CN107654083A - A kind of existing underground space uses the method that no-dig technique mode carries out horizontal expansion - Google Patents

A kind of existing underground space uses the method that no-dig technique mode carries out horizontal expansion Download PDF

Info

Publication number
CN107654083A
CN107654083A CN201710719765.4A CN201710719765A CN107654083A CN 107654083 A CN107654083 A CN 107654083A CN 201710719765 A CN201710719765 A CN 201710719765A CN 107654083 A CN107654083 A CN 107654083A
Authority
CN
China
Prior art keywords
construction
tube coupling
concrete walls
underground space
intensity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710719765.4A
Other languages
Chinese (zh)
Other versions
CN107654083B (en
Inventor
官林星
范益群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201710719765.4A priority Critical patent/CN107654083B/en
Publication of CN107654083A publication Critical patent/CN107654083A/en
Application granted granted Critical
Publication of CN107654083B publication Critical patent/CN107654083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of method that existing underground space carries out horizontal expansion using no-dig technique mode, comprise the steps of:More piece tube coupling is constructed successively;In the range of more piece tube coupling surrounds without in supporting zone carry out inwall construction;After the intensity of inwall reaches preset strength standard, temporary support construction is carried out in each tube coupling;Upper support is removed, top concrete walls construction is carried out in upper support position;After the intensity of top concrete walls reaches preset strength standard, lower support is removed, bottom concrete walls construction is carried out in lower support position;After the intensity of bottom concrete walls reaches preset strength standard, side supports are removed, sidepiece concrete walls construction is carried out in side supports position;After the intensity of sidepiece concrete walls reaches preset strength standard, intermediate supports and temporary support are removed.The present invention can realize the construction in small space using the method for small tube coupling, and the influence of surrounding environment will be preferably minimized.

Description

A kind of existing underground space uses the method that no-dig technique mode carries out horizontal expansion
Technical field
The present invention relates to Construction Technique of Underground Works field, and in particular to a kind of existing underground space uses no-dig technique mode The method for carrying out horizontal expansion.
Background technology
It is to realize the important hand of urban sustainable developmentization development using the underground space under conditions of land resource is increasingly deficient Section.The developed countries such as Japan, the U.S., the underground of " networking, three-dimensional, intensive, deep layer, synthesization " is advocated for a long time Space utilization theory, achieve extraordinary effect.In the urban underground space construction starting evening in China, it is single to build more presentations The characteristics of changing, fighting separately.Such as the mutual independence in Shanghai Lujiazui's finance core space underground space, reduce underground sky Between resource effective rate of utilization.The technology that interconnects of the underground space turns into the key technology of underground space development.On the other hand, The built underground space in part can not meet capacity and function requirement.For example, the underground that last century 70, the eighties build is stopped Garage can not solve the situation of " storehouse is hard to find " of present society appearance, and it is when business that these underground garages are carried out with increase-volume Need.
Constructed in the existing underground space, it is narrow and small there is construction space, what heavy construction equipment can not be applied Feature.Existing facility is in use state, and surrounding environment certainly will be influenceed by carrying out transformation to it, and this poses must use The mode of no-dig technique carries out the construction of engineering.The method that the underground space is built in existing building increasing mainly has vertically extending formula increasing to build, water Flat extension increasing is built and hybrid increasing is built.It is directly under building that the existing underground space is downward that vertically extending formula increasing, which is built, Extension.Mode is built in this increasing has the advantages of being not take up the building periphery underground space, but due to depth of foundation to be increased, construction Difficulty is very big, and cost is very high.The reconstruction of horizontal extension formula is to make full use of building periphery vacant lot or greenery patches, is increased under the greenery patches of vacant lot Add basement.Though this increasing mode of building need to take the building periphery underground space, relatively vertically extending formula, which increases, builds difficulty of construction Low, cost can receive.It is to increase horizontal extension reconstruction method and vertically extending formula to build method comprehensive utilization that hybrid increasing, which is built,.
The content of the invention
It is an object of the invention to provide a kind of existing underground space to use the no-dig technique mode method that carries out horizontal expansion, Construction in small space can be realized using the method for small tube coupling, the influence of surrounding environment will be preferably minimized.
In order to achieve the above object, the present invention is achieved through the following technical solutions:A kind of existing underground space is opened using non- The method that excavation formula carries out horizontal expansion, is characterized in, comprises the steps of:
S102, more piece tube coupling is constructed successively, set in multilayer multiple row, connected between tube coupling using connector, Mei Yiguan Section includes the polygonal structures of head and the tail connection;
S104, in the range of tube coupling surrounds without in supporting zone carry out inwall construction;
S106, after the intensity of inwall reaches preset strength standard, temporary support construction is carried out in each tube coupling, and is being faced When support on apply prestressing force;
S108, upper support is removed, top concrete walls construction is carried out in upper support position;
S110, after the intensity of top concrete walls reaches preset strength standard, remove lower support, enter in lower support position The concrete walls construction of row bottom;
S112, after the intensity of bottom concrete walls reaches preset strength standard, remove side supports, enter in side supports position Row sidepiece concrete walls are constructed;
S114, after the intensity of sidepiece concrete walls reaches preset strength standard, intermediate supports and temporary support are removed, so as to complete The construction of horizontal expansion is carried out into the existing underground space.
Also included comprising a step S100, described step S100 before described step S102:
If the existing underground space, which is in, rich in water area, to be needed to carry out foundation stabilization construction to the periphery of the existing underground space, The space of closing is formed, then carries out drainage operation of drawing water in the inside of the existing underground space, performs step S102 afterwards.
Also included in described step S102 by controlling the mesh openings rate of benchmark tube coupling to realize the control to surface subsidence System;Described mesh openings rate is the area of cutting panel upper shed and the ratio of the panel gross area.
When also including tube coupling jacking to precalculated position in described step S102, all soil-discharging ports are closed;Described casting Mouth is arranged on out the bottom of soil cabin.
The construction that assembling reinforcement is carried out in each tube coupling is also included in before described step S104.
Described connector includes the chute and tenon being correspondingly arranged on two tube couplings.
Described tube coupling is headed into soil using the principle of push bench process.
Described top concrete walls are constructed in the form of post-cast strip.
A kind of existing underground space of the present invention carries out the method for horizontal expansion compared with prior art using no-dig technique mode With advantages below:By widening transformation to the existing underground space, the networking intercommunication of the existing underground space, small sky can be achieved Between the space of underground installation widen dilatation, the extension energization of single function underground installation, realize that networking astrolabe is scattereded all over like men on a chessboard multi-functional Urban Underground Complex;By widening transformation to the existing underground space, so as to improve the comprehensive of the existing underground space in inner city Cyclization border, the overall quality of the inner city underground space is lifted, widen the service function of urban central zone;The present invention was according to both There is the characteristics of underground space is narrow and small, large-scale construction equipment can not be applied, using the method for " breaking the whole up into parts ", tube coupling is carried out small-sized Change, modularization, to meet requirement to construction space, tube coupling use grid type opening casting mode, with solution without receiving work Well, the problem that push-bench head can not recall, while dynamic information construction can be carried out according to ground deformation situation;Inside Serve as a contrast in work progress, by the way of interim post, repeatedly carry out structure conversion, study liner when tearing steel construction open, realize structure The construction of inwall;The concrete poured into a mould afterwards forms composite construction form with steel construction, and the bearing capacity of steel construction can also be had Effect utilizes;Inwall is complete cast-in-place concrete structure, has good water resistance.
Brief description of the drawings
Fig. 1 is the horizontal plan expanded of the existing underground space
Fig. 2 is the horizontal elevation expanded of the existing underground space
Fig. 3 is the flow chart for the method that a kind of existing underground space of the present invention carries out horizontal expansion using no-dig technique mode;
Fig. 4 A ~ 4F are respectively tube coupling sequence of construction figure;
Fig. 5 is the overall structure diagram of tube coupling;
Fig. 6 is the connection diagram of two tube couplings;
Fig. 7 A ~ 7F are respectively the schematic diagram corresponding to step S104 ~ S114.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferable specific embodiment in detail, the present invention is further elaborated.
A kind of existing underground space uses the method that no-dig technique mode carries out horizontal expansion, and the existing underground space is horizontal to be expanded Plan and elevation respectively as depicted in figs. 1 and 2, the method includes the steps of, as shown in Figure 3:
If S100, the existing underground space, which are in, rich in water area, to be needed to carry out foundation stabilization to the periphery of the existing underground space Construction, forms the space of closing, then carries out drainage operation of drawing water in the inside of the existing underground space.
S102, more piece tube coupling is constructed successively, set in multilayer more piece, more piece tube coupling, specifically N × M section Tube coupling, N are layer, and M is that row M is layer, and N is row,(M, N is natural number), connected using connector between tube coupling, each tube coupling bag The polygonal structures of the connection containing head and the tail, as Fig. 4 A ~ 4F show four side structures, wherein constructed using six section tube couplings as row, wherein Tube coupling on the basis of one section, three-joint pipe section are arranged on upper strata, and lower floor is correspondingly arranged three-joint pipe section, as shown in figure 5, in order to realize tube coupling Between connection, connected using connector between tube coupling, connector includes chute 12 and the tenon being correspondingly arranged on two tube couplings 13, as shown in fig. 6, the accurate docking of position between tube coupling can be realized.
Six section tube couplings are headed into soil using the principle of push bench process.Tube coupling uses the form of steel construction, can pass through welding The making and processing of tube coupling are realized, to meet the requirement constructed in the narrow and small underground space.Due to no active well, push pipe The head of machine can not enter hole, in the present embodiment by controlling the mesh openings rate of benchmark tube coupling to realize the control to surface subsidence System;Mesh openings rate for cutting panel upper shed area and the panel gross area ratio, all tube coupling jackings to precalculated position When, close all soil-discharging ports;And soil-discharging port is arranged on out the bottom of soil cabin.
S104, being constructed without progress inwall 7 in supporting zone in the underground space in tube coupling besieged city, as shown in Figure 7 A.
First, in the underground space of formation, the construction of assembling reinforcement is carried out in each tube coupling, then carries out inwall 7 Construction.
S106, after the intensity of inwall reaches preset strength standard, in each tube coupling carry out temporary support 8 construct, And apply prestressing force in temporary support 8, as shown in Figure 7 B.
S108, upper support is removed, carrying out top concrete walls 9 in upper support position constructs, as seen in figure 7 c.
Wherein, described top concrete walls 9 are constructed in the form of post-cast strip.
S110, after the intensity of top concrete walls 9 reaches preset strength standard, remove lower support, in lower support Position carries out bottom concrete walls 10 and constructed, as illustrated in fig. 7d.
S112, after the intensity of bottom concrete walls 10 reaches preset strength standard, remove side supports, in side supports Position carries out sidepiece concrete walls 11 and constructed, as seen in figure 7e.
S114, after the intensity of sidepiece concrete walls 11 reaches preset strength standard, remove intermediate supports and temporary support 8, so as to complete the construction of existing underground space carry out level expansion, as shown in Figure 7 F.
Although present disclosure is discussed in detail by above preferred embodiment, but it should be appreciated that above-mentioned Description is not considered as limitation of the present invention.After those skilled in the art have read the above, for the present invention's A variety of modifications and substitutions all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (8)

1. a kind of existing underground space uses the method that no-dig technique mode carries out horizontal expansion, it is characterised in that includes following step Suddenly:
S102, more piece tube coupling is constructed successively, set in multilayer multiple row, connected between tube coupling using connector, Mei Yiguan Section includes the polygonal structures of head and the tail connection;
S104, in the range of tube coupling surrounds without in supporting zone carry out inwall construction;
S106, after the intensity of inwall reaches preset strength standard, temporary support construction is carried out in each tube coupling, and is being faced When support on apply prestressing force;
S108, upper support is removed, top concrete walls construction is carried out in upper support position;
S110, after the intensity of top concrete walls reaches preset strength standard, remove lower support, enter in lower support position The concrete walls construction of row bottom;
S112, after the intensity of bottom concrete walls reaches preset strength standard, remove side supports, enter in side supports position Row sidepiece concrete walls are constructed;
S114, after the intensity of sidepiece concrete walls reaches preset strength standard, intermediate supports and temporary support are removed, so as to complete The construction of horizontal expansion is carried out into the existing underground space.
2. the method as described in claim 1, it is characterised in that also include a step S100, institute before described step S102 The step S100 stated is included:
If the existing underground space, which is in, rich in water area, to be needed to carry out foundation stabilization construction to the periphery of the existing underground space, The space of closing is formed, then carries out drainage operation of drawing water in the inside of the existing underground space, performs step S102 afterwards.
3. the method as described in claim 1, it is characterised in that also included in described step S102 by controlling benchmark tube coupling Mesh openings rate realize control to surface subsidence;Described mesh openings rate is the area and panel of cutting panel upper shed The ratio of the gross area.
4. the method as described in claim 1, it is characterised in that also comprising tube coupling jacking to pre-determined bit in described step S102 When putting, all soil-discharging ports are closed;Described soil-discharging port is arranged on out the bottom of soil cabin.
5. the method as described in claim 1, it is characterised in that also be included in each tube coupling before described step S104 The construction of row assembling reinforcement.
6. the method as described in claim 1, it is characterised in that described connector is included and is correspondingly arranged on two tube couplings Chute and tenon.
7. the method as described in claim 1, it is characterised in that described tube coupling is headed into soil using the principle of push bench process.
8. the method as described in claim 1, it is characterised in that described top concrete walls are carried out in the form of post-cast strip Construction.
CN201710719765.4A 2017-08-21 2017-08-21 Method for carrying out horizontal expansion on existing underground space in non-excavation mode Active CN107654083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710719765.4A CN107654083B (en) 2017-08-21 2017-08-21 Method for carrying out horizontal expansion on existing underground space in non-excavation mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710719765.4A CN107654083B (en) 2017-08-21 2017-08-21 Method for carrying out horizontal expansion on existing underground space in non-excavation mode

Publications (2)

Publication Number Publication Date
CN107654083A true CN107654083A (en) 2018-02-02
CN107654083B CN107654083B (en) 2022-08-26

Family

ID=61128161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710719765.4A Active CN107654083B (en) 2017-08-21 2017-08-21 Method for carrying out horizontal expansion on existing underground space in non-excavation mode

Country Status (1)

Country Link
CN (1) CN107654083B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1126786A (en) * 1994-09-24 1996-07-17 北京市城建设计研究院 Hidden construction process of large underground engineering with flat roof and vertical walls
CN102287194A (en) * 2010-06-21 2011-12-21 福建省信通工程建设有限公司 Construction method of multi-span gently arc tunnel
CN105089669A (en) * 2015-09-07 2015-11-25 济南轨道交通集团有限公司 Underground station constructed by prefabricated parts and construction method thereof
CN105370300A (en) * 2015-11-17 2016-03-02 中铁工程装备集团有限公司 Two-layer or multi-layer underground space construction method
CN105781595A (en) * 2016-04-01 2016-07-20 中铁工程装备集团有限公司 Method for mechanical branch underground excavation construction of rectangular and quasi-rectangular cross-section underground engineering
CN206376884U (en) * 2017-01-03 2017-08-04 厦门大学嘉庚学院 Steel pipe joint and multibreak facial canal nodule structure suitable for minimum spacing substep jacking construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1126786A (en) * 1994-09-24 1996-07-17 北京市城建设计研究院 Hidden construction process of large underground engineering with flat roof and vertical walls
CN102287194A (en) * 2010-06-21 2011-12-21 福建省信通工程建设有限公司 Construction method of multi-span gently arc tunnel
CN105089669A (en) * 2015-09-07 2015-11-25 济南轨道交通集团有限公司 Underground station constructed by prefabricated parts and construction method thereof
CN105370300A (en) * 2015-11-17 2016-03-02 中铁工程装备集团有限公司 Two-layer or multi-layer underground space construction method
CN105781595A (en) * 2016-04-01 2016-07-20 中铁工程装备集团有限公司 Method for mechanical branch underground excavation construction of rectangular and quasi-rectangular cross-section underground engineering
CN206376884U (en) * 2017-01-03 2017-08-04 厦门大学嘉庚学院 Steel pipe joint and multibreak facial canal nodule structure suitable for minimum spacing substep jacking construction

Also Published As

Publication number Publication date
CN107654083B (en) 2022-08-26

Similar Documents

Publication Publication Date Title
CN103195085B (en) Downward story-adding basement and construction method thereof
CN105239594B (en) Pile for prestressed pipe column
WO2021027025A1 (en) High-rise building settling reinforcing and lifting correcting construction method
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN104963705B (en) A kind of underground space tunneling construction method
CN105239578B (en) Water-rich sand layer deep foundation pit underwater construction method
CN105926804A (en) Reinforcement method of 3D printed reinforced masonry shear wall
CN103912134A (en) Construction in-situ underground space structure and construction method
CN203856227U (en) In-situ underground spatial structure of existing building
CN110284723A (en) A kind of composite structure and its construction method in existing pile periphery set hollow pile
CN102953385B (en) Construction method for changing support of foundation pit at irregular place of rampway
CN202706620U (en) Lift type underground stereo garage shaft
CN109610466A (en) The asynchronous construction method of the built irregular deep basal pit in subway station two sides and structure
CN107448005A (en) A kind of existing underground space carries out the device of horizontal expansion using no-dig technique mode
CN205116202U (en) Stake of prestressing force side and integrated stand of steel lattice column
CN203701129U (en) Bridge reinforcement foundation and bridge
CN110616739B (en) Vertical construction method for underground space of existing building
CN107642361A (en) A kind of method that Underground Subway Station is built using rectangular shield push-bench
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN107654083A (en) A kind of existing underground space uses the method that no-dig technique mode carries out horizontal expansion
CN111485571A (en) Arch bridge foundation of limestone foundation under deep round gravel layer and construction method thereof
CN203429661U (en) Basement with additional downward layers
CN105297758B (en) Prestress square pile and the integrated column of steel lattice column
CN214695649U (en) Deep foundation pit supporting structure
CN110616714B (en) Novel enclosure construction method for existing underground structure deepening

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant