CN107623328A - 一种降低配电网合环电流的方法 - Google Patents

一种降低配电网合环电流的方法 Download PDF

Info

Publication number
CN107623328A
CN107623328A CN201710870674.0A CN201710870674A CN107623328A CN 107623328 A CN107623328 A CN 107623328A CN 201710870674 A CN201710870674 A CN 201710870674A CN 107623328 A CN107623328 A CN 107623328A
Authority
CN
China
Prior art keywords
mrow
msub
mover
voltage
mtr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710870674.0A
Other languages
English (en)
Other versions
CN107623328B (zh
Inventor
徐大勇
朱凌
王毕元
徐宝琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Huizhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201710870674.0A priority Critical patent/CN107623328B/zh
Publication of CN107623328A publication Critical patent/CN107623328A/zh
Application granted granted Critical
Publication of CN107623328B publication Critical patent/CN107623328B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及电网调度自动化领域,更具体地,涉及一种降低配电网合环电流的方法,包括以下步骤S1,进行主配网模型拼接。S2,对拼接后的模型进行状态评估。S3,对容抗器分组并按容量排序。S4,进行初始潮流计算。S5,进行合环电流计算。S6,判断是否满足终止计算条件,S7,判断是否有可投切的容抗器,S8按组别顺序逐个投切容抗器。S9,重新进行潮流计算。S10,按组别、电压幅值变动量排序并进行合环电流计算。S11,对主档位进行操作并进行潮流计算。S12,进行合环电流计算,S13判断是否终止计算条件。本发明能够主动将合环电流降低至开关保护限额,防止因合环电流过大越限而跳闸,减少因合环操作失败而导致的停电风险。

Description

一种降低配电网合环电流的方法
技术领域
本发明涉及电网调度自动化领域,更具体地,涉及一种降低配电网合环电流的方法。
背景技术
配电网中负荷的大小和分布位置,将影响电网电压的分布,使得合环开关两侧存在一定的电势差。当进行合环操作时,在电势差的作用下,环网中将产生环流,导致电网的潮流分布发生变化。因此,网络结构及负荷分布的不对称性所引起的合环开关两侧的电势差是合环电流产生的主要原因。
当配电网进行检修和非故障区负荷转移时,常常需要进行合环操作。合环时,必须要控制合环电流的大小,只有在确保合环电流不超过保护限额时,才能够对两条线路进行合环,否则,会导致合环电流过大越限而跳闸,使操作失败,造成停电范围扩大。
对配电网而言,合环电流的大小与合环点两侧电压幅值差、相角差、等值阻抗等因素相关,一旦计算出的合环电流超出保护限额,按照操作规程,调控人员无法进行合环操作,只能被动地等待合环电流降低至开关保护限额时再进行合环操作,何时合环电流才能不超出开关遮断容量具有一定的不确定性,造成停电区域不能够及时恢复。
发明内容
本发明为克服上述现有技术所述的至少一种缺陷,提供一种降低配电网合环电流的方法,能够主动将合环电流降低至开关保护限额,从而防止合环电流过大越限而跳闸,造成操作失败导致停电范围扩大。
为解决上述技术问题,本发明采用的技术方案是:一种降低配电网合环电流的方法,包括以下步骤:
S1,进行主配网模型拼接;
S2,对拼接后的模型进行状态评估;
S3,对容抗器分组并按容量排序;
S4,进行初始潮流计算;
S5,进行合环电流计算;
S6,判断是否满足终止计算条件,如果不满足终止条件,则继续进行下一步操作;
S7,判断是否有可投切的容抗器;
S8,按组别顺序逐个投切容抗器;
S9,重新进行潮流计算;
S10,进行合环电流计算,并判断是否终止计算;
S11,当无可投切的容抗器时,对主变档位进行操作,并重新进行潮流计算;
S12,进行合环电流计算,并判断是否终止计算;
S13,终止计算。
进一步的,在步骤S1中,进行主配网模型拼接:配电网中合环电流大小受电网网架影响较大,特别是受电网分区影响较大,仅仅依赖配电网模型无法有效完成合环电流的计算,计算结果可信度较低。主配网模型拼接时按照电网分级管理原则进行拼接。
拼接的模型为节点-支路模型。主要分为以下三种类型的模型:
a.母线节点:把配电网中的开关站母线、变电站10kV母线均简化为母线节点。
b.支路:把电缆支路、架空线路当成支路。
c.绕组:把变压器当成绕组。
进一步的,在步骤S2中,对拼接后的模型进行状态估计,状态估计是电力***分析的基础应用,其目的是根据电网的量测信息估计电网的实际运行状态,实用中一般基于加权最小二乘原理进行状态估计。
利用电力***状态估计问题的分块特征对量测雅可比矩阵进行分块,根据信息矩阵的分块稀疏结构进行列编号的优化,采用变转轴逐列消元策略,基于最小度原则动态选择转轴元素,根据非零注入元素最少的原则选择旋转元素,既减少了所需的内存空间,又明显提高了执行效率。
进一步的,在步骤S3中,列出合环开关两侧的电容器、电抗器及变压器,对容抗器按容量大小分组排序,以高电压侧电容器、低电压侧电抗器、低电压侧电容器、高电压侧电抗器依次排序。
进一步的,步骤S4中,首先对欲合环的开关进行初始潮流计算,获取母线电压差的比例差。
进一步的,步骤S5中,进行计算合环电流后,如果开关合环电流超过开关保护限额,则继续下一步计算,否则停止合环计算。
其中,在配电网中,功率因数较高,可以将合环电流看作负荷差值与电压压差共同作用的结果。对于给定的网架和方式,假设负荷差值与环路阻抗不变,则可以通过调节电压压差来影响合环电流。故将合环电流的计算等值为:
其中:
Iloop_base为合环电流有效值;
Ibase为合环前两侧负荷差值所引起的环流;
为合环前电压幅值高的一侧的电压向量;
为合环前电压幅值较低一侧的电压向量。
进一步的,利用步骤S5计算结果,判断是否满足S6终止计算条件。
终止计算条件包括:
1无可用的容抗器资源或主变资源;
2合环电流小于保护限额;
进一步的,如果因容抗器动作而进行的合环电流计算,则终止的条件是无主变档资源可调。
进一步的,在步骤S7中,当无可投切的容抗器后依然没有满足终止计算条件,则进行主变操作S11。当有可投切的容抗器后,则进入步骤S8继续执行。
判断合环开关两侧容抗器状态,按照下述步骤投入容抗器:
a.首先对电压高的一侧按容量大小顺序切除电容器;
b.当电压高的一侧无可切除的电容器时,在电压低侧按容量大小顺序切除电抗器;
c.在电压低的一侧投入电容器;
d.当电压低的一侧可投电容器之外,则在电压高的一侧投入电抗器。
采用这些原则,可以避免一些在实际运行中不合理的投切,减少设备动作次数,提高设备使用寿命。
进一步的,步骤S9中,在每次容抗器动作后,重新进行潮流计算,获取合环开关两侧的新幅值和相角的变化量;
计算公式如下:
其中:
为本次调整后低压侧电压向量;
Uim-1为上一次动作后低压侧电压调整向量;
为本次调整后高压侧电压向量;
为上一次动作后高压侧电压向量。
进一步的,步骤S10中,对容抗器投切操作后母线电压幅值变动量按步骤S3中的组别分别进行排序并重新计算合环电流,直到合环电流不超越保护限额(则停止计算)或无容抗可动,则停止计算;
计算公式为:
其中:
Iloop为合环电流;
ILimit为保护限额,;
为投入或切除容抗器后的新的电压向量;
为累计动作后电压变动量;
当同一组别中动作完成后,才能进行下一组别动作。
进一步的,步骤S11中,对合环开关两侧的主变档位依次进行增加和减少操作,计算原则如下:
a.当电压高一侧所对应的主变高压侧电压偏上限时,所对应的主变高压侧档位向上调动一档;
b.当电压低侧所对应的主变高压侧电压偏下限时,所对应的主变高压侧档位向下调动一档;
c.重新进行潮流计算后,获取合环开关两侧的母线电压幅值和相角的变化量。
计算公式如下:
其中:
为本次调整后低压侧电压向量;
Uin-1为上一次动作后低压侧电压调整向量;
为本次调整后高压侧电压向量;
为上一次动作后高压侧电压调整向量。
进一步的,步骤S11中,按主变档位后母线电压幅值变动量从大到小依次进行操作,运用步骤S8中公式重新计算合环电流,直到合环电流不超越限额(则停止计算)或无主变可调(则停止步骤S13)。
与现有技术相比,有益效果是:
1、能够主动将合环电流降低至开关保护限额,从而防止合环电流过大越限而跳闸,造成操作失败导致停电范围扩大;
2、采用步骤S8中的原则,可以避免一些在实际运行中不合理的投切,减少设备动作次数,提高设备使用寿命。
附图说明
图1是本发明的流程示意图;
图2是本发明步骤S3中的容抗器按容量大小分组排序的流程。
具体实施方式
附图仅用于示例性说明,不能理解为对本专利的限制;为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对于本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。附图中描述位置关系仅用于示例性说明,不能理解为对本专利的限制。
如图1、2所示,一种降低配电网合环电流的方法,包括以下步骤:
S1,进行主配网模型拼接;
S2,对拼接后的模型进行状态评估;
S3,对容抗器分组并按容量排序;
S4,进行初始潮流计算;
S5,进行合环电流计算;
S6,判断是否满足终止计算条件,如果不满足终止条件,则继续进行下一步操作;
S7,判断是否有可投切的容抗器;
S8,按组别顺序逐个投切容抗器;
S9,重新进行潮流计算;
S10,进行合环电流计算,并判断是否终止计算;
S11,当无可投切的容抗器时,对主变档位进行操作,并重新进行潮流计算;
S12,进行合环电流计算,并判断是否终止计算;
S13,终止计算。
在本实施例中,在步骤S1中,进行主配网模型拼接:配电网中合环电流大小受电网网架影响较大,特别是受电网分区影响较大,仅仅依赖配电网模型无法有效完成合环电流的计算,计算结果可信度较低。主配网模型拼接时按照电网分级管理原则进行拼接。
拼接的模型为节点-支路模型。主要分为以下三种类型的模型:
a.母线节点:把配电网中的开关站母线、变电站10kV母线均简化为母线节点。
b.支路:把电缆支路、架空线路当成支路。
c.绕组:把变压器当成绕组。
在本实施例中,在步骤S2中,对拼接后的模型进行状态估计,状态估计是电力***分析的基础应用,其目的是根据电网的量测信息估计电网的实际运行状态,实用中一般基于加权最小二乘原理进行状态估计。
其中,利用电力***状态估计问题的分块特征对量测雅可比矩阵进行分块,根据信息矩阵的分块稀疏结构进行列编号的优化,采用变转轴逐列消元策略,基于最小度原则动态选择转轴元素,根据非零注入元素最少的原则选择旋转元素,既减少了所需的内存空间,又明显提高了执行效率。
在本实施例中,在步骤S3中,列出合环开关两侧的电容器、电抗器及变压器,对容抗器按容量大小分组排序,以高电压侧电容器、低电压侧电抗器、低电压侧电容器、高电压侧电抗器依次排序。
在本实施例中,步骤S4中,首先对欲合环的开关进行初始潮流计算,获取母线电压差的比例差。
在本实施例中,步骤S5中,进行计算合环电流,如果开关合环电流超过开关保护限额,则继续下一步计算,否则停止合环计算。
其中,在配电网中,功率因数较高,可以将合环电流看作负荷差值与电压压差共同作用的结果。对于给定的网架和方式,假设负荷差值与环路阻抗不变,则可以通过调节电压压差来影响合环电流。故将合环电流的计算等值为:
其中:
Iloop_base为合环电流有效值;
Ibase为合环前两侧负荷差值所引起的环流;
为合环前电压幅值高侧的电压向量;
为合环前电压幅值低侧的电压向量。
在本实施例中,步骤S6中,如果开关合环电流超过开关保护限额,则继续下一步S7判断,否则停止合环计算。
在本实施例中,步骤S7判断是否有可投切的容抗器,如果没有可投切的容抗器,即所有容抗器资源均已参与计算,则转入步骤S11进行计算。否则转入步骤S8中,
在本实施例中,在步骤S8中,判断合环开关两侧容抗器状态,按照下述步骤投入容抗器:
a.首先对电压高的一侧按容量大小顺序切除电容器;
b.当电压高的一侧无可切除的电容器时,在电压低侧按容量大小顺序切除电抗器;
c.在电压低的一侧投入电容器;
d.当电压低的一侧可投电容器之外,则在电压高的一侧投入电抗器。
采用这些原则,可以避免一些在实际运行中不合理的投切,减少设备动作次数,提高设备使用寿命。
在本实施例中,步骤S8中,在每次容抗器动作后,重新进行S9潮流计算,获取合环开关两侧的新幅值和相角的变化量;
计算公式如下:
其中:
为本次调整后低压侧电压向量;
Uim-1为上一次动作后低压侧电压调整向量;
为本次调整后高压侧电压向量;
为上一次动作后高压侧电压向量。
在本实施例中,步骤S10中,对容抗器投切操作后母线电压幅值变动量按步骤S3中的组别分别进行排序并重新计算合环电流,直到合环电流不超越保护限额(则停止计算)或无容抗可动,则停止计算;
计算公式为:
其中:
Iloop为合环电流;
ILimit为保护限额,;
为投入或切除容抗器后的新的电压向量;
为累计动作后电压变动量;
当同一组别中动作完成后,才能进行下一组别动作。
在本实施例中,步骤S11中,对合环开关两侧的主变档位依次进行增加和减少操作,计算原则如下:
a.当电压高一侧所对应的主变高压侧电压偏上限时,所对应的主变高压侧档位向上调动一档;
b.当电压低侧所对应的主变高压侧电压偏下限时,所对应的主变高压侧档位向下调动一档;
c.重新进行潮流计算后,获取合环开关两侧的母线电压幅值和相角的变化量。
计算公式如下:
其中:
为本次调整后低压侧电压向量;
Uin-1为上一次动作后低压侧电压调整向量;
为本次调整后高压侧电压向量;
为上一次动作后高压侧电压调整向量。
在本实施例中,步骤S11中,按主变档位后母线电压幅值变动量从大到小依次进行操作,运用步骤S10中公式重新计算合环电流S12,并判断是否满足终止计算条件S6,如果满足,则终止计算S13。
显然,本发明的上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明权利要求的保护范围之内。

Claims (11)

1.一种降低配电网合环电流的方法,其特征在于,包括以下步骤:
S1,进行主配网模型拼接;
S2,对拼接后的模型进行状态评估;
S3,对容抗器分组并按容量排序;
S4,进行初始潮流计算;
S5,进行合环电流计算;
S6,判断是否满足终止计算条件,如果不满足终止条件,则继续进行下一步操作;
S7,判断是否有可投切的容抗器;
S8,按组别顺序逐个投切容抗器;
S9,重新进行潮流计算;
S10,进行合环电流计算,并判断是否终止计算;
S11,当无可投切的容抗器时,对主变档位进行操作,并重新进行潮流计算;
S12,进行合环电流计算,并判断是否终止计算;
S13,终止计算。
2.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S1中,所述的主配网模型拼接按照电网分级管理原则进行拼接,拼接的模型为节点-支路模型,主要分为以下三种类型的模型:
a.母线节点:把配电网中的开关站母线、变电站10kV母线均简化为母线节点;
b.支路:把电缆支路、架空线路当成支路;
c.绕组:把变压器当成绕组。
3.根据权利要求1所述的所述的一种降低配电网合环电流的方法,其特征在于,步骤S2中,对拼接后的模型进行状态估计,利用电力***状态估计问题的分块特征对量测雅可比矩阵进行分块,根据信息矩阵的分块稀疏结构进行列编号的优化,采用变转轴逐列消元策略,基于最小度原则动态选择转轴元素,根据非零注入元素最少的原则选择旋转元素。
4.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S3中,列出合环开关两侧的电容器、电抗器及变压器,对容抗器按容量大小分组排序,所述的排序为:高电压侧电容器、低电压侧电抗器、低电压侧电容器、高电压侧电抗器依次排序。
5.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S5中,如果开关合环电流超过开关保护限额,则继续下一步计算,否则停止合环计算,合环电流的计算等值为:
<mrow> <msub> <mi>I</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>o</mi> <mi>p</mi> <mo>_</mo> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>I</mi> <mrow> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>+</mo> <mi>k</mi> <mo>&amp;times;</mo> <mrow> <mo>(</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>i</mi> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>-</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>j</mi> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>)</mo> </mrow> </mrow>
其中:
Iloop_base为合环电流有效值;
Ibase为合环前两侧负荷差值所引起的环流;k为环路导纳;
为合环前高电压幅值一侧的电压向量;
为合环前低电压幅值一侧的电压向量。
6.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S6中,终止计算条件包括:
1.无可用的容抗器资源或主变资源;
2.合环电流小于保护限额。
7.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S8中,按照以下步骤投入容抗器:
a.首先对高电压一侧按容量大小顺序切除电容器;
b.当高电压较一侧无可切除的电容器时,在低电压一侧按容量大小顺序切除电抗器;
c.在低电压一侧投入电容器;
d.当低电压一侧无可投电容器之外,则在高电压一侧投入电抗器。
8.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S9中,在每次容抗器动作后,重新进行潮流计算,获取合环开关两侧的新幅值和相角的变化量;
计算公式如下:
<mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mrow> <mi>i</mi> <mi>m</mi> </mrow> </msub> <mo>=</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>i</mi> <mi>m</mi> </mrow> </msub> <mo>-</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>i</mi> <mi>m</mi> <mo>-</mo> <mn>1</mn> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mrow> <mi>j</mi> <mi>m</mi> </mrow> </msub> <mo>=</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>j</mi> <mi>m</mi> </mrow> </msub> <mo>-</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>j</mi> <mi>m</mi> <mo>-</mo> <mn>1</mn> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
其中:
为本次调整后低压侧电压向量;
Uim-1为上一次动作后低压侧电压调整向量;
为本次调整后高压侧电压向量;
为上一次动作后高压侧电压向量。
9.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S10中,对容抗器投切操作后母线电压幅值变动量按步骤S3中的组别分别进行排序并重新计算合环电流,直到满足终止计算条件,则停止计算;
计算公式为:
<mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>I</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>o</mi> <mi>p</mi> </mrow> </msub> <mo>&amp;le;</mo> <msub> <mi>I</mi> <mrow> <mi>L</mi> <mi>i</mi> <mi>m</mi> <mi>i</mi> <mi>t</mi> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mi>i</mi> </msub> <mo>=</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>i</mi> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <msub> <mi>&amp;Delta;U</mi> <mrow> <mi>i</mi> <mi>t</mi> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mi>j</mi> </msub> <mo>=</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>j</mi> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>m</mi> </munderover> <mrow> <msub> <mi>&amp;Delta;U</mi> <mrow> <mi>j</mi> <mi>t</mi> </mrow> </msub> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>I</mi> <mrow> <mi>l</mi> <mi>o</mi> <mi>o</mi> <mi>p</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>I</mi> <mrow> <mi>b</mi> <mi>a</mi> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>+</mo> <mi>k</mi> <mo>&amp;times;</mo> <mrow> <mo>(</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mi>i</mi> </msub> <mo>-</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mi>j</mi> </msub> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> </mfenced>
其中:
Iloop为合环电流;
ILimit为保护限额;
为投入或切除容抗器后的新的电压向量;
为累计动作后电压变动量;
当同一组别中动作完成后,才能进行下一组别动作。
10.根据权利要求1所述的一种降低配电网合环电流的方法,其特征在于,步骤S11中,对合环开关两侧的主变档位依次进行增加和减少操作,原则如下:
a.当电压较高一侧所对应的主变高压侧电压偏上限时,所对应的主变高压侧档位向上调动一档;
b.当电压低一侧所对应的主变高压侧电压偏下限时,所对应的主变高压侧档位向下调动一档;
c.重新进行潮流计算后,获取合环开关两侧的母线电压幅值和相角的变化量;
计算公式为:
<mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mrow> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>i</mi> <mi>n</mi> </mrow> </msub> <mo>-</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>i</mi> <mi>n</mi> <mo>-</mo> <mn>1</mn> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;U</mi> <mrow> <mi>j</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>j</mi> <mi>n</mi> </mrow> </msub> <mo>-</mo> <msub> <mover> <mi>U</mi> <mo>&amp;CenterDot;</mo> </mover> <mrow> <mi>j</mi> <mi>n</mi> <mo>-</mo> <mn>1</mn> </mrow> </msub> </mrow> </mtd> </mtr> </mtable> </mfenced>
其中:
为本次调整后低压侧电压向量;
Uin-1为上一次动作后低压侧电压调整向量;
为本次调整后高压侧电压向量;
为上一次动作后高压侧电压调整向量。
11.根据权利要求1-10任一项所述的一种降低配电网合环电流的方法,其特征在于,步骤S11中,按主变档位动作后母线电压幅值变动量从大到小依次进行操作,运用步骤S8中公式重新计算合环电流,直到满足终止计算条件。
CN201710870674.0A 2017-09-21 2017-09-21 一种降低配电网合环电流的方法 Active CN107623328B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710870674.0A CN107623328B (zh) 2017-09-21 2017-09-21 一种降低配电网合环电流的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710870674.0A CN107623328B (zh) 2017-09-21 2017-09-21 一种降低配电网合环电流的方法

Publications (2)

Publication Number Publication Date
CN107623328A true CN107623328A (zh) 2018-01-23
CN107623328B CN107623328B (zh) 2020-12-29

Family

ID=61090181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710870674.0A Active CN107623328B (zh) 2017-09-21 2017-09-21 一种降低配电网合环电流的方法

Country Status (1)

Country Link
CN (1) CN107623328B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149573A (zh) * 2018-09-26 2019-01-04 云南电网有限责任公司电力科学研究院 一种基于tcr调节的智能配电合环装置

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1571690A (en) * 1976-10-02 1980-07-16 Bbc Brown Boveri & Cie Computing circuit
CN101431255A (zh) * 2008-11-17 2009-05-13 国电南瑞科技股份有限公司 电力***合环操作风险分析方法
CN101860026A (zh) * 2010-05-28 2010-10-13 北京中恒博瑞数字电力科技有限公司 城市配网电磁合环倒电操作的分析方法
CN101908763A (zh) * 2010-07-23 2010-12-08 广东电网公司中山供电局 一种配网合环的控制方法
CN103280778A (zh) * 2013-04-19 2013-09-04 广东电网公司电力科学研究院 环网无冲击分合闸装置与环网断路器
CN103746374A (zh) * 2014-01-14 2014-04-23 国家电网公司 含多微网配电网的合环控制方法
CN105610156A (zh) * 2016-01-20 2016-05-25 国网浙江省电力公司杭州供电公司 一种多线路并发合环方法
WO2017000224A1 (en) * 2015-06-30 2017-01-05 Abb Technology Ltd Transformer-less static synchronous series compensator and protection method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1571690A (en) * 1976-10-02 1980-07-16 Bbc Brown Boveri & Cie Computing circuit
CN101431255A (zh) * 2008-11-17 2009-05-13 国电南瑞科技股份有限公司 电力***合环操作风险分析方法
CN101860026A (zh) * 2010-05-28 2010-10-13 北京中恒博瑞数字电力科技有限公司 城市配网电磁合环倒电操作的分析方法
CN101908763A (zh) * 2010-07-23 2010-12-08 广东电网公司中山供电局 一种配网合环的控制方法
CN103280778A (zh) * 2013-04-19 2013-09-04 广东电网公司电力科学研究院 环网无冲击分合闸装置与环网断路器
CN103746374A (zh) * 2014-01-14 2014-04-23 国家电网公司 含多微网配电网的合环控制方法
WO2017000224A1 (en) * 2015-06-30 2017-01-05 Abb Technology Ltd Transformer-less static synchronous series compensator and protection method thereof
CN105610156A (zh) * 2016-01-20 2016-05-25 国网浙江省电力公司杭州供电公司 一种多线路并发合环方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
NAOTAKA OKADA,ETC.: "LOOP POWER FLOW CONTROL AND VOLTAGE CHARACTERISTICS OF DISTRIBUTION SYSTEM FOR DISTRIBUTED GENERATION INCLUDING PV SYSTEM", 《3RD WORLD CONFERENCE ON PHOROVOLROIC ENERGV CONVERSION》 *
刘磊: "城市电网安全预警与保障决策支持***", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *
白晓昆: "配电网合环分析综述", 《电力科技》 *
蒋璧玉: "配电网合环运行电流分析及控制策略研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149573A (zh) * 2018-09-26 2019-01-04 云南电网有限责任公司电力科学研究院 一种基于tcr调节的智能配电合环装置

Also Published As

Publication number Publication date
CN107623328B (zh) 2020-12-29

Similar Documents

Publication Publication Date Title
Guo et al. Allocation of centrally switched fault current limiters enabled by 5G in transmission system
CN101860026B (zh) 城市配网电磁合环倒电操作的分析方法
US10283965B2 (en) Method for incorporating non-operating station into operating system in multi-terminal flexible DC transmission system
CN105048488B (zh) 一种柔性直流网络直流短路故障穿越方法
CN109659967A (zh) 含有电阻型超导限流器和直流断路器的换流站及其直流故障处理策略
CN104283235B (zh) 风力发电机组的变流器、变流器的控制方法及装置
Qin et al. Study on the development and reliability of HVDC transmission systems in China
CN108957245A (zh) 一种基于全故障电流的柔性直流配电网单极故障辨识方法
CN108400605A (zh) 一种具有智能监控功能的充电配电控制方法及***
CN105429137A (zh) 配网合环转供电的方法
CN112421570B (zh) 分级式可控并联电抗器零序差动阻抗匝间保护方法及装置
Thukaram et al. Optimal reactive power dispatch in a large power system with AC–DC and FACTS controllers
CN103647304B (zh) 一种有外部支援的电网黑启动子***并列方法
Liu et al. Protection of microgrids with high amounts of renewables: Challenges and solutions
Kuchanskyi et al. Modes of electrical systems and grids with renewable energy sources
Kolluri et al. Design and operating experience with fast acting load shedding scheme in the Entergy system to prevent voltage collapse
CN103618332A (zh) 一种cscc-hvdc***中可控电容的控制方法
CN104393602B (zh) 一种分布式能源网络的调节方法及装置
CN102868227A (zh) 中压配网环网倒闸操作方法
CN107623328A (zh) 一种降低配电网合环电流的方法
Robak et al. Transient stability enhancement by series braking resistor control using local measurements
CN103490408A (zh) 一种基于电网多回直流协同调制的方法
CN107785921B (zh) 基于柔性直流输电技术的城市电网分区互联运行调度方法
CN110071499A (zh) 一种快速判断配电网安全合环的方法和***
CN104967116A (zh) 一种多直流馈入受端电网的电磁环网开环方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant