CN107730027A - A kind of load forecasting method and device based on region building property - Google Patents

A kind of load forecasting method and device based on region building property Download PDF

Info

Publication number
CN107730027A
CN107730027A CN201710823338.0A CN201710823338A CN107730027A CN 107730027 A CN107730027 A CN 107730027A CN 201710823338 A CN201710823338 A CN 201710823338A CN 107730027 A CN107730027 A CN 107730027A
Authority
CN
China
Prior art keywords
load
subregion
building
distant view
target area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710823338.0A
Other languages
Chinese (zh)
Inventor
谭春辉
黄有为
刘甲甲
田诗语
张雪峰
侯惠勇
陈扬华
杨志成
卢奕城
樊嫣然
郑睿敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Original Assignee
SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd filed Critical SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Priority to CN201710823338.0A priority Critical patent/CN107730027A/en
Publication of CN107730027A publication Critical patent/CN107730027A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of load forecasting method based on region building property, including:Subregion is carried out to target area;Each subregion power planning prediction index is obtained, power planning prediction index includes type, all kinds of construction areas, all kinds of building electricity consumption load intensity indexs and the load simultaneity factor of building;According to power planning prediction index, it is determined that the subregion distant view saturation load forecasting value of each subregion;According to the subregion distant view saturation load forecasting value, the total distant view saturation load forecasting value in target area is determined.The present invention relates to technical field of power systems, load forecasting method and device based on region building property, target area is subjected to subregion, according to the type of building, all kinds of construction areas, all kinds of building electricity consumption load intensity indexs and load simultaneity factor, calculate subregion distant view saturation load forecasting value, the total distant view saturation load forecasting value in target area is determined further according to subregion distant view saturation load forecasting value, compared with prior art, the load prediction precision to target area is higher.

Description

A kind of load forecasting method and device based on region building property
Technical field
The present invention relates to technical field of power systems, more particularly to a kind of load forecasting method based on region building property And device.
Background technology
Plot ratio:The ratio of overall floorage and the total land area of project in the range of project land used.
Simultaneity factor is exactly the absolute maximum load sum that power system synthesis maximum load respectively forms unit with power system Ratio.
Load Prediction In Power Systems are the history numbers according to electric load, economy, society, meteorology etc., explore electric load Influence of the historical data changing rule to future load, the inner link sought between electric load and various correlative factors, from And the prediction of the electric load progress science to future.
At present, regional planning electric load is determined using load density method mostly.Load density method is divided into region land used Inhabitation, communal facility, industry, storage, road traffic etc. are different classes of, according to the unit area electric strength of these classification lands used (W/m2) be predicted.In the prior art, according to reallocation of land function division, the probability for using different land use type is calculated, And by the probability of every kind of land-use style be added after the product of the load density of land-use style, obtain planning function subregion load Density, and the load density of planning function subregion is multiplied with the land area of planning function subregion, to obtain planning function point The load prediction results in area, and the probability of different land-use styles is variable, the load density of each land-use style be also it is variable, both Multiplication may cause larger error.
The content of the invention
In order to solve the above-mentioned technical problem, it is an object of the invention to provide a kind of high-precision based on region building property Load forecasting method.
The technical solution adopted in the present invention is:A kind of load forecasting method based on region building property, including:
Subregion is carried out to target area;
Obtain each subregion power planning prediction index, the power planning prediction index includes the type of building, all kinds of built Build area, all kinds of building electricity consumption load intensity indexs and load simultaneity factor;
According to power planning prediction index, it is determined that the subregion distant view saturation load forecasting value of each subregion;
According to the subregion distant view saturation load forecasting value, the total distant view saturation load forecasting value in target area is determined.
As the further improvement of such scheme, the distant view saturation load forecasting value for determining each subregion, it is specially: According to the soil land-use style planning of subregion department offer, it is determined that the type of building and every class construction area in each subregion;
Obtain per class building electricity consumption load intensity index and all kinds of building load simultaneity factors;
According to the type built in each subregion, per class construction area, it is per class building electricity consumption load intensity index and all kinds of Building load simultaneity factor, it is determined that the subregion distant view saturation load forecasting value of each subregion:
Wherein, PkK-th of partition distant view saturation load forecasting value is represented, Di represents that k-th of class of subregion i-th is for building Electric load intensity index, Si represent k-th of subregion the i-th class construction area, and η represents all kinds of building loads of k-th of subregion simultaneously Rate.
As the further improvement of such scheme, each subregion distant view saturation load forecasting value is overlapped, obtained The distant view saturation load forecasting value total to target area.
As the further improvement of such scheme, the land area of the target area is obtained, according to the target area Total distant view saturation load forecasting value and the land area of the target area, obtain the load density of target area.
As the further improvement of such scheme, the building electricity consumption load intensity index is according to construction scope and default energy Consumption index is preset.
A kind of load prediction device based on region building property, including:
Zoning unit, for carrying out subregion to target area;
Memory cell, for obtaining each subregion power planning prediction index, the power planning prediction index includes building Type, all kinds of construction areas, default all kinds of building electricity consumption load intensity indexs and load simultaneity factor;
Determining unit, for according to power planning prediction index, it is determined that the subregion distant view saturation load forecasting of each subregion Value, and according to the subregion distant view saturation load forecasting value, determine the total distant view saturation load forecasting value in target area.
As the further improvement of such scheme, the area's predicted load for determining each subregion, it is specially:It is described true Order member is used for the soil land-use style planning according to the offer of subregion department, it is determined that the type of building and every class in each subregion Construction area;
The memory cell is used to obtain the categorical data of building and the every class construction area of storage in each subregion, per class Building electricity consumption load intensity index and all kinds of building load simultaneity factors;
The determining unit is additionally operable to according to the type built in each subregion, every class construction area, per class building electricity consumption Load intensity index and all kinds of building load simultaneity factors, it is determined that the subregion distant view saturation load forecasting value of each subregion:
Wherein, PkK-th of subregion distant view saturation prediction load is represented, Di represents k-th of subregion the i-th class building electricity consumption load Intensity index, Si represent k-th of subregion the i-th class construction area, and η represents all kinds of building load simultaneity factors of k-th of subregion.
As the further improvement of such scheme, the determining unit is used for each subregion distant view saturation loading is pre- Measured value is overlapped, and obtains the total distant view saturation load forecasting value in target area.
As the further improvement of such scheme, the memory cell is used for the land area for obtaining the target area, According to the total distant view saturation load forecasting value in the target area and the land area of the target area, target area is obtained Load density.
As the further improvement of such scheme, the memory cell is used for pre- according to construction scope and default energy consumption index If building electricity consumption load intensity index.
The beneficial effects of the invention are as follows:
It is a kind of based on region building property load forecasting method, target area is subjected to subregion, according to the type of building, All kinds of construction areas, all kinds of building electricity consumption load intensity indexs and load simultaneity factor, calculate subregion distant view saturation load forecasting Value, total distant view saturation load forecasting value of target area is determined further according to subregion distant view saturation load forecasting value, with prior art Compare, the load prediction precision to target area is higher.
It is a kind of based on region building property load prediction device, target area is subjected to subregion, according to the type of building, All kinds of construction areas, all kinds of building electricity consumption load intensity indexs and load simultaneity factor, calculate subregion distant view saturation load forecasting Value, determines the total distant view saturation load forecasting value in target area, with prior art further according to subregion distant view saturation load forecasting value Compare, the load prediction precision to target area is higher.
Brief description of the drawings
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 is a kind of load forecasting method flow chart based on region building property of the present invention.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.
Fig. 1 is a kind of load forecasting method flow chart based on region building property of the present invention, as shown in figure 1, a kind of base In the load forecasting method of region building property, including:
Subregion is carried out to target area;
Each subregion power planning prediction index is obtained, wherein, power planning prediction index includes the type of building, all kinds of built Build area, all kinds of building electricity consumption load intensity indexs and load simultaneity factor;
According to power planning prediction index, it is determined that the subregion distant view saturation load forecasting value of each subregion;
According to subregion distant view saturation load forecasting value, the total distant view saturation load forecasting value in target area is determined.
Specifically, the soil land-use style planning provided according to subregion department, it is determined that in each subregion building type with And per class construction area, obtain per class building electricity consumption load intensity index and all kinds of building load simultaneity factors, wherein, built per class Land used load intensity index is preset according to the construction scope and default energy consumption index built per class.According in each subregion The type of building, every class construction area, every class building electricity consumption load intensity index and all kinds of building load simultaneity factors, it is determined that each The subregion distant view saturation load forecasting value of subregion:
Wherein, PkK-th of subregion distant view saturation load forecasting value is represented, Di represents that k-th of subregion the i-th class building electricity consumption is born Lotus intensity index, Si represent k-th of subregion the i-th class construction area, and η represents all kinds of building load simultaneity factors of k-th of subregion.
As the further improvement of above method embodiment, each subregion distant view saturation load forecasting value is overlapped, All subregion distant view saturation prediction load values in target area are overlapped, it is pre- to obtain the total distant view saturation loading in target area Measured value.
As the further improvement of above method embodiment, the land area of target area is obtained, it is total according to target area Distant view saturation load forecasting value and target area land area, by the total distant view saturation load forecasting value in target area divided by The land area of target area, obtain the load density of target area.
A kind of load prediction device based on region building property, including:Zoning unit, for dividing target area Area;Memory cell, for obtaining each subregion power planning prediction index, the power planning prediction index includes the class of building Type, all kinds of construction areas, default all kinds of building electricity consumption load intensity indexs and load simultaneity factor;Determining unit, for basis Power planning prediction index, it is determined that the subregion distant view saturation load forecasting value of each subregion, and satisfied according to the subregion distant view And predicted load, determine the total distant view saturation load forecasting value in target area.
Specifically, determining unit is used for the soil land-use style planning provided according to subregion department, it is determined that in each subregion The type of building and every class construction area;It is every that memory cell is used to obtain the categorical data of building and storage in each subregion Class construction area, every class building electricity consumption load intensity index and all kinds of building load simultaneity factors;Memory cell is additionally operable to basis and built Build scale and default energy consumption index preset building power load intensity index.Determining unit is additionally operable to build according in each subregion Type, per class construction area, per class building electricity consumption load intensity index and all kinds of building load simultaneity factors, it is determined that each subregion Subregion distant view saturation load forecasting value:
Wherein, PkK-th of subregion distant view saturation prediction load is represented, Di represents k-th of subregion the i-th class building electricity consumption load Intensity index, Si represent k-th of subregion the i-th class construction area, and η represents all kinds of building load simultaneity factors of k-th of subregion.
Specifically, determining unit is used to each subregion distant view saturation load forecasting value being overlapped, target is obtained The total distant view saturation load forecasting value in region.
Specifically, memory cell is used for the land area for obtaining the target area, satisfied according to the distant view that target area is total With predicted load and the land area of the target area, by target area total distant view saturation load forecasting value divided by target The land area in region, obtain the load density of target area.
The load forecasting method for giving region building property to the present invention using certain Cooperative District as embodiment elaborates, It is specific as follows:
According to certain Cooperative District unified plan, the cooperation is distinguished into 3 sections, 3 pieces are distinguished into 22 units, by 22 Individual unit is divided into 102 neighbours, then 102 neighbours are divided into 661 plot.
Specifically, first, according to each neighbour's construction scale, each neighbour accordingly all kinds of building electricity consumption load intensity indexs and All kinds of building load simultaneity factors, neighbour's distant view saturation load forecasting value of 102 neighbours is calculated;
Secondly, neighbour's distant view saturation load forecasting value that each unit is corresponded to neighbour is overlapped, and obtains 22 units Unit distant view saturation load forecasting value, can similarly obtain the total distant view of the section distant view saturation load forecasting values of 3 sections, the whole district Saturation load forecasting value.
Furthermore 102 neighbour's distant view saturation load forecasting values are assigned to plot according to each plot floor space size, obtained To plot distant view saturation load forecasting value.
Specifically, urban construction scale is decomposed, town site can be divided into R (inhabitation), A (public administration with it is public Service facility), B (commerce services industry facility), M (industry), W (logistic storage), U (communal facility), S (traffic), G (greenery patches and Square) 8 major class campsites.In the present embodiment, it is assumed that the total land area 14.92km in the Cooperative District2, the m of total construction scale about 26,000,0002 To 30,000,000 m2, wherein, 26,000,000 m2On the basis of scale, 30,000,000 m2It is always remote with certain Cooperative District in the present embodiment for upper limit scale Based on scape saturation load forecasting above limit gauge mould.3 sections, respectively the first section, the second section are divided into the cooperation With the 3rd section, wherein, the land area about 2.95km of the first section2, upper limit building total amount about 10,600,000 m2, average volume rate For 3.6;Second section land area about 3.1km2, upper limit building total amount about 7,050,000 m2, average volume rate is 2.3;3rd section Land area about 6.2km2, upper limit building total amount about 12,250,000 m2, average volume rate is 2.0.The then average volume rate of the Cooperative District Reach 2.0.
The m of the office building total amount upper limit about 1863.1 ten thousand2, accounting 62%;The m of the commercial building total amount upper limit about 261.8 ten thousand2, accounting 9%;Live and office apartment builds the m of the total amount upper limit about 440.6 ten thousand2, accounting 14%;The communal facility building total amount upper limit about 148 Ten thousand m2, accounting 5%;The m of the elasticity building total amount upper limit about 286.5 ten thousand2, accounting 10%.
The Cooperative District land area and construction scale index decomposition are shown in Table 1.1:
Cooperative District land area and construction scale index decomposition table 1.1
After the cooperation is distinguished into 3 sections, 3 pieces are distinguished into 22 units, specifically, the first section includes 6 Unit (unit one to unit six), the second section include 7 units (unit seven to unit 13), and the 3rd section includes 8 lists First (unit 14 to unit 21), unit 22 is water gallery, according to all kinds of construction scopes in the Cooperative District and default energy All kinds of building electricity consumption load intensity indexs in each section in the selecting index Cooperative District are consumed, specifically as shown in table 1.2:
All kinds of building load index tables 1.2 in Cooperative District
According to each unit construction scale, the corresponding building electricity consumption load intensity index of each unit and all kinds of building loads simultaneously Rate, the section distant view saturation load forecasting value of each section is calculated, wherein, the first section be 604MW, the second section 408MW, 3rd section 590MW.Each section load density and power load distributing situation are as shown in table 1.3, unit detailed data such as table It is 1.4 shown.
Each section future load forecast result table 1.3 in Cooperative District
Cooperative District each unit future load forecast detail list 1.4
The present embodiment is by taking certain Cooperative District as an example, from regional development electric power demand side, by regional construction (building) scale Subdivision, chooses appropriate power load intensity index respectively, under conditions of different load simultaneity factor is investigated, synthesizes the whole district and burst Area's saturation electric load, the saturation loading scale that is likely to be breached of regional power grid development is obtained, finally with total load divided by use ground Product obtains the regional complex load density.
It is a kind of based on region building property load forecasting method, target area is subjected to subregion, according to the type of building, All kinds of construction areas, all kinds of building electricity consumption load intensity indexs and load simultaneity factor, calculate subregion distant view saturation load forecasting Value, determines the total distant view saturation load forecasting value in target area, with prior art further according to subregion distant view saturation load forecasting value Compare, the load prediction precision to target area is higher.
It is a kind of based on region building property load prediction device, target area is subjected to subregion, according to the type of building, All kinds of construction areas, all kinds of building electricity consumption load intensity indexs and load simultaneity factor, calculate subregion distant view saturation load forecasting Value, determines the total distant view saturation load forecasting value in target area, with prior art further according to subregion distant view saturation load forecasting value Compare, the load prediction precision to target area is higher.
Above is the preferable implementation to the present invention is illustrated, but the invention is not limited to the implementation Example, those skilled in the art can also make a variety of equivalent variations on the premise of without prejudice to spirit of the invention or replace Change, these equivalent deformations or replacement are all contained in the application claim limited range.

Claims (10)

1. a kind of load forecasting method based on region building property, it is characterised in that it includes:
Subregion is carried out to target area;
Each subregion power planning prediction index is obtained, the power planning prediction index includes the type of building, all kinds of building sides Long-pending, all kinds of building electricity consumption load intensity indexs and load simultaneity factor;
According to power planning prediction index, it is determined that the subregion distant view saturation load forecasting value of each subregion;
According to the subregion distant view saturation load forecasting value, the total distant view saturation load forecasting value in target area is determined.
2. a kind of load forecasting method based on region building property according to claim 1, it is characterised in that described true Area's predicted load of fixed each subregion, it is specially:
According to the soil land-use style planning of subregion department offer, it is determined that the type of building and every class building sides in each subregion Product;
Obtain per class building electricity consumption load intensity index and all kinds of building load simultaneity factors;
According to the type built in each subregion, every class construction area, per class building electricity consumption load intensity index and all kinds of buildings Load simultaneity factor, it is determined that the subregion distant view saturation load forecasting value of each subregion:
<mrow> <msub> <mi>P</mi> <mi>k</mi> </msub> <mo>=</mo> <mrow> <mo>(</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <mi>D</mi> <mi>i</mi> <mo>&amp;times;</mo> <mi>S</mi> <mi>i</mi> <mo>)</mo> </mrow> <mo>&amp;times;</mo> <mi>&amp;eta;</mi> <mo>,</mo> </mrow>
Wherein, PkK-th of subregion distant view saturation prediction load is represented, Di represents k-th of subregion the i-th class building electricity consumption load intensity Index, Si represent k-th of subregion the i-th class construction area, and η represents all kinds of building load simultaneity factors of k-th of subregion.
3. a kind of load forecasting method based on region building property according to claim 2, it is characterised in that will be each The subregion distant view saturation load forecasting value is overlapped, and obtains the total distant view saturation load forecasting value in target area.
4. a kind of load forecasting method based on region building property according to claim 3, it is characterised in that obtain institute The land area of target area is stated, according to the total distant view saturation load forecasting value in the target area and the use of the target area Ground area, obtain the load density of target area.
5. a kind of load forecasting method based on region building property according to claim 1, it is characterised in that described to build Power load intensity index is built to be preset according to construction scope and default energy consumption index.
6. a kind of load prediction device based on region building property, it is characterised in that it includes:
Zoning unit, for carrying out subregion to target area;
Memory cell, for obtaining each subregion power planning prediction index, the power planning prediction index includes the class of building Type, construction area, default all kinds of building electricity consumption load intensity indexs and load simultaneity factor;
Determining unit, for according to power planning prediction index, it is determined that the subregion distant view saturation load forecasting value of each subregion, with And according to the subregion distant view saturation load forecasting value, determine the total distant view saturation load forecasting value in target area.
7. a kind of load prediction device based on region building property according to claim 6, it is characterised in that described true Area's predicted load of fixed each subregion, it is specially:
The determining unit is used for the soil land-use style planning provided according to subregion department, it is determined that the class of the interior building of each subregion Type and every class construction area;
The memory cell is used to obtain the categorical data of building and storage in each subregion and built per class construction area, per class Power load intensity index and all kinds of building load simultaneity factors;
The determining unit is additionally operable to according to the type built in each subregion, every class construction area, per class building electricity consumption load Intensity index and all kinds of building load simultaneity factors, it is determined that the subregion distant view saturation load forecasting value of each subregion:
<mrow> <msub> <mi>P</mi> <mi>k</mi> </msub> <mo>=</mo> <mrow> <mo>(</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>n</mi> </munderover> <mi>D</mi> <mi>i</mi> <mo>&amp;times;</mo> <mi>S</mi> <mi>i</mi> <mo>)</mo> </mrow> <mo>&amp;times;</mo> <mi>&amp;eta;</mi> <mo>,</mo> </mrow>
Wherein, PkK-th of subregion distant view saturation prediction load is represented, Di represents k-th of subregion the i-th class building electricity consumption load intensity Index, Si represent k-th of subregion the i-th class construction area, and η represents all kinds of building load simultaneity factors of k-th of subregion.
8. a kind of load prediction device based on region building property according to claim 7, it is characterised in that described true Order member is used to each subregion distant view saturation load forecasting value being overlapped, and obtains the total distant view saturation in target area and bears Lotus predicted value.
9. a kind of load prediction device based on region building property according to claim 6, it is characterised in that described to deposit Storage unit is used to obtain the land area of the target area, according to the total distant view saturation load forecasting value in the target area and The land area of the target area, obtain the load density of target area.
10. a kind of load prediction device based on region building property according to claim 9, it is characterised in that described Memory cell is used for according to construction scope and default energy consumption index preset building power load intensity index.
CN201710823338.0A 2017-09-13 2017-09-13 A kind of load forecasting method and device based on region building property Pending CN107730027A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710823338.0A CN107730027A (en) 2017-09-13 2017-09-13 A kind of load forecasting method and device based on region building property

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710823338.0A CN107730027A (en) 2017-09-13 2017-09-13 A kind of load forecasting method and device based on region building property

Publications (1)

Publication Number Publication Date
CN107730027A true CN107730027A (en) 2018-02-23

Family

ID=61206089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710823338.0A Pending CN107730027A (en) 2017-09-13 2017-09-13 A kind of load forecasting method and device based on region building property

Country Status (1)

Country Link
CN (1) CN107730027A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108491969A (en) * 2018-03-16 2018-09-04 国家电网公司 Spatial Load Forecasting model building method based on big data
CN108870671A (en) * 2018-04-19 2018-11-23 天津大学 A kind of Air-conditioning Load Prediction method suitable for the building plans stage
CN111612031A (en) * 2020-04-03 2020-09-01 华电电力科学研究院有限公司 Regional building dynamic load prediction method based on high-dimensional spatial clustering neighbor search
CN111626485A (en) * 2020-05-11 2020-09-04 新智数字科技有限公司 Load prediction system and method for regional building energy system
CN112001525A (en) * 2020-07-22 2020-11-27 温州电力设计有限公司 Regional perspective and near-intermediate-period comprehensive load prediction method
CN112541618A (en) * 2020-11-30 2021-03-23 国网河北省电力有限公司经济技术研究院 Active power distribution network planning method based on gridding and storage medium
CN112541617A (en) * 2020-11-30 2021-03-23 国网河北省电力有限公司经济技术研究院 Constant volume and site selection method for transformer substation and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104252652A (en) * 2014-10-17 2014-12-31 广东电网公司电网规划研究中心 Space load predicting method in electricity system
CN104751249A (en) * 2015-04-15 2015-07-01 国家电网公司 Space load prediction method
CN106355278A (en) * 2016-08-30 2017-01-25 新奥泛能网络科技股份有限公司 Load forecasting method and equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104252652A (en) * 2014-10-17 2014-12-31 广东电网公司电网规划研究中心 Space load predicting method in electricity system
CN104751249A (en) * 2015-04-15 2015-07-01 国家电网公司 Space load prediction method
CN106355278A (en) * 2016-08-30 2017-01-25 新奥泛能网络科技股份有限公司 Load forecasting method and equipment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王宗耀等: "空间负荷预测方法相关问题的探讨", 《科技工厂》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108491969A (en) * 2018-03-16 2018-09-04 国家电网公司 Spatial Load Forecasting model building method based on big data
CN108491969B (en) * 2018-03-16 2021-12-24 国家电网公司 Big data-based space load prediction model construction method
CN108870671A (en) * 2018-04-19 2018-11-23 天津大学 A kind of Air-conditioning Load Prediction method suitable for the building plans stage
CN111612031A (en) * 2020-04-03 2020-09-01 华电电力科学研究院有限公司 Regional building dynamic load prediction method based on high-dimensional spatial clustering neighbor search
CN111626485A (en) * 2020-05-11 2020-09-04 新智数字科技有限公司 Load prediction system and method for regional building energy system
CN112001525A (en) * 2020-07-22 2020-11-27 温州电力设计有限公司 Regional perspective and near-intermediate-period comprehensive load prediction method
CN112541618A (en) * 2020-11-30 2021-03-23 国网河北省电力有限公司经济技术研究院 Active power distribution network planning method based on gridding and storage medium
CN112541617A (en) * 2020-11-30 2021-03-23 国网河北省电力有限公司经济技术研究院 Constant volume and site selection method for transformer substation and storage medium
CN112541617B (en) * 2020-11-30 2022-11-22 国网河北省电力有限公司经济技术研究院 Constant volume and site selection method for transformer substation and storage medium
CN112541618B (en) * 2020-11-30 2023-01-10 国网河北省电力有限公司经济技术研究院 Active power distribution network planning method based on gridding and storage medium

Similar Documents

Publication Publication Date Title
CN107730027A (en) A kind of load forecasting method and device based on region building property
Tröndle et al. Home-made or imported: On the possibility for renewable electricity autarky on all scales in Europe
Jin et al. Designing a spatial pattern to rebalance the orientation of development and protection in Wuhan
Mentis et al. A GIS-based approach for electrification planning—A case study on Nigeria
Wang et al. A novel approach for the layout of electric vehicle charging station
CN112541618B (en) Active power distribution network planning method based on gridding and storage medium
Szabó et al. Sustainable energy planning: Leapfrogging the energy poverty gap in Africa
Li et al. Energy performance simulation for planning a low carbon neighborhood urban district: A case study in the city of Macau
Wu et al. Present and future of urban water balance in the rapidly urbanizing Heihe River Basin, Northwest China
Rao Multi-criteria spatial decision analysis for forecasting urban water requirements: a case study of Dehradun city, India
CN112541617B (en) Constant volume and site selection method for transformer substation and storage medium
Noori et al. A reliable GIS-based FAHP-FTOPSIS model to prioritize urban water supply management scenarios: A case study in semi-arid climate
CN104751249A (en) Space load prediction method
CN107590568A (en) A kind of load forecasting method that becomes more meticulous based on space subdivision
CN107506433A (en) Urban development space general layout Scene Simulation system
Esmaeili Shayan et al. Possibility of supplying energy to border villages by solar energy sources
Karl et al. Environmental performance assessment of the use stage of buildings using dynamic high-resolution energy consumption and data on grid composition
CN104636834A (en) Improved optimization method for joint probability programming model system
Alamanos et al. Urban water demand assessment for sustainable water resources management, under climate change and socioeconomic changes
Liu et al. Improving urban sustainability and resilience with the optimal arrangement of water-energy-food related practices
Ji et al. AVSS 2011 demo session: A large-scale benchmark dataset for event recognition in surveillance video
CN107169589A (en) A kind of low pressure grid based on KNN and roulette algorithm becomes more meticulous load forecasting method
Rozos et al. Exploring the link between urban development and water demand: The impact of water-aware technologies and options
de Castro Marins Comparative assessment of sustainability strategies applied to urban neighbourhoods in Brazil, Germany and Sweden
Li et al. The promising future of developing large-scale PV solar farms in China: A three-stage framework for site selection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223

RJ01 Rejection of invention patent application after publication