CN107621415A - A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine - Google Patents

A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine Download PDF

Info

Publication number
CN107621415A
CN107621415A CN201710280075.3A CN201710280075A CN107621415A CN 107621415 A CN107621415 A CN 107621415A CN 201710280075 A CN201710280075 A CN 201710280075A CN 107621415 A CN107621415 A CN 107621415A
Authority
CN
China
Prior art keywords
pressure
water
waffle slab
true triaxial
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710280075.3A
Other languages
Chinese (zh)
Inventor
朱桂华
徐洪威
王建业
柳颖娇
朱天宏
洪小波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201710280075.3A priority Critical patent/CN107621415A/en
Publication of CN107621415A publication Critical patent/CN107621415A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention relates to a kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine, including back-shaped frame system, hydraulic loaded and pressure-retaining system, control system, pressure water system, Equipment Foundations system and model disassembly system, its feature to be:Back-shaped frame system is all-sealed structure, can carry out the face three-dimensional loading of true triaxial five, it is possible to provide be higher thanModel surface stress, the pressurize of long-time high pressure can be achieved and can carry out rich water pressurize experiment.The present invention is applied to the multinomial scientific research in mine deep part tunnel, and the interactional simulated tests such as underground passage engineering excavation, supporting, driving, gushing water and highland pressure can be achieved, have it is compact-sized, simple, it is easy to operate, the advantages of environmental protection and energy saving.

Description

A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine
Technical field
Patent of the present invention be applied to mine deep tunnel multinomial scientific research, realize underground passage engineering excavation, supporting, The interactional model tests such as driving, gushing water and highland pressure.
Background technology
Underground mining is the main path in mineral resources source, in the exploitation of long-term big intensity, the storage of superficial part mineral resources Amount gradually decreases, and the well depth of exploitation is increasing.With the increase of mining mining depth, highland pressure and high hydraulic pressure mine kata-rocks It is more and more that disaster occurs for body tunnel.Under large ground pressure, structure, mechanical characteristic and the engineering response of deep surrounding rock of chamber There are a series of new features and phenomenon, it has also become rock-soil mechanics and the hot issue of engineering field research.Model test has There is its unique superiority, at home and abroad ground is used widely with mining engineering circle, is turned into and is carried out underground engineering research Necessary means.
Existing relevant device and system have the following disadvantages:There is no hermetically sealed true triaxial loading system, without can The pressure water system of the high hydraulic pressure in deep is simulated, without enough on-load pressures, and without prolonged pressure holding effect so that simulation In the case of force-bearing of surrounding rock mass situation and truth it is widely different, infiltration, gushing water and water burst under reality etc. can not be simulated Rich water is tested.
The content of the invention
Patent of the present invention aims to overcome that insufficient existing for existing geomechanical model test machine, there is provided a kind of true triaxial Multifunctional large-scale Deep Mine Roadway model testing machine;Using all-sealed back-shaped frame system, the face three of true triaxial five can be carried out To loading, it is possible to provide be higher thanModel surface stress, long-time high pressure pressurize can be achieved, rich water experiment can be carried out.
The technical scheme that patent of the present invention uses is:This model test machine includes back-shaped frame system, hydraulic loaded and guarantor Pressure system, pressure water system, Equipment Foundations system, model disassembly system and control system.It is characterized in that:(1)It is described back-shaped Frame system includes three-back-shaped main frame, preceding waffle slab, rear waffle slab and anti-interference frame;The anti-interference frame is welded by 8 square columns Composition is connect, including 4 circumferential 4 square columns, longitudinal direction square columns, for preventing adjacent load plate while interfering when loading;Institute 4 square columns in longitudinal direction are stated, middle part passes through the three-back-shaped main frame, and front end is screw rod, for connecting the forward and backward waffle slab, is held By fore-and-aft direction model counter-force;Waffle slab is provided with the gusset being distributed along surrounding, and the rib and the three-back-shaped master after described Framework and 4 square column welding of the circumference are integral;The three-back-shaped main frame, the preceding waffle slab and the rear waffle slab Form model test cavity;The preceding waffle slab centre is reserved with basic peep hole, with three-level flange end of different sizes Lid combination, which is assembled on the basic peep hole, obtains the various sizes of peep hole of three-level, realizes under three kinds of sizes to experiment Excavation, monitoring and the observation of model;The installation screw interlaced arrangement of three-level flange end cap of different sizes, realizes described group Attach together and match somebody with somebody;(2)The hydraulic loaded includes load plate, hydraulic actuator, fluid pressure line, hydraulic valve, hydraulic pressure with pressure-retaining system Pump, accumulator and fuel tank;Upper and lower, left and right grid beam column of the hydraulic actuator mosaic arrangements in the three-back-shaped main frame After interior and described in waffle slab grid, the true triaxial loading of five face three-dimensionals is realized;The hydraulic actuator oil inlet and outlet is unified The hydraulic actuator afterbody is arranged in, fluid pressure line is connected outside equipment so that dismounting is simple, and maintenance is convenient;The liquid Pressure loading can realize the Arbitrary Gradient surface pressing simultaneously or independently loaded under deep rock thrust stress with pressure-retaining system;It is described any Gradient surface pressure and dwell time are controlled by the control system;The hydraulic pump is divided into high-power main pump and small-power repairing Pump, the high-power main pump and the small-power slippage pump coordinate the accumulator effect, realize long-time, high accuracy, pressure Self compensation pressurize, and pressure maintaining period energy consumption is low;(3)The pressure water system(Utility model is separately applied for)Including water under high pressure Pump, water valve, water pipe, water tank and seal;The seal is arranged on the peace for connecting the model cavity and extraneous each part Dress face, hermetically sealed cavity is formed, the press water for providing the high-pressure hydraulic pump carries out pressurize;The high-pressure hydraulic pump is multistage Centrifugal high pressure water pump, it is possible to provide the water under high pressure under deep rock thrust stress, for the hermetically sealed cavity water filling, being seeped water, The rich water such as gushing water and water burst is tested;The water valve is electric proportional valve, can be precisely controlled hydraulic pressure;(4)The Equipment Foundations system is set Set sink, the Equipment Foundations system are provided with tank, and the tank makes water flow back, and recirculation water reuses after precipitation, enters And realize energy-saving;(5)The model disassembly system includes flat car, track, running gear, a lid oil cylinder and discharging oil Cylinder;Described lid oil cylinder, it is divided into left and right two, mosaic arrangements are in the preceding waffle slab both sides, when experiment finishes, grid before release After connection between plate and back-shaped framework, play lid cylinder piston rod and stretch out, waffle slab and back-shaped framework apart, are realized certainly before promotion Lid is moved.The unloading fuel tank is upper and lower two big stroke oil cylinders, and mosaic arrangements are in the rear on waffle slab, after experiment, Model sample is pushed out on the flat car by the unloading fuel tank from the hermetically sealed cavity, realizes automatic discharging;The rail Road includes cross track and long rails;The running gear includes preceding waffle slab running gear and flat car running gear, by Electrical motor driven, the preceding waffle slab is walked on the long rails, make the flat car in the long rails and Walked on the cross track, realize automatic transport;(6)The control system is applied to the excitation of subjects when can be experiment The real-time formation curve of the response signal of signal and subjects.
Brief description of the drawings
Patent of the present invention is further illustrated below in conjunction with the accompanying drawings.
Accompanying drawing 1 is patent main part structural representation of the present invention.
Accompanying drawing 2 is patent hydraulic actuator and push pedal scheme of installation of the present invention(Left view, axis are half-sectional).
Accompanying drawing 3 is patent anti-interference mount structure schematic diagram of the present invention.
Accompanying drawing 4 is patent three-level peep hole schematic diagram of the present invention.
In figure:Waffle slab after 1., 2. three-back-shaped main frames, waffle slab before 3., 4. hydraulic actuators, 5. circumferential push pedals, 6. Anti-interference frame, circumferential four square columns of 6-1,6-2,6-3,6-4. longitudinal direction four square column 6-5,6-6,6-7,6-8., 7. flat cars, 8. Flat car running gear, 9. long rails, 10. cross tracks, waffle slab mounting hole before 11., 12. lid oil cylinders, 13. bases are seen Examine hole, 13-1. one-levels observation flange, 13-2. two levels observation flange, 13-3. three-levels observation flange, waffle slab walking dress before 14. Put, 15. unloading fuel tanks, 16. deep floors, 17. discharging push pedals.
Embodiment
Referring to the drawings 1-3:(1)Afterwards hydraulic actuation is inlaid with waffle slab 1 and on four faces of three-back-shaped main frame 2 Device 4, and there is mouth to be uniformly arranged in outside, wherein the movable end of the hydraulic actuator 4 on three-back-shaped main frame 2 and circumferential push pedal 5 It is connected;(2)Two unloading fuel tanks 15 up and down are inlaid with waffle slab 1 afterwards, the movable end of unloading fuel tank 15 is connected with discharging push pedal 17; (3)Longitudinal direction four square columns 6-1,6-2,6-3,6-4 of anti-interference frame 6 pass through three-back-shaped main frame 2, and its contact surface is welded and fixed, Circumferential four square columns 6-5,6-6,6-7,6-8 of anti-interference frame 6 are welded and fixed with rear waffle slab 1;(4)Deep floor 16 and rear net Panel 1, three-back-shaped main frame 2 are welded and fixed;(5)Circumferential push pedal 5, can be along anti-interference frame 6 in the presence of hydraulic actuator 4 Guide direction motion;(6)Waffle slab running gear 14, can be moved along long rails 9 before the lower end of preceding waffle slab 3 is provided with; (7)The lower end of flat car 7 is provided with flat car running gear 8, can be moved along long rails 9 and cross track 10;(8)Preceding net 4 preceding waffle slab mounting holes 11 and basic peep hole 13 are provided with panel 3;(9)Left and right two is disposed with preceding waffle slab Play lid oil cylinder 12;Referring to the drawings 4:(10)One-level observation flange 13-1, two level observation flange 13-2, three-level observe flange 13-3's Installation screw interlaced arrangement, one-level are installed based on observing basic peep holes 13 of the flange 13-1 in the past on waffle slab 3, and two level is seen Examine flange 13-2 to install based on one-level observation flange 13-1, three-level observes flange 13-3 and observes flange 13-2 as base using two level Plinth is installed.
Its work process is as follows
Step 1:Make device in running order, reset all hydraulic actuator, grid board mounting assembly before unloading, play lid oil Cylinder piston rod stretches out, waffle slab and back-shaped framework apart, waffle slab running gear before driving before promotion, and waffle slab is remote before making returns Font main frame;
Step 2:Test material and related sensor are placed in simulation test machine and be compacted;
Step 3:Waffle slab running gear before driving, preceding waffle slab is moved to working face and press close to three-back-shaped main frame, make anti-dry The front end screw rod for relating to four square columns in longitudinal direction of frame passes through preceding waffle slab mounting hole, waffle slab before installation;
Step 4:Model is loaded, monitored, gathers test data;
Step 5:Repeat step 1, flat car running gear is driven, before causing it to move to three-back-shaped main frame, enables unloading fuel tank, Unloading fuel tank piston rod is stretched out, and model is pushed out on flat car out of die cavity;
Step 6:Flat car running gear is driven, flat car is moved to cross track;
Step 7:Repeat step 3.

Claims (8)

1. a kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine, including back-shaped frame system, hydraulic loaded with Pressure-retaining system, pressure water system, Equipment Foundations system, model disassembly system and control system.
2. true triaxial multifunctional large-scale Deep Mine Roadway model testing machine according to claim 1, it is characterised in that described Back-shaped frame system includes three-back-shaped main frame, preceding waffle slab, rear waffle slab and anti-interference frame;The anti-interference frame is by 8 sides Post is welded to form, including 4 circumferential 4 square columns, longitudinal direction square columns, for preventing adjacent load plate while mutually doing when loading Relate to;Described 4 square columns in longitudinal direction, middle part pass through the three-back-shaped main frame, and front end is screw rod, for connecting the forward and backward grid Plate, bear fore-and-aft direction model counter-force;Waffle slab surrounding gusset and the three-back-shaped main frame and the circumference 4 after described Square column welding is integral;The three-back-shaped main frame, the preceding waffle slab and the rear waffle slab form the experiment of the model Cavity;The preceding waffle slab centre is reserved with basic peep hole, is assembled to three-level flange end cap combination of different sizes The various sizes of peep hole of three-level is obtained on the basic peep hole, realize excavation under three kinds of sizes to test model, Monitoring and observation;The installation screw interlaced arrangement of three-level flange end cap of different sizes, realize the combination assembling.
3. true triaxial multifunctional large-scale Deep Mine Roadway model testing machine according to claim 1, it is characterised in that described Hydraulic loaded includes load plate, hydraulic actuator, fluid pressure line, hydraulic valve, hydraulic pump, accumulator and oil with pressure-retaining system Case;The hydraulic actuator mosaic arrangements in the upper and lower, left and right grid beam column of the three-back-shaped main frame and it is described after In waffle slab grid, the true triaxial loading of five face three-dimensionals is realized;The hydraulic actuator oil inlet and outlet is uniformly arranged in the liquid Actuator afterbody is pressed, fluid pressure line is connected outside equipment so that dismounting is simple, and maintenance is convenient;The hydraulic loaded and pressurize System can realize the Arbitrary Gradient surface pressing simultaneously or independently loaded under deep rock thrust stress;The Arbitrary Gradient surface pressing Controlled with the dwell time by the control system;The hydraulic pump is divided into high-power main pump and small-power slippage pump, the big work( Rate main pump and the small-power slippage pump coordinate the accumulator effect, realize long-time, high accuracy, pressure autocompensation pressurize, And pressure maintaining period energy consumption is low.
4. true triaxial multifunctional large-scale Deep Mine Roadway model testing machine according to claim 1, it is characterised in that described Pressure water system includes high-pressure hydraulic pump, water valve, water pipe, water tank and seal;The seal is arranged on the connection Model Space The mounting surface of chamber and extraneous each part, forms hermetically sealed cavity, the press water for providing the high-pressure hydraulic pump is protected Pressure;The high-pressure hydraulic pump is multistage pressure centrifugal water pump, it is possible to provide the water under high pressure under deep rock thrust stress, for described complete close Cavity water filling is sealed, is seeped water, the experiment of the rich water such as gushing water, water burst;The water valve is electric proportional valve, can be precisely controlled hydraulic pressure.
5. true triaxial multifunctional large-scale Deep Mine Roadway model testing machine according to claim 1, it is characterised in that described Equipment Foundations system is provided with tank, and the tank makes water flow back, and recirculation water reuses after precipitation, and then realizes energy-conservation drop Consumption.
6. true triaxial multifunctional large-scale Deep Mine Roadway model testing machine according to claim 1, it is characterised in that described Model disassembly system includes flat car, track, running gear, lid oil cylinder and unloading fuel tank;Described lid oil cylinder, it is divided into left and right Two, mosaic arrangements are in the preceding waffle slab both sides, when experiment finishes, the connection before release between waffle slab and back-shaped framework Afterwards, the stretching of lid cylinder piston rod is played, waffle slab and back-shaped framework apart before promotion, realizes automatic lid.
7. the unloading fuel tank is upper and lower two big stroke oil cylinders, mosaic arrangements are in the rear on waffle slab, the unloading fuel tank For upper and lower two big stroke oil cylinders, mosaic arrangements are in the rear on waffle slab, and after experiment, the unloading fuel tank tries model Sample is pushed out on the flat car from the hermetically sealed cavity, realizes automatic discharging;The track includes cross track and longitudinal direction Track;The running gear includes preceding waffle slab running gear and flat car running gear, by electrical motor driven, make it is described before Waffle slab is walked on the long rails, the flat car is walked on the long rails and the cross track, real Existing automatic transport.
8. true triaxial multifunctional large-scale Deep Mine Roadway model testing machine according to claim 1, it is characterised in that described Control system is applied to the response signal real-time formation curve of the pumping signal and subjects of subjects when can be experiment.
CN201710280075.3A 2017-04-26 2017-04-26 A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine Pending CN107621415A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710280075.3A CN107621415A (en) 2017-04-26 2017-04-26 A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710280075.3A CN107621415A (en) 2017-04-26 2017-04-26 A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine

Publications (1)

Publication Number Publication Date
CN107621415A true CN107621415A (en) 2018-01-23

Family

ID=61086777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710280075.3A Pending CN107621415A (en) 2017-04-26 2017-04-26 A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine

Country Status (1)

Country Link
CN (1) CN107621415A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110132733A (en) * 2019-06-10 2019-08-16 中国科学院武汉岩土力学研究所 A kind of three-dimensional high stress hydraulic fracturing physical simulation experiment system of real time imagery
CN110346216A (en) * 2019-06-20 2019-10-18 太原理工大学 Three axis load testing machine of coal and rock and method in the case of a kind of simulation driving disturbance
CN112595480A (en) * 2020-12-07 2021-04-02 中国矿业大学 Roadway hydraulic energy-absorbing support analog simulation experiment device
CN114992187A (en) * 2022-08-03 2022-09-02 中国矿业大学(北京) Multifunctional balanced loading device and method for model test

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201081084Y (en) * 2007-07-17 2008-07-02 中国国际海运集装箱(集团)股份有限公司 Container straining intensifying system
CN102446447A (en) * 2011-08-30 2012-05-09 中国矿业大学(北京) Three-dimensional model testing system of deep mine construction engineering
CN203101030U (en) * 2012-10-12 2013-07-31 朱桂华 Multi-hydraulic cylinder combined large-sized hydraulic testing machine
CN103398861A (en) * 2013-08-05 2013-11-20 中国科学院武汉岩土力学研究所 Physical simulation test system for true triaxial rockburst of deep-buried tunnel
CN106226502A (en) * 2016-09-19 2016-12-14 山东大学 Deep high-ground stress coal and rock dynamic disaster and displacement simulation pilot system and method
CN207263548U (en) * 2017-04-26 2018-04-20 中南大学 A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201081084Y (en) * 2007-07-17 2008-07-02 中国国际海运集装箱(集团)股份有限公司 Container straining intensifying system
CN102446447A (en) * 2011-08-30 2012-05-09 中国矿业大学(北京) Three-dimensional model testing system of deep mine construction engineering
CN203101030U (en) * 2012-10-12 2013-07-31 朱桂华 Multi-hydraulic cylinder combined large-sized hydraulic testing machine
CN103398861A (en) * 2013-08-05 2013-11-20 中国科学院武汉岩土力学研究所 Physical simulation test system for true triaxial rockburst of deep-buried tunnel
CN106226502A (en) * 2016-09-19 2016-12-14 山东大学 Deep high-ground stress coal and rock dynamic disaster and displacement simulation pilot system and method
CN207263548U (en) * 2017-04-26 2018-04-20 中南大学 A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110132733A (en) * 2019-06-10 2019-08-16 中国科学院武汉岩土力学研究所 A kind of three-dimensional high stress hydraulic fracturing physical simulation experiment system of real time imagery
CN110346216A (en) * 2019-06-20 2019-10-18 太原理工大学 Three axis load testing machine of coal and rock and method in the case of a kind of simulation driving disturbance
CN110346216B (en) * 2019-06-20 2022-01-14 太原理工大学 Coal rock triaxial loading test device and method under condition of simulated tunneling disturbance
CN112595480A (en) * 2020-12-07 2021-04-02 中国矿业大学 Roadway hydraulic energy-absorbing support analog simulation experiment device
CN112595480B (en) * 2020-12-07 2021-08-24 中国矿业大学 Roadway hydraulic energy-absorbing support analog simulation experiment device
CN114992187A (en) * 2022-08-03 2022-09-02 中国矿业大学(北京) Multifunctional balanced loading device and method for model test
CN114992187B (en) * 2022-08-03 2022-11-01 中国矿业大学(北京) Multifunctional balanced loading device and method for model test

Similar Documents

Publication Publication Date Title
CN107621415A (en) A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine
CN103398902B (en) Test apparatus for flexible loading and instantaneously unloading of high geostress, and test method
CN100390357C (en) Analogue experiment stand for interreaction of tunnel structure, surrounding rock and underground water
CN109386270B (en) Coal rock stratum gas power permeability-increasing seepage and displacement simulation test system and test method
CN109269910B (en) Triaxial freeze thawing test device for piles and anchor rods
CN105628501B (en) True triaxial hydrofracturing rock mechanics testing system
CN104535728A (en) Two-dimensional physical simulation test system and method for water inrush disaster of deep-buried tunnel
CN202210098U (en) Dynamic/dead load-seepage coupling test device for rich-water cracking rock mass
CN104713738B (en) Intelligent two-way multi-angle overturn model test device and test method
CN106644836A (en) Visual fracturing grouting model testing device and testing method thereof
CN106980014A (en) Simulate concrete for hydraulic structure corrosion deterioration test device and method under high hydraulic gradient
CN108362631A (en) Anchor pole or anchor cable corrosion resistance experimental rig and its test method
CN103792104A (en) Tunnel analog loading experimental platform
CN106680467B (en) A kind of buried stratum high-pressure slip-casting simulation test device and test method
CN105548506A (en) Simulation testing device for testing system for simulating water inrush at coal seam floor under treading influence
CN104897425A (en) Plane strain tunnel surrounding rock model loading observation system and measurement method thereof
CN207263548U (en) A kind of true triaxial multifunctional large-scale Deep Mine Roadway model testing machine
CN106018732A (en) Quick releasing device for gas dynamic disaster simulator stand and testing method thereof
CN205538273U (en) A indoor test device for simulating deep tunnel excavation
CN204359770U (en) Deep tunnel water bursting disaster two-dimensional physical simulation experiment system
CN205176021U (en) Tunnelling simulation modeling experiment device
CN105628526B (en) Dynamic loading hydraulic fracturing rock mechanical test system
CN205538894U (en) A testing system for simulating it influences floor of coal seam gushing water to be adopted
CN106769506B (en) Similarity simulation experiment platform and Effects of Supporting experimental test procedures
CN205538895U (en) Adopted floor of coal seam gushing water analogue test system that influences

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination