CN107631477A - A kind of preparation method of more return stroke wet back type boilers - Google Patents

A kind of preparation method of more return stroke wet back type boilers Download PDF

Info

Publication number
CN107631477A
CN107631477A CN201710915632.4A CN201710915632A CN107631477A CN 107631477 A CN107631477 A CN 107631477A CN 201710915632 A CN201710915632 A CN 201710915632A CN 107631477 A CN107631477 A CN 107631477A
Authority
CN
China
Prior art keywords
backhaul
flue
tube bank
smoke box
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710915632.4A
Other languages
Chinese (zh)
Inventor
陈文顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Zheng Xin Thermal Hardware Manufacturing Co Ltd
Original Assignee
Tianjin Zheng Xin Thermal Hardware Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Zheng Xin Thermal Hardware Manufacturing Co Ltd filed Critical Tianjin Zheng Xin Thermal Hardware Manufacturing Co Ltd
Priority to CN201710915632.4A priority Critical patent/CN107631477A/en
Publication of CN107631477A publication Critical patent/CN107631477A/en
Pending legal-status Critical Current

Links

Landscapes

  • Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)

Abstract

The present invention provides a kind of preparation method of more return stroke wet back type boilers,Including body of heater and burner,Furnace interior is provided with flue,Water containing chamber,Return combustion chamber,Front smoke box,Second backhaul is restrained,3rd backhaul is restrained and rear smoke box,Energy-saving appliance and condenser are provided with smoke box afterwards,Burner is arranged on outside body of heater and is connected with the import of flue,The outlet of flue is connected with the import of return combustion chamber,The outlet of return combustion chamber is connected with the entrance point of the second backhaul tube bank,The port of export of second backhaul tube bank is connected with the import of front smoke box,The entrance point of 3rd backhaul tube bank is connected with the outlet of front smoke box,The port of export of 3rd backhaul tube bank is connected with rear smoke box,Condenser includes smoke pipe and heat exchanger tube,Smoke pipe is provided with smoke inlet and outlet flue,Smoke inlet is connected with energy-saving appliance,Heat exchanger tube is fixedly connected with the outside of smoke pipe,Water inlet and delivery port are provided with heat exchanger tube,Delivery port is connected with water containing chamber.The advantages that present invention has flue gas backhaul length, and heat exchanger effectiveness is high.

