CN107730069A - The method and apparatus of standard construction flow - Google Patents

The method and apparatus of standard construction flow Download PDF

Info

Publication number
CN107730069A
CN107730069A CN201710769038.9A CN201710769038A CN107730069A CN 107730069 A CN107730069 A CN 107730069A CN 201710769038 A CN201710769038 A CN 201710769038A CN 107730069 A CN107730069 A CN 107730069A
Authority
CN
China
Prior art keywords
user
task
construction
current location
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710769038.9A
Other languages
Chinese (zh)
Other versions
CN107730069B (en
Inventor
刘润生
盛宇军
李洪斌
穆克彬
蔡有军
陈明
王伟波
***
常晓旗
张惟中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710769038.9A priority Critical patent/CN107730069B/en
Publication of CN107730069A publication Critical patent/CN107730069A/en
Application granted granted Critical
Publication of CN107730069B publication Critical patent/CN107730069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of method and apparatus of standard construction flow.Wherein, this method includes:The task guiding book being pre-configured with, task based access control guiding book are obtained, the user type according to belonging to user determines task type, and generates construction process according to task type, wherein, construction process is used for the construction behavior of specification user.The present invention solves easily there is the technical problem of security incident caused by the operation of workmen is lack of standardization.

Description

The method and apparatus of standard construction flow
Technical field
The present invention relates to power engineering field, in particular to a kind of method and apparatus of standard construction flow.
Background technology
With expanding economy and people's living standards continue to improve, staff is at work to construction environment It is required that also more and more higher, especially in the higher engineering of the construction risk degree such as power engineering.Excellent construction environment is not only It can make workmen that there is good working order, moreover, excellent construction environment can also reduce the generation of security incident.
However, during power construction, although power department takes many safety precautions, but if construction Personnel have ignored a certain tiny safety measure, it is possible to cause serious security incident.Further, since neither one specification Flow guiding, in work progress, add that the construction of workmen is random, and the randomness of collection data.Therefore, At present, due to not according to the standardization of rules and regulations constructed and caused by beyond it is of common occurrence.
Easily there is the problem of security incident caused by the operation of workmen is lack of standardization for above-mentioned, at present not yet It is proposed effective solution.
The content of the invention
The embodiments of the invention provide a kind of method and apparatus of standard construction flow, at least to solve due to workmen Operation it is lack of standardization caused by easily there is the technical problem of security incident.
One side according to embodiments of the present invention, there is provided a kind of method of standard construction flow, including:Obtain advance The task guiding book of configuration;Task based access control guiding book, the user type according to belonging to user determine task type;According to task class Type generates construction process, wherein, construction process is used for the construction behavior of specification user.
Another aspect according to embodiments of the present invention, a kind of device of standard construction flow is additionally provided, including:First obtains Modulus block, for obtaining the task guiding book being pre-configured with;First determining module, for task based access control guiding book, according to user Affiliated user type determines task type;First generation module, for generating construction process according to task type, wherein, apply Work flow is used for the construction behavior of specification user.
Another aspect according to embodiments of the present invention, a kind of storage medium is additionally provided, the storage medium includes storage Program, wherein, the method that program performs standard construction flow.
Another aspect according to embodiments of the present invention, a kind of processor being additionally provided, the processor is used for operation program, its In, the method for execution standard construction flow when program is run.
In embodiments of the present invention, it is advance by obtaining by the way of the construction behavior of task guiding book specification user The task guiding book of configuration, task based access control guiding book, the user type according to belonging to user determine task type, and according to task Type generates construction process, wherein, construction process is used for the construction behavior of specification user, has reached the construction of standard construction personnel The purpose of behavior, it is achieved thereby that ensureing the technique effect of job site and workmen's safety, and then solve due to applying Worker person operation it is lack of standardization caused by easily there is the technical problem of security incident.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of method flow diagram of standard construction flow according to embodiments of the present invention;
Fig. 2 is a kind of method flow diagram of optional standard construction flow according to embodiments of the present invention;
Fig. 3 is a kind of method flow diagram of optional standard construction flow according to embodiments of the present invention;
Fig. 4 is a kind of display interface schematic diagram of the mobile terminal of optional workmen according to embodiments of the present invention; And
Fig. 5 is a kind of apparatus structure schematic diagram of standard construction flow according to embodiments of the present invention.
Embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, it should all belong to the model that the present invention protects Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so use Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipment Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or the intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of the method for standard construction flow is, it is necessary to illustrate, attached The step of flow of figure illustrates can perform in the computer system of such as one group computer executable instructions, though also, So logical order is shown in flow charts, but in some cases, can be with different from shown by order execution herein Or the step of description.
Fig. 1 is the method flow diagram of standard construction flow according to embodiments of the present invention, as shown in figure 1, this method includes Following steps:
Step S102, obtain the task guiding book being pre-configured with.
It should be noted that task guiding book is the specification or standard for instructing staff to complete task, i.e., Staff can complete corresponding work according to the job step of defined in task guiding book, for example, in power engineering, apply Worker person can complete the placement operations to job site according to the operating process of task guiding book.
In a kind of optional embodiment, task that workmen can be issued by acquisition for mobile terminal to supervising platform Guiding book, after workmen reaches job site, it can get currently to be performed by the task guiding book on mobile terminal Task and perform task flow.Wherein, above-mentioned mobile terminal can be but be not limited to smart mobile phone, flat board and can wear Equipment etc. is worn, above-mentioned supervising platform can issue task to mobile terminal by network and task corresponding with the task instructs Book, or, task and task guiding book can be also issued on mobile terminal by supervising platform by way of wired connection.
In addition it is also necessary to explanation, supervising platform according to different staff issue different tasks and Task guiding book corresponding with task, wherein, corresponding to supervising platform can issue according to the identification information of mobile terminal Task and task guiding book.
, can be according to the good behaviour of specification in task guiding book in addition, staff is after task guiding book is got Task is performed as flow, so as to the specification working specification of staff, staff is effectively prevent and omits task link The problem of.
Step S104, the user type according to belonging to user determine task type.
It should be noted that above-mentioned user is using the staff of the mobile terminal with task guiding book, in electric power Public engineering field, above-mentioned user can be workmen.By being performed for task of different workmens be it is different, because This, supervising platform needs to issue different tasks for different workmens.Wherein, supervising platform is according to different mobile ends The identification information at end determines to need issuing to the mobile terminal of the user for task.Supervising platform user is issued task it Afterwards, user can check that supervising platform issues the task type of task by mobile terminal, if it find that times that supervising platform issues Being performed with oneself for task of business is not inconsistent, and user can be reported by mobile terminal to supervising platform.Supervising platform is receiving After what mobile terminal was sent reports information, task is issued again for user.Or user is recognized by authority on mobile terminals After card, task type is modified on mobile terminals, and amended task is uploaded to supervising platform, by supervising platform Backed up and corrected.
In addition it is also necessary to explanation, different tasks is issued according to different workmens, so as to make workmen The task of oneself is performed in order, is avoided the occurrence of mistake and is performed other people tasks and cause the problem of security incident occur, and then improves The operating efficiency of workmen.
Step S106, task based access control guiding book, construction process is generated according to task type, wherein, construction process is used to advise The construction behavior of model user.
In a kind of optional embodiment, after the task type of workmen is determined, supervising platform is by under task It is dealt on the mobile terminal (for example, mobile phone) of corresponding workmen, applications client on mobile terminals is installed according to appointing Business guiding book generates the construction process on the mobile terminal, and workmen can be constructed according to construction process, and completes to apply After link in work flow, click on and determine in applications client, to show that the link corresponding to the task has been completed.
It should be noted that task guiding book can be in the form of word, picture, voice, video etc. in applications client It is shown, workmen can be made being not easy to manually operated applications client to check construction process by the form of voice In the case of remain to get the content of construction process.Also, workmen comes except the mode for manually operating applications client Outside being confirmed to construction process, it can also pass through operational order corresponding to the form to applications client input of voice.
The scheme limited based on above-mentioned steps S102 to step S106, it can know, by obtaining times being pre-configured with Business guiding book, task based access control guiding book, the user type according to belonging to user determines task type, and is generated according to task type Construction process, wherein, construction process is used for the construction behavior of specification user.
It is easily noted that, the task that user or workmen to be performed is determined for task guiding book and perform should The construction process of task, user or workmen only need that according to step suggested in construction process task can be completed, from And the problem of the step of effectively avoiding user or workmen from omitting execution task caused harm workmen's personal safety, And then provide guarantee for the personal safety of workmen.
Above-described embodiment of the application can reach the purpose of the construction behavior of standard construction personnel, it is achieved thereby that ensureing Job site and the technique effect of workmen's safety, and then solve caused by the operation of workmen is lack of standardization Easily there is the technical problem of security incident.
In a kind of optional embodiment, Fig. 2 shows a kind of method flow diagram of optional standard construction flow, such as schemes Shown in 2, after construction process is generated according to task type, method also includes:
Step S202, obtain the current location where user;
Step S204, the construction location of user is determined according to task type;
Step S206, in the case of matching in the current location where user and the construction location of user, send first Prompt message, wherein, the first prompt message is used to indicate to allow user to perform construction task according to construction process;
Step S208, in the case of it is determined that the construction location of the current location and user where user is unmatched, send Second prompt message, and/or, current location where user is determined to the optimal route of the construction location of user, wherein, second Prompt message mismatches for the current location where prompting user and the construction location of user.
It should be noted that the construction location corresponding to different types of task is probably what is differed, and workmen The construction location for performing first construction task and the construction location for performing second construction task are also likely to be what is differed, because This, before workmen performs construction task, it is thus necessary to determine that whether workmen reaches job site.
Specifically, the GPS module on mobile terminal can get the current location where workmen, meanwhile, it is arranged on Applications client on mobile terminal can determine construction location according to the task for the workmen for holding the mobile terminal, and judge Current location where workmen whether in the boundary of works area of construction location, if, it is determined that workmen has reached Job site, now, applications client prompt workmen to start to construct by forms such as voice or words.If constructor Current location where member is not in boundary of works area, it is determined that workmen is not up to job site, and now, workmen is nothing Method by being operated to the node of flow of task in applications client, meanwhile, applications client does not remind workmen also not Reach job site, it is necessary to could start to construct after reaching job site.
In an alternative embodiment, in the case of it is determined that workmen is not up to job site, application client End ejection navigation interface, and cook up workmen by current location to job site optimal route and it is optimal by bus or Driving route, and voice navigates for workmen.
In addition it is also necessary to explanation, by being positioned to the current location of workmen, and according to workmen's Current location determines whether workmen reaches job site, it is possible to prevente effectively from workmen reaches the construction field of mistake Ground, task not corresponding with construction process is performed, and then the operating efficiency of workmen can be effectively improved, avoid the hair of accident It is raw.
In addition, if workmen has found that the construction location shown by mobile terminal to be performed task with workmen Position is not consistent, and mistake can be reported to supervising platform by workmen by mobile terminal, be handled by supervising platform.
A kind of optional embodiment also be present, after workmen has performed current task, it may be necessary to perform next Individual task, but the construction location of current task and the construction location of next task may not be same construction location, now, Also need to the further construction location of the position of the current task to workmen and next task and judge that specific method is such as A kind of method flow diagram of optional standard construction flow shown in Fig. 3, this method specifically comprise the following steps:
Step S302, judges whether user completes current task;
Step S304, in the case of it is determined that user completes current task, if current location and user where user The position for the next task to be performed matches, then prompts user to perform next task;
Step S306, if the current location and the position of user's next task to be performed where user mismatch, Then determine user current location to the optimal route of the position of user's next task to be performed.
Specifically, workmen, after current construction task is completed, workmen is arranged on movement eventually by clicking on The submitting button in applications client on end, current task is submitted.After workmen submits task, applications client Determine that workmen has completed current task, and determine whether workmen also has being performed for task.It is determined that workmen In the case of also being performed for task, mobile terminal judges the construction location of current task and the construction location of next task Whether it is same position, if same position, then prompts workmen to can perform next task, otherwise, prompts workmen Not up to job site, next task is not can perform, meanwhile, plan current location to the construction position of next task for workmen The optimal route put.
It should be noted that workmen can also view the Construction State of other workmens by applications client, The display interface schematic diagram of the mobile terminal of a kind of optional workmen as shown in Figure 4, in fig. 4 it is shown that 3 constructions The working condition of personnel, wherein, workmen A is the state for task of having completed, and workmen B is the shape for handling task State, and workmen C is the state of untreated task.According to display interface as shown in Figure 4, workmen can view other The Construction State of workmen, and can be exchanged by clicking on the icon corresponding to corresponding workmen with it, wherein, hand over The form of stream includes but is not limited to written communication, voice call or video etc..
Embodiment 2
According to embodiments of the present invention, a kind of device embodiment of standard construction flow is additionally provided.
Fig. 5 is the apparatus structure schematic diagram of standard construction flow according to embodiments of the present invention, as shown in figure 5, the device Including:First acquisition module 501, the first determining module 503 and the first generation module 505.
Wherein, the first acquisition module 501, for obtaining the task guiding book being pre-configured with;First determining module 503, use In task based access control guiding book, the user type according to belonging to user determines task type;First generation module 505, for basis Task type generates construction process, wherein, construction process is used for the construction behavior of specification user.
It should be noted that above-mentioned first acquisition module 501, the first determining module 503 and the first generation module 505 are right Should be in the step S102 in embodiment 1 to step S106, three modules example realized with corresponding step and application scenarios It is identical, but it is not limited to the disclosure of that of above-described embodiment 1.
In a kind of optional embodiment, the device of standard construction flow also includes:Second acquisition module, second determine mould Block, the first sending module and the second sending module.Wherein, the second acquisition module, for obtaining the current location where user; Second determining module, for determining the construction location of user according to task type;First sending module, for where user In the case that the construction location of current location and user match, the first prompt message is sent, wherein, the first prompt message is used for Instruction allows user to perform construction task according to construction process;Second sending module, for it is determined that present bit where user Put with the construction location of user it is unmatched in the case of, send the second prompt message, and/or, determine the present bit where user Put to the optimal route of the construction location of user, wherein, the second prompt message is for the current location where prompting user and use The construction location at family mismatches.
It should be noted that above-mentioned second acquisition module, the second determining module, the first sending module and second send mould The step S202 to step S208 that block corresponds in embodiment 1, the example and application that four modules are realized with corresponding step Scene is identical, but is not limited to the disclosure of that of above-described embodiment 1.
In a kind of optional embodiment, the device of standard construction flow also includes:First judge module, second judge mould Block and the 3rd determining module.Wherein, the first judge module, for judging whether user completes current task;Second judges mould Block, in the case of it is determined that user completes current task, if what current location where user to be performed with user In the case that the position of next task matches, then user is prompted to perform next task;3rd determining module, if for user In the case of the current location at place and the position of user's next task to be performed are unmatched, it is determined that user current location The optimal route of the position for the next task to be performed to user.
Implement it should be noted that above-mentioned first judge module, the second judge module and the 3rd determining module correspond to Step S302 to step S306 in example 1, three modules are identical with example and application scenarios that corresponding step is realized, but not It is limited to the disclosure of that of above-described embodiment 1.
Embodiment 3
Another aspect according to embodiments of the present invention, a kind of storage medium is additionally provided, the storage medium includes storage Program, wherein, the method that program performs the standard construction flow in embodiment 1.
Embodiment 4
Another aspect according to embodiments of the present invention, a kind of processor being additionally provided, the processor is used for operation program, its In, the method for standard construction flow when program is run in execution embodiment 1.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in some embodiment The part of detailed description, it may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, others can be passed through Mode is realized.Wherein, device embodiment described above is only schematical, such as the division of the unit, Ke Yiwei A kind of division of logic function, can there is an other dividing mode when actually realizing, for example, multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module Connect, can be electrical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is used as independent production marketing or use When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part to be contributed in other words to prior art or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are causing a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the present invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

  1. A kind of 1. method of standard construction flow, it is characterised in that including:
    Obtain the task guiding book being pre-configured with;
    User type according to belonging to user determines task type;
    Based on the task guiding book, construction process is generated according to the task type, wherein, the construction process is used for specification The construction behavior of the user.
  2. 2. according to the method for claim 1, it is characterised in that after construction process is generated according to the task type, Methods described also includes:
    Obtain the current location where the user;
    The construction location of the user is determined according to the task type;
    In the case where the construction location of the current location where the user and the user matches, the first prompting letter is sent Breath, wherein, first prompt message is used to indicate to allow the user to perform construction task according to the construction process.
  3. 3. according to the method for claim 2, it is characterised in that it is determined that current location where the user and the use In the case of the construction location at family is unmatched, the second prompt message is sent, and/or, determine the current location where the user To the optimal route of the construction location of the user, wherein, second prompt message is for working as where prompting the user Front position and the construction location of the user mismatch.
  4. 4. according to the method for claim 1, it is characterised in that after construction process is generated according to the task type, Methods described also includes:
    Judge whether the user completes current task;
    In the case of it is determined that the user completes the current task, if current location and the use where the user The position of the family next task to be performed matches, then prompts the user to perform next task;
    If the current location and the position of the user next task to be performed where the user mismatch, it is determined that The user current location to the position of the user next task to be performed optimal route.
  5. A kind of 5. device of standard construction flow, it is characterised in that including:
    First acquisition module, for obtaining the task guiding book being pre-configured with;
    First determining module, for based on the task guiding book, the user type according to belonging to user to determine task type;
    First generation module, for generating construction process according to the task type, wherein, the construction process is used for specification institute State the construction behavior of user.
  6. 6. device according to claim 5, it is characterised in that described device also includes:
    Second acquisition module, for obtaining the current location where the user;
    Second determining module, for determining the construction location of the user according to the task type;
    First sending module, situation about matching for the construction location in the current location where the user and the user Under, the first prompt message is sent, wherein, first prompt message is used to indicate to allow the user according to the construction process Perform construction task.
  7. 7. device according to claim 6, it is characterised in that described device also includes:
    Second sending module, for it is determined that current location and the construction location of the user where the user are unmatched In the case of, the second prompt message is sent, and/or, determine the current location where the user to the construction location of the user Optimal route, wherein, the current location that second prompt message is used to prompt where the user is applied with the user's Station puts mismatch.
  8. 8. device according to claim 5, it is characterised in that described device also includes:
    First judge module, for judging whether the user completes current task;
    Second judge module, in the case of it is determined that the user completes the current task, if where the user Current location and the user next task to be performed position match in the case of, then prompt user's execution Next task;
    3rd determining module, if for the current location where the user and the user next task to be performed In the case of position is unmatched, it is determined that the position of the user current location to the user next task to be performed Optimal route.
  9. A kind of 9. storage medium, it is characterised in that the storage medium includes the program of storage, wherein, described program right of execution The method that profit requires the standard construction flow described in any one in 1 to 4.
  10. A kind of 10. processor, it is characterised in that the processor is used for operation program, wherein, right of execution when described program is run The method that profit requires the standard construction flow described in any one in 1 to 4.
CN201710769038.9A 2017-08-30 2017-08-30 Method and device for standardizing construction process Active CN107730069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710769038.9A CN107730069B (en) 2017-08-30 2017-08-30 Method and device for standardizing construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710769038.9A CN107730069B (en) 2017-08-30 2017-08-30 Method and device for standardizing construction process

Publications (2)

Publication Number Publication Date
CN107730069A true CN107730069A (en) 2018-02-23
CN107730069B CN107730069B (en) 2021-05-07

Family

ID=61205429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710769038.9A Active CN107730069B (en) 2017-08-30 2017-08-30 Method and device for standardizing construction process

Country Status (1)

Country Link
CN (1) CN107730069B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109508906A (en) * 2018-12-20 2019-03-22 国网北京市电力公司 The control method and device of well lid operation
CN109687342A (en) * 2018-12-20 2019-04-26 国网北京市电力公司 The control method and device of wireline operation
CN110197422A (en) * 2019-06-20 2019-09-03 四川省劲腾环保建材有限公司 A kind of Project Management System platform based on BIM network technology
CN114037221A (en) * 2021-10-20 2022-02-11 中车青岛四方机车车辆股份有限公司 Process management method and system for rail transit assembly production line

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080281510A1 (en) * 2007-05-10 2008-11-13 Microsoft Corporation Recommending actions based on context
CN103617500A (en) * 2013-12-04 2014-03-05 国家电网公司 Operation and maintenance method of substation device
CN104902011A (en) * 2015-05-07 2015-09-09 国家电网公司 Overhauling operation control method based on mobile terminal
CN104915752A (en) * 2015-05-14 2015-09-16 上海铁路局上海机务段 Method used for providing prompt message before operation and system
US20160077674A1 (en) * 2014-09-17 2016-03-17 Microsoft Corporation Task completion across devices using a shared work space
CN106570649A (en) * 2016-11-09 2017-04-19 国网江西省电力公司检修分公司 Realization method and inspection system for intelligent inspection and route planning based on cloud computing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080281510A1 (en) * 2007-05-10 2008-11-13 Microsoft Corporation Recommending actions based on context
CN103617500A (en) * 2013-12-04 2014-03-05 国家电网公司 Operation and maintenance method of substation device
US20160077674A1 (en) * 2014-09-17 2016-03-17 Microsoft Corporation Task completion across devices using a shared work space
CN104902011A (en) * 2015-05-07 2015-09-09 国家电网公司 Overhauling operation control method based on mobile terminal
CN104915752A (en) * 2015-05-14 2015-09-16 上海铁路局上海机务段 Method used for providing prompt message before operation and system
CN106570649A (en) * 2016-11-09 2017-04-19 国网江西省电力公司检修分公司 Realization method and inspection system for intelligent inspection and route planning based on cloud computing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109508906A (en) * 2018-12-20 2019-03-22 国网北京市电力公司 The control method and device of well lid operation
CN109687342A (en) * 2018-12-20 2019-04-26 国网北京市电力公司 The control method and device of wireline operation
CN110197422A (en) * 2019-06-20 2019-09-03 四川省劲腾环保建材有限公司 A kind of Project Management System platform based on BIM network technology
CN114037221A (en) * 2021-10-20 2022-02-11 中车青岛四方机车车辆股份有限公司 Process management method and system for rail transit assembly production line

Also Published As

Publication number Publication date
CN107730069B (en) 2021-05-07

Similar Documents

Publication Publication Date Title
CN107730069A (en) The method and apparatus of standard construction flow
CN110245220A (en) Electronic document signs method, apparatus and server, storage medium
CN107203626A (en) A kind of BPM method and system
CN106330575A (en) Safety service platform and safety service deployment method
CN105307287A (en) Connection method and wearable equipment
CN104992301A (en) Flow circulation control method and apparatus for project management of beyond enterprise/organization
CN107657441A (en) Self-service dealing method, system, server and mobile terminal
CN108564345B (en) Insurance platform data processing method, electronic device and computer readable storage medium
CN105787674A (en) Paperless mobile office system
CN104144409B (en) A kind of air card-writing method, system and home location register
CN107704991A (en) The method and apparatus of specification inspection flow
CN104468486A (en) Information processing method and system and electronic device
CN108183814A (en) The malfunction elimination method and apparatus of the communication channel of power information acquisition system
CN107172007A (en) The concentration authorization management method and device of a kind of multifactor adaptation
CN108806071A (en) Self-service dispenser management method, self-service dispenser managing device and electronic equipment
CN108830596A (en) The acquisition device and terminal device of a kind of acquisition methods of information, information
CN106202425A (en) Data processing method and device and mobile terminal
CN110060393A (en) Outbound control method based on electronic riding information, smart watch and mobile terminal
CN111669466A (en) Intelligent outbound system configuration method, device and computer readable storage medium
CN109948328A (en) Key information generation, checking method, electronic device, equipment and storage medium
CN115329313A (en) Dealer customer data management system and method
CN107979529A (en) Information processing method, device, computer installation and computer-readable recording medium
CN107220538A (en) Pay class application management method, device and mobile terminal
CN110689237B (en) Management method for vehicle manager and related products thereof
CN109522993A (en) A kind of method, terminal device and storage medium for examining paster consistency

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant