CN107643682A - For switching the control method and device of controller redundant signals - Google Patents
For switching the control method and device of controller redundant signals Download PDFInfo
- Publication number
- CN107643682A CN107643682A CN201710736478.4A CN201710736478A CN107643682A CN 107643682 A CN107643682 A CN 107643682A CN 201710736478 A CN201710736478 A CN 201710736478A CN 107643682 A CN107643682 A CN 107643682A
- Authority
- CN
- China
- Prior art keywords
- controller
- voltage value
- potentiometer
- gear
- potentiometric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Safety Devices In Control Systems (AREA)
- Control Of Transmission Device (AREA)
Abstract
The invention discloses a kind of control method and device for being used to switch controller redundant signals.Wherein, this method includes:Obtain the first potentiometric first voltage value on controller, and the second potentiometric second voltage value on controller;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope;In the case where difference exceeds the first preset voltage value scope, according to the current gear information of controller, the currently employed potentiometer of controller is determined.The present invention solves in the prior art that driver controls vehicle by operating controller, is transfinited or export in itself the technical problem that the situation of inaccuracy causes operating vehicle proteges of the powerful who stay with their benefactions like parasites's phenomenon often occur due to not accounting for controller.
Description
Technical field
The present invention relates to field of vehicle control, in particular to a kind of control for being used to switch controller redundant signals
Method and apparatus.
Background technology
Driver controller is railway locomotive, EMUs and the control device of industrial automation, as locomotive commutation, speed governing
Master control electrical apparatus.Driver controller using the low-voltage electrical apparatus of control circuit come the electrical equipment of indirect control main circuit, what it was acted
Quality directly influences the steady manipulation of locomotive and the realization of various operating modes.
Because driver mainly controls the operation of train by operating controller, if occurring controller in use
Itself transfinite or export inaccurate situation, then can seriously affect the operation of train.At present, existing city rail vehicle only exists
The redundancy switching of signal is just carried out during acquisition module failure.Controller is once gone wrong, and operation vehicle will necessarily be caused to be forced
The proteges of the powerful who stay with their benefactions like parasites is offline, caused by social influence it is very serious.
Vehicle is controlled by operating controller for above-mentioned driver in the prior art, due to not accounting for controller in itself
The situation for transfiniting or exporting inaccuracy causes operating vehicle the problem of proteges of the powerful who stay with their benefactions like parasites's phenomenon often occur, not yet proposes at present effective
Solution.
The content of the invention
The embodiments of the invention provide a kind of control method and device for being used to switch controller redundant signals, at least to solve
Certainly driver controls vehicle by operating controller in the prior art, transfinites or exports inaccurate in itself due to not accounting for controller
True situation causes operating vehicle the technical problem of proteges of the powerful who stay with their benefactions like parasites's phenomenon often occur.
A kind of one side according to embodiments of the present invention, there is provided controlling party for being used to switch controller redundant signals
Method, including:Obtain the first potentiometric first voltage value on controller, and the second potentiometric second voltage on controller
Value;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope;Exceed first in difference
In the case of preset voltage value scope, according to the current gear information of controller, the currently employed potentiometer of controller is determined.
Another aspect according to embodiments of the present invention, additionally provide a kind of control dress for being used to switch controller redundant signals
Put, including:Acquisition module, for obtaining the first potentiometric first voltage value on controller, and the second current potential on controller
The second voltage value of meter;Judge module, for judging whether the difference of first voltage value and second voltage value is default beyond first
Range of voltage values;Determining module, in the case of exceeding the first preset voltage value scope in difference, current according to controller
Gear information, determine the currently employed potentiometer of controller.
Another aspect according to embodiments of the present invention, additionally provide a kind of storage medium, it is characterised in that storage medium bag
The program of storage is included, wherein, program performs the above-mentioned control method for being used to switch controller redundant signals.
Another aspect according to embodiments of the present invention, additionally provide a kind of processor, it is characterised in that processor is used to transport
Line program, wherein, program performs the above-mentioned control method for being used to switch controller redundant signals when running.
Another aspect according to embodiments of the present invention, a kind of terminal is additionally provided, including:First potentiometer;Second current potential
Meter;Processor, processor operation program, wherein, for the number from the first potentiometer and the output of the second potentiometer when program is run
According to the following processing step of execution:Obtain the first potentiometric first voltage value on controller, and the second potentiometer on controller
Second voltage value;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope;In difference
In the case that value exceeds the first preset voltage value scope, according to the current gear information of controller, determine that controller is currently employed
Potentiometer.
Another aspect according to embodiments of the present invention, a kind of terminal is additionally provided, including:First potentiometer;Second current potential
Meter;Storage medium, for storage program, wherein, program operationally for from the first potentiometer and the second potentiometer output
Data perform following processing step:Obtain the first potentiometric first voltage value on controller, and the second current potential on controller
The second voltage value of meter;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope;
In the case that difference exceeds the first preset voltage value scope, according to the current gear information of controller, determine that controller is currently adopted
Potentiometer.
In embodiments of the present invention, by obtaining the first potentiometric first voltage value on controller, and on controller
Second potentiometric second voltage value;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value
Scope;In the case where difference exceeds the first preset voltage value scope, according to the current gear information of controller, controller is determined
Currently employed potentiometer, the potentiometer to be broken down in automatic identification controller is reached, and has switched in normal condition
Potentiometric purpose, it is achieved thereby that improve dual potentineter utilization rate, and reduce the proteges of the powerful who stay with their benefactions like parasites caused by potentiometer failure
The technique effect of phenomenon, and then solve in the prior art that driver controls vehicle by operating controller, due to not accounting for
Controller transfinites or exported the situation technical problem that causes operating vehicle proteges of the powerful who stay with their benefactions like parasites's phenomenon often occur of inaccuracy in itself.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair
Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of control method flow chart for being used to switch controller redundant signals according to embodiments of the present invention;
Fig. 2 is the potentiometric voltage curve schematic diagram of a kind of optional controller according to embodiments of the present invention;
Fig. 3 is according to embodiments of the present invention a kind of optionally with the control method flow of switching controller redundant signals
Figure;
Fig. 4 is according to embodiments of the present invention a kind of optionally with the control method flow of switching controller redundant signals
Figure;
Fig. 5 is that a kind of control system optionally with switching controller redundant signals according to embodiments of the present invention is illustrated
Figure;
Fig. 6 is according to embodiments of the present invention a kind of optionally with the control method flow of switching controller redundant signals
Figure;And
Fig. 7 is a kind of control device schematic diagram for being used to switch controller redundant signals according to embodiments of the present invention.
Embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention
Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained under the premise of creative work is not made, it should all belong to the model that the present invention protects
Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, "
Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so use
Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or
Order beyond those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover
Cover it is non-exclusive include, be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipment
Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product
Or the intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of control method embodiment for being used to switch controller redundant signals, need
It is noted that can be in the computer system of such as one group computer executable instructions the flow of accompanying drawing illustrates the step of
Middle execution, although also, show logical order in flow charts, in some cases, can be with different from herein
Order performs shown or described step.
Fig. 1 is a kind of control method flow chart for being used to switch controller redundant signals according to embodiments of the present invention, such as
Shown in Fig. 1, this method comprises the following steps:
Step S102, obtains the first potentiometric first voltage value on controller, and on controller it is second potentiometric
Second voltage value.
As a kind of optional example, the controller in the application above-mentioned steps can be any one vehicle (including but
Be not limited to subway, light rail etc.) on for driver operation to control the master control electrical apparatus that vehicle is run, the controller can use two electricity
Position meter, two potentiometers may be incorporated for the gear positions information of collection vehicle, when driver is by pulling control handle in difference
Control gear when, above-mentioned potentiometer can produce different magnitudes of voltage as vehicle control signal.Using the department of dual potentineter
Control device, it is possible to achieve the switching of redundant signals, when a potentiometer failure causes the magnitude of voltage inaccuracy of output, can switch
For another normal potentiometer.In order to further determine that controller should control vehicle using which potentiometric magnitude of voltage
Operation, two potentiometric magnitudes of voltage, and root can be obtained simultaneously using the gear positions information of two potentiometer collection vehicles
The whether equal normal work of two potentiometers is determined according to the two potentiometric magnitudes of voltage.
Step S104, judges whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope.
It should be noted that above-mentioned first preset voltage value scope can be used for characterizing first voltage value and second voltage value exists
In the error range of permission, because two potentiometers are identical potentiometers, then for same gear positions information, two current potentials
Magnitude of voltage caused by meter is identical or within a certain error range, thus, in the shelves by two potentiometer collection vehicles
Position positional information, after obtaining the first potentiometric first voltage value and the second potentiometric second voltage value, it can be determined that two
The difference of person primarily determines that the current potential with the presence or absence of failure whether in the range of the first preset voltage value according to judged result
Meter.If the difference of first voltage value and second voltage value in the range of the first preset voltage value, illustrates that two potentiometers are equal
Normal work;, whereas if the difference of first voltage value and second voltage value exceeds the first preset voltage value scope, then illustrate two
There is a potentiometer to break down in individual potentiometer.
Alternatively, above-mentioned first preset voltage value scope can be 0-aV, wherein, a value can be appointing in 2.5-9V
One value of meaning.
Step S106, in the case where difference exceeds the first preset voltage value scope, believed according to the current gear of controller
Breath, determines the currently employed potentiometer of controller.
Specifically, in above-mentioned steps, when caused by first voltage value caused by the first potentiometer and the second potentiometer the
In the case that the difference of two magnitudes of voltage exceeds the first preset voltage value scope, then illustrate there is a potentiometer hair in two potentiometers
Raw failure, in this case, which current potential in two potentiometers can be determined whether according to the current gear information of controller
Meter breaks down, so that controller controls vehicle to run using the potentiometric magnitude of voltage of current normal work.
Herein it should be noted that in theory, controller is in different gears, and the magnitude of voltage of potentiometer output is all right
In the voltage range answered, Fig. 2 is the potentiometric voltage curve schematic diagram of a kind of optional controller according to embodiments of the present invention.
Thus, surpass in the difference of first voltage value and second voltage value caused by the second potentiometer caused by the first potentiometer
In the case of going out the first preset voltage value scope, i.e. have in two potentiometers in the case that a potentiometer breaks down, can be with
According further to the potentiometric voltage curve of controller, according to the current gear information of controller, determine that potentiometer is normally electric
Pressure value scope, if magnitude of voltage caused by potentiometer in range of voltage values corresponding to current gear, illustrates that potentiometer is normal;Instead
It, if magnitude of voltage caused by potentiometer illustrates that potentiometer breaks down not in range of voltage values corresponding to current gear.
From the foregoing, it will be observed that in the above embodiments of the present application, using two potentiometric controllers, the first current potential is being got
After second voltage value caused by meter in first voltage value and the second potentiometer, first voltage value and second voltage value are judged
Difference whether in the error range (i.e. above-mentioned first preset voltage value scope) of permission, if two potentiometric magnitudes of voltage it
Difference then determines normal current potential in two potentiometers not in the error range of permission according to the current gear information of controller
Meter, and using normal potentiometric magnitude of voltage control vehicle operation, reached the current potential to be broken down in automatic identification controller
Meter, and switches to the potentiometric purpose in normal condition, it is achieved thereby that improve the utilization rate of dual potentineter, and reduce by
In the technique effect of proteges of the powerful who stay with their benefactions like parasites's phenomenon caused by potentiometer failure, so solve in the prior art driver by operate controller come
Vehicle is controlled, causes operating vehicle often to occur due to not accounting for the controller inaccurate situation that transfinites or export in itself
The technical problem of proteges of the powerful who stay with their benefactions like parasites's phenomenon.
Alternatively, the above method also includes:Step S108, in situation of the difference without departing from the first preset voltage value scope
Under, control controller uses any one potentiometer in the first potentiometer and the second potentiometer.
Specifically, in above-mentioned steps, the first potentiometric first voltage value and second potentiometric are being got
After two magnitudes of voltage, if the difference of first voltage value and second voltage value is in the first preset voltage value scope (error allowed
Scope) in, then illustrate that two potentiometers are normal, controller can be controlled to use appointing in the first potentiometer and the second potentiometer
The potentiometric magnitude of voltage control vehicle operation of meaning one.
It should be noted that if the difference of two potentiometer values is within the scope of defined, with reference to existing vehicle
Information realization is to the potentiometric automatic identification of controller, it is alternatively possible to according to the current gear information of controller, it is determined that department's control
The currently employed potentiometer of device.In a kind of optional embodiment, as shown in figure 3, exceeding the first preset voltage value scope in difference
In the case of, according to the current gear information of controller, the currently employed potentiometer of controller is determined, including:
Step S302, according to the current gear information of controller, determine the gear that controller is currently located;
Step S304, judge whether the gear that controller is currently located is preset gear, wherein, preset gear includes as follows
At least one:One grade of traction, two grades of traction, one grade of braking, two grades of braking, neutral and brake hard shelves;
Step S306, if the gear that controller is currently located is preset gear, the potentiometric electricity based on controller
Line of buckling determines standard voltage value of the potentiometer under gear on controller;
Step S308, based on standard voltage value, judge whether first voltage value and/or second voltage value are normal;
Step S310, according to judged result, determine the currently employed potentiometer of controller.