Description

A kind of preparation method of more return stroke wet back type boilers
Technical field
The present invention relates to a kind of boiler, more particularly, to a kind of preparation method of more return stroke wet back type boilers.
Background technology
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy, electric energy, high-temperature flue gas in fuel The form such as heat energy, and pass through boiler and change, outwards steam, high-temperature water or organic heat carrier of the output with certain heat energy.
Following defect be present in existing boiler:1st, flue is arranged on below body of heater, belongs to eccentric design, this design makes flue Temperature is relatively low, adds the unburnt uncertainty of combustion gas;2nd, flue gas backhaul is short, and the flue-gas temperature of discharge is high, and heat energy is handed over It is low to change efficiency, utilization rate, is unfavorable for energy-conserving and environment-protective;3rd, various impurity can be accumulated in backhaul tube bank, are difficult to after adhering to for a long time clear Wash, permanent presence can influence heat exchange efficiency.
The content of the invention
A kind of the shortcomings that it is an object of the invention to overcome prior art, there is provided preparation side of more return stroke wet back type boilers Method, it is possible to increase heat exchanger effectiveness.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of preparation of more return stroke wet back type boilers Method, including body of heater and burner, the furnace interior are provided with flue, water containing chamber, return combustion chamber, front smoke box, the second return duct Beam, the 3rd backhaul is restrained and rear smoke box, and energy-saving appliance and condenser, the energy-saving appliance and the condensation are provided with the rear smoke box Device is successively arranged along flue gas discharge direction, and the water intaking valve being connected with the water containing chamber and water outlet are provided with the top of the body of heater Valve, second backhaul tube bank are arranged on the flue both sides, the burner be arranged on the body of heater it is outer and with the flue Import be connected.
Further, the outlet of the flue is connected with the import of the return combustion chamber, the outlet of the return combustion chamber and institute The entrance point for stating the second backhaul tube bank is connected, and the port of export of the second backhaul tube bank is connected with the import of the front smoke box Connect, the entrance point of the 3rd backhaul tube bank is connected with the outlet of the front smoke box, the port of export of the 3rd backhaul tube bank It is connected with the rear smoke box, the condenser includes smoke pipe and heat exchanger tube, and the smoke pipe is provided with smoke inlet and outlet flue, institute State smoke inlet with the energy-saving appliance to be connected, heat exchanger tube is fixedly connected with the outside of the smoke pipe, is provided with the heat exchanger tube Water inlet and delivery port, the delivery port are connected with the water containing chamber, and cleaning sprayer is provided with the front smoke box, described clear Wash the end that shower nozzle extends to the second backhaul tube bank and the 3rd backhaul tube bank.
Further, the quantity of the cleaning sprayer is restrained with second backhaul and total quantity is restrained in the 3rd backhaul It is identical.
Further, the be shaped as tubular and outer wall of the flue are corrugated.
Further, the surface of the heat exchanger tube is provided with fin.
Further, smoke filtration net is provided with the outlet flue.
The present invention has the advantages and positive effects of:Due to using above-mentioned technical proposal, making high-temperature flue gas and water containing chamber Interior water is fully exchanged heat, and flue is located in the middle part of body of heater, flue temperature is added, avoids combustion gas in flue from not exclusively firing Burn, enhance efficiency of combustion, and flue gas backhaul is long, heat exchanger effectiveness is high;Set cleaning sprayer can be right in time at front smoke box Backhaul tube bank is cleaned, and goes the removal of impurity to improve heat exchange efficiency;Moisturizing is carried out to water containing chamber by the heat exchanger tube of condenser, carried High boiler thermal output, the pernicious gas in flue gas is dissolved in liquid water with the condensation of vapor within the condenser, so as to reduce The content of pernicious gas in smoke evacuation tail gas.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is condenser structure schematic diagram of the present invention.
In figure:
1st, body of heater 2, burner 3, flue
4th, water containing chamber 5, return combustion chamber 6, front smoke box
7th, the 8, the 3rd backhaul tube bank 9, rear smoke box are restrained in the second backhaul
10th, energy-saving appliance 11, condenser 111, smoke pipe
112nd, heat exchanger tube 113, smoke inlet 114, outlet flue
115th, water inlet 116, delivery port 12, water intaking valve
13rd, outlet valve 14, cleaning sprayer
Embodiment
With reference to embodiment and accompanying drawing, the present invention is described further.
As depicted in figs. 1 and 2, the present embodiment provides a kind of preparation method of more return stroke wet back type boilers, including the He of body of heater 1 Burner 2, body of heater 1 are internally provided with flue 3, water containing chamber 4, return combustion chamber 5, front smoke box 6, the second backhaul the 7, the 3rd return duct of tube bank Beam 8 and rear smoke box 9, are provided with energy-saving appliance 10 and condenser 11 in rear smoke box 9, and energy-saving appliance 10 and condenser 11 are along flue gas discharge side Arranged to priority, the top of body of heater 1 is provided with the water intaking valve 12 and outlet valve 13 being connected with water containing chamber 4, and the second backhaul tube bank 7 is set Put and be arranged on the upper end of water containing chamber 4 in the both sides of flue 3, the 3rd backhaul tube bank 8.
Burner 2 is arranged on outside body of heater 1 and is connected with the import of flue 3, the outlet of flue 3 and the import of return combustion chamber 5 It is connected, the outlet of return combustion chamber 5 is connected with the entrance point of the second backhaul tube bank 7, the port of export and preceding cigarette of the second backhaul tube bank 7 The import of case 6 is connected, and the entrance point of the 3rd backhaul tube bank 8 is connected with the outlet of front smoke box 6, and the 3rd backhaul tube bank 8 goes out Mouth end is connected with rear smoke box 9.
Condenser 11 includes smoke pipe 111 and heat exchanger tube 112, and smoke pipe 111 is provided with smoke inlet 113 and outlet flue 114, enters cigarette Mouth 113 is connected with energy-saving appliance 10, and the outside of smoke pipe 11 is fixedly connected with heat exchanger tube 112, and water inlet is provided with heat exchanger tube 112 115 and delivery port 116, delivery port 115 be connected with water containing chamber 4, cleaning sprayer 14, cleaning sprayer 14 are provided with front smoke box 6 Extend to the end of the second backhaul tube bank 7 and the 3rd backhaul tube bank 8.The surface of heat exchanger tube 112 is provided with fin, outlet flue 114 Inside it is provided with smoke filtration net.
The quantity of cleaning sprayer 14 is identical with the second backhaul tube bank 7 and the 3rd backhaul 8 total quantitys of tube bank.
The be shaped as tubular and outer wall of flue 3 are corrugated.
The course of work of this example:Gaseous fuel and air mix in burner 2 first, and are ejected into the internal combustion of flue 3 Burn, thermal-flame caused by burning and flue gas carry out radiation heat transfer with flue 3, transfer heat in the outside water containing chamber 4 of flue 3 Water in.Then flue gas through flue 3 enter 5 further completely burned of return combustion chamber after, high-temperature flue gas by the second backhaul tube bank 7, The backhaul of front smoke box 6 and the 3rd tube bank 8, the second backhaul tube bank 7 and the 3rd backhaul are restrained 8 water into water containing chamber 4 and exchanged heat.It Flue gas enters the energy-saving appliance 10 of rear smoke box from the 3rd backhaul tube bank 8 afterwards, subsequently enters condenser 11, the smoke inlet through smoke pipe 111 113 enter cigarette, are discharged from outlet flue 114, and the moisturizing of water containing chamber 4 is intake by the water inlet 115 of heat exchanger tube 112, the water outlet of delivery port 116 After reenter in water containing chamber 4, this process supplements about 80 degree or so of water to water containing chamber 4, improves the thermal efficiency of boiler, flue gas Discharged after the smoke filtration net filtration in outlet flue 114.In the intervals of business, cleaning sprayer 14 is opened, to the second backhaul tube bank 7 It is rinsed with the 3rd backhaul tube bank 8, goes the removal of impurity.
The beneficial effects of the invention are as follows:Due to using above-mentioned technical proposal, making high-temperature flue gas and the water in water containing chamber abundant Exchanged heat, flue is located in the middle part of body of heater, flue temperature is added, avoids combustion gas imperfect combustion in flue, enhance combustion Efficiency is burnt, and flue gas backhaul is long, heat exchanger effectiveness is high;Set cleaning sprayer in time can restrain backhaul at front smoke box to carry out Cleaning, goes the removal of impurity to improve heat exchange efficiency;Moisturizing is carried out to water containing chamber by the heat exchanger tube of condenser, improves boiler thermal effect Rate, the pernicious gas in flue gas is dissolved in liquid water with the condensation of vapor within the condenser, so as to reduce smoke evacuation tail gas The content of middle pernicious gas.
One or more embodiments of the invention is described in detail above, but the content be only the present invention compared with Good embodiment, it is impossible to be considered as the practical range for limiting the present invention.All equivalent changes made according to the present patent application scope With improve etc., all should still belong to the present invention patent covering scope within.

Claims (6)

1. a kind of preparation method of more return stroke wet back type boilers, including body of heater and burner, it is characterised in that:The furnace interior It is provided with flue, water containing chamber, return combustion chamber, front smoke box, the second backhaul tube bank, the 3rd backhaul tube bank and rear smoke box, the rear smoke box Energy-saving appliance and condenser are inside provided with, the energy-saving appliance and the condenser are successively arranged along flue gas discharge direction, the body of heater Top is provided with the water intaking valve and outlet valve being connected with the water containing chamber, and the second backhaul tube bank is arranged on the flue two Side, the burner are arranged on outside the body of heater and are connected with the import of the flue.
2. the preparation method of more return stroke wet back type boilers according to claim 1, it is characterised in that:The outlet of the flue Import with the return combustion chamber is connected, and the outlet of the return combustion chamber is connected with the entrance point of second backhaul tube bank, institute The port of export for stating the second backhaul tube bank is connected with the import of the front smoke box, the entrance point that the 3rd backhaul is restrained with it is described The outlet of front smoke box is connected, and the port of export of the 3rd backhaul tube bank is connected with the rear smoke box, and the condenser includes Smoke pipe and heat exchanger tube, the smoke pipe are provided with smoke inlet and outlet flue, and the smoke inlet is connected with the energy-saving appliance, the cigarette Heat exchanger tube is fixedly connected with the outside of pipe, water inlet and delivery port, the delivery port and the appearance are provided with the heat exchanger tube Water cavity is connected, and cleaning sprayer is provided with the front smoke box, and the cleaning sprayer extends to the second backhaul tube bank and institute State the end of the 3rd backhaul tube bank.
3. the preparation method of more return stroke wet back type boilers according to claim 1, it is characterised in that:The cleaning sprayer Quantity is restrained with second backhaul and the 3rd backhaul tube bank total quantity is identical.
4. the preparation method of more return stroke wet back type boilers according to claim 1, it is characterised in that:The shape of the flue It is corrugated for tubular and outer wall.
5. the preparation method of more return stroke wet back type boilers according to claim 1, it is characterised in that:The table of the heat exchanger tube Face is provided with fin.
6. the preparation method of more return stroke wet back type boilers according to claim 1, it is characterised in that:Set in the outlet flue It is equipped with smoke filtration net.
CN201710915632.4A 2017-09-30 2017-09-30 A kind of preparation method of more return stroke wet back type boilers Pending CN107631477A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710915632.4A CN107631477A (en) 2017-09-30 2017-09-30 A kind of preparation method of more return stroke wet back type boilers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710915632.4A CN107631477A (en) 2017-09-30 2017-09-30 A kind of preparation method of more return stroke wet back type boilers

Publications (1)

Publication Number Publication Date
CN107631477A true CN107631477A (en) 2018-01-26

Family

ID=61105062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710915632.4A Pending CN107631477A (en) 2017-09-30 2017-09-30 A kind of preparation method of more return stroke wet back type boilers

Country Status (1)

Country Link
CN (1) CN107631477A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111023569A (en) * 2019-11-07 2020-04-17 赵素真 Circulating condensation boiler

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936520A (en) * 2010-08-16 2011-01-05 江苏双良锅炉有限公司 Horizontal type oil-gas condensing steam boiler with energy saver and condenser arranged outside independently
CN103438416A (en) * 2013-08-22 2013-12-11 郑州豫懒环保锅炉有限公司 Horizontal type internal combustion wet back boiler
CN204438519U (en) * 2015-01-28 2015-07-01 郭福洲 The fuel-oil or fuel-gas boiler of horizontal built-in condenser/energy-saving appliance
CN204534518U (en) * 2015-01-06 2015-08-05 广州迪森热能设备有限公司 Three backhaul combustion gas condensation steam boilers
CN105650866A (en) * 2016-03-24 2016-06-08 吉林省鑫华锅炉科技有限责任公司 Mini-type wet back type three-return gas-fired hot water boiler
CN205505405U (en) * 2016-04-19 2016-08-24 青海恒业装备制造有限公司 Condensing gas boiler who contains belt cleaning device
CN207422653U (en) * 2017-09-30 2018-05-29 天津征鑫热能设备制造有限公司 A kind of more return stroke wet back type boilers

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936520A (en) * 2010-08-16 2011-01-05 江苏双良锅炉有限公司 Horizontal type oil-gas condensing steam boiler with energy saver and condenser arranged outside independently
CN103438416A (en) * 2013-08-22 2013-12-11 郑州豫懒环保锅炉有限公司 Horizontal type internal combustion wet back boiler
CN204534518U (en) * 2015-01-06 2015-08-05 广州迪森热能设备有限公司 Three backhaul combustion gas condensation steam boilers
CN204438519U (en) * 2015-01-28 2015-07-01 郭福洲 The fuel-oil or fuel-gas boiler of horizontal built-in condenser/energy-saving appliance
CN105650866A (en) * 2016-03-24 2016-06-08 吉林省鑫华锅炉科技有限责任公司 Mini-type wet back type three-return gas-fired hot water boiler
CN205505405U (en) * 2016-04-19 2016-08-24 青海恒业装备制造有限公司 Condensing gas boiler who contains belt cleaning device
CN207422653U (en) * 2017-09-30 2018-05-29 天津征鑫热能设备制造有限公司 A kind of more return stroke wet back type boilers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111023569A (en) * 2019-11-07 2020-04-17 赵素真 Circulating condensation boiler

Similar Documents

Publication Publication Date Title
CN105157012B (en) A kind of gas fired-boiler for being used to overheat external steam
CN104033883A (en) Oil field steam-drum-type steam injection boiler for producing overheated steam
CN206145968U (en) Coal -fired type boiler system of energy saving and emission reduction
CN207422653U (en) A kind of more return stroke wet back type boilers
CN107631477A (en) A kind of preparation method of more return stroke wet back type boilers
CN201522091U (en) Horizontal flashback coal burning boiler
CN206695096U (en) A kind of steam boiler
CN204611725U (en) High-efficiency environment friendly energy-conservation Water heating steam generation stove
CN207422187U (en) A kind of steam boiler for processing function of giving up with tail
CN206280939U (en) Bidirectional rotational flow thermal medium boiler
CN214223090U (en) Circulating fluidized bed boiler using solid waste
CN207555579U (en) A kind of alcohol-based fuel boiler
CN208967773U (en) A kind of environment-friendlyboiler boiler system
CN207112773U (en) Condenser applied to steam boiler
CN201032278Y (en) High efficiency energy-saving heat exchanger
CN206037008U (en) Gas boiler
CN2637909Y (en) Condensity fuel oil and gas boiler
CN203203231U (en) Combined biomass hot water boiler
CN203203230U (en) Biomass high-efficiency hot water boiler
CN202562021U (en) Energy-saving environment-friendly sea water boiler
CN106369588A (en) Gas-fired boiler
CN211716865U (en) Novel efficient energy-saving gas boiler
CN204062980U (en) A kind of double-barrel transverse formula expansion chamber spray denitration corner tube boiler
CN203298288U (en) Wall type reheater of boiler
CN205783769U (en) Conserving boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180126

WD01 Invention patent application deemed withdrawn after publication