize cell phone application, shows the people of RFID card
The information of member, compared with field check personnel holds actual person by the RFID card photo and identity card of reading with mobile phone,
It is identical, it was demonstrated that holder's management information is correct, is otherwise mistake;When the mobile phone holder with management information is close to read-write equipment
During sphere of action, read-write equipment reads the information of the RFID card in mobile phone, and microcomputer is transferred information to by WIFI;
Microcomputer is mainly provided with wireless WIFI module and 3G module, memory module, database module, judge module, data
Processing module, phone number read through model and output module;Wireless WIFI module receives the RFID card in read-write equipment reading mobile phone
Information is simultaneously stored information by memory module, and microcomputer has the related data that project manager needs to check;
Microcomputer is collected into real-time RFID information and judged compared with the information that microcomputer is deposited, and judges whether it is scene
Project personnel, personnel belong to that job site, belong to that unit in charge of construction, are the units of total bag or subpackage, are custodians
Member or construction team personnel, are each grades of what work post;Project personnel judge implementation method, are that microcomputer is collected into live hand
Machine SIM card compared with being stored in microcomputer database storing item workmen mobile phone SIM number card, sentence by such as identical can
Be set to project personnel, into project scene judgement, if compare be without SIM card number, mobile phone hold artificially non-project people
Member, alarm signal is distally sent out in locality warning or 4G by processing module and speaker module;By that analogy, administrative staff's list is entered
Position, total subpackage, personnel's property, work post judge that the personnel that upper level judges to be are transferred to next stage and judge input, with microcomputer
The demographic data of memory storage compares, and no personnel enter processing module, and processing module is counted all kinds of personnel and position
And temporally store, to inquire about in the future, and distinguished with different mark, shown in the total of output or divide on plane map, with
Just all levels of management personnel intuitively understands Field Force's situation;Processing module is transmitted remote in addition to exporting at the scene by sending module 4G
Square supervising device;
Remote monitoring device is subjected to the field apparatus transmission of the 4G wireless networks transmission of the field apparatus of the multiple projects in a distant place
Field data, recorded, stored and counted, and the data related to each live microcomputer project database progress is comprehensive
Analysis is closed, compares and arranges, and each Project Management Information can be shown in output display device;
When project under construction has personnel to increase or decrease, or persons eligible and management identity change, remote monitoring people can
Control information is sent to live microcomputer by 4G, changes the comparison information in microcomputer storehouse, and by wireless
The read-write equipment of WIFI controls, when mobile phone holder is close to read-write equipment, microcomputer sends instructions to read-write equipment, rewrites
The RFID information of live mobile phone holder, it is achieved in that long-range renewal control mobile phone holder information;
In the distance, the real-time inspection of Field Force can be achieved, it is long-range that its method is that remote monitoring personnel pass through in remote monitoring device
Supervising device sends out control command, is sent to live microcomputer by wireless 4G networks, live microcomputer passes through WIFI
Verbal announcement mobile phone holder, mobile phone holder is by APP real-time image transmissions or shoots my photo on request and is sent to far
Square supervising device, remote monitoring people can determine whether that job site mobile phone is held according to database and transmission image or the picture at scene
People to mistake, realize long-range real-time core pair, long-distance monitorng device is needed to set multiple monitoring clients by management.
The project under construction unit information includes civil engineering, electrical construction, total bag or subpackage unit, contracted in the project
Scope and intend operating time information in the project.
My identity information includes identification card number and my recent photo.
The mobile phone holder information relevant with project under construction, including my academic title, occupational qualification, special expertise and this
The mankind are like work experience information.
The microcomputer has the related data that project manager needs to check, including described project under construction
Three kinds of information of personnel and project management by job scheduling renewal real time personnel control information and project general layout and
Associated construction place plan.
The microcomputer has the related data that project manager needs to check, including described construction
The real time personnel control information and project general layout that three kinds of information of project personnel and project management are updated by job scheduling
And associated construction place plan.
The present invention changes traditional personnel on site's inspection method, can in the personal managements at long-range scenes more in real time, method is simple,
It is effectively and reliable, the efficiency of management of personnel is improved, the construction cost of personal management is reduced, there is good promotion prospect.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is project personnel's long-distance real-time management system structural representation.
Fig. 2 is personnel's long-distance real-time management system principle schematic.
Embodiment
A kind of project under construction personnel long-distance real-time management system, including field apparatus, communication network and remote monitoring equipment;
Field apparatus using the mobile phone, read-write equipment and microcomputer of RFID-SIM cards by being formed;Field apparatus it is individual several
Determined according to the job site quantity for needing to control;Mobile phone quantity needs controllers quantity to determine by each;RFID in mobile phone,
Three kinds of information of project under construction personnel are record, when project under construction unit information, second, my identity of mobile phone holder is believed
Breath, third, the information that mobile phone holder is relevant with project under construction;Construction project management needs the personal information checked, and is placed on RFID
In, the function of site inspection project personnel can be thus realized, inspection method is to utilize cell phone application, shows the people of RFID card
The information of member, compared with field check personnel holds actual person by the RFID card photo and identity card of reading with mobile phone,
It is identical, it was demonstrated that holder's management information is correct, is otherwise mistake;When the mobile phone holder with management information is close to read-write equipment
During sphere of action, read-write equipment reads the information of the RFID card in mobile phone, and microcomputer is transferred information to by WIFI;
Microcomputer is mainly provided with wireless WIFI module and 3G module, memory module, database module, judge module, data
Processing module, phone number read through model and output module;Wireless WIFI module receives the RFID card in read-write equipment reading mobile phone
Information is simultaneously stored information by memory module, and microcomputer has the related data that project manager needs to check;
Microcomputer is collected into real-time RFID information and judged compared with the information that microcomputer is deposited, and judges whether it is scene
Project personnel, personnel belong to that job site, belong to that unit in charge of construction, are the units of total bag or subpackage, are custodians
Member or construction team personnel, are each grades of what work post;Project personnel judge implementation method, are that microcomputer is collected into live hand
Machine SIM card compared with being stored in microcomputer database storing item workmen mobile phone SIM number card, sentence by such as identical can
Be set to project personnel, into project scene judgement, if compare be without SIM card number, mobile phone hold artificially non-project people
Member, alarm signal is distally sent out in locality warning or 4G by processing module and speaker module;By that analogy, administrative staff's list is entered
Position, total subpackage, personnel's property, work post judge that the personnel that upper level judges to be are transferred to next stage and judge input, with microcomputer
The demographic data of memory storage compares, and no personnel enter processing module, and processing module is counted all kinds of personnel and position
And temporally store, to inquire about in the future, and distinguished with different mark, shown in the total of output or divide on plane map, with
Just all levels of management personnel intuitively understands Field Force's situation;Processing module is transmitted remote in addition to exporting at the scene by sending module 4G
Square supervising device;
Remote monitoring device is subjected to the field apparatus transmission of the 4G wireless networks transmission of the field apparatus of the multiple projects in a distant place
Field data, recorded, stored and counted, and the data related to each live microcomputer project database progress is comprehensive
Analysis is closed, compares and arranges, and each Project Management Information can be shown in output display device;
When project under construction has personnel to increase or decrease, or persons eligible and management identity change, remote monitoring people can
Control information is sent to live microcomputer by 4G, changes the comparison information in microcomputer storehouse, and by wireless
The read-write equipment of WIFI controls, when mobile phone holder is close to read-write equipment, microcomputer sends instructions to read-write equipment, rewrites
The RFID information of live mobile phone holder, it is achieved in that long-range renewal control mobile phone holder information;
In the distance, the real-time inspection of Field Force can be achieved, it is long-range that its method is that remote monitoring personnel pass through in remote monitoring device
Supervising device sends out control command, is sent to live microcomputer by wireless 4G networks, live microcomputer passes through WIFI
Verbal announcement mobile phone holder, mobile phone holder is by APP real-time image transmissions or shoots my photo on request and is sent to far
Square supervising device, remote monitoring people can determine whether that job site mobile phone is held according to database and transmission image or the picture at scene
People to mistake, realize long-range real-time core pair, long-distance monitorng device is needed to set multiple monitoring clients by management.
The project under construction unit information includes civil engineering, electrical construction, total bag or subpackage unit, contracted in the project
Scope and intend operating time information in the project.
My identity information includes identification card number and my recent photo.
The mobile phone holder information relevant with project under construction, including my academic title, occupational qualification, special expertise and this
The mankind are like work experience information.
The microcomputer has the related data that project manager needs to check, including described project under construction
Three kinds of information of personnel and project management by job scheduling renewal real time personnel control information and project general layout and
Associated construction place plan.
The microcomputer has the related data that project manager needs to check, including described construction
The real time personnel control information and project general layout that three kinds of information of project personnel and project management are updated by job scheduling
And associated construction place plan.
Claims (6)
1. a kind of project under construction personnel long-distance real-time management system, it is characterized in that:Supervised including field apparatus, communication network and a distant place
Control equipment;
Field apparatus using the mobile phone, read-write equipment and microcomputer of RFID-SIM cards by being formed;Field apparatus it is individual several
Determined according to the job site quantity for needing to control;Mobile phone quantity needs controllers quantity to determine by each;RFID in mobile phone,
Three kinds of information of project under construction personnel are record, when project under construction unit information, second, my identity of mobile phone holder is believed
Breath, third, the information that mobile phone holder is relevant with project under construction;Construction project management needs the personal information checked, and is placed on RFID
In, the function of site inspection project personnel can be thus realized, inspection method is to utilize cell phone application, shows the people of RFID card
The information of member, compared with field check personnel holds actual person by the RFID card photo and identity card of reading with mobile phone,
It is identical, it was demonstrated that holder's management information is correct, is otherwise mistake;When the mobile phone holder with management information is close to read-write equipment
During sphere of action, read-write equipment reads the information of the RFID card in mobile phone, and microcomputer is transferred information to by WIFI;
Microcomputer is mainly provided with wireless WIFI module and 3G module, memory module, database module, judge module, data
Processing module, phone number read through model and output module;Wireless WIFI module receives the RFID card in read-write equipment reading mobile phone
Information is simultaneously stored information by memory module, and microcomputer has the related data that project manager needs to check;
Microcomputer is collected into real-time RFID information and judged compared with the information that microcomputer is deposited, and judges whether it is scene
Project personnel, personnel belong to that job site, belong to that unit in charge of construction, are the units of total bag or subpackage, are custodians
Member or construction team personnel, are each grades of what work post;Project personnel judge implementation method, are that microcomputer is collected into live hand
Machine SIM card compared with being stored in microcomputer database storing item workmen mobile phone SIM number card, sentence by such as identical can
Be set to project personnel, into project scene judgement, if compare be without SIM card number, mobile phone hold artificially non-project people
Member, alarm signal is distally sent out in locality warning or 4G by processing module and speaker module;By that analogy, administrative staff's list is entered
Position, total subpackage, personnel's property, work post judge that the personnel that upper level judges to be are transferred to next stage and judge input, with microcomputer
The demographic data of memory storage compares, and no personnel enter processing module, and processing module is counted all kinds of personnel and position
And temporally store, to inquire about in the future, and distinguished with different mark, shown in the total of output or divide on plane map, with
Just all levels of management personnel intuitively understands Field Force's situation;Processing module is transmitted remote in addition to exporting at the scene by sending module 4G
Square supervising device;
Remote monitoring device is subjected to the field apparatus transmission of the 4G wireless networks transmission of the field apparatus of the multiple projects in a distant place
Field data, recorded, stored and counted, and the data related to each live microcomputer project database progress is comprehensive
Analysis is closed, compares and arranges, and each Project Management Information can be shown in output display device;
When project under construction has personnel to increase or decrease, or persons eligible and management identity change, remote monitoring people can
Control information is sent to live microcomputer by 4G, changes the comparison information in microcomputer storehouse, and by wireless
The read-write equipment of WIFI controls, when mobile phone holder is close to read-write equipment, microcomputer sends instructions to read-write equipment, rewrites
The RFID information of live mobile phone holder, it is achieved in that long-range renewal control mobile phone holder information;
In the distance, the real-time inspection of Field Force can be achieved, it is long-range that its method is that remote monitoring personnel pass through in remote monitoring device
Supervising device sends out control command, is sent to live microcomputer by wireless 4G networks, live microcomputer passes through WIFI
Verbal announcement mobile phone holder, mobile phone holder is by APP real-time image transmissions or shoots my photo on request and is sent to far
Square supervising device, remote monitoring people can determine whether that job site mobile phone is held according to database and transmission image or the picture at scene
People to mistake, realize long-range real-time core pair, long-distance monitorng device is needed to set multiple monitoring clients by management.
2. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:The project under construction list
Position information includes civil engineering, electrical construction, total bag or subpackage unit, the scope contracted in the project and intends working in the project
Temporal information.
3. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:My identity is believed
Breath includes identification card number and my recent photo.
4. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:The mobile phone holder
The information relevant with project under construction, including my academic title, occupational qualification, special expertise and my similar work experience information.
5. project under construction personnel long-distance real-time management system according to claim 1, it is characterized in that:The microcomputer
There is the related data that project manager needs to check, includes the three kinds of information and project of described project under construction personnel
The real time personnel control information and project general layout and associated construction place plan that management is updated by job scheduling.
6. project under construction personnel long-distance real-time management system according to claim 2, it is characterized in that:The microcomputer
Calculation machine, which has project manager, needs the related data checked, including three kinds of information of described project under construction personnel and
The real time personnel control information and project general layout and associated construction place plan that project management is updated by job scheduling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711046684.9A CN107730212A (en) | 2017-10-31 | 2017-10-31 | A kind of project under construction personnel long-distance real-time management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711046684.9A CN107730212A (en) | 2017-10-31 | 2017-10-31 | A kind of project under construction personnel long-distance real-time management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107730212A true CN107730212A (en) | 2018-02-23 |
Family
ID=61203532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711046684.9A Pending CN107730212A (en) | 2017-10-31 | 2017-10-31 | A kind of project under construction personnel long-distance real-time management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107730212A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109389360A (en) * | 2018-08-28 | 2019-02-26 | 安徽继远软件有限公司 | A kind of personnel safety management-control method based on multiple authentication manipulation permission |
CN110210793A (en) * | 2019-06-25 | 2019-09-06 | 广州银禾网络通信有限公司 | A kind of project sites construction remote monitoring platform, system and method |
CN110334928A (en) * | 2019-06-24 | 2019-10-15 | 国网江苏省电力有限公司南通供电分公司 | Construction operation ticket personnel management system |
CN113609132A (en) * | 2021-08-12 | 2021-11-05 | 国网江苏省电力有限公司南通供电分公司 | Test data monitoring system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204270381U (en) * | 2014-11-25 | 2015-04-15 | 北京爱必优得科技发展有限公司 | The working-yard personnel of taking part in building are carried out to the system of system of real name management and control |
CN105184434A (en) * | 2015-07-14 | 2015-12-23 | 国家电网公司 | Construction project real-time management system |
CN105809362A (en) * | 2016-03-16 | 2016-07-27 | 江苏省电力公司常州供电公司 | Operating method of outsourcing team management and control system |
CN107180312A (en) * | 2017-06-02 | 2017-09-19 | 国网浙江省电力公司嘉兴供电公司 | A kind of capital construction operation intelligent safety monitoring method and system |
-
2017
- 2017-10-31 CN CN201711046684.9A patent/CN107730212A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204270381U (en) * | 2014-11-25 | 2015-04-15 | 北京爱必优得科技发展有限公司 | The working-yard personnel of taking part in building are carried out to the system of system of real name management and control |
CN105184434A (en) * | 2015-07-14 | 2015-12-23 | 国家电网公司 | Construction project real-time management system |
CN105809362A (en) * | 2016-03-16 | 2016-07-27 | 江苏省电力公司常州供电公司 | Operating method of outsourcing team management and control system |
CN107180312A (en) * | 2017-06-02 | 2017-09-19 | 国网浙江省电力公司嘉兴供电公司 | A kind of capital construction operation intelligent safety monitoring method and system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109389360A (en) * | 2018-08-28 | 2019-02-26 | 安徽继远软件有限公司 | A kind of personnel safety management-control method based on multiple authentication manipulation permission |
CN110334928A (en) * | 2019-06-24 | 2019-10-15 | 国网江苏省电力有限公司南通供电分公司 | Construction operation ticket personnel management system |
CN110210793A (en) * | 2019-06-25 | 2019-09-06 | 广州银禾网络通信有限公司 | A kind of project sites construction remote monitoring platform, system and method |
CN113609132A (en) * | 2021-08-12 | 2021-11-05 | 国网江苏省电力有限公司南通供电分公司 | Test data monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107370983B (en) | method and device for acquiring track of video monitoring system | |
CN107730212A (en) | A kind of project under construction personnel long-distance real-time management system | |
CN203720890U (en) | Wearable polling terminal | |
CN107944838A (en) | A kind of intelligent barrier gate Field Monitoring System and method | |
CN104700211A (en) | RFID management system for site construction worker safety | |
CN108197801A (en) | Site staff's management method and system and method based on visualized presence monitoring system | |
CN111768123A (en) | Visual management system for power distribution network construction site | |
CN108038674A (en) | A kind of visualized presence monitoring system and method for possessing construction dynamic monitoring function | |
CN107239868A (en) | End message processing method and processing device for security cruising inspection system | |
CN112101495A (en) | Risk monitoring method, system and related equipment | |
CN203054575U (en) | Pollution source on-line monitoring system | |
CN105844846B (en) | A kind of method for safety monitoring based on Ibeacon technologies, apparatus and system | |
CN107578160A (en) | Construction personnel's real-name management method | |
CN113408683A (en) | Construction site safety supervision method and system | |
TW201123038A (en) | A personnel location tracking and management system and the method thereof | |
CN111882288A (en) | Intelligent office system | |
CN108615286B (en) | Intelligent management method and system for cell | |
CN106303420A (en) | A kind of monitoring method being applied to moving target and monitoring system | |
CN107767497A (en) | Construction personnel's Non-contact attendance method | |
CN109598645A (en) | Scenic spot tourist's real-time distribution analysis method and device based on GIS and RFID | |
CN107301516A (en) | A kind of method and system of work about electric power site safety management | |
CN109857829A (en) | A kind of geographic information data fusion system | |
CN104269061B (en) | Yellow label car detection and management system and detection and management method based on network | |
CN110148229A (en) | It is a kind of to monitor, go on patrol integrated management system and method | |
CN107680665A (en) | A kind of medical management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180223 |
|
RJ01 | Rejection of invention patent application after publication |