CN107685125B CN201710746723.XA CN201710746723A CN107685125B CN 107685125 B CN107685125 B CN 107685125B CN 201710746723 A CN201710746723 A CN 201710746723A CN 107685125 B CN107685125 B CN 107685125B
Authority
CN
China
Prior art keywords
stirrup
reinforcement
connecting rod
spiral
longitudinal reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710746723.XA
Other languages
Chinese (zh)
Other versions
CN107685125A (en
Inventor
陈贵全
文远松
唐虹靖
何锋
蔡灿
徐贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Poly Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Poly Xinlian Blasting Engineering Group Co Ltd filed Critical Poly Xinlian Blasting Engineering Group Co Ltd
Priority to CN201710746723.XA priority Critical patent/CN107685125B/en
Publication of CN107685125A publication Critical patent/CN107685125A/en
Application granted granted Critical
Publication of CN107685125B publication Critical patent/CN107685125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/20Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Wire Processing (AREA)

Abstract

The invention discloses a rapid steel reinforcement cage installation device, wherein a longitudinal steel reinforcement fixing groove is formed in a longitudinal steel reinforcement fixer, longitudinal steel reinforcement is inserted into the longitudinal steel reinforcement fixing groove, a plurality of spiral stirrups are sleeved on the longitudinal steel reinforcement, and the two spiral stirrups are connected through two stirrup connectors. The device has a simple structure until binding of the reinforcement cage is completed, wherein the rack is pushed into the stirrup connector to drive the half gear and the half disc to rotate, the first helical gear pushes the first connecting rod into the sleeve, when the rotation is stopped, the first helical gear is meshed with the second helical gear to prevent the half gear and the half disc from rotating, the spiral stirrup is further fixed, the spiral stirrup is prevented from falling off, the device not only can be used for rapidly installing the pile foundation reinforcement cage, but also can be used for accurately positioning the longitudinal reinforcement and the spiral stirrup, the design positions of the reinforcement and the stirrup are ensured, the construction quality is ensured, the structure is simple to install, and the operation is convenient.

Description

Device for quickly installing reinforcement cage
Technical Field
The invention relates to the field of reinforcement cages, in particular to a device for quickly installing reinforcement cages.
Background
At present, pile foundation reinforcement cage construction is carried out in a reinforcement processing factory, then the pile foundation reinforcement cage is transported to a construction site through a transportation automobile, the transportation is inconvenient because the reinforcement cage is overlong, the reinforcement cage is easy to deform in the transportation process, and in order to ensure the quality of the reinforcement cage, a device needs to be developed to ensure the quality of the reinforcement cage in the manufacturing and transportation processes, so that the pile foundation reinforcement cage has important significance.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides a rapid steel reinforcement cage installation device.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
the utility model provides a install steel reinforcement cage device fast, includes longitudinal reinforcement, longitudinal reinforcement fixer, longitudinal reinforcement fixed slot, spiral stirrup and stirrup connector, the longitudinal reinforcement fixed slot has been seted up on the longitudinal reinforcement fixer, longitudinal reinforcement has been inserted in the longitudinal reinforcement fixed slot, cup jointed a plurality of spiral stirrup on the longitudinal reinforcement, connect through two stirrup connectors between two spiral stirrups, the outer lane of stirrup connector is connected with two fixed blocks, and fixed block threaded connection on two stirrup connectors has same bolt, bolt threaded connection has the nut.
Preferably, the stirrup connector includes first arc cardboard, the inside of first arc cardboard is equipped with the second arc cardboard, the terminal surface is connected with the rack under the second arc cardboard, rack engagement semi-toothed wheel, the lateral wall of the mounting groove of seting up on semi-toothed wheel and the first arc cardboard rotates to be connected, the breach department of semi-toothed wheel is connected with the semicircle board, and the outer lane of semicircle board is connected with first skewed tooth, first skewed tooth meshing second skewed tooth, and the second skewed tooth is connected with the head rod, the one end activity that the second skewed tooth was kept away from to the head rod has cup jointed the sleeve, and the sleeve is connected with the lateral wall of mounting groove, the one end that the head rod is located the sleeve inside is connected with the limiting plate, the activity is pegged graft in the first through-hole of seting up on the limiting plate has the second connecting rod, and the both ends of second connecting rod all are connected with telescopic inside wall, be connected with the spring between the lateral wall of limiting plate and telescopic inner bottom wall, peg graft the second connecting rod in the spring, the second through-hole of seting up of the bottom wall of mounting groove is run through to the lower extreme of rack.
Preferably, the upper end face of the second arc-shaped clamping plate is connected with teeth.
Preferably, the second connecting rod and the spring are both two and are symmetrically arranged relative to the first connecting rod.
Preferably, the combined structure of the half gears is two in total and symmetrically arranged about the rack.
Compared with the prior art, the invention has the beneficial effects that: the device is simple in structure, each longitudinal steel bar is installed into the longitudinal steel bar fixing groove by adding the structures of the rack, the half gear, the half disk, the first helical tooth, the second helical tooth and the like, at the moment, the longitudinal steel bars are fixed through the spiral stirrups and the longitudinal steel bar fixing device, then adjacent sections of spiral stirrups are placed in the stirrup connector in a tail mode, the stirrup connector is fixed through bolts and nuts, the integrity of the spiral stirrups is guaranteed, the spiral stirrups are bound on the longitudinal steel bars at the top end of a reinforcement cage, the spiral stirrups are sequentially bound on the longitudinal steel bars until the reinforcement cage binding is completed, the rack is pushed to the inside of the stirrup connector, the half gear and the half disk are driven to rotate, the first helical tooth pushes the first connecting rod into the sleeve, when rotation is stopped, the first helical tooth and the second helical tooth are meshed, the half gear and the half disk are prevented from rotating, the spiral stirrups are further fixed, the foundation reinforcement cage can be rapidly installed, the positioning of the spiral stirrups is accurate, the design position of the longitudinal steel bars and the pile stirrups is guaranteed, the construction quality is guaranteed, and the structure installation is simple, and operation is convenient.
Drawings
FIG. 1 is a schematic diagram of a structure according to the present invention;
fig. 2 is a side view of the longitudinal bar holder of the present invention;
FIG. 3 is a front view of the stirrup connector of the invention;
FIG. 4 is a side view of the stirrup connector of the invention;
fig. 5 is an enlarged schematic view of the structure a of the present invention.
In the figure: longitudinal steel bar 1, longitudinal steel bar fixer 2, longitudinal steel bar fixing groove 3, spiral stirrup 4, stirrup connector 5, first arc-shaped clamping plate 51, second arc-shaped clamping plate 52, rack 53, half gear 54, half disc 55, first helical tooth 56, second helical tooth 57, first connecting rod 58, sleeve 59, limiting plate 510, second connecting rod 511, spring 512, mounting groove 513, fixed block 6, bolt 7, nut 8.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-5, a quick installation reinforcement cage device, including vertical reinforcement 1, vertical reinforcement fixer 2, vertical reinforcement fixed slot 3, spiral stirrup 4 and stirrup connector 5, vertical reinforcement fixed slot 3 has been seted up on the vertical reinforcement fixer 2, vertical reinforcement 1 has been pegged graft in the vertical reinforcement fixed slot 3, a plurality of spiral stirrup 4 has been cup jointed on the vertical reinforcement 1, connect through two stirrup connectors 5 between two spiral stirrups 4, the outer lane of stirrup connector 5 is connected with two fixed blocks 6, fixed block 6 threaded connection on two stirrup connectors 5 has same bolt 7, bolt 7 threaded connection has nut 8.
The stirrup connector 5 includes first arc cardboard 51, the inside of first arc cardboard 51 is equipped with second arc cardboard 52, the terminal surface is connected with rack 53 under the second arc cardboard 52, rack 53 meshing half gear 54, the lateral wall rotation of the mounting groove 513 of seting up on half gear 54 and the first arc cardboard 51 is connected, the breach department of half gear 54 is connected with half disc 55, and the outer lane of half disc 55 is connected with first helical tooth 56, first helical tooth 56 meshing second helical tooth 57, and second helical tooth 57 is connected with head rod 58, the one end activity that head rod 58 kept away from second helical tooth 57 has cup jointed sleeve 59, and sleeve 59 is connected with the lateral wall of mounting groove 513, the one end that head rod 58 is located sleeve 59 inside is connected with limiting plate 510, movable grafting has second connecting rod 511 in the first through-hole of seting up on the limiting plate 510, and both ends of second connecting rod 511 are all connected with the inside wall of sleeve 59, be connected with spring 512 between the lateral wall of limiting plate 510 and the inner bottom wall of sleeve 59, and spring 512 interpolation connects second connecting rod 511, the bottom wall of second helical tooth 57 runs through mounting groove's one end has sleeve 59, head rod 58 has two symmetrical tooth connection about two, two sets of head rods 53, and two sets of tooth connection rod pairs are symmetrical about the first connecting rod 53, two sets of tooth pairs are symmetrical, and about the head rod pair of tooth pairs is provided with the head rod 53.
Working principle: the flat place before installing the reinforcement cage, penetrate the longitudinal reinforcement 1 between spiral stirrup 4 and the longitudinal reinforcement fixer 2, install a longitudinal reinforcement fixer 2 according to every three meters, install every longitudinal reinforcement 1 to in the longitudinal reinforcement fixed slot 3, this moment longitudinal reinforcement 1 gives fixedly through spiral stirrup 4 and longitudinal reinforcement fixer 2, then lay adjacent segmental spiral stirrup 4 end-to-end in stirrup connector 5, give stirrup connector 5 fixedly through bolt 7 and nut 8, the integrality of spiral stirrup 4 has been guaranteed, with spiral stirrup 4 ligature on longitudinal reinforcement 1 in the reinforcement cage top, in proper order with spiral stirrup 4 ligature on longitudinal reinforcement 1, until accomplish the reinforcement cage ligature, wherein promote rack 53 to inside the stirrup connector 5, drive half gear 54 and half disc 55 rotation, first helical tooth 56 is inside with head rod 58 jack-in sleeve 59, when the rotation stops, first helical tooth 56 and second helical tooth 57 mesh, half gear 54 and half disc 55 gyration, further fix spiral stirrup 4, this device can not install the reinforcement cage fast enough, the installation quality is convenient for the reinforcement cage is easy to install, the pile foundation, the quality is guaranteed.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (2)

1. The utility model provides a install steel reinforcement cage device fast, includes longitudinal reinforcement (1), longitudinal reinforcement fixer (2), longitudinal reinforcement fixed slot (3), spiral stirrup (4) and stirrup connector (5), longitudinal reinforcement fixed slot (3) have been seted up on longitudinal reinforcement fixer (2), longitudinal reinforcement (1) have been inserted in longitudinal reinforcement fixed slot (3), a plurality of spiral stirrup (4) have been cup jointed on longitudinal reinforcement (1), connect through two stirrup connectors (5) between two spiral stirrups (4), its characterized in that: the outer ring of the stirrup connector (5) is connected with two fixing blocks (6), the fixing blocks (6) on the two stirrup connectors (5) are connected with the same bolt (7) in a threaded manner, and the bolt (7) is connected with a screw cap (8) in a threaded manner; the stirrup connector (5) comprises a first arc-shaped clamping plate (51), a second arc-shaped clamping plate (52) is arranged in the first arc-shaped clamping plate (51), a rack (53) is connected to the lower end face of the second arc-shaped clamping plate (52), the rack (53) is meshed with a half gear (54), the half gear (54) is rotationally connected with the side wall of a mounting groove (513) formed in the first arc-shaped clamping plate (51), a half disc (55) is connected with the notch of the half gear (54), a first bevel gear (56) is connected with the outer ring of the half disc (55), the first bevel gear (56) is meshed with a second bevel gear (57), the second bevel gear (57) is connected with a first connecting rod (58), one end of the first connecting rod (58) far away from the second bevel gear (57) is movably sleeved with a sleeve (59), one end of the sleeve (59) is connected with the side wall of the mounting groove (513), one end of the first connecting rod (58) located in the sleeve (59) is connected with a limiting plate (510), the inner side wall of the limiting plate (510) is connected with the inner side wall of the second connecting rod (511) which is movably connected with the inner side wall of the sleeve (511), a second connecting rod (511) is inserted into the spring (512), and the lower end of the rack (53) penetrates through a second through hole formed in the bottom wall of the mounting groove (513); the upper end surface of the second arc-shaped clamping plate (52) is connected with teeth; the second connecting rod (511) and the spring (512) are both two, and are both symmetrically arranged relative to the first connecting rod (58).
2. A quick install reinforcement cage apparatus as set forth in claim 1, wherein: the combined structure of the half gears (54) is two in total, and the half gears are symmetrically arranged about the racks (53).
CN201710746723.XA 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage Active CN107685125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710746723.XA CN107685125B (en) 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710746723.XA CN107685125B (en) 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage

Publications (2)

Publication Number Publication Date
CN107685125A CN107685125A (en) 2018-02-13
CN107685125B true CN107685125B (en) 2023-08-18

Family

ID=61155423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710746723.XA Active CN107685125B (en) 2017-08-27 2017-08-27 Device for quickly installing reinforcement cage

Country Status (1)

Country Link
CN (1) CN107685125B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108581351B (en) * 2018-07-11 2023-11-21 广州鑫桥建筑工程有限公司 Automatic welding equipment for rotating positioning device and underground diaphragm wall reinforcement cage
CN112454647B (en) * 2020-11-18 2022-05-17 嘉兴鸿华管桩有限公司 Prefabricated reinforced concrete tubular pile forming and processing system
CN112854205A (en) * 2021-01-08 2021-05-28 赵学洪 Steel reinforcement cage fixed mounting structure

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311867A (en) * 1995-05-18 1996-11-26 Kensetsu Kiso Eng Co Ltd Construction method for high stress-proof pile
JPH1136288A (en) * 1997-07-16 1999-02-09 East Japan Railway Co Fixing method for hoop bar
JPH11152745A (en) * 1997-11-19 1999-06-08 Taisei Corp Structure of pile to be formed in site
CN102877465A (en) * 2012-10-19 2013-01-16 天津宝丰混凝土桩杆有限公司 Tubular pile reinforcement cage with stranded steel wire
CN104096786A (en) * 2014-07-05 2014-10-15 武汉嗨拓科技有限公司 Rebar cage former
CN105150132A (en) * 2015-08-07 2015-12-16 重庆市福顺动力配件厂 Clamp for cylindrical parts
CN105569277A (en) * 2015-12-16 2016-05-11 天津银龙高科新材料研究院有限公司 Reinforcing bar connecter
CN106087870A (en) * 2016-08-16 2016-11-09 重庆市晟庄建材有限责任公司 A kind of flood-fighting special reinforcing steel cage
CN205722575U (en) * 2016-03-10 2016-11-23 云南经济管理学院 Reassembling type pile foundation and cylinder steel reinforcement cage model
CN206170243U (en) * 2016-11-15 2017-05-17 连云港宫良木业有限公司 Work piece clamping device of stuff groove cutting machine
CN106903521A (en) * 2017-03-09 2017-06-30 刘艳平 A kind of cylindric workpiece punching frock clamp
CN106988301A (en) * 2017-05-21 2017-07-28 荆门创佳机械科技有限公司 A kind of intermediate strutting device for processing circular steel reinforcement cage
CN207086806U (en) * 2017-08-27 2018-03-13 贵州新联***工程集团有限公司 A kind of Fast Installation reinforcing bar cage assembly

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08311867A (en) * 1995-05-18 1996-11-26 Kensetsu Kiso Eng Co Ltd Construction method for high stress-proof pile
JPH1136288A (en) * 1997-07-16 1999-02-09 East Japan Railway Co Fixing method for hoop bar
JPH11152745A (en) * 1997-11-19 1999-06-08 Taisei Corp Structure of pile to be formed in site
CN102877465A (en) * 2012-10-19 2013-01-16 天津宝丰混凝土桩杆有限公司 Tubular pile reinforcement cage with stranded steel wire
CN104096786A (en) * 2014-07-05 2014-10-15 武汉嗨拓科技有限公司 Rebar cage former
CN105150132A (en) * 2015-08-07 2015-12-16 重庆市福顺动力配件厂 Clamp for cylindrical parts
CN105569277A (en) * 2015-12-16 2016-05-11 天津银龙高科新材料研究院有限公司 Reinforcing bar connecter
CN205722575U (en) * 2016-03-10 2016-11-23 云南经济管理学院 Reassembling type pile foundation and cylinder steel reinforcement cage model
CN106087870A (en) * 2016-08-16 2016-11-09 重庆市晟庄建材有限责任公司 A kind of flood-fighting special reinforcing steel cage
CN206170243U (en) * 2016-11-15 2017-05-17 连云港宫良木业有限公司 Work piece clamping device of stuff groove cutting machine
CN106903521A (en) * 2017-03-09 2017-06-30 刘艳平 A kind of cylindric workpiece punching frock clamp
CN106988301A (en) * 2017-05-21 2017-07-28 荆门创佳机械科技有限公司 A kind of intermediate strutting device for processing circular steel reinforcement cage
CN207086806U (en) * 2017-08-27 2018-03-13 贵州新联***工程集团有限公司 A kind of Fast Installation reinforcing bar cage assembly

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柱体箍筋卷动器制作桩柱钢筋笼施工工法;李江;;青海交通科技(第04期);63-67 *

Also Published As

Publication number Publication date
CN107685125A (en) 2018-02-13

Similar Documents

Publication Publication Date Title
CN107685125B (en) Device for quickly installing reinforcement cage
CN109201942B (en) Bending device for processing reinforcing steel bars
CN203770970U (en) Pan-tilt
CN111119459B (en) Cement leveling device
CN204257853U (en) Auto-articulated earthing clamp
CN204504042U (en) A kind of automatic collecting mechanism of tube and pipe of aluminium alloy
CN204729590U (en) Elevator rack
CN207362872U (en) A kind of earth-retaining wall bracket for conveniently building dismounting
CN107138806B (en) A kind of tubing circular hole chamfering device
CN113525889A (en) Conveying bracket for integrated circuit board machining
CN204891047U (en) Portable hand formula lift horizontal bar
CN203783121U (en) Modularization assembled type steel frame keel formwork structure
CN204511284U (en) The automatic stake holes machine of numerical control
CN102350691A (en) Station appliance with gravity overturning structure
CN221277770U (en) Adjustable supporting device
CN204732659U (en) A kind of gear turning device
CN212927280U (en) Novel communication tower is fixed for electronic information engineering device
CN217028791U (en) A building stake hole positioning device for engineering management
CN220414177U (en) Oil boom end connector
CN213197295U (en) Fixing device is used in harp production
CN215369141U (en) Novel municipal works safety protection device
CN221356159U (en) Portable drawing board frame for building planning design
CN218798748U (en) Reinforcing bar bending device that engineering construction used
CN217897295U (en) Concrete formwork supporting device based on building engineering
CN212801466U (en) Axial force monitoring device for foundation pit monitoring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Applicant after: POLY XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd.

Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Applicant before: GUIZHOU XINLIAN BLASTING ENGINEERING GROUP Co.,Ltd.

GR01 Patent grant