CN107675709A - A kind of efficient multi-functional construction of hydro project dredging drill hole equipment - Google Patents

A kind of efficient multi-functional construction of hydro project dredging drill hole equipment Download PDF

Info

Publication number
CN107675709A
CN107675709A CN201710885825.XA CN201710885825A CN107675709A CN 107675709 A CN107675709 A CN 107675709A CN 201710885825 A CN201710885825 A CN 201710885825A CN 107675709 A CN107675709 A CN 107675709A
Authority
CN
China
Prior art keywords
welded
construction
connection
bolt
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710885825.XA
Other languages
Chinese (zh)
Other versions
CN107675709B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Hydropower Construction Co., Ltd.
Original Assignee
Shaanxi Road Shield Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Road Shield Highway Engineering Co Ltd filed Critical Shaanxi Road Shield Highway Engineering Co Ltd
Priority to CN201710885825.XA priority Critical patent/CN107675709B/en
Publication of CN107675709A publication Critical patent/CN107675709A/en
Application granted granted Critical
Publication of CN107675709B publication Critical patent/CN107675709B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Treatment Of Sludge (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of efficient multi-functional construction of hydro project dredging drill hole equipment, including car body, working hole, movable pulley, grafting groove, working cabined, store motor, first storage wheel, support for construction, pulley, connecting steel wire ropes, fixed chute, fixing and mounting bracket, slide limited block, drilling motor, punch cylinder, reinforcing bar, silt dredging pump, go out the pipe that becomes silted up, silt-sucking tube, fixed position-limited rack structure, level measuring spherical structure, standing harden structure, anti- stopper structure, article moves string bag structure, seal tubular construction and support wheel construction, described working hole is opened in the right-hand member of car body.Beneficial effects of the present invention are:Pass through the setting of fixed position-limited rack structure, be advantageous to easily fix the similar article such as casing, what is be also convenient for simultaneously makes article more precisely be installed to the position specified, and by the setting of level measuring spherical structure, is advantageous to more easily detect whether have substantial amounts of water in opened hole.

Description

A kind of efficient multi-functional construction of hydro project dredging drill hole equipment
Technical field
The invention belongs to construction of hydro project engineering device technique field, more particularly to a kind of efficient multi-functional hydraulic engineering Dredging drill hole equipment is used in construction.
Background technology
Engineering driller is one of rig classification and extension, as its name suggests, engineering driller be for skyscraper, harbour, The rig of the large-diameter bored pile construction of the engineerings such as harbour, dam, electric power, bridge, engineering driller classification:Impact drill, lean on The up-and-down movement of drilling tool, make drill bit impact shaft bottom with broken rock.Its is simple in construction, does not have circulation well cleanup system, landwaste Removing can not be carried out simultaneously with rig, thus effect is relatively low.Rotary drill, by the gyration broken rock of drilling tool And pore-forming.Combinationdrill has 2 kinds:A kind of is that will impact the water drilling rig that drilling is combined together with gyroscopic action, such as pneumatic Down-hole hammer rig.Down-hole hammer drilling tool is made up of cylinder sleeve and piston etc..Pressure-air is provided by air compressor to promote above and below piston Move back and forth, drill hammer with strengthen drill bit drilling rock stratum ability.Another kind is increased on the basis of rotating disk rotary drill If beater mechanism, based on rotary drilling, the dual-purpose water drilling rig of percussion drilling when running into boulder bed, to various stratum Strong adaptability, prior art be China Patent Publication No. be CN201710121422.8 a kind of construction of hydro project drilling Technical scheme is used by machine:Including base, filtered water tank is provided with the left of base upper end, suction hose is provided with the middle part of filtered water tank, is inhaled Water pipe upper end is connected with pulsating pump, and pulsating pump upper end is connected with aqueduct, No.1 hydraulic cylinder, base are provided with the middle part of filtered water tank right-hand member Pressing filter box is provided with the right side of upper end, is provided with pressing plate inside pressing filter box upper end, pressing filter box bottom inner portion is provided with filter plate, and filter plate lower end is provided with Shower nozzle, shower nozzle lower end are connected with distributive pipe, are provided with the left of pressing filter box upper end and draw dredge pump, drawn dredge pump upper end and be connected with mud guide pipe, pressed No.1 lifting arm is provided with the middle part of filter box right-hand member, No.1 lifting arm upper end is connected with lifting large arm, and lifting large arm upper end is connected with two Number lifting arm, lifts large arm and No. two lifting arm right-hand members are connected with drilling pipe.
But also there is conveniently make casing and other items more for existing multi-functional construction of hydro project dredging drill hole equipment Add and be accurately installed to the position specified, conveniently learn in opened up hole whether there is ponding and in silt dredging easily easily to inhaling The problem of silt pipe results in blockage.
Therefore, a kind of efficient multi-functional construction of hydro project dredging drill hole equipment of invention seems very necessary.
The content of the invention
In order to solve the above-mentioned technical problem, it is clear with drilling to provide a kind of efficient multi-functional construction of hydro project by the present invention Silt equipment, conveniently make casing and other items more accurately to solve existing multi-functional construction of hydro project dredging drill hole equipment It is installed to the position specified, conveniently learns in opened up hole whether have ponding and easily easily silt-sucking tube is caused in silt dredging The problem of blocking.A kind of efficient multi-functional construction of hydro project dredging drill hole equipment, including car body, working hole are mobile Wheel, grafting groove, working cabined, motor is stored, the first storage is taken turns, support for construction, pulley, connecting steel wire ropes, fixed chute, Gu Dingan County is shelved, and is slided limited block, drilling motor, is punched cylinder, reinforcing bar, silt dredging pump, go out the pipe that becomes silted up, silt-sucking tube, fixed position-limited rack knot Structure, level measuring spherical structure, standing harden structure, anti-stopper structure, article movement string bag structure, sealing tubular construction and support rolling hitch Structure, described working hole are opened in the right-hand member of car body;Described movable pulley is separately mounted to the left and right sides of car body front surface;Institute The grafting groove stated is opened in the left side of car body front surface;Described working cabined is welded on the upper left quarter of car body;Described storage Motor bolt is arranged on the right side of working cabined;The first described storage wheel is arranged on the output shaft of storage motor;Described applies Work support frame is welded on the upper right quarter of car body;Described pulley bolt is arranged on the top of support for construction inwall;Described company Steel wire rope one end and the first storage wheel connection are connect, the other end is connected with fixing and mounting bracket;Described fixed chute is opened in construction On the inwall of support frame;Described fixing and mounting bracket is fixed on the fixed chute of support for construction inwall by sliding limited block On;Described drilling motor bolt is arranged on the lower section inside fixing and mounting bracket;Described punching cylinder is pacified through fixing and mounting bracket On the output shaft of drilling motor;Described reinforcing bar one end and support for construction bolt connection, the other end and car body bolt Connection;Described silt dredging pump is arranged on the longitudinally intermediate portion position of car body upper surface;The described pipe that becomes silted up that goes out is arranged on the positive table of silt dredging pump The upper left quarter in face;Described silt-sucking tube is arranged on the upper right quarter of silt dredging pump;Described fixation position-limited rack structure welding is in construction branch The upper right corner of support;Described level measuring spherical structure is welded on the right side of silt dredging pump;Described standing harden structure is placed on slotting Connect in groove;Described anti-stopper structure is arranged on the top of silt-sucking tube;Described article movement string bag structural bolts are arranged on The top of fixed position-limited rack structure;Lower left quarter of the described seal pipe structure welding in fixed position-limited rack structure;Described support Wheel construction is welded on the bottom of fixed position-limited rack structure.
Preferably, described fixation position-limited rack structure includes Connection Bracket, working plate, places installing plate, hydraulic cylinder, peace Bar is filled, folding stand, fixed plate, the first fixing bolt, fuel tank, oil pipe and oil pump, described working plate are welded on Connection Bracket Bottom;Described placement installing plate is welded on the rear wall of Connection Bracket;Described hydraulic cylinder bolt, which is arranged on to place, pacifies The upper surface of loading board;Described mounting rod is arranged on the left end of hydraulic cylinder;Described folding stand is welded on the left end of mounting rod;Institute The bolt of fixing plate stated is arranged on the left end on the inside of folding stand;Described fuel tank is welded on the upper surface of working plate;Described oil Pipe one end is connected with hydraulic cylinder, and the other end is connected with fuel tank;Described oil pump is arranged on oil pipe.
Preferably, described level measuring spherical structure includes fixed block, bearing, rotary shaft, transverse slat, handle, take-up pulley, connects Extension bar, hollow pipe, the second fixing bolt, detection rope and floater shot, described bearing are embedded in the top of fixed block front surface;Institute The rotary shaft stated is plugged in bearing;Described transverse slat is welded on the rear portion of rotary shaft;Described handle is welded on transverse slat rear wall Right side;Described connecting rod is welded on the right lower quadrant of fixed block;Described hollow pipe is welded on the right-hand member of connecting rod;Described Second fixing bolt is threaded in the upper left quarter of hollow pipe.
Preferably, described standing harden structure includes box body, containing cavities, hinge, cage plate, expansion plate, lifts steel wire and station Vertical block, described containing cavities are opened in the upper surface of box body;Described cage plate is arranged on a left side for box body by hinge bolt respectively Right both sides;Described expansion plate is plugged on the inside of cage plate.
Preferably, described anti-stopper structure includes connector, telescoping tube, socket pipe, regulating bolt, positive baffle plate, side block Plate and floating cylinder, described telescoping tube one end are welded on the left and right sides of connector upper surface, and the other end is plugged in socket pipe; Described regulating bolt is threaded in the junction of telescoping tube and socket pipe;The described floating cementing upper table in side shield of cylinder Face.
Preferably, described article movement string bag structure includes lifting moving motor, mounting disc, and the second storage is taken turns, and first Bearing steel wire, hook, the second bearing steel wire and the placement string bag, described lifting moving motor is arranged on by mounting disc bolt to be connected Connect the upper surface of fixed mount;The second described storage wheel is on the output shaft of lifting moving motor;The first described load-bearing Steel wire one end is connected with the second storage wheel connection, the other end by linking up with the second bearing steel wire;The described placement string bag is fixed In the bottom of the second bearing steel wire.
Preferably, described sealing tubular construction includes regulation pipe, connecting plate, communicating pipe body, connect chamber, closure, erect Bar, sealing ring and protective cover, described regulation pipe are welded on the right-hand member of communicating pipe body;Described connecting plate is welded on regulation pipe Right-hand member;Described connection chamber is opened in the inside of communicating pipe body;Described closure is placed on the top of communicating pipe body; Described montant is welded on the upper left quarter of closure;Described sealing ring is glued to the lower surface of communicating pipe body;Described is anti- Shield is welded on the bottom of communicating pipe tube wall.
Preferably, described folding stand specifically uses U-shaped stainless steel frame, and the fixed plate on the inside of described folding stand is specifically adopted With stainless steel plate, arc is arranged on the right side of described fixed plate, the first fixation is threaded with the left of described fixed plate Bolt.
Preferably, described mounting rod one end is connected with hydraulic cylinder, and the other end is connected with folding stand.
Preferably, described floater shot specifically uses foam ball, described floater shot by detect rope through hollow pipe with Take-up pulley is connected, and the middle part of described detection rope is fixed in hollow pipe by the second fixing bolt.
Preferably, described take-up pulley is socketed in the front portion of rotary shaft, described take-up pulley and detection rope connection.
Preferably, described standing block is connected by lifting steel wire with standing block, and described standing block and lifting steel wire are put Put and specifically use PVC plastic block in the inside of containing cavities, described standing block.
Preferably, described telescoping tube and socket pipe are adapted, and are fixed by regulating bolt.
Preferably, described positive baffle plate is welded on the top of socket pipe, and the left and right ends of described positive baffle plate are welded with side Baffle plate.
Preferably, the described placement string bag specifically uses steel wire, the described placement string bag by the second bearing steel wire with Hook connection.
Preferably, the described interior connection lumen pore footpath of communicating pipe body is 30 centimetres to 35 centimetres, described connection Chamber connects with protective cover.
Compared with prior art, beneficial effects of the present invention are:
1. in the present invention, described folding stand specifically uses U-shaped stainless steel frame, and the fixed plate on the inside of described folding stand is specifically adopted With stainless steel plate, arc is arranged on the right side of described fixed plate, the first fixation is threaded with the left of described fixed plate Bolt, be advantageous to easily fix the similar article such as casing, at the same be also convenient for article is more precisely installed to specified Position.
2. in the present invention, described mounting rod one end is connected with hydraulic cylinder, and the other end is connected with folding stand, the side of being advantageous to Just the position of installation article required for adjustment.
3. in the present invention, described floater shot specifically uses foam ball, described floater shot is restricted through hollow by detecting Pipe is connected with take-up pulley, and the middle part of described detection rope is fixed in hollow pipe by the second fixing bolt, is advantageous to more Whether add in the opened hole of convenient detection has substantial amounts of water.
4. in the present invention, described take-up pulley is socketed in the front portion of rotary shaft, described take-up pulley and detection rope connection, Be advantageous to more easily store detection rope.
5. in the present invention, described standing block is connected by lifting steel wire with standing block, described standing block and lifting steel Silk is placed on the inside of containing cavities, and described standing block specifically uses PVC plastic block, is advantageous to easily make staff stand On standing block, while also staff is more easily operated, also help and add the multi-functional hydraulic engineering The function of construction dredging drill hole equipment.
6. in the present invention, described telescoping tube and socket pipe are adapted, and are fixed by regulating bolt, the side of being advantageous to Just the length of telescoping tube and socket pipe is adjusted, while what is be also convenient for is placed into the too deep place of mud.
7. in the present invention, described positive baffle plate is welded on the top of socket pipe, the left and right ends welding of described positive baffle plate There is side shield, be advantageous in silt dredging, the problem of anti-stopper structure can be avoided to be resulted in blockage when going deep into mud.
8. in the present invention, the described placement string bag specifically uses steel wire, the described placement string bag passes through the second load-bearing steel Silk connects with hook, is advantageous in construction, in that context it may be convenient to mobile overweight stone or other articles.
9. in the present invention, the described interior connection lumen pore footpath of communicating pipe body is 30 centimetres to 35 centimetres, described Connection chamber connects with protective cover, is advantageous in rainwater weather, can prevent substantial amounts of rainwater from entering the multi-functional water conservancy work In the hole that journey construction dredging drill hole equipment is opened.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of the fixation position-limited rack structure of the present invention.
Fig. 3 is the structural representation of the level measuring spherical structure of the present invention.
Fig. 4 is the structural representation of the standing harden structure of the present invention.
Fig. 5 is the structural representation of the anti-stopper structure of the present invention.
Fig. 6 is the structural representation of the article movement string bag structure of the present invention.
Fig. 7 is the structural representation of the sealing tubular construction of the present invention.
In figure:
1st, car body;2nd, working hole;3rd, movable pulley;4th, grafting groove;5th, working cabined;6th, motor is stored;7th, the first storage wheel;8th, it is solid Determine frame;9th, pulley;10th, connecting steel wire ropes;11st, fixed chute;12nd, fixing and mounting bracket;13rd, limited block is slided;14th, punching electricity Machine;15th, cylinder is punched;16th, reinforcing bar;17th, silt dredging pump;18th, the pipe that becomes silted up is gone out;19th, silt-sucking tube;20th, fixed position-limited rack structure;201st, even Connect fixed mount;202nd, working plate;203rd, installing plate is placed;204th, hydraulic cylinder;205th, mounting rod;206th, folding stand;207th, it is fixed Plate;208th, the first fixing bolt;209th, fuel tank;2010th, oil pipe;2011st, oil pump;21st, level measuring spherical structure;211st, it is fixed Block;212nd, bearing;213rd, rotary shaft;214th, transverse slat;215th, handle;216th, take-up pulley;217th, connecting rod;218th, hollow pipe; 219th, the second fixing bolt;2110th, detection rope;2111st, floater shot;22nd, standing harden structure;221st, box body;222nd, containing cavities; 223rd, hinge;224th, cage plate;225th, expansion plate;226th, steel wire is lifted;227th, standing block;23rd, anti-stopper structure;231st, connect Head;232nd, telescoping tube;233rd, socket pipe;234th, regulating bolt;235th, positive baffle plate;236th, side shield;237th, cylinder is floated;24th, thing Product move string bag structure;241st, lifting moving motor;242nd, mounting disc;243rd, the second storage wheel;244th, the first bearing steel wire; 245th, link up with;246th, the second bearing steel wire;247th, the string bag is placed;25th, tubular construction is sealed;251st, regulation pipe;252nd, connecting plate; 253rd, communicating pipe body;254th, chamber is connected;255th, closure;256th, montant;257th, sealing ring;258th, protective cover;26th, support wheel Structure.
Embodiment
The present invention is described further below in conjunction with accompanying drawing:
Embodiment:
As shown in accompanying drawing 1 to accompanying drawing 7
The present invention provides one kind efficient multi-functional construction of hydro project dredging drill hole equipment, including car body 1, working hole 2, Movable pulley 3, grafting groove 4, working cabined 5, store motor 6, the first storage wheel 7, support for construction 8, pulley 9, connecting steel wire ropes 10, fixed chute 11, fixing and mounting bracket 12, limited block 13 is slided, drilling motor 14, punches cylinder 15, reinforcing bar 16, silt dredging pump 17, go out to become silted up pipe 18, silt-sucking tube 19, fixed position-limited rack structure 20, level measuring spherical structure 21, standing harden structure 22, anti-plug knot Structure 23, article movement string bag structure 24, sealing tubular construction 25 and support wheel construction 26, described working hole 2 are opened in car body 1 Right-hand member;Described movable pulley 3 is separately mounted to the left and right sides of the front surface of car body 1;Described grafting groove 4 is opened in car body 1 The left side of front surface;Described working cabined 5 is welded on the upper left quarter of car body 1;The described bolt of storage motor 6 is arranged on working cabined 5 right side;The first described storage wheel 7 is arranged on the output shaft of storage motor 6;Described support for construction 8 is welded on car The upper right quarter of body 1;The described bolt of pulley 9 is arranged on the top of the inwall of support for construction 8;Described one end of connecting steel wire ropes 10 It is connected with the first storage wheel 7, the other end is connected with fixing and mounting bracket 12;Described fixed chute 11 is opened in support for construction 8 Inwall on;Described fixing and mounting bracket 12 is fixed on the fixed chute 11 of the inwall of support for construction 8 by sliding limited block 13 On;The described bolt of drilling motor 14 is arranged on the lower section inside fixing and mounting bracket 12;Described punching cylinder 15 is pacified through fixed 12 are shelved to be arranged on the output shaft of drilling motor 14;Described one end of reinforcing bar 16 and the bolt connection of support for construction 8, it is another End and the bolt connection of car body 1;Described silt dredging pump 17 is arranged on the longitudinally intermediate portion position of the upper surface of car body 1;Described goes out the pipe that becomes silted up 18 are arranged on the upper left quarter of the front surface of silt dredging pump 17;Described silt-sucking tube 19 is arranged on the upper right quarter of silt dredging pump 17;Described consolidates Fixing limit frame structure 20 is welded on the upper right corner of support for construction 8;Described level measuring spherical structure 21 is welded on silt dredging pump 17 Right side;Described standing harden structure 22 is placed in grafting groove 4;Described anti-stopper structure 23 is arranged on silt-sucking tube 19 Top;Described article movement string bag structure 24 bolt is arranged on the top of fixed position-limited rack structure 20;Described seal pipe knot Structure 25 is welded on the lower left quarter of fixed position-limited rack structure 20;Described support wheel construction 26 is welded on fixed position-limited rack structure 20 Bottom.
In above-described embodiment, specifically, described fixation position-limited rack structure 20 includes Connection Bracket 201, working plate 202, place installing plate 203, hydraulic cylinder 204, mounting rod 205, folding stand 206, fixed plate 207, the first fixing bolt 208, oil Case 209, oil pipe 2010 and oil pump 2011, described working plate 202 are welded on the bottom of Connection Bracket 201;Described placement Installing plate 203 is welded on the rear wall of Connection Bracket 201;The described bolt of hydraulic cylinder 204, which is arranged on, places installing plate 203 Upper surface;Described mounting rod 205 is arranged on the left end of hydraulic cylinder 204;Described folding stand 206 is welded on mounting rod 205 Left end;The described bolt of fixed plate 207 is arranged on the left end of the inner side of folding stand 206;Described fuel tank 209 is welded on working plate 202 upper surface;Described one end of oil pipe 2010 is connected with hydraulic cylinder 204, and the other end is connected with fuel tank 209;Described oil pump 2011 are arranged on oil pipe 2010.
In above-described embodiment, specifically, described level measuring spherical structure 21 includes fixed block 211, bearing 212, rotation Axle 213, transverse slat 214, handle 215, take-up pulley 216, connecting rod 217, hollow pipe 218, the second fixing bolt 219, detection rope 2110 and floater shot 2111, described bearing 212 be embedded in the top of the front surface of fixed block 211;The described grafting of rotary shaft 213 In bearing 212;Described transverse slat 214 is welded on the rear portion of rotary shaft 213;Described handle 215 is welded on the rear wall of transverse slat 214 Right side;Described connecting rod 217 is welded on the right lower quadrant of fixed block 211;Described hollow pipe 218 is welded on connecting rod 217 Right-hand member;The second described fixing bolt 219 is threaded in the upper left quarter of hollow pipe 218.
In above-described embodiment, specifically, described standing harden structure 22 includes box body 221, containing cavities 222, hinge 223, Cage plate 224, expansion plate 225, lifts steel wire 226 and standing block 227, described containing cavities 222 are opened in the upper table of box body 221 Face;Described cage plate 224 is arranged on the left and right sides of box body 221 by the bolt of hinge 223 respectively;Described expansion plate 225 is inserted It is connected on the inside of cage plate 224.
In above-described embodiment, specifically, described anti-stopper structure 23 includes connector 231, telescoping tube 232, socket pipe 233, regulating bolt 234, positive baffle plate 235, side shield 236 and floating cylinder 237, described one end of telescoping tube 232 is welded on connection The left and right sides of first 231 upper surface, the other end are plugged in socket pipe 233;Described regulating bolt 234 is threaded in flexible The junction of pipe 232 and socket pipe 233;Described floating cylinder 237 is cementing in the upper surface of side shield 236.
In above-described embodiment, specifically, described article movement string bag structure 24 includes lifting moving motor 241, install Disk 242, the second storage wheel 243, the first bearing steel wire 244, hook 245, the second bearing steel wire 246 and the placement string bag 247, it is described Lifting moving motor 241 by the bolt of mounting disc 242 be arranged on Connection Bracket 201 upper surface;The second described storage Wheel 243 is arranged on the output shaft of lifting moving motor 241;243 are taken turns with the second storage in described one end of the first bearing steel wire 244 Connection, the other end are connected by hook 245 with the second bearing steel wire 246;The described placement string bag 247 is fixed on the second load-bearing steel The bottom of silk 246.
In above-described embodiment, specifically, described sealing tubular construction 25 includes regulation pipe 251, connecting plate 252, communicating pipe Body 253, chamber 254 is connected, closure 255, montant 256, sealing ring 257 and protective cover 258, described regulation pipe 251 are welded In the right-hand member of communicating pipe body 253;Described connecting plate 252 is welded on the right-hand member of regulation pipe 251;Described connection chamber 254 is opened It is located at the inside of communicating pipe body 253;Described closure 255 is placed on the top of communicating pipe body 253;Described montant 256 are welded on the upper left quarter of closure 255;Described sealing ring 257 is glued to the lower surface of communicating pipe body 253;Described Protective cover 258 is welded on the bottom of the outer wall of communicating pipe body 253.
In above-described embodiment, specifically, described folding stand 206 specifically uses U-shaped stainless steel frame, described folding stand The fixed plate 207 of 206 inner sides specifically uses stainless steel plate, and the right side of described fixed plate 207 is arranged to arc, described fixation The left side of plate 207 is threaded with the first fixing bolt 208, is advantageous to easily fix the similar article such as casing, simultaneously What is be also convenient for makes article more precisely be installed to the position specified.
In above-described embodiment, specifically, described one end of mounting rod 205 is connected with hydraulic cylinder 204, the other end and folding stand 206 connections, the position of installation article required for being advantageous to convenient adjustment.
In above-described embodiment, specifically, described floater shot 2111 specifically uses foam ball, described floater shot 2111 leads to Cross detection rope 2110 to be connected with take-up pulley 216 through hollow pipe 218, the middle part of described detection rope 2110 is solid by second Determine bolt 219 to be fixed in hollow pipe 218, be advantageous to more easily detect whether have substantial amounts of water in opened hole.
In above-described embodiment, specifically, described take-up pulley 216 is socketed in the front portion of rotary shaft 213, described take-up pulley 216 are connected with detection rope 2110, are advantageous to more easily store detection rope 2110.
In above-described embodiment, specifically, described standing block 227 is connected by lifting steel wire 226 with standing block 227, institute The standing block 227 and lifting steel wire 226 stated are placed on the inside of containing cavities 222, and described standing block 227 specifically uses PVC plastic Expect block, be advantageous to easily make operator station stand on standing block 227, while also make staff more easily carry out work Make, also help the function of adding the multi-functional construction of hydro project dredging drill hole equipment.
In above-described embodiment, specifically, described telescoping tube 232 and socket pipe 233 is adapted, and pass through regulating bolt 234 fix, and are advantageous to the length of convenient regulation telescoping tube 232 and socket pipe 233, at the same be also convenient for be placed into mud too deep Place.
In above-described embodiment, specifically, described positive baffle plate 235 is welded on the top of socket pipe 233, described positive baffle plate 235 left and right ends are welded with side shield 236, are advantageous in silt dredging, and the anti-stopper structure 23 can be avoided to go deep into mud When the problem of resulting in blockage.
In above-described embodiment, specifically, the described placement string bag 247 specifically uses steel wire, the described placement string bag 247 245 be connected, is advantageous in construction with hook by the second bearing steel wire 246, in that context it may be convenient to move overweight stone or its Its article.
In above-described embodiment, specifically, connection chamber 254 aperture is 30 centimetres to three in described communicating pipe body 253 15 centimetres, described connection chamber 254 connects with protective cover 258, is advantageous to that, in rainwater weather, substantial amounts of rainwater can be prevented Enter in the hole that the multi-functional construction of hydro project dredging drill hole equipment is opened.
Operation principle
The operation principle of the present invention:When installing other articles such as casing, by the setting of fixed position-limited rack structure 20, can make Casing and other items is more precisely fixed to the position specified, and occurs the east such as stone really up to the mark and overweight around punch position when running into When western, the setting of string bag structure 24 is moved by article, in that context it may be convenient to the thing such as mobile stone really up to the mark and overweight, carrying out During mud, by the setting of anti-stopper structure 23, the problem of silt-sucking tube 19 can be avoided to block, when without punching, pass through The setting of level measuring spherical structure 21, in that context it may be convenient to learn what the multi-functional construction of hydro project dredging drill hole equipment was opened Whether ponding is had in hole, meanwhile, pass through the setting of standing harden structure 22, in that context it may be convenient to staff is carried out other works Make, when running into rainwater weather, by sealing the setting of tubular construction 25, substantial amounts of rainwater can be avoided to enter beaten hole It is interior.
Using technical solutions according to the invention, or those skilled in the art is under the inspiration of technical solution of the present invention, Similar technical scheme is designed, and reaches above-mentioned technique effect, is to fall into protection scope of the present invention.

Claims (10)

  1. A kind of 1. efficient multi-functional construction of hydro project dredging drill hole equipment, it is characterised in that efficient more work( Energy construction of hydro project dredging drill hole equipment, including car body(1), working hole(2), movable pulley(3), grafting groove(4), work Cabinet(5), store motor(6), the first storage wheel(7), support for construction(8), pulley(9), connecting steel wire ropes(10), fixed chute (11), fixing and mounting bracket(12), slide limited block(13), drilling motor(14), punch cylinder(15), reinforcing bar(16), silt dredging pump (17), go out the pipe that becomes silted up(18), silt-sucking tube(19), fixed position-limited rack structure(20), level measuring spherical structure(21), standing harden structure (22), anti-stopper structure(23), article movement string bag structure(24), seal tubular construction(25)With support wheel construction(26), it is described Working hole(2)It is opened in car body(1)Right-hand member;Described movable pulley(3)It is separately mounted to car body(1)The left and right two of front surface Side;Described grafting groove(4)It is opened in car body(1)The left side of front surface;Described working cabined(5)It is welded on car body(1)'s Upper left quarter;Described storage motor(6)Bolt is arranged on working cabined(5)Right side;The first described storage wheel(7)Installed in receipts Receive motor(6)Output shaft on;Described support for construction(8)It is welded on car body(1)Upper right quarter;Described pulley(9)Spiral shell Bolt is arranged on support for construction(8)The top of inwall;Described connecting steel wire ropes(10)Taken turns with the first storage one end(7)Connection, The other end and fixing and mounting bracket(12)Connection;Described fixed chute(11)It is opened in support for construction(8)Inwall on;It is described Fixing and mounting bracket(12)By sliding limited block(13)It is fixed on support for construction(8)The fixed chute of inwall(11)On;Institute The drilling motor stated(14)Bolt is arranged on fixing and mounting bracket(12)Internal lower section;Described punching cylinder(15)Pacify through fixed Shelve(12)Installed in drilling motor(14)Output shaft on;Described reinforcing bar(16)One end and support for construction(8)Bolt Connection, the other end and car body(1)Bolt connection;Described silt dredging pump(17)Installed in car body(1)The longitudinally intermediate portion of upper surface Position;Described goes out the pipe that becomes silted up(18)Installed in silt dredging pump(17)The upper left quarter of front surface;Described silt-sucking tube(19)Installed in silt dredging Pump(17)Upper right quarter;Described fixation position-limited rack structure(20)It is welded on support for construction(8)The upper right corner;Described water level Measure spherical structure(21)It is welded on silt dredging pump(17)Right side;Described standing harden structure(22)It is placed on grafting groove(4)It is interior; Described anti-stopper structure(23)Installed in silt-sucking tube(19)Top;Described article movement string bag structure(24)Bolt is installed In fixed position-limited rack structure(20)Top;Described sealing tubular construction(25)It is welded on fixed position-limited rack structure(20)Lower-left Portion;Described support wheel construction(26)It is welded on fixed position-limited rack structure(20)Bottom;Described fixation position-limited rack structure (20)Including Connection Bracket(201), working plate(202), place installing plate(203), hydraulic cylinder(204), mounting rod(205), Folding stand(206), fixed plate(207), the first fixing bolt(208), fuel tank(209), oil pipe(2010)And oil pump(2011), institute The working plate stated(202)It is welded on Connection Bracket(201)Bottom;Described placement installing plate(203)It is solid to be welded on connection Determine frame(201)Rear wall on;Described hydraulic cylinder(204)Bolt, which is arranged on, places installing plate(203)Upper surface;Described peace Fill bar(205)Installed in hydraulic cylinder(204)Left end;Described folding stand(206)It is welded on mounting rod(205)Left end;Institute The fixed plate stated(207)Bolt is arranged on folding stand(206)The left end of inner side;Described fuel tank(209)It is welded on working plate (202)Upper surface;Described oil pipe(2010)One end and hydraulic cylinder(204)Connection, the other end and fuel tank(209)Connection;Institute The oil pump stated(2011)Installed in oil pipe(2010)On;Described level measuring spherical structure(21)Including fixed block(211), bearing (212), rotary shaft(213), transverse slat(214), handle(215), take-up pulley(216), connecting rod(217), hollow pipe(218), the Two fixing bolts(219), detection rope(2110)And floater shot(2111), described bearing(212)It is embedded in fixed block(211)Just The top on surface;Described rotary shaft(213)It is plugged on bearing(212)It is interior;Described transverse slat(214)It is welded on rotary shaft (213)Rear portion;Described handle(215)It is welded on transverse slat(214)The right side of rear wall;Described connecting rod(217)It is welded on Fixed block(211)Right lower quadrant;Described hollow pipe(218)It is welded on connecting rod(217)Right-hand member;Described second fixes spiral shell Bolt(219)It is threaded in hollow pipe(218)Upper left quarter;Described standing harden structure(22)Including box body(221), containing cavities (222), hinge(223), cage plate(224), expansion plate(225), lift steel wire(226)With standing block(227), described containing cavities (222)It is opened in box body(221)Upper surface;Described cage plate(224)Pass through hinge respectively(223)Bolt is arranged on box body (221)The left and right sides;Described expansion plate(225)It is plugged on cage plate(224)Inside;Described anti-stopper structure(23)Bag Include connector(231), telescoping tube(232), socket pipe(233), regulating bolt(234), positive baffle plate(235), side shield(236)With Float cylinder(237), described telescoping tube(232)One end is welded on connector(231)The left and right sides of upper surface, other end grafting In socket pipe(233)It is interior;Described regulating bolt(234)It is threaded in telescoping tube(232)And socket pipe(233)Connection Place;Described floating cylinder(237)It is cementing in side shield(236)Upper surface;Described article movement string bag structure(24)Including Lifting moving motor(241), mounting disc(242), the second storage wheel(243), the first bearing steel wire(244), hook(245), the Two bearing steel wires(246)With the placement string bag(247), described lifting moving motor(241)Pass through mounting disc(242)Bolt is installed In Connection Bracket(201)Upper surface;The second described storage wheel(243)Installed in lifting moving motor(241)Output On axle;The first described bearing steel wire(244)Taken turns with the second storage one end(243)Connection, the other end pass through hook(245)With Two bearing steel wires(246)Connection;The described placement string bag(247)It is fixed on the second bearing steel wire(246)Bottom;Described is close Tube sealing structure(25)Including regulation pipe(251), connecting plate(252), communicating pipe body(253), connect chamber(254), closure (255), montant(256), sealing ring(257)And protective cover(258), described regulation pipe(251)It is welded on communicating pipe body (253)Right-hand member;Described connecting plate(252)It is welded on regulation pipe(251)Right-hand member;Described connection chamber(254)It is opened in Communicating pipe body(253)Inside;Described closure(255)It is placed on communicating pipe body(253)Top;Described montant (256)It is welded on closure(255)Upper left quarter;Described sealing ring(257)It is glued to communicating pipe body(253)Following table Face;Described protective cover(258)It is welded on communicating pipe body(253)The bottom of outer wall.
  2. 2. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The folding stand stated(206)Specifically use U-shaped stainless steel frame, described folding stand(206)The fixed plate of inner side(207)It is specific to use Stainless steel plate, described fixed plate(207)Right side be arranged to arc, described fixed plate(207)Left side be threaded with First fixing bolt(208).
  3. 3. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The mounting rod stated(205)One end and hydraulic cylinder(204)Connection, the other end and folding stand(206)Connection.
  4. 4. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The floater shot stated(2111)Specifically use foam ball, described floater shot(2111)Restricted by detecting(2110)Through hollow pipe (218)With take-up pulley(216)Connection, described detection rope(2110)Middle part pass through the second fixing bolt(219)It is fixed In hollow pipe(218)It is interior.
  5. 5. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The take-up pulley stated(216)It is socketed in rotary shaft(213)Front portion, described take-up pulley(216)Restricted with detection(2110)Connection.
  6. 6. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The standing block stated(227)By lifting steel wire(226)With standing block(227)Connection, described standing block(227)With lifting steel wire (226)It is placed on containing cavities(222)Inside, described standing block(227)Specifically use PVC plastic block.
  7. 7. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The telescoping tube stated(232)And socket pipe(233)It is adapted, and passes through regulating bolt(234)Fix.
  8. 8. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The positive baffle plate stated(235)It is welded on socket pipe(233)Top, described positive baffle plate(235)Left and right ends be welded with side block Plate(236).
  9. 9. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that institute The placement string bag stated(247)Specifically use steel wire, the described placement string bag(247)Pass through the second bearing steel wire(246)With extension Hook(245)Connection.
  10. 10. efficient multi-functional construction of hydro project dredging drill hole equipment as claimed in claim 1, it is characterised in that Described communicating pipe body(253)Interior connection chamber(254)Aperture is 30 centimetres to 35 centimetres, described connection chamber (254)With protective cover(258)Connection.
CN201710885825.XA 2017-09-27 2017-09-27 A kind of multi-functional construction of hydro project dredging drill hole equipment Expired - Fee Related CN107675709B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710885825.XA CN107675709B (en) 2017-09-27 2017-09-27 A kind of multi-functional construction of hydro project dredging drill hole equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710885825.XA CN107675709B (en) 2017-09-27 2017-09-27 A kind of multi-functional construction of hydro project dredging drill hole equipment

Publications (2)

Publication Number Publication Date
CN107675709A true CN107675709A (en) 2018-02-09
CN107675709B CN107675709B (en) 2019-05-17

Family

ID=61138294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710885825.XA Expired - Fee Related CN107675709B (en) 2017-09-27 2017-09-27 A kind of multi-functional construction of hydro project dredging drill hole equipment

Country Status (1)

Country Link
CN (1) CN107675709B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636818A (en) * 2020-06-09 2020-09-08 温州市晨绕机械科技有限公司 Drilling device for automatic dredging

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070267222A1 (en) * 2005-10-03 2007-11-22 Oilfield-Electric-Marine, Inc. Low speed ac motor for direct drive applications
CN204457435U (en) * 2015-01-15 2015-07-08 河南理工大学 A kind of hydraulic flushing in hole, desilting and deslagging integrated apparatus
CN105369888A (en) * 2014-08-08 2016-03-02 湘潭腾升机械研究制造有限公司 Sewer dredging device
CN106677702A (en) * 2017-03-02 2017-05-17 合肥智慧龙图腾知识产权股份有限公司 Drilling machine for hydraulic engineering construction
CN206233281U (en) * 2016-12-05 2017-06-09 惠安温雅坊装饰设计有限公司 A kind of packaged type desilting equipment for hydroelectric power plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070267222A1 (en) * 2005-10-03 2007-11-22 Oilfield-Electric-Marine, Inc. Low speed ac motor for direct drive applications
CN105369888A (en) * 2014-08-08 2016-03-02 湘潭腾升机械研究制造有限公司 Sewer dredging device
CN204457435U (en) * 2015-01-15 2015-07-08 河南理工大学 A kind of hydraulic flushing in hole, desilting and deslagging integrated apparatus
CN206233281U (en) * 2016-12-05 2017-06-09 惠安温雅坊装饰设计有限公司 A kind of packaged type desilting equipment for hydroelectric power plant
CN106677702A (en) * 2017-03-02 2017-05-17 合肥智慧龙图腾知识产权股份有限公司 Drilling machine for hydraulic engineering construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111636818A (en) * 2020-06-09 2020-09-08 温州市晨绕机械科技有限公司 Drilling device for automatic dredging

Also Published As

Publication number Publication date
CN107675709B (en) 2019-05-17

Similar Documents

Publication Publication Date Title
CN206737837U (en) A kind of rig used for geological prospecting
WO2009049470A1 (en) A bored pile drilling machine
CN107675709A (en) A kind of efficient multi-functional construction of hydro project dredging drill hole equipment
CN105239946B (en) The experimental provision of coiled tubing tractor
CN203742443U (en) Pile casing pressing and pulling drill rig
CN212001106U (en) Hole cleaning system for cast-in-place pile
CN103806834B (en) Casing pressure pulls out rig
CN206753527U (en) A kind of comprehensive coal dust collection device of coal mine drilling
CN109252809A (en) A kind of 10KV electric power transmission line foundation excavation device
CN206554793U (en) Use from the platform-type anti-well rig of shifting in a kind of colliery
CN115354673B (en) Anti-slide pile pore-forming method for red-layer soft rock area and hoisting type artificial auxiliary device
CN218880917U (en) Dewatering well structure for foundation pit drainage
CN105089624A (en) Horizontal-well coiled tubing conveying dynamic logging method
CN111236234A (en) Hole cleaning system and hole cleaning method for cast-in-place pile
CN206128160U (en) Operation device that open caisson sinks unearthedly
CN213540496U (en) Mine deep well surrounding rock supporting structure with moisture content detection function
CN103615000A (en) Construction device of original-state earth-borrowing cast-in-place pile
CN210216388U (en) Crawler-type drainage plate clamping, sealing and anti-blocking spiral plate inserting machine
CN106050125A (en) Portable full hydraulic engineering investigation drilling rig
CN208023598U (en) A kind of base pit dewatering pipe well
CN207812448U (en) Static pressure built pile machine
CN206328039U (en) Rotary drilling rig dry drilling bar-mat reinforcement lifts fixing device
CN214245665U (en) Drilling and water taking equipment for geotechnical engineering investigation
CN220203847U (en) Colliery ground coring device
CN220599700U (en) Air sac wall protection type rectangular deep hole drilling machine with synchronous expansion and direction changing drill bit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190418

Address after: 516001 Floor 3, Nine East Water Conservancy Buildings, Zixi Ridge, Nantan North Road, Huizhou City, Guangdong Province

Applicant after: Huizhou Hydropower Construction Co., Ltd.

Address before: 710065 room 21502, Hai Jia Yun Ding commercial and residential building, 2 hi tech three road, hi tech Zone, Xi'an, Shaanxi, China.

Applicant before: Shaanxi road shield Highway Engineering Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190517

Termination date: 20200927