CN107617332A - Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field - Google Patents

Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field Download PDF

Info

Publication number
CN107617332A
CN107617332A CN201710821866.2A CN201710821866A CN107617332A CN 107617332 A CN107617332 A CN 107617332A CN 201710821866 A CN201710821866 A CN 201710821866A CN 107617332 A CN107617332 A CN 107617332A
Authority
CN
China
Prior art keywords
gas pass
vertical gas
scr inlet
flue
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710821866.2A
Other languages
Chinese (zh)
Inventor
李玉贵
任衍辉
董鸿业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Northeast Electric Power Test and Research Institute Co Ltd
Original Assignee
Datang Northeast Electric Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Northeast Electric Power Test and Research Institute Co Ltd filed Critical Datang Northeast Electric Power Test and Research Institute Co Ltd
Priority to CN201710821866.2A priority Critical patent/CN107617332A/en
Publication of CN107617332A publication Critical patent/CN107617332A/en
Pending legal-status Critical Current

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field the present invention relates to a kind of, the system includes:The turbulent baffle being hinged on the walling of flue of SCR inlet vertical gas pass, the turbulent baffle jointed crank connecting rod mechanism, the anglec of rotation of turbulent baffle is controlled by the crank connecting, the turbulent baffle rotates between 0 ° to 90 °, the flow-disturbing flow-stopping plate is under 0 ° of state, the walling of flue that the turbulent baffle is bonded the SCR inlet vertical gas pass is set, and the facing walling of flue of the SCR inlet vertical gas pass is provided with the temperature sensor for being used for obtaining the flue gas passed through in flue.

Description

Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field
Technical field
Solves the vertical gas pass turbulent baffle that SCR inlet temperature flow field is uneven after gas bypass is transformed the present invention relates to a kind of Technology.
Background technology
Thermal power generation unit uses SCR denitration technology at present, and nucleus equipment is vanadium Ti-base catalyst, the work in catalyst Property composition is V2O5.Catalyst typically allows running temperature section at 300~420 DEG C, when flue-gas temperature is less than 300 DEG C, takes off The ammonia of nitre entrance can generate sulfate of ammoniac and hydrogen sulfate ammonia (commonly referred to as ABS) with the SO3 reactions in flue gas, in certain temperature region In the range of, ABS is that liquid easily penetrates into denitrating catalyst capillary micropore, hinders NH3 and NO in flue gas to be diffused into catalyst activity Grain surface carries out reduction reaction, causes catalyst activity to reduce or fail, causes catalyst poisoning, leads to for this equipment for denitrifying flue gas Standing fixed minimum continuous spray ammonia temperature MOT, the temperature are usually set to 300 DEG C or so.When SCR inlet flue-gas temperature is less than 300 DEG C, it is necessary to stop spray ammonia (or spraying ammonia in short term).
Because the boiler gone into operation before 2008 does not design denitrification apparatus substantially, thus most boilers there is The problem of economizer exit cigarette temperature is less than 300 DEG C during 50%-70% loads;In addition by recent years, fired power generating unit is averagely using small When the influence that declines, fired power generating unit rate of load condensate reduces year by year, in indivedual periods power scheduling require that unit maintains 50% load Operation, former boiler of the design with denitrification apparatus is set the problem of SCR inlet flue-gas temperature is low during underload also occur;
National Energy Board 2016 continuously holds a meeting and sent the documents at the beginning of the year, proposes clearly to carrying out thermoelectricity flexibility transformation Ask, China implements the flexibility transformation of 2.2 hundred million kilowatts of coal units during plan " 13 ", unit is possessed depth peak regulation Power, and further increase load -response-speed, part of generating units possesses rapid starting/stopping peak modulation capacity.Lifting flexibility transformation is expected will Thermoelectricity unit is set to increase the peak modulation capacity of 20% rated capacity, minimum technology, which is contributed, reaches 40%~50% rated capacity;Pure condensate Unit increases the peak modulation capacity of 15%~20% rated capacity, and minimum technology, which is contributed, reaches 30%~35% rated capacity.
Under the forcing of above-mentioned situation, power plant takes boiler to meet that unit is less than 50% load and following operation Tail flue gas bypass flue renovation technique, the method that the high-temperature flue gas by extracting anterior flue mixes with low-temperature flue gas, improve SCR inlet flue-gas temperature, meet that denitrification apparatus puts into temperature requirements during underload.
In view of the defects of above-mentioned, the design people is actively subject to research and innovation, to design a kind of solution SCR inlet temperature stream The uneven vertical gas pass flow-disturbing system in field, make it with more the value in industry.
The content of the invention
To solve above-mentioned technology, safety problem, it is an object of the invention to provide a kind of laminar condition for being sufficiently destroyed flue gas, Flue gas is sufficiently mixed, flue gas bulk temperature is reached unanimity, the solution SCR for thoroughly eliminating temperature flow field deviation enters The uneven vertical gas pass flow-disturbing system and method in mouth temperature flow field.
The present invention solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, including:SCR inlet is hinged on to hang down Turbulent baffle on the walling of flue of straight flue, the turbulent baffle jointed crank connecting rod mechanism, passes through the crank connecting The anglec of rotation of turbulent baffle is controlled, the turbulent baffle rotates between 0 ° to 90 °, and the flow-disturbing flow-stopping plate is in 0 ° of state Under, the walling of flue that the turbulent baffle is bonded the SCR inlet vertical gas pass is set, and the SCR inlet vertical gas pass is facing Walling of flue be provided with the temperature sensor for being used for obtaining the flue gas passed through in flue.
Further, the length direction using the length direction of SCR inlet vertical gas pass as the turbulent baffle, the flow-disturbing The length of baffle plate is not less than the 1/2 of SCR inlet vertical gas pass, and the length of the turbulent baffle is not more than the vertical cigarette of SCR inlet The 2/3 of road.
Further, the bottom of the turbulent baffle is provided with some ash discharges, and the center spacing of two neighboring ash discharging hole is 1.0 To 1.5mm.
Further, described ash discharging hole is rectangle, circle or diamond structure.
Further, one end of the crank connecting is connected with the turbulent baffle, and the crank connects machine The other end of structure is connected with reductor, and the reductor is driven by motor.
Further, when the angle between the walling of flue of SCR inlet vertical gas pass of the turbulent baffle is in more than 0 °, The opening upwards of the turbulent baffle.
Further, the push rod of the crank connecting is connected with the turbulent baffle, and the end of the push rod is provided with Perforation, the reinforcing plate are provided with two installed parts, and each installed part is provided with pin shaft hole, and the push rod is arranged on two installed parts Between, bearing pin is rotatably connected to one through described perforation, pin shaft hole, the push rod by bearing pin and the turbulent baffle Rise.
Further, the position that the turbulent baffle is connected with the push rod is provided with reinforcing plate, and the installed part is set In the reinforcing plate.
Further, the push rod is cylindrical-shaped structure, and the walling of flue of the SCR inlet vertical gas pass is provided with pipe, The push rod passes through the pipe.
The present invention solves the uneven vertical gas pass flow-disturbing method in SCR inlet temperature flow field, including above-mentioned solution SCR inlet The uneven vertical gas pass flow-disturbing system in temperature flow field, methods described specifically include:
Two temperature sensors detect that the out of stock mouth entrance vertical gas pass both sides cigarette temperature difference more than when reaching 10 DEG C, passes through drive Dynamic motor and reductor drive push rod, and turbulent baffle is headed into SCR inlet vertical gas pass, makes turbulent baffle and vertical gas pass shape Angled α, α are more than 0 °, and the length headed into according to vertical flue both sides gas temperature windage value adjustment push rod in stove, and flue gas is by disturbing When flowing baffle plate, half side mixed flue gas flow direction is forced to change before flue, fully disturbs and mixes with the flue gas of rear side, laminar flow boundary Area is entirely destroyed, and smoke-filling movement reaches unanimity, and eliminates flue-gas temperature deviation.
By such scheme, the present invention, which solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, at least to be had Advantages below:
Turbulent baffle can effectively change flue gas flow direction on front side of SCR inlet flue, flue gas is fully disturbed and is mixed, thoroughly disappear Except the flue-gas temperature deviation brought due to laminar flow boundary layer.
Push rod can be driven by motor and reductor, can flexibly be adjusted according to the size of the vertical flue both sides cigarette temperature difference Whole turbulent baffle angle, reach the purpose for eliminating gas temperature windage.
When gas bypass is out of service and during smokeless temperature deviation, push rod is 9. withdrawn by motor and reductor, Turbulent baffle is stowed away, and one is formed with former flue.
Ash discharging hole is designed in turbulent baffle bottom, the problem of effectively prevent dust stratification in baffle plate and flue wall angle.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is that back-end ductwork bypass transformation of the present invention and flue gas mix, flow pattern schematic figure;
Fig. 2 is the schematic diagram that the present invention solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field;
Fig. 3 is that the present invention solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field and flue gas mixing, flowing shape Body is illustrated;
Fig. 4 is that the part for the embodiment 1 that the present invention solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field is shown It is intended to;
Fig. 5 is that the part for the embodiment 2 that the present invention solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field is shown It is intended to;
Fig. 6 is the structure for the turbulent baffle that the present invention solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field Schematic diagram;
In figure:Flue gas back-end ductwork 1;Out of stock body flue 2;Gas bypass 3;Gas bypass controllable register 4;Gas bypass Turn off baffle plate 5;Economizer flue collector adjustable plate 6;Ammonia injector 7;SCR inlet vertical gas pass 8;Decelerator 9;Turbulent baffle 10;Push rod 11.
Embodiment
With reference to the accompanying drawings and examples, the embodiment of the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Embodiment 1
As shown in Figures 1 to 4, the present embodiment solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, including: The turbulent baffle being hinged on the walling of flue of SCR inlet vertical gas pass, the turbulent baffle jointed crank connecting rod mechanism, passes through institute The anglec of rotation of crank connecting control turbulent baffle is stated, the turbulent baffle rotates between 0 ° to 90 °, the flow-disturbing gear Flowing plate is under 0 ° of state, and the walling of flue that the turbulent baffle is bonded the SCR inlet vertical gas pass is set, and the SCR inlet hangs down The facing walling of flue of straight flue is provided with the temperature sensor for being used for obtaining the flue gas passed through in flue.
In the present embodiment, the angle between the walling of flue of SCR inlet vertical gas pass of the turbulent baffle is in be more than 0 ° When, the opening upwards of the turbulent baffle.Length side using the length direction of SCR inlet vertical gas pass as the turbulent baffle To the length of the turbulent baffle is not less than the 1/2 of SCR inlet vertical gas pass, and the length of the turbulent baffle is not more than SCR The 2/3 of entrance vertical gas pass.
The push rod of the crank connecting is connected with the turbulent baffle, and the end of the push rod is provided with perforation, described Reinforcing plate is provided with two installed parts, and each installed part is provided with pin shaft hole, and the push rod is arranged between two installed parts, bearing pin Through described perforation, pin shaft hole, together with the push rod is rotatably connected by bearing pin with the turbulent baffle.
Further, one end of the crank connecting is connected with the turbulent baffle, and the crank connects machine The other end of structure is connected with reductor, and the reductor is driven by motor.
The present embodiment solves the operation principle of the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field:By flue gas After road 3 is put into, during the front and rear sides cigarette temperature difference of SCR inlet vertical gas pass 8 larger (reaching 10 DEG C), to the safety of denitration agent Operation forms certain threat, now drives push rod 11 by motor and reductor 9, turbulent baffle 10 is headed into SCR and entered In mouth vertical gas pass 8, turbulent baffle 10 is set to form certain angle [alpha], 0 ° of α > with vertical gas pass.
After gas bypass 3 is put into, bypass flue gas and the top flue gas forming layer stream of flue collector 1, and along the vertical cigarette of SCR inlet The front side flow of road 8, and the flue gas of the bottom of flue collector 1 flows after turning to along the rear side of SCR inlet vertical gas pass 8.
When flue gas passes through turbulent baffle 10, half side mixed flue gas flow direction is forced to change before flue, is filled with the flue gas of rear side Divide and disturb and mix, laminar flow watershed area is entirely destroyed, and smoke-filling movement reaches unanimity, and eliminates flue-gas temperature deviation.
Embodiment 2
As shown in FIG. 5 and 6, the present embodiment solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, is implementing On the basis of example 1, the bottom of the turbulent baffle is provided with some ash discharges, the center spacing of two neighboring ash discharging hole for 1.0 to 1.5mm.To prevent dust stratification between turbulent baffle and flue wall, wall can not be adjacent to when withdrawing by influenceing turbulent baffle, in baffle plate The separated some baffle plate ash discharging holes in top.When having dust stratification in angle between baffle plate and flue, dust stratification can be discharged by ash discharging hole. In the present embodiment, described ash discharging hole is rectangle, circle or diamond structure.
In the various embodiments described above, the position that the turbulent baffle is connected with the push rod is provided with reinforcing plate, the installation Part is arranged in the reinforcing plate.
In the various embodiments described above, the push rod is cylindrical-shaped structure, and the walling of flue of the SCR inlet vertical gas pass is provided with Pipe, the push rod pass through the pipe.
Embodiment 3
The present embodiment solves the uneven vertical gas pass flow-disturbing method in SCR inlet temperature flow field, including above-described embodiment 1 or 2 Described solves the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, and methods described specifically includes:
Two temperature sensors detect that the out of stock mouth entrance vertical gas pass both sides cigarette temperature difference more than when reaching 10 DEG C, passes through drive Dynamic motor and reductor drive push rod, and turbulent baffle is headed into SCR inlet vertical gas pass, makes turbulent baffle and vertical gas pass shape Angled α, α are more than 0 °, and the length headed into according to vertical flue both sides gas temperature windage value adjustment push rod in stove, and flue gas is by disturbing When flowing baffle plate, half side mixed flue gas flow direction is forced to change before flue, fully disturbs and mixes with the flue gas of rear side, laminar flow boundary Area is entirely destroyed, and smoke-filling movement reaches unanimity, and eliminates flue-gas temperature deviation.
Described above is only the preferred embodiment of the present invention, is not intended to limit the invention, it is noted that for this skill For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is some improvement and Modification, these improvement and modification also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, it is characterised in that including:It is hinged on SCR Turbulent baffle on the walling of flue of entrance vertical gas pass, the turbulent baffle jointed crank connecting rod mechanism, is connected by the crank Connection mechanism controls the anglec of rotation of turbulent baffle, and the turbulent baffle rotates between 0 ° to 90 °, and the flow-disturbing flow-stopping plate is at 0 ° Under state, the walling of flue that the turbulent baffle is bonded the SCR inlet vertical gas pass is set, the SCR inlet vertical gas pass phase The walling of flue faced is provided with the temperature sensor for being used for obtaining the flue gas passed through in flue.
2. according to claim 1 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists It is not small in, the length direction using the length direction of SCR inlet vertical gas pass as the turbulent baffle, the length of the turbulent baffle In the 1/2 of SCR inlet vertical gas pass, and the length of the turbulent baffle is not more than the 2/3 of SCR inlet vertical gas pass.
3. according to claim 1 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In the bottom of the turbulent baffle is provided with some ash discharges, and the center spacing of two neighboring ash discharging hole is 1.0 to 1.5mm.
4. according to claim 41 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In described ash discharging hole is rectangle, circle or diamond structure.
5. according to claim 1 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In one end of the crank connecting is connected with the turbulent baffle, and the other end of the crank connecting is with subtracting Fast machine connection, the reductor are driven by motor.
6. according to claim 1 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In, when the angle between the walling of flue of SCR inlet vertical gas pass of the turbulent baffle is in more than 0 °, the turbulent baffle Opening upwards.
7. according to claim 1 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In the push rod of the crank connecting is connected with the turbulent baffle, and the end of the push rod is provided with perforation, the reinforcing plate Two installed parts are provided with, each installed part is provided with pin shaft hole, and the push rod is arranged between two installed parts, and bearing pin passes through institute The perforation stated, pin shaft hole, together with the push rod is rotatably connected by bearing pin with the turbulent baffle.
8. according to claim 7 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In the position that the turbulent baffle is connected with the push rod is provided with reinforcing plate, and the installed part is arranged in the reinforcing plate.
9. according to claim 1 solve the uneven vertical gas pass flow-disturbing system in SCR inlet temperature flow field, its feature exists In the push rod is cylindrical-shaped structure, and the walling of flue of the SCR inlet vertical gas pass is provided with pipe, and the push rod passes through institute State pipe.
10. a kind of solve the uneven vertical gas pass flow-disturbing method in SCR inlet temperature flow field, it is characterised in that including claim 1 To 9 any described vertical gas pass flow-disturbing systems for solving SCR inlet temperature flow field inequality, methods described specifically includes:
Two temperature sensors detect that the out of stock mouth entrance vertical gas pass both sides cigarette temperature difference more than when reaching 10 DEG C, passes through and drives electricity Machine and reductor drive push rod, and turbulent baffle is headed into SCR inlet vertical gas pass, turbulent baffle is formed angle with vertical gas pass α is spent, α is more than 0 °, and the length headed into according to vertical flue both sides gas temperature windage value adjustment push rod in stove, flue gas are kept off by flow-disturbing During plate, half side mixed flue gas flow direction is forced to change before flue, fully disturbs and mixes with the flue gas of rear side, laminar flow watershed area quilt Thoroughly destroy, smoke-filling movement reaches unanimity, and eliminates flue-gas temperature deviation.
CN201710821866.2A 2017-09-13 2017-09-13 Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field Pending CN107617332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710821866.2A CN107617332A (en) 2017-09-13 2017-09-13 Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710821866.2A CN107617332A (en) 2017-09-13 2017-09-13 Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field

Publications (1)

Publication Number Publication Date
CN107617332A true CN107617332A (en) 2018-01-23

Family

ID=61089476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710821866.2A Pending CN107617332A (en) 2017-09-13 2017-09-13 Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field

Country Status (1)

Country Link
CN (1) CN107617332A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112203532A (en) * 2018-05-31 2021-01-08 日本烟草产业株式会社 Fragrance generating device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090297417A1 (en) * 2008-05-27 2009-12-03 Fuel Tech, Inc. SELECTIVE CATALYTIC NOx REDUCTION PROCESS AND APPARATUS PROVIDING IMPROVED GASSIFICATION OF UREA TO FORM AMMONIA-CONTAINING GAS
CN203862030U (en) * 2014-04-23 2014-10-08 陈美青 Cover plate opening-closing control mechanism of dust pretreatment device
CN204346192U (en) * 2014-12-25 2015-05-20 七台河宝泰隆煤化工股份有限公司 Hand-rail type furnace flue damper regulator
CN104759206A (en) * 2015-03-31 2015-07-08 山东鑫源环保工程技术有限公司 SCR flue gas denitrification device provided with temperature-raising flue gas mixer
CN206152630U (en) * 2016-08-26 2017-05-10 杭州明锐环保技术有限公司 Online continuously adjustable nodal pattern SCR reactor flue gas flow straightener

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090297417A1 (en) * 2008-05-27 2009-12-03 Fuel Tech, Inc. SELECTIVE CATALYTIC NOx REDUCTION PROCESS AND APPARATUS PROVIDING IMPROVED GASSIFICATION OF UREA TO FORM AMMONIA-CONTAINING GAS
CN203862030U (en) * 2014-04-23 2014-10-08 陈美青 Cover plate opening-closing control mechanism of dust pretreatment device
CN204346192U (en) * 2014-12-25 2015-05-20 七台河宝泰隆煤化工股份有限公司 Hand-rail type furnace flue damper regulator
CN104759206A (en) * 2015-03-31 2015-07-08 山东鑫源环保工程技术有限公司 SCR flue gas denitrification device provided with temperature-raising flue gas mixer
CN206152630U (en) * 2016-08-26 2017-05-10 杭州明锐环保技术有限公司 Online continuously adjustable nodal pattern SCR reactor flue gas flow straightener

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112203532A (en) * 2018-05-31 2021-01-08 日本烟草产业株式会社 Fragrance generating device

Similar Documents

Publication Publication Date Title
US9132391B2 (en) Air pollution control device
US9084965B2 (en) Air pollution control device and method for reducing amount of mercury in flue gas
CN207694604U (en) The adjustable full load denitrating system of denitration flue-gas temperature
CN102179171A (en) Multi-stage themolysis coupled denitration method using front flow field uniformizing device and device thereof
CN103638805B (en) A kind of CFB boiler SNCR denitration method for flue gas of dual reducting agents
CN106166437A (en) A kind of cement kiln flue gas desulphurization system and method
CN109058979A (en) Cyclone furnace denitrating system and method
CN107583430A (en) One kind sintering denitrating flue gas processing unit and method
CN109751612A (en) It is a kind of for improving the therrmodynamic system and method for boiler SCR inlet flue-gas temperature
CN107617332A (en) Solves the uneven vertical gas pass flow-disturbing system and method in SCR inlet temperature flow field
CN207734831U (en) Solve the vertical gas pass flow-disturbing system of SCR inlet temperature flow field unevenness
CN207734832U (en) Solve the horizontal flue flow-disturbing system of SCR inlet temperature flow field unevenness
CN101342457A (en) Flue gas denitrating whirling current mixer and whirling current mixing method
EP2578936A1 (en) Combustion apparatus provided with spray nozzle
CN207025089U (en) A kind of ammonia system processed that urea pyrolysis is directly realized using high temperature flue-gas from boiler
NZ555146A (en) An SNCR distribution grid for delivering a reactant for reducing NOx into a gas stream containing NOx
CN107837677A (en) Solves the uneven horizontal flue flow-disturbing system and method in SCR inlet temperature flow field
CN205995253U (en) A kind of cement kiln flue gas desulphurization system
CN104696951A (en) Boiler-in integrated coupled desulfurization and denitrification method for circulating fluidized bed boiler
CN208194116U (en) A kind of full load equipment for denitrifying flue gas
CN110787609A (en) Flue gas denitration device for tank furnace and denitration method thereof
CN104785104B (en) A kind of relatively low remodeling method of inlet flue gas temperature for solving power plant boiler denitrification apparatus
CN202087235U (en) Multi-level thermolysis coupling denitrification device with pre-flow field equalizing device
CN106582281A (en) Coal fired boiler low-load operation SCR denitration device and process thereof
CN109621707A (en) A kind of circulating fluidized bed device and denitrating technique for industrial smoke low-temperature denitration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180123

RJ01 Rejection of invention patent application after publication