CN107724334A - Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure - Google Patents

Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure Download PDF

Info

Publication number
CN107724334A
CN107724334A CN201710980129.7A CN201710980129A CN107724334A CN 107724334 A CN107724334 A CN 107724334A CN 201710980129 A CN201710980129 A CN 201710980129A CN 107724334 A CN107724334 A CN 107724334A
Authority
CN
China
Prior art keywords
mold
bagged concrete
reinforced gabion
reinforcement cage
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710980129.7A
Other languages
Chinese (zh)
Inventor
杨玉川
孔科
王小波
周顺文
王勇胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201710980129.7A priority Critical patent/CN107724334A/en
Publication of CN107724334A publication Critical patent/CN107724334A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/123Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of mold-bagged concrete protective slope structure and a kind of steel reinforcement cage with anchor structure, belong to Geotechnical Engineering field, can apply in fields such as Hydraulic and Hydro-Power Engineering, municipal works, river regulations.The present invention provides a kind of mold-bagged concrete protective slope structure, with reinforced gabion combination application, extends the usage time of mold-bagged concrete, improves its bank protection ability.Mold-bagged concrete protective slope structure, domatic in side slope is fixedly installed mold-bagged concrete, the top surface of side slope is extended at the top of mold-bagged concrete, and it is fixedly installed reinforced gabion on the mold-bagged concrete of side slope top surface, reinforced gabion bottom is fixedly installed anchor pole, and anchor pole is anchored in side slope after passing through mold-bagged concrete.Grouting Pipe is provided with the top of reinforced gabion, entirety is formed by the block stone inside slip casting reinforced gabion and mold-bagged concrete.Mold-bagged concrete extends at the toe of side slope to river valley, and carries out presser feet by reinforced gabion in extension.

Description

Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure
Technical field
The present invention relates to a kind of mold-bagged concrete protective slope structure and a kind of steel reinforcement cage with anchor structure, belong to ground work Journey field, it can apply in fields such as Hydraulic and Hydro-Power Engineering, municipal works, river regulations.
Background technology
Mold-bagged concrete bank protection has rapid, saving expense of constructing, particularly applied under water compared with traditional masonry project The convenient superiority of work.External mold-bagged concrete bank protection sees the Toronto navigation channel experiment work being completed for 1969 earliest Cheng Zhong.After the eighties in 19th century, according to the invention of American Architecture technology company, (nineteen sixty is special for Japanese Asahi Kasei Corporation Profit) various mould bags have been made with the type cloth of high tenacity polyester fiber 66 it is also known as method cloth.Method cloth has water penetration, make concrete residual moisture by It can in time be excluded after to pouring pressure, reduce the ratio of mud, accelerated concrete or mortar solidification, obtain high density, high intensity Concrete or mortar masonry.China just promotes the use of geotextile in hydraulic engineering in recent years, and mold-bagged concrete is coastal Applied in dike mill, river slope bank-protection works and also belong to the stage at the early-stage.
Mold-bagged concrete bank protection is exactly with woven geotechnical fabric bag to make Flexible formwork assembly, using concrete pump by microlith coagulation Soil pressure enters mould bag, and formation has certain thickness, the concrete unit of certain planar dimension, and some units are coupled to by mould bagging It is overall, so as to reach the function of bank protection.
Mould bag belongs to geosynthetics, and it is with double-deck baggy fabric of the high-strength chemical-fibre long filament through being woven from.Mould bag Along 2 directions in length and breadth every a segment distance (being mostly 25cm~20cm) between upper and lower two layers, have certain length (be mostly 7cm~ Nylon rope 10cm), upper and lower two-layer fabrics are bound up, and the thickness for controlling perfusion to shape.Because it can play template Effect, therefore be called mould bag.Mould bag basic pattern can be divided into mortar type and coagulation type according to packing material difference, according to mould bag Bank protection effect is different with structure.Because uniform section type concrete lining self-bearing ability is strong, 1 can be layered on:On 1 abrupt slope, it can increase Add domatic stability against sliding, prevent from coming down.It is commonly used for River Embankment bank protection, channel, pond lining cutting.
Currently in order to preventing mould bag coasting, often it is appropriately arranged with beyond top of the slope mould bag upper limb binds concrete groove The stake of gully position.The spacing of guide pile is depending on the conditions such as length of grade, the gradient, mould bag thickness.Typically demarcate in the junior unit of mould bagging Face sets a guide pile, is fastened the steel pipe penetrated in mould bag perforation hole with nylon rope, and the other end is by take-up device with determining Position stake is connected.With strand thick stick is tensed on per pile, to adjust mould bag upper and lower position and stent bag.The larger construction of stormy waves shows , it can be disperseed to push down the mould bag completed with sand pocket, prevent stormy waves from conjugate mould bag.But slided preventing mold-bagged concrete protective slope structure Dynamic fixing device is relatively single, often lacks complete protective slope structure system, causes many mold-bagged concrete bank protections to be transported Sliding rupture just occurs after row a period of time.
The mold-bagged concrete protective slope structure found at present, it is the most famous with following two:First, Ling Chunhai et al. is introduced The third villages of Mei Jiang power station flood season left bank diversion canal uses the applicable cases and effect of geotechnical fabric bag concrete revetment, referring to [icepro Spring is extra large, Zhang Zhenxin, application [J] the people pearls of Zhang Yuanhai geotechnical fabric bags concrete in the protection of the third village power station left bank flood season River, 2003,6:33-35 pages of], due to open channel excavation slope by design 1:1 is changed to l:0.4, whole side slope is top-heavy, Under the influence of current, side slope pin, which is necessarily formed, draws brush.For this, opposite side toe is covered with block stone presser feet, side slope with rock ballast, spats and The upstream face of bank protection carries out erosion control processing using mold-bagged concrete.Presser foot block stone design side slope is 1: 1.2, bottom width 10.5m, is filled out High 4m;Bank protection rock ballast is filled on presser foot block stone, and design side slope is 1: 1.2, bottom width 6.3m, top width 1.5m, is filled to elevation 68m, bank protection bottom set the maintenance packway of a wide 1m.
In the case where plum river stream and rainy season charge for remittance wash away, bank protection side boundaries, bottom boundary are formed and emptied, and can influence mould bag shield Slope resistance to overturning, bank protection safety is directly affected, therefore, mould bag top, side are taken mixed along slope ditching, mould bag knuckle and backfill Solidifying soil processing, bottom boundary make the processing of boulder presser feet;
Second, Liu Yangmin and Yue Yiquan describe application of the geotechnical fabric bag concrete in Hydraulic and Hydro-Power Engineering bank protection, referring to [application [J] the engineering constructions of Liu Yangmin, Yue Yi power geotechnical fabric bags concrete in Hydraulic and Hydro-Power Engineering bank protection, 2004,117 (3):54-55 pages of], project post-evaluation design is wide without filter point mould bag using C20 mold-bagged concretes lining shield, mould bag model rectangle 4m, it is 150mm to enrich thickness, and seam crossing is using geotechnological anti-filter cloth overlap joint wide 1.6m.The laying of geotechnical fabric bag is applied using segmentation The method of work and continuous productive process is carried out.Vertical dike can axially be divided into 3 sections of base section, concrete revetment section and horizontal bedding section, suitable Dike is axially 1 section (using mould bag breadth 4m as modulus) per 12m.Every section carries out base section construction first, then carries out slope successively Section and the construction of bedding section or both are constructed simultaneously.Direct-axis to can it is separated by a distance progress multistage parallel operations, two construction sections away from From using 12m as modulus.Slope section geotechnical fabric bag is laid from top to bottom, is worn in top of the slope with what steel pipe penetrated that top of the slope mould bag sews in advance In pipe cloth, fixation is adjusted.Horizontal bedding is laid from toe to bedding head end.Mould bag tension and relaxation appropriateness is paid attention to during laying, is avoided Stress concentration and artificial damage.Want modulus bag to be coincide with ground, layer contacts face smooth, prevent mould bag wrinkle from forming penetrating passage Phenomenon.Underwater portion is then first pulled open mould bagging with canoe, is then lain in mould bagging on station keeping ship with rope, to prevent water The mould bagging volume of lower part together or positioning, again loosens rope in concrete filling., will while mould bag is laid The reserved draining hole site of PVC drain pipe insertion mould bag, then carry out charging for concrete.
Current technology is often only referred to how to lay mold-bagged concrete, and for fixed, bottom at the top of mold-bagged concrete Presser feet is introduced seldom, and currently used way is exactly to take to make along the processing of slope ditcher fill concrete, bottom boundary at top Handled with boulder presser feet.This processing method often leads to that top destruction just occurs after using very short time, and it is sliding to produce part Move, the phenomenon of top solid failure occur.And sliding phenomenon often occurs under strong flow action in bottom boulder, so as to from mould Bag concrete bottom is destroyed, and lacks a kind of system of the fixation mold-bagged concrete of system.
The content of the invention
The purpose of the present invention is for weak point present in above-mentioned existing background technology, there is provided a kind of mold-bagged concrete Protective slope structure, with reinforced gabion combination application, extend the usage time of mold-bagged concrete, improve its bank protection ability.
The technical solution adopted for the present invention to solve the technical problems is:Mold-bagged concrete protective slope structure, on the slope of side slope Face is fixedly installed mold-bagged concrete, and the top surface of side slope is extended at the top of mold-bagged concrete, and positioned at the mould of side slope top surface Reinforced gabion is fixedly installed on bag concrete, reinforced gabion bottom is fixedly installed anchor pole, after anchor pole passes through mold-bagged concrete It is anchored in side slope.
It is further:Reinforced gabion is rectangle;Anchor pole is vertically arranged, and anchor pole top is stretched into reinforced gabion, bottom Stretch out reinforced gabion.
It is further:Grouting Pipe is provided with the top of reinforced gabion, by the block stone inside slip casting reinforced gabion with Mold-bagged concrete forms entirety.
It is further:Grouting Pipe is vertically arranged.
It is further:Mold-bagged concrete extends at the toe of side slope to river valley, and passes through reinforced gabion in extension Carry out presser feet.
It is further:Reinforced gabion at toe is also rectangle.
Corresponding with the top fixed form of mold-bagged concrete protective slope structure, present invention simultaneously provides one kind to have anchoring knot The steel reinforcement cage of structure, including for depositing the steel reinforcement cage of block stone, steel reinforcement cage bottom is fixedly installed anchor pole.Steel reinforcement cage is rectangle; Anchor pole is vertically arranged, and anchor pole one end is stretched into steel reinforcement cage, and the other end stretches out steel reinforcement cage.Grouting Pipe is provided with the top of steel reinforcement cage, is noted Slurry pipe is vertically arranged.
The beneficial effects of the invention are as follows:Anchored using in the reinforced gabion that building-site is easier to make and cost is cheap Mold-bagged concrete, so as to further increase mold-bagged concrete along domatic anchor force, it is set to paste slope finer and close, and slip casting Reinforced gabion afterwards can not only anchor mold-bagged concrete structure, and can form natural road surface and block protection structure, protect road The vehicle in face and pedestrian.
The present invention is quick, convenient, and can effectively improve mold-bagged concrete antiskid performance and service life.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the floor map of the anchor pole distribution of the present invention;
In figure mark for:1- reinforced gabions, 2- anchor poles, 3- Grouting Pipes, 4- side slopes, 5- mold-bagged concretes.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
As shown in Figure 1 and Figure 2, the present invention is fixedly installed mold-bagged concrete 5 in the domatic of side slope 4, mold-bagged concrete 5 Top extends to the top surface of side slope 4, and is fixedly installed reinforced gabion 1, steel on the mold-bagged concrete 5 of the top surface of side slope 4 The bottom of muscle gabion 1 is fixedly installed anchor pole 2, and anchor pole 2 is anchored in side slope 4 after passing through mold-bagged concrete 5.Mold-bagged concrete 5 exists Top is anchored by reinforced gabion 1, improves mold-bagged concrete 5 along domatic anchor force, it is pasted slope finer and close, this Outside, reinforced gabion 1 is easier to make in building-site and cost is cheap.
To improve anchoring effect, reinforced gabion 1 is preferably rectangle;2 yuan of anchor pole is elected as vertically arranged, and the top of anchor pole 2 is stretched Enter in reinforced gabion 1, reinforced gabion 1 is stretched out in bottom.
The top of reinforced gabion 1 is provided with Grouting Pipe 3, passes through the block stone inside slip casting reinforced gabion 1 and mould bag coagulation Soil 5 forms overall.Reinforced gabion 1 after slip casting not only can further anchor mold-bagged concrete structure, and can be formed certainly Protection structure is blocked on right road surface, protects vehicle and the pedestrian on road surface.Grouting Pipe 3 is preferably vertically arranged.
The present invention has done further improvement to mold-bagged concrete 5 in the fixed structure of toe simultaneously, and mold-bagged concrete 5 is on side Extend at the toe on slope 4 to river valley, and presser feet is carried out by reinforced gabion 1 in extension.Relative to use of the prior art The processing of boulder presser feet, does not fear current scour, improves the ability of resistant slide, may be such that patch slope is finer and close at toe, prolongs The usage time of long mold-bagged concrete.Reinforced gabion 1 at toe is preferably also rectangle.
Corresponding with the top fixed form of mold-bagged concrete protective slope structure, present invention simultaneously provides one kind to have anchoring knot The steel reinforcement cage of structure, including for depositing the steel reinforcement cage of block stone, steel reinforcement cage bottom is fixedly installed anchor pole 2.Steel reinforcement cage is rectangle; Anchor pole 2 is vertically arranged, and the one end of anchor pole 2 is stretched into steel reinforcement cage, and the other end stretches out steel reinforcement cage.Grouting Pipe 3 is provided with the top of steel reinforcement cage, Grouting Pipe 3 is vertically arranged.When in use, the block stone that particle diameter differs is put into inside steel reinforcement cage, finally steel reinforcement cage is formed and closed Structure.
Embodiment:
The construction procedure of mold-bagged concrete protective slope structure is:
(1) first, mold-bagged concrete is carried out pasting slope arrangement, top of the slope has more 1.2m or so distance, and bottom of slope reaches river valley 0.5m or so;
(2) after mold-bagged concrete fills concrete, steel reinforcement cage is put into mold-bagged concrete top, then insertion is appropriate long Anchor bar as anchor pole, be anchored to road surface at least more than 0.5m;
(3) the block stone of certain particle diameter is put into steel reinforcement cage inside, and is put into Grouting Pipe simultaneously;
(4) using the reinforced gabion template made in advance, Grouting Pipe is passed through using the concrete as mold-bagged concrete To the slip casting of reinforced gabion inside, so that its internal block stone forms entirety with mold-bagged concrete, mold-bagged concrete is further anchored Protective slope structure;
(5) for mold-bagged concrete slurry is poured in after it has some strength, is put into non-slip casting in the part of riverbed bottom Reinforced gabion presser feet, you can protect its toe.

Claims (10)

1. mold-bagged concrete protective slope structure, domatic in side slope (4) are fixedly installed mold-bagged concrete (5), it is characterised in that:Mould The top surface of side slope (4) is extended at the top of bag concrete (5), and it is fixed on the mold-bagged concrete (5) of side slope (4) top surface Reinforced gabion (1) is provided with, reinforced gabion (1) bottom is fixedly installed anchor pole (2), after anchor pole (2) passes through mold-bagged concrete (5) It is anchored in side slope (4).
2. mold-bagged concrete protective slope structure as claimed in claim 1, it is characterised in that:Reinforced gabion (1) is rectangle;Anchor pole (2) vertically arranged, anchor pole (2) top is stretched into reinforced gabion (1), reinforced gabion (1) is stretched out in bottom.
3. mold-bagged concrete protective slope structure as claimed in claim 1, it is characterised in that:Grouting Pipe is provided with the top of reinforced gabion (1) (3), formed by the internal block stone of slip casting reinforced gabion (1) with mold-bagged concrete (5) overall.
4. mold-bagged concrete protective slope structure as claimed in claim 3, it is characterised in that:Grouting Pipe (3) is vertically arranged.
5. the mold-bagged concrete protective slope structure as described in any one in Claims 1-4, it is characterised in that:Mold-bagged concrete (5) extend at the toe of side slope (4) to river valley, and presser feet is carried out by reinforced gabion (1) in extension.
6. mold-bagged concrete protective slope structure as claimed in claim 5, it is characterised in that:Reinforced gabion (1) at toe is also Rectangle.
7. the steel reinforcement cage with anchor structure, including for depositing the steel reinforcement cage of block stone, it is characterised in that:Steel reinforcement cage bottom is fixed It is provided with anchor pole (2).
8. there is the steel reinforcement cage of anchor structure as claimed in claim 7, it is characterised in that:Steel reinforcement cage is rectangle;Anchor pole (2) Vertically arranged, anchor pole (2) one end is stretched into steel reinforcement cage, and the other end stretches out steel reinforcement cage.
9. there is the steel reinforcement cage of anchor structure as claimed in claim 7 or 8, it is characterised in that:Note is provided with the top of steel reinforcement cage Slurry pipe (3).
10. there is the steel reinforcement cage of anchor structure as claimed in claim 9, it is characterised in that:Grouting Pipe (3) is vertically arranged.
CN201710980129.7A 2017-10-19 2017-10-19 Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure Pending CN107724334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710980129.7A CN107724334A (en) 2017-10-19 2017-10-19 Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710980129.7A CN107724334A (en) 2017-10-19 2017-10-19 Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure

Publications (1)

Publication Number Publication Date
CN107724334A true CN107724334A (en) 2018-02-23

Family

ID=61212120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710980129.7A Pending CN107724334A (en) 2017-10-19 2017-10-19 Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure

Country Status (1)

Country Link
CN (1) CN107724334A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824428A (en) * 2018-09-06 2018-11-16 沙洲职业工学院 A kind of quick anchoring device preventing reservoir landslide and construction method
CN108867669A (en) * 2018-09-06 2018-11-23 沙洲职业工学院 A kind of retaining structure on quick reply landslide
CN109356091A (en) * 2018-11-21 2019-02-19 中国电建集团成都勘测设计研究院有限公司 Mountain stream river levee engineering
CN110080167A (en) * 2019-04-29 2019-08-02 水利部交通运输部国家能源局南京水利科学研究院 Mould bag fills sludge solidification ecological slope protection construction method
CN111034582A (en) * 2019-12-19 2020-04-21 郑楚英 Water-intercepting micro-irrigation method for concrete frame slope protection plants
CN113481938A (en) * 2021-07-10 2021-10-08 绿美艺环境建设集团有限公司 Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037157A (en) * 1996-07-27 1998-02-10 Nisshoku Corp Protection and greening construction method of river immersion region
CN1534141A (en) * 2003-03-31 2004-10-06 Method of proceeding engineering surface protection using ecological material
JP2005016112A (en) * 2003-06-25 2005-01-20 Isao Ogata Construction method of permeable bagged dry-mixed concrete block, tough emergency disaster temporary earth retention and permanent revetment
CN105874959A (en) * 2016-04-13 2016-08-24 北京林业大学 Edge slope vegetation ecological restoration method and system
CN206204879U (en) * 2016-09-12 2017-05-31 辽宁省水利水电科学研究院 A kind of bar planting formula concrete revetment mould bag
CN207314271U (en) * 2017-10-19 2018-05-04 中国电建集团成都勘测设计研究院有限公司 Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037157A (en) * 1996-07-27 1998-02-10 Nisshoku Corp Protection and greening construction method of river immersion region
CN1534141A (en) * 2003-03-31 2004-10-06 Method of proceeding engineering surface protection using ecological material
JP2005016112A (en) * 2003-06-25 2005-01-20 Isao Ogata Construction method of permeable bagged dry-mixed concrete block, tough emergency disaster temporary earth retention and permanent revetment
CN105874959A (en) * 2016-04-13 2016-08-24 北京林业大学 Edge slope vegetation ecological restoration method and system
CN206204879U (en) * 2016-09-12 2017-05-31 辽宁省水利水电科学研究院 A kind of bar planting formula concrete revetment mould bag
CN207314271U (en) * 2017-10-19 2018-05-04 中国电建集团成都勘测设计研究院有限公司 Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘兴池: "护岸新技术在塔里木河干流河道治理工程中的运用分析", 《北京农业》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824428A (en) * 2018-09-06 2018-11-16 沙洲职业工学院 A kind of quick anchoring device preventing reservoir landslide and construction method
CN108867669A (en) * 2018-09-06 2018-11-23 沙洲职业工学院 A kind of retaining structure on quick reply landslide
CN109356091A (en) * 2018-11-21 2019-02-19 中国电建集团成都勘测设计研究院有限公司 Mountain stream river levee engineering
CN109356091B (en) * 2018-11-21 2024-01-19 中国电建集团成都勘测设计研究院有限公司 Mountain stream river embankment project
CN110080167A (en) * 2019-04-29 2019-08-02 水利部交通运输部国家能源局南京水利科学研究院 Mould bag fills sludge solidification ecological slope protection construction method
CN111034582A (en) * 2019-12-19 2020-04-21 郑楚英 Water-intercepting micro-irrigation method for concrete frame slope protection plants
CN111034582B (en) * 2019-12-19 2021-09-17 郑楚英 Water-intercepting micro-irrigation method for concrete frame slope protection plants
CN113481938A (en) * 2021-07-10 2021-10-08 绿美艺环境建设集团有限公司 Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof

Similar Documents

Publication Publication Date Title
CN107724334A (en) Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure
CN103410167B (en) Three-dimensional reinforced rigid-soft composite ecological retaining wall and construction method
CN106120823B (en) A kind of Temporary Cofferdam combination against seepage structure and rapid constructing method
CN207314271U (en) Mold-bagged concrete protective slope structure and the steel reinforcement cage with anchor structure
CN106930231B (en) A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
CN106284081B (en) A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method
CN101333818A (en) Pile film cofferdam and its construction method
CN203668885U (en) Novel hydraulic reclamation mould bag
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN112030878A (en) Rapid rush-to-pass construction method along river subgrade water damage
CN112343003A (en) Reinforcing and seepage-proofing treatment method for ultra-shallow soil covering of river bed in tunnel underpass river construction
CN110273429A (en) A kind of piling bar plate and film bag sand cofferdam construction method
CN207267975U (en) A kind of bed stabilization structure for being used under shield tunnel wear river
CN209760147U (en) A ecological bank protection for hydraulic engineering
CN207582477U (en) A kind of concrete cofferdam and earth rock cofferdam combined cofferdam
CN201495521U (en) Hinged large earth bags for river emergency and flood prevention
CN208604552U (en) For the stake woods dam under complex geological condition
CN104947630B (en) For the mistake adfluxion slag weir of Hydraulic and Hydro-Power Engineering and its construction method
CN207295418U (en) The concrete buttress structure for preventing high gradient slope bridge pier from deviating
CN105256763A (en) Diking method based on bamboo raft frame structure
CN206267097U (en) For the concrete hinge soft raft structure of antiscour protection works under water
CN101691744B (en) Overflow pre-settling construction method for concrete face rock-fill dam
CN206298869U (en) A kind of concrete guard wall structure of free drainage
CN105569055A (en) Structure for preventing mountain landslide
CN205875096U (en) Enrockment is from dam break

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223