Specifically, in the above-described embodiments, preset gear can include but is not limited to above-mentioned six gears (traction one grade,
Two grades of traction, one grade of braking, two grades of braking, neutral and brake hard shelves) in any one or more, according to concrete application field
Scape is different, can also set other gears.As shown in Fig. 2 gear where controller is different, then magnitude of voltage corresponding to potentiometer
Scope is also different.Range of voltage values corresponding to neutral gear is 2.85V~3.15V, draw 1 grade of shelves corresponding to range of voltage values be 3V~
5.5V, draw 2 grades of shelves corresponding to range of voltage values be 5.5V~7.85V, brake 1 grade of shelves corresponding to range of voltage values for 3V~
5.5V, range of voltage values corresponding to 2 grades of shelves of braking is 5.5V~7.85V, 7.85V~8.15V corresponding to brake hard shelves.It is above-mentioned
Standard voltage value can be any one value in the range of voltage values under current gear.Believe according to the current gear of controller
After breath determines the gear that is currently located of controller, gear that controller is currently located is judged whether in preset gear, if
In preset gear, then potentiometer voltage value or range of voltage values according to corresponding to the gear judge that current potentiometric magnitude of voltage is
No potentiometer that is normal, and determining to break down according to judged result.
It is determined that after the potentiometer to be broken down in two potentiometers, controller can be switched to normal potentiometer
On.Based on above-described embodiment, as an alternative embodiment, as shown in figure 4, according to judged result, determine that controller is worked as
The potentiometer of preceding use, may include steps of:
Step S402, if first voltage value is normal and second voltage value is abnormal, control controller uses the first current potential
Meter, and the first prompt message is exported, wherein, the first prompt message is used to prompt the second potentiometer to break down;
Step S404, if second voltage value is normal and first voltage value is abnormal, control controller uses the second current potential
Meter, and the second prompt message is exported, wherein, the second prompt message is used to prompt the first potentiometer to break down;
Step S406, if first voltage value and second voltage value are abnormal, the 3rd prompt message is exported, wherein, the
Three prompt messages are used to prompt the first potentiometer and the second potentiometer to break down.
It should be noted that in a kind of optional embodiment, judging whether the gear that controller is currently located is pre-
If after gear, the above method can also include:
Step S305, if the gear that controller is currently located is not preset gear, by the gear switch of controller extremely
Neutral or brake hard shelves.
According to above-mentioned any one optional embodiment, the first potentiometric first voltage value on controller is obtained, and
The second potentiometric second voltage value, can include on controller:Adopted by the first acquisition module being connected with the first potentiometer
Collect first voltage value, and the collection second voltage value of the second acquisition module by being connected with the second potentiometer.
Based on above-described embodiment, as a kind of optional embodiment, in the first collection by being connected with the first potentiometer
Module gathers first voltage value, and after the collection second voltage value of the second acquisition module by being connected with the second potentiometer, on
The method of stating can also include:Judge whether the working condition of the first acquisition module and the second acquisition module is normal, and judge first
Whether magnitude of voltage and second voltage value are in the second predetermined voltage range.
Specifically, in the above-described embodiments, above-mentioned second predetermined voltage range can be a default range of voltage values,
Normal operating conditions is in for characterizing potentiometer.Judging first voltage value and second voltage value whether beyond the first default electricity
Before pressing scope, first have to judge whether the state of acquisition module and the potentiometer information collected are accurate.
As a kind of preferred embodiment, Fig. 5 is one kind according to embodiments of the present invention optionally with switching controller
The control system schematic diagram of redundant signals, as shown in figure 5, the control system includes:Using dual potentineter (potentiometer 1 and current potential
2) and the controller of dual potentineter information acquisition module (potentiometer acquisition module 1 and potentiometer acquisition module 2), vehicle control meter
Device processed and driver's display.Acquisition module can be realized by communication bus and interacted with the information state of train control, interactive
Content includes the health status of module and the potentiometer information of collection.Wherein, potentiometer acquisition module 1 and potentiometer collection mould
The analog signal of potentiometer 1 and potentiometer 2 can be converted to data signal by block 2 respectively.
Based on above-described embodiment, as an alternative embodiment, potentiometer 1 and potentiometer 2 carry out redundancy switching
Method can as indicated with 6, and Fig. 6 is according to embodiments of the present invention a kind of optionally with the control of switching controller redundant signals
Method flow diagram, as shown in fig. 6, the information that controller combination acquisition module transmits, judges the state of acquisition module and adopt
Whether the potentiometer information collected accurate, if two information are accurate, then judge potentiometer values that two modules collect it
Whether difference is within the scope of defined.If the difference of two potentiometric current potentials is within normal range (NR), preferentially using potentiometer 1
Information participates in Train Control;If the difference of two potentiometer values is not within the scope of defined, with reference to existing information of vehicles
Realize as follows to the potentiometric automatic identification of controller and selection, automatic identification step:
The first step, the positional information collected with reference to potentiometer acquisition module, carry out the judgement of controller gear.If department's control
Device is in 2 grades of (P2) gears of traction 1 grade (P1) or traction, then according to the potentiometric voltage curve of controller, calculates current shelves
Potentiometer values corresponding to position is lower, are contrasted using the numerical value as the numerical value that standard implementation collects to two acquisition modules, sentenced
Breaking, it is normal which potentiometer, which potentiometer failure, automatic to choose normal potentiometric information, and to fault potential meter with therefore
The mode of barrier prompting notifies driver.
Second step, if controller is in 2 grades of (B2) gears of braking 1 grade (B1) or braking, if then according to controller current potential
The voltage curve of meter, corresponding potentiometer values under current gear are calculated, be that standard implementation gathers moulds to two using the numerical value
The numerical value that block collects is contrasted, and judges which potentiometer is normal, which potentiometer failure, chooses normal potentiometer automatically
Information, and driver is notified in a manner of fault cues to fault potential meter.
3rd step, if controller is in neutral position, according to the potentiometric voltage curve of controller, calculate current gear
Potentiometer values corresponding to lower, are contrasted using the numerical value as the numerical value that standard implementation collects to two acquisition modules, are judged
It is normal to go out which potentiometer, which potentiometer failure is automatic to choose normal potentiometric information, and to fault potential meter with failure
The mode of prompting notifies driver.
4th step, if controller is in emergency position, according to the potentiometric voltage curve of controller, calculate current
Corresponding potentiometer values under gear, are contrasted by the numerical value that standard implementation collects to two acquisition modules of the numerical value,
Judge which potentiometer is normal, which potentiometer failure is automatic to choose normal potentiometric information, and to fault potential meter with
The mode of fault cues notifies driver.
5th step, if controller not in the gear that the first step is previously mentioned to the 4th step, prompt driver by controller extremely
Meet the condition to automatically switch in neutral gear or emergency position, and perform the 4th step or the 5th step.
Pass through the above-mentioned first step to the 5th step, it is possible to achieve the switching automatically or semi-automatically of potentiometer information is (i.e. to row
The free switching of the input of car control device controller), reduce the operation of driver, avoid the generation of proteges of the powerful who stay with their benefactions like parasites's failure.Simultaneously will
The advantage of dual potentineter further embodies, and improves the availability of vehicle.
Embodiment 2
According to embodiments of the present invention, additionally provide a kind of for realizing the above-mentioned control for being used to switch controller redundant signals
The device embodiment of method, Fig. 7 are a kind of control devices for being used to switch controller redundant signals according to embodiments of the present invention
Schematic diagram, as shown in fig. 7, the device includes:Acquisition module 701, judge module 703 and determining module 705.
Wherein, acquisition module 701, for obtaining the first potentiometric first voltage value on controller, and on controller
Second potentiometric second voltage value;
Judge module 703, for judging whether first voltage value and the difference of second voltage value exceed the first predeterminated voltage
It is worth scope;
Determining module 705, in the case of exceeding the first preset voltage value scope in difference, current according to controller
Gear information, determine the currently employed potentiometer of controller.
Herein it should be noted that above-mentioned acquisition module 701, judge module 703 and determining module 705 correspond to embodiment
Step S102 to S106 in 1, above-mentioned module is identical with example and application scenarios that corresponding step is realized, but is not limited to
State the disclosure of that of embodiment 1.It should be noted that above-mentioned module can be in such as one group of calculating as a part of of device
Performed in the computer system of machine executable instruction.
From the foregoing, it will be observed that in the above embodiments of the present application, using two potentiometric controllers, passing through acquisition module
After 701 get the second voltage value on the first potentiometer in caused first voltage value and the second potentiometer, by judging mould
Block 703 judge first voltage value and second voltage value difference whether permission error range (i.e. above-mentioned first predeterminated voltage
Be worth scope) in, and by determining module 705 two potentiometric magnitudes of voltage the difference not situation in the error range in permission
Under, normal potentiometer in two potentiometers is determined according to the current gear information of controller, and utilize normal potentiometric electricity
The control vehicle operation of pressure value, has reached the potentiometer to be broken down in automatic identification controller, and switch in normal condition
Potentiometric purpose, it is achieved thereby that improve dual potentineter utilization rate, and reduce the proteges of the powerful who stay with their benefactions like parasites caused by potentiometer failure
The technique effect of phenomenon, and then solve in the prior art that driver controls vehicle by operating controller, due to not accounting for
Controller transfinites or exported the situation technical problem that causes operating vehicle proteges of the powerful who stay with their benefactions like parasites's phenomenon often occur of inaccuracy in itself.
In a kind of optional embodiment, said apparatus also includes:Control module, for default without departing from first in difference
In the case of range of voltage values, control controller uses any one potentiometer in the first potentiometer and the second potentiometer.
In a kind of optional embodiment, above-mentioned determining module includes:First determining unit, for current according to controller
Gear information, determine the gear that controller is currently located;First judging unit, the gear being currently located for judging controller
Whether it is preset gear, wherein, preset gear includes at least one following:One grade of traction, two grades of traction, one grade of braking, braking
Two grades, neutral and brake hard shelves;Second determining unit, if being preset gear for the gear that controller is currently located,
Potentiometric voltage curve based on controller determines standard voltage value of the potentiometer under gear on controller;Second judges
Unit, for based on standard voltage value, judging whether first voltage value and/or second voltage value are normal;3rd determining unit, use
According to judged result, the currently employed potentiometer of controller is determined.
In a kind of optional embodiment, above-mentioned 3rd determining unit includes:First performs subelement, if for first
Magnitude of voltage is normal and second voltage value is abnormal, then controls controller to use the first potentiometer, and exports the first prompt message, its
In, the first prompt message is used to prompt the second potentiometer to break down;Second performs subelement, if for second voltage value just
Often and first voltage value is abnormal, then controls controller to use the second potentiometer, and exports the second prompt message, wherein, second carries
Show information be used for prompt the first potentiometer break down;3rd performs subelement, if for first voltage value and second voltage
Value is abnormal, then exports the 3rd prompt message, wherein, the 3rd prompt message is used to prompt the first potentiometer and the second potentiometer equal
Break down.
In a kind of optional embodiment, said apparatus also includes:Switch unit, if be currently located for controller
Gear is not preset gear, then by the gear switch of controller to neutral or brake hard shelves.
In a kind of optional embodiment, above-mentioned acquisition module includes:Collecting unit, for by connecting with the first potentiometer
The the first acquisition module collection first voltage value connect, and the electricity of the collection of the second acquisition module by being connected with the second potentiometer second
Pressure value.
In a kind of optional embodiment, said apparatus also includes:3rd judging unit, for judging the first acquisition module
It is whether normal with the working condition of the second acquisition module, and judge first voltage value and second voltage value whether in the second default electricity
Press scope.
Embodiment 3
According to embodiments of the present invention, a kind of storage medium is additionally provided, storage medium includes the program of storage, wherein, journey
Any one is optional in sequence execution embodiment 1 or is preferably used in the control method of switching controller redundant signals.
Embodiment 4
According to embodiments of the present invention, a kind of processor is additionally provided, processor is used for operation program, wherein, program operation
The control method for being used to switch controller redundant signals of any one in Shi Zhihang embodiments 1.
Embodiment 5
According to embodiments of the present invention, a kind of terminal is additionally provided, including:First potentiometer;Second potentiometer;Processor,
Processor operation program, wherein, it is as follows for being performed from the data of the first potentiometer and the output of the second potentiometer when program is run
Processing step:Obtain the first potentiometric first voltage value on controller, and the second potentiometric second voltage on controller
Value;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope;Exceed first in difference
In the case of preset voltage value scope, according to the current gear information of controller, the currently employed potentiometer of controller is determined.
Embodiment 6
According to embodiments of the present invention, a kind of terminal is additionally provided, including:First potentiometer;Second potentiometer;Storage is situated between
Matter, for storage program, wherein, program from the data of the first potentiometer and the output of the second potentiometer operationally for performing such as
Lower processing step:Obtain the first potentiometric first voltage value on controller, and the second potentiometric second electricity on controller
Pressure value;Judge whether first voltage value and the difference of second voltage value exceed the first preset voltage value scope;In difference beyond the
In the case of one preset voltage value scope, according to the current gear information of controller, the currently employed potentiometer of controller is determined.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in some embodiment
The part of detailed description, it may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, others can be passed through
Mode is realized.Wherein, device embodiment described above is only schematical, such as the division of the unit, Ke Yiwei
A kind of division of logic function, can there is an other dividing mode when actually realizing, for example, multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual
Between coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module
Connect, can be electrical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On unit.Some or all of unit therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also
That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list
Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is used as independent production marketing or use
When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially
The part to be contributed in other words to prior art or all or part of the technical scheme can be in the form of software products
Embody, the computer software product is stored in a storage medium, including some instructions are causing a computer
Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the present invention whole or
Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes
Medium.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (12)
- A kind of 1. control method for being used to switch controller redundant signals, it is characterised in that including:Obtain the first potentiometric first voltage value on controller, and the second potentiometric second voltage on the controller Value;Judge whether the first voltage value and the difference of the second voltage value exceed the first preset voltage value scope;In the case where the difference exceeds the first preset voltage value scope, believed according to the current gear of the controller Breath, determines the currently employed potentiometer of the controller.
- 2. control method according to claim 1, it is characterised in that in the difference without departing from first predeterminated voltage In the case of being worth scope, the controller is controlled to use any one electricity in first potentiometer and second potentiometer Position meter.
- 3. control method according to claim 1, it is characterised in that exceed first preset voltage value in the difference In the case of scope, according to the current gear information of the controller, the currently employed potentiometer of the controller is determined, is wrapped Include:According to the current gear information of the controller, the gear that the controller is currently located is determined;Judge whether the gear that the controller is currently located is preset gear, wherein, the preset gear is included as follows at least One of:One grade of traction, two grades of traction, one grade of braking, two grades of braking, neutral and brake hard shelves;If the gear that the controller is currently located is the preset gear, the potentiometric voltage based on the controller Curve determines standard voltage value of the potentiometer under the gear on the controller;Based on the standard voltage value, judge whether the first voltage value and/or the second voltage value are normal;According to judged result, the currently employed potentiometer of the controller is determined.
- 4. control method according to claim 3, it is characterised in that according to judged result, determine that the controller is current The potentiometer of use, including:If the first voltage value is normal and the second voltage value is abnormal, the controller is controlled using the described first electricity Position meter, and the first prompt message is exported, wherein, first prompt message is used to prompt second potentiometer to break down;If the second voltage value is normal and the first voltage value is abnormal, the controller is controlled using the described second electricity Position meter, and the second prompt message is exported, wherein, second prompt message is used to prompt first potentiometer to break down;If the first voltage value and the second voltage value are abnormal, the 3rd prompt message is exported, wherein, the described 3rd Prompt message is used to prompt first potentiometer and second potentiometer to break down.
- 5. control method according to claim 3, it is characterised in that judging that the gear that the controller is currently located is It is no be preset gear after, methods described also includes:If the gear that the controller is currently located is not the preset gear, by the gear switch of the controller to institute State neutral or the brake hard shelves.
- 6. control method according to claim 1, it is characterised in that obtain the first potentiometric first voltage on controller Value, and the second potentiometric second voltage value on the controller, including:The first voltage value is gathered by the first acquisition module for being connected with first potentiometer, and by with described second Second acquisition module of potentiometer connection gathers the second voltage value.
- 7. control method according to claim 6, it is characterised in that in first by being connected with first potentiometer Acquisition module gathers the first voltage value, and the second acquisition module by be connected with second potentiometer gathers described the After two magnitudes of voltage, methods described includes:Judge whether the working condition of first acquisition module and second acquisition module is normal, and judge first electricity Whether pressure value and the second voltage value are in the second predetermined voltage range.
- A kind of 8. control device for being used to switch controller redundant signals, it is characterised in that including:Acquisition module, for obtaining the first potentiometric first voltage value on controller, and the second current potential on the controller The second voltage value of meter;Judge module, for judging whether the first voltage value and the difference of the second voltage value exceed the first predeterminated voltage It is worth scope;Determining module, in the case of exceeding the first preset voltage value scope in the difference, according to the controller Current gear information, determine the currently employed potentiometer of the controller.
- A kind of 9. storage medium, it is characterised in that the storage medium includes the program of storage, wherein, described program right of execution Profit requires the control method for being used to switch controller redundant signals described in any one in 1 to 7.
- A kind of 10. processor, it is characterised in that the processor is used for operation program, wherein, right of execution when described program is run Profit requires the control method for being used to switch controller redundant signals described in any one in 1 to 7.
- A kind of 11. terminal, it is characterised in that including:First potentiometer;Second potentiometer;Processor, the processor operation program, wherein, for electric from first potentiometer and second when described program is run The data of position meter output perform following processing step:Obtain the first potentiometric first voltage value on controller, and the department Control the second potentiometric second voltage value on device;Judge whether the difference of the first voltage value and the second voltage value exceeds First preset voltage value scope;In the case where the difference exceeds the first preset voltage value scope, controlled according to the department The current gear information of device, determine the currently employed potentiometer of the controller.
- A kind of 12. terminal, it is characterised in that including:First potentiometer;Second potentiometer;Storage medium, for storage program, wherein, described program is operationally for from first potentiometer and the second current potential The data of meter output perform following processing step:Obtain the first potentiometric first voltage value on controller, and department's control Second potentiometric second voltage value on device;Judge the difference of the first voltage value and the second voltage value whether beyond the One preset voltage value scope;In the case where the difference exceeds the first preset voltage value scope, according to the controller Current gear information, determine the currently employed potentiometer of the controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710736478.4A CN107643682B (en) | 2017-08-23 | 2017-08-23 | Control method and device for switching redundant signals of driver controller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710736478.4A CN107643682B (en) | 2017-08-23 | 2017-08-23 | Control method and device for switching redundant signals of driver controller |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107643682A true CN107643682A (en) | 2018-01-30 |
CN107643682B CN107643682B (en) | 2021-05-07 |
Family
ID=61110835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710736478.4A Active CN107643682B (en) | 2017-08-23 | 2017-08-23 | Control method and device for switching redundant signals of driver controller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107643682B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111186450A (en) * | 2018-11-15 | 2020-05-22 | 中车永济电机有限公司 | Level control method and control equipment for railway vehicle and railway vehicle |
CN112816815A (en) * | 2020-12-31 | 2021-05-18 | 成都中车四方轨道车辆有限公司 | Overhauling process method for metro vehicle driver controller |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1776560A (en) * | 2004-08-30 | 2006-05-24 | 沙厄-丹福丝股份有限公司 | Joystick device with redundant processing |
CN102358298A (en) * | 2011-08-31 | 2012-02-22 | 大连瑞特科技有限公司 | Driver controller |
US20140233990A1 (en) * | 2013-02-19 | 2014-08-21 | Canon Kabushiki Kaisha | Image forming apparatus |
CN105191222A (en) * | 2013-03-14 | 2015-12-23 | Fts电脑技术有限公司 | Device and method for the autonomous control of motor vehicles |
-
2017
- 2017-08-23 CN CN201710736478.4A patent/CN107643682B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1776560A (en) * | 2004-08-30 | 2006-05-24 | 沙厄-丹福丝股份有限公司 | Joystick device with redundant processing |
CN102358298A (en) * | 2011-08-31 | 2012-02-22 | 大连瑞特科技有限公司 | Driver controller |
US20140233990A1 (en) * | 2013-02-19 | 2014-08-21 | Canon Kabushiki Kaisha | Image forming apparatus |
CN105191222A (en) * | 2013-03-14 | 2015-12-23 | Fts电脑技术有限公司 | Device and method for the autonomous control of motor vehicles |
Non-Patent Citations (2)
Title |
---|
孟晓风 等: ""双余度传感器的故障检测与识别"", 《自动化学报》 * |
王磊: ""地铁车辆司机控制器的研究"", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111186450A (en) * | 2018-11-15 | 2020-05-22 | 中车永济电机有限公司 | Level control method and control equipment for railway vehicle and railway vehicle |
CN112816815A (en) * | 2020-12-31 | 2021-05-18 | 成都中车四方轨道车辆有限公司 | Overhauling process method for metro vehicle driver controller |
Also Published As
Publication number | Publication date |
---|---|
CN107643682B (en) | 2021-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106094798B (en) | A kind of method for diagnosing faults based on CAN communication bus system | |
CN110474943A (en) | Vehicle net redundant system and gateway handoff method based on MVB and Ethernet | |
CN102879680B (en) | The general detection of rail transit vehicle equipment and method for diagnosing faults and system | |
CN107757593A (en) | A kind of electronic parking control system and its control method with redundancy parking function | |
CN103685560B (en) | A kind of network structure of automobile electronic system | |
CN107697072A (en) | Driving mode switching method, vehicle and vehicle control unit | |
CN101417636A (en) | Pure electric motor coach communication system and method based on three CAN bus | |
CN103112459B (en) | Locomotive control device, system and method | |
CN204340923U (en) | A kind of whole-control system and there is its vehicle | |
CN107643682A (en) | For switching the control method and device of controller redundant signals | |
EP3455915B1 (en) | Method and device for monitoring a power supply device of a traffic system | |
CN106671898A (en) | Whole vehicle control method and device for pure electric vehicle | |
CN107031684A (en) | A kind of two-shipper Safety Redundancy type LKJ host computer systems and method | |
CN108255123A (en) | Train LCU control devices based on the voting of two from three software and hardware | |
US20180170412A1 (en) | Control arrangement for a vehicle | |
CN108757418B (en) | Piston type air compressor fault early warning method, piston type air compressor and track train | |
CN108011361A (en) | The method of AT short trouble sections is judged based on AT power supply mode feeder current matrix methods | |
CN109412265B (en) | Safety and stability control system and control method thereof | |
CN107792094A (en) | The method and apparatus for controlling locomotive automatic running | |
CN106627606A (en) | Driver controller based on Ethernet control | |
CN204871012U (en) | A human -computer interaction system that is used for contact net to synthesize overhauing operation car and link up work platform | |
CN206162187U (en) | Whole vehicle CAN bus network system | |
CN109343391A (en) | A kind of railway engineering motor vehicles and machines control system | |
CN113992308A (en) | Motor train unit control system fusion framework | |
CN208969494U (en) | A kind of encoder switching device of the double tank elevators of auxiliary shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